SlideShare a Scribd company logo
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB 60103 - SITE SURVEYING
FIELDWORK REPORT 2
TRAVERSING
NAME STUDENT ID. MARKS
LEE KAILYN 0320273
LIEW POH KA 0320424
DEONG KHAI KEAT 0320055
HUSNI NAIM BIN MOHD ZUHALI 0326126
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
TABLE OF CONTENT
CONTENT PAGES NO.
COVER PAGE 1
TABLE OF CONTENT 2
INTRODUCTION OF TRAVERSING 3 - 5
APPARATUS USED 6 - 8
OBJECTIVE 9
FIELD DATA 10 - 11
ADJUSTED FIELD DATA 12 - 15
ADJUSTED COURSE
LATITUDE & DEPARTURE
16 - 17
COMPUTATION OF STATION
COORDINATES & GRAPH
18 - 19
DISCUSSION 20 - 21
REFERENCES 22
2
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
INTRODUCTION OF TRAVERSING
Traverse Surveying is a popular method of surveying. This article includes
definition of traverse surveying along with its classification, errors in traversing,
checks, the completed method of traversing and plotting of traverse survey. A
traverse is a series of connected lines whose lengths and directions of the survey
lines are measured with the help of an angle measuring instrument and a tape or
chain respectively. The lines connect a series of connected points called traverse
stations. The angles and distances between points are measured using different
types of measuring equipment. The angles are often measured using total station
or theodolite while the distances are often measured using steel tape, total
station or electronic distance measurement instrument. Traversing is used in
control survey to determine a network of horizontal reference points called
control points.
There are 2 type of Traversing
a) Open Traverse
An open traverse is a series of connected lines that do not intersect or form a
loop. An open traverse is one which does not close on the point of the beginning.
It ends at a station whose relative position is not known before. It is normally not
used as there is no check on fieldwork or starting data.
3
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
b) Closed Traverse
A closed traverse is a series of connected lines whose lengths and bearings are
measured off these lines (or sides), which enclose an area. A closed traverse
can be used to show the shape of the perimeter of a fire or burn area. If you were
to pace continuously along the sides of a closed traverse, the finishing point
would be the same as the starting location.
There are two types of closed traverse:
i) Loop traverse:
It starts and ends at the same point, forming a loop or a polygon.
ii) Connecting traverse:
It looks similar to open traverse, however it starts and ends at points of known
position at every end of traverse.
Bearing and Azimuth
The direction or angle of the lines can be described by its azimuth or bearing
Azimuth
An azimuth is the direction measured in degrees clockwise from north on an
azimuth circle. An azimuth circle consists of 360 degrees. Ninety degrees
corresponds to east, 180 degrees is south, 270 degrees is west, and 360
degrees and 0 degrees mark north.
4
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
Bearing
A bearing provides a direction given as the primary compass direction (north or
south), degree of angle, and an east or west designation. A bearing describes a
line as heading north or south, and deflected some number of degrees toward
the east or west. A bearing, therefore, will always have an angle less than 90°. It
can belong to one of four quadrants:
Compass Rule and Transit Rule
There are two ways of adjusting the course latitude and departures during
traversing. This is to do correction to the data to enable accurate result.
The Compass rule is based on the assumption that all lengths we measured
with equal care and all angles taken with approximately the same precision.
Transit rule is the method of adjusting a traverse by the transit rule similar to the
method using the compass rule. The main difference is that with the transit rule the
latitude and departure corrections depend on the length of the latitude and
departure of the course respectively instead of both depending on the length of the
course.
5
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
APPARATUS USED
a) Theodolite
A theodolite consists of a telescope mounted on a base. The telescope has a
sight on the top of it that is used to align the target. The instrument has a
focusing knob that is used to make the object clear. A theodolite works by
combining optical plummets (or plumb bobs), a spirit (bubble level), and
graduated circles to find vertical and horizontal angles in surveying. The
telescope contains an eyepiece that the user looks through to find the target
being sighted. The theodolite's base is threaded for easy mounting on a tripod.
b) Adjustable leg-tripod
A sturdy tripod in good condition is essential for obtaining accurate
measurement. They provide a level base to easily mount and securely hold your
instrument. The legs of tripod are adjustable and are made of wood, fiberglass or
aluminium are adjustable for use in different types of surveying equipment.
6
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
c) Levelling Rod
Levelling rods can be one piece, but many are sectional and can be shortened
for storage and transport or lengthened for use. Aluminum rods may be
shortened by telescoping sections inside each other. It also a graduated rod used
in measuring the vertical distance between a point on the ground and the line of
sight of a surveyor's level.
d) Optical Plummet /Tribrach
In surveying, a device used in place of a plumb bob to center transits and
theodolites over a given point, preferred for its steadiness in strong winds.
7
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
e) Spirit Bubble
A spirit level, bubble level or simply a level is an instrument designed to indicate
whether a surface is horizontal (level) or vertical (plumb). It is used in different
types of instrument by the surveyor.
8
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
OBJECTIVE
 To enhance the student knowledge learn in class about traversing
procedure and apply it in the field work.
 To learn the principles of running a closed field traverse.
 To let students have experience in setting up and working with the
instruments such as theodolite.
 To enable us to learn how to analyze data collected.
 To increase team working skills among the group members.
 To allow us to have the ability to undertake site measurements and
calculations.
 To determine the error of closure and compute the accuracy of the work.
 To determine the area encompassed within a boundary.
 To establish the positions of boundary lines.
 To determine and adjust the course of latitude and departures.
 To be familiar with the various types and methods of traversing surveying
for detailing.
 To determine the adjusted independent coordinates of the traverse
stations so that they can be plotted at the graph.
 To enable us to know the precautions should be taken while using
theodolite.
9
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
FIELD DATA
Station A B C D
Sighted Station D B A C B D C A
Stadia
Reading
Top 1.600 1.450 1.538 1.690 1.725 1.570 1.650 1.600
Middle 1.382 1.382 1.470 1.470 1.505 1.505 1.580 1.580
Bottom 1.163 1.315 1.403 1.253 1.285 1.435 1.515 1.165
Difference between
Top and Bottom
0.437 0.135 0.135 0.437 0.440 0.135 0.135 0.435
Vertical Angle
90˚
06’00’’
90˚
08’20’’
89˚
50’20’’
90˚
04’20’’
89˚
55’50’’
89˚
54’40’’
90˚
04’20’
89˚
53’40’’
269˚
54’00’’
259˚
51’20’’
270˚
09’40’’
269˚
55’20’’
270˚
05’00’’
270˚
04’20’’
268˚
55’40’
270˚
07’40’’
Average Vertical
Angle
90˚
06’00’’
90˚
08’30’’
89˚
50’20’’
90˚
04’30’’
89˚
55’25’’
89˚
55’10’’
90˚
34’20’
89˚
53’00’’
Average of
Elevation/
Depression
-06’00’’ -08’30’’ 09’40’’ -04’30’’ 04’35’’ 04’50’’ -34’20’ 07’00’’
Interior Angle
85˚18’30’’ 94˚12’45’’ 84˚16’14’’ 96˚14’38’’
85˚19’30’’ 94˚12’11’’ 84˚15’18’’ 96˚15’34’’
Average Interior
Angle 85° 19’ 00” 94° 12’ 28” 84° 15’ 46” 96° 15’ 06”
10
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
FIELD DATA
11
Station Field Angles
A 85° 19’ 00”
B 94° 12’ 28”
C 84° 15’ 46”
D 96° 15’ 06”
Total 360° 02’ 20”
Raw Data
Unadjusted
85˚19’00’’
95˚15’06’’
94˚12’28’’
84˚15’46’
’
D
A
C
B
(Not to scale)
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
ANGULAR ERROR AND ANGLE ADJUSTMENTS
Total Angular Error = 360°02’20” - 360°
= 02’ 20”
Therefore, error per angle = 0° 02’ 20” ÷ 4 = 0°0’35” per angle
Station Field Angles Correction Adjusted Angles
A 85° 19’ 00” 0° 0’ 35” 85° 18’ 25”
B 94° 12’ 28” 0° 0’ 35” 94° 11’ 53”
C 84° 15’ 46” 0° 0’ 35” 84° 15’ 11”
D 96° 15’ 06” 0° 0’ 35” 96° 14’ 31”
Total 360° 02’ 20” 360° 0’ 0”
12
Raw Data
Adjusted
85˚18’25’’
96˚14’31’’
94˚11’53’’
84˚15’11’
’D
A
C
B
(Not to scale)
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
CALCULATION OF HORIZONTAL DISTANCE
D = K × s × cos²(θ) + C × cos(θ)
Station Distance Average Distance
A-D
D = 100 × 0.437 × cos²(-6’00’’) + 0 × cos(-
6’00’’) =
43.6999 43.6999 + 43.4998
2
= 43.5999
D-A
D = 100 × 0.435 × cos²(7’00’’) + 0 × cos(7’00’’)
=
43.4998
B-A
D = 100 × 0.135 × cos²(9’40’’) + 0 × cos(9’40’’)
=
13.4999 13.4999 +13.4999
2
= 13.4999
A-B
D = 100 × 0.135 × cos²(-8’30’’) + 0 × cos(-
8’30’’) =
13.4999
C-B
D = 100 × 0.440 × cos²(4’35’’) + 0 × cos(4’35’’)
=
43.9999 43.9999 +43.6999
2
= 43.8499
B-C
D = 100 × 0.437 × cos²(-4’30’’) + 0 × cos(-
4’30’’) =
43.6999
D-C
D = 100 × 0.135 × cos²(-34’20’’) + 0 × cos(-
34’20’’) =
13.4987 13.3987 +13.5000
2
=13.4994
C-D
D = 100 × 0.135 × cos²(4’50’’) + 0 × cos(4’50’’)
=
13.5000
13
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
COMPUTING COURSE AZIMUTHS AND BEARINGS
14
A
B
D
85˚18’25’’
D
B
C
00˚29’42’’
Azimuths Bearings
85˚18’25’’ N 85˚18’25” E
85˚18’25’’
+ 180˚00’00’’
+ 94˚11’53’’
359˚30’18’’
359˚30’18’’
180˚00’00’’
‒ 85˚18’25’’
‒ 94˚11’53’’
00˚29’42’’
N 00˚29’42’’ W
359˚30’18’’
– 180˚00’00’’
179˚30’18’’
+ 84˚15’11’’
263˚45’29’’
263˚45’29’’
84˚15’11’’
‒ 00˚29’42’’
83˚45’29’’
S 83˚45’29’’ W
263˚45’29’’
‒ 180˚00’00’’
83˚45’29’’
+ 96˚14’31’’
180˚00’00’’
180˚00’00’’
180˚00’00’’
‒ 83˚45’29’’
‒ 96˚14’31’’
00˚00’00’’
S 00˚00’00’’ E
15
A - B
B - C
C - D
D - A
Line
A
B
C
94˚11’53’’
?
85˚18’25’’
D
A
C
96˚14’31’’
83˚45’29’’
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
Station Length Bearing Cosine,
Cos β
Sine,
Sin β
Latitude,
L Cos β
Departure,
L Sin β
A-B 13.4999 N 85°18’ 25” E 0.0818 0.9966 1.1043 13.4540
B-C 43.8499 N 0° 29’42” W 1.0000 0.0086 43.8499 -0.3771
C-D 13.4994 S 83°45’ 29”W 0.1087 0.9941 -1.467 -13.4198
D-A 43.5999 S 0°00’00” E 1.0000 0 -43.5999 0
Total 114.4491 -0.1127 -0.3429
Accuracy calculation:
Accuracy = 1: (P/Ec) , typical 3000
Ec = [(sum of latitude)² + (sumof departure)²]1/2
= [ (-0.1127)² + (-0.3429)² ] 1/2
= 0.3609
Calculation :
Accuracy = 1: (114.4491 /0.3609)
= 1: 317
Error in departure
A ∑Δx= - 0.3429
Error in latitude
Ec ∑Δy = - 0.1127
Total Error
0.3609 ft
A’
Therefore, the traversing is not acceptable.
15
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
ADJUSTED COURSE LATITUDE AND DEPARTURE
The compass rule :
Correction = - [∑Δy] ÷ P x L or - [∑Δx] ÷ P x L
LATITUDE CORRECTION
The correction to the latitude of course A-B is
[-0.1127÷ 114.4491] x 13.4999 = -0.01329
The correction to the latitude of course B-C is
[-0.1127÷ 114.4491] x 43.8499 = -0.04318
The correction to the latitude of course C-D is
[-0.1127÷ 114.4491] x 13.4994 = -0.01329
The correction the latitude of course D-A is
[-0.1127÷ 114.4491] x 43.5999 = -0.04293
DEPARTURE CORRECTION
The correction to the departure of course A-B is
[-0.3429÷ 114.4491] x 13.4999 = -0.04045
The correction to the departure of course B-C is
[-0.3429÷ 114.4491] x 43.8499 = -0.13138
The correction to the departure of course C-D is
[-0.3429÷ 114.4491] x 13.4994 =-0.04045
The correction to the departure of course D-A is
[-0.3429÷ 114.4491] x 43.5999 = -0.13063
16
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
17
Station Unadjusted Correction Adjusted
Latitude Departure Latitude Departure Latitude Departure
A
B
C
D
A
+1.1043
+43.8499
-1.467
-43.5999
+13.4540
- 0.3771
-13.4198
0
0.0133
0.0432
0.0133
0.0429
0.0404
0.1314
0.0405
0.1306
+1.1176
+43.8931
-1.4537
-43.5570
+13.4944
-0.2457
-13.3793
+0.1306
Check -0.1127 -0.3429 0.1127 0.3429 0.0000 0.0000
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
COMPUTE STATION COORDINATES
18
Station N coordinate* Latitude E coordinate* Departure
A
B
C
D
A
1000.0000
+ 1.1176
1001.1176
+ 43.8931
1045.0107
- 1.4537
1043.5770
- 43.5570
1000.0000
1000.0000
+ 13.4944
1013.4944
- 0.2457
1013.2487
- 13.3793
999.8694
+ 0.1306
1000.0000
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
19
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
DISCUSSION
This report is for our second field work. For this field work, each group is required
to have 4 people to complete the field work. This field work is to do a traversing
which is closed loop traverse. Closed loop traverse is a loop traverse starts and
ends at the same point, forming a closed geometric figure called a polygon which
is the boundary lines of a tract land. The equipment that we utilized requires
theodolite, tripod and measuring rod. The main activity we have to conduct is to
setup the measuring rod at different points and use the auto level machine to
calculate the angle between the measuring rods. Before we start our field work,
we are required to mark four points of stations which are station A, B, C and D.
After that, we are required to setup the instrument. We have to level the
theodolite before we took the measurement. There’s an air bubble inside the
boundary of the circle is to ensure the theodolite is on the flat surface.
Next, we used the theodolite to measure the angles of the four stations as our
field data. The theodolite will be placed on point A which is our starting point and
started to conduct our survey. One person is assigned to hold measuring rod and
required to stand at the point we fixed. One person is assigned to record down
the data and the others are taking the readings for the traverse survey. The
angles of the theodolite must be read from the left to the right to obtain an
accurate reading. In the vision through the theodolite, we are able to receive 3
horizontal line act as marking which are top stadia, middle stadia and bottom
stadia readings. This process is repeated at each of the point on the site. During
measurement, the horizontal and vertical angles will be shown on the digital
readout panel. We are able to get the length of the field work by subtracting the
top and bottom.
The total angle must be 360°. Our total angular for loop traverse is 360°02’20”
and the total angular error is about 0°02’20”. Thus, we had to adjust it. There is a
0°0’35” of error in every angle we measured. Besides, we are able to calculate
the error by determining the bearing. Our error in latitude is -0.1127 while our
error in departure is -0.3429. The total error is 0.3609. Before we adjust our
readings we get, the accuracy should be at least 1:3000 is important to be
calculated to ensure the error of closure and the accuracy are acceptable.
However, after carry out the second attempts for this field work, we are still
unable to obtain the accurate and acceptable result. The accuracy we calculated
is 317 which are unacceptable. There are some possible errors that affecting
the results which caused us unable to obtain accurate and acceptable result.
There might be instrument errors while doing the field work such as 20
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
non-adjustment plate bubble. This happens when the axis of plate bubble may
not be perpendicular to vertical axis. When the plate level is centered, the vertical
axis may not be truly vertical. If the horizontal circle would be inclined, the angle
will be measured in an inclined plane. This would cause an error. Some of the
instruments have long time never send to calibrate will also cause error to the
reading when obtaining. Other than that, personal error may be the possible
error. The centering may not be done perfectly due to carelessness. The leveling
may not be done carefully according to usual procedure. If the clamp screws are
not properly fixed, the instrument may slip easily. Therefore, error would be result
when obtaining the reading. Besides personal error, natural errors will also
affecting the result. Natural errors might come from high temperature
environment and strong wind. Hot temperature can causes error due to irregular
refraction and high wind can causes vibration in the instrument and this may lead
to wrong readings while doing the field work. To adjust the error exist in the
latitude and departure, we are required to use the formula of the compass rule.
The compass rule:
Correction = - [∑Δy] ÷ P x L or - [∑Δx] ÷ P x L
After the field data are adjusted, we are required to compute stations coordinates
using their coordinates at a graph with assuming the coordinates of station A is
(1000.000, 1000.000).
Throughout this field work, it is a great experience for us to explore and to have a
better understanding about the traversing. We are able to apply the technique
and knowledge that we learnt during lecture class. By carry out this field work, we
find out that the formula is much harder for us to understand compared to
levelling. Our group has faced some problems during the field work. We carried
out two attempts in this field work since the first attempt has failed to get the
accurate result. However, after repeating this field work twice, we are still failed
to get the accurate result. Furthermore, we have learnt the team work is very
important in this field work. Through this field work, we are able to gain a lot
hands on knowledge about the surveying. Thanks to our lecturer Mr. Chai for
giving us the opportunity to learn and experience the hands on in levelling. We
appreciate to have the opportunity to have a practical experience in site
surveying.
21
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
References
1) (Dictionary of Construction, n.d.)
http://www.dictionaryofconstruction.com/definition/optical-plummet.html
2) (Ben Meadow’s, n.d.)
https://www.benmeadows.com/refinfo/techfacts/techpdf/survey_equipment_1360.
pdf
3) (Surveying & Measurement, n.d.)
http://moodle.najah.edu/pluginfile.php/47169/mod_resource/content/0/Angles_Az
imuths_Bearings.pdf
4) (Open & Closed Traverse, n.d.)
http://cms.cerritos.edu/uploads/dmussaw/open%20and%20closed%20traverse.p
df
5) (Fire Fighter Math, n.d.)
http://www.firefightermath.org/index.php?option=com_content&view=article&id=5
8&Itemid=72
22

More Related Content

DOCX
Tranverse report
DOCX
Sem 2 Site surveying report 2
PDF
Ss report 2
DOCX
DOCX
Site surveying-report-2
DOCX
Site Surveying Report 2 (Traversing)
DOCX
Fieldwork 2 (Traversing)
DOCX
Ss report 2 report
Tranverse report
Sem 2 Site surveying report 2
Ss report 2
Site surveying-report-2
Site Surveying Report 2 (Traversing)
Fieldwork 2 (Traversing)
Ss report 2 report

What's hot (20)

DOCX
Project 2- traversing
DOCX
ABC Report - 123 (gathered with reference)
DOCX
Theory of theodolite traversing
DOCX
Assignment 2 - Traverse
PDF
Traversing final-report
PDF
Traversing
DOCX
Site survey Fieldwork1 (levelling)
DOCX
Leveling report
DOCX
SITE SURVEYING: Transversing
DOCX
Site surveying report 1
DOC
Ss report 2
PDF
Leveling final-report
DOCX
Site surveying-Leveling
DOCX
Site Surveying Report - Traversing
DOCX
Closed Traverse Surveying - Report
PDF
Site surveying report (levelling)
DOCX
SITE SURVEYING LEVELING
PDF
Site Surveying Traversing
PPTX
SURVEYING UNIT-1 31033
PDF
Site Surveying Traversing
Project 2- traversing
ABC Report - 123 (gathered with reference)
Theory of theodolite traversing
Assignment 2 - Traverse
Traversing final-report
Traversing
Site survey Fieldwork1 (levelling)
Leveling report
SITE SURVEYING: Transversing
Site surveying report 1
Ss report 2
Leveling final-report
Site surveying-Leveling
Site Surveying Report - Traversing
Closed Traverse Surveying - Report
Site surveying report (levelling)
SITE SURVEYING LEVELING
Site Surveying Traversing
SURVEYING UNIT-1 31033
Site Surveying Traversing
Ad

Similar to Ss report-2-field-data-latest (20)

DOCX
Traversing
DOCX
Site surveying report 2
DOCX
2 nd report
DOCX
Site survey Fieldwork 2 traversing
DOCX
Project 2- traversing
DOCX
Theodolite report
DOCX
Site survey report 2
DOCX
Site surveying report 2
PDF
Ss report 2
DOCX
Site surveying assignment
PDF
Site Surveying report2 traversing
DOCX
Site surveying report ii
PDF
Survey camp report main (2nd) Part
PDF
Site surveying 2 done
PDF
Site surveying-2-done-1
PDF
Theodolite surveying
DOCX
Fieldwork 2
DOCX
Fieldwork 2
PDF
Traversing Notes |surveying II | Sudip khadka
PPTX
Introduction To Theodolite Traversing.pptx
Traversing
Site surveying report 2
2 nd report
Site survey Fieldwork 2 traversing
Project 2- traversing
Theodolite report
Site survey report 2
Site surveying report 2
Ss report 2
Site surveying assignment
Site Surveying report2 traversing
Site surveying report ii
Survey camp report main (2nd) Part
Site surveying 2 done
Site surveying-2-done-1
Theodolite surveying
Fieldwork 2
Fieldwork 2
Traversing Notes |surveying II | Sudip khadka
Introduction To Theodolite Traversing.pptx
Ad

More from Kailyn Lee (20)

PDF
Software
PDF
Software Application report
PDF
Estimating presentation
PDF
Estimating various types of estimating
PDF
PP1 presentation
PDF
PP1 report
PDF
Eca presentation
PDF
Measurement 4 presentation
PDF
Buildingservices2 bld60503
DOCX
People's dynamic individual (autosaved)
DOC
Safety individual final
PPTX
Traffic management safety six key issues
DOCX
Bs 2 individual
PDF
Managementscienceassignment
DOCX
Ss field-data
PDF
Bs1 final report_templaterecovered
DOCX
Ct bm measurement report
PPTX
Psycho video-slides
PPTX
Psycho slides-1 (1)
PDF
Psychologylor
Software
Software Application report
Estimating presentation
Estimating various types of estimating
PP1 presentation
PP1 report
Eca presentation
Measurement 4 presentation
Buildingservices2 bld60503
People's dynamic individual (autosaved)
Safety individual final
Traffic management safety six key issues
Bs 2 individual
Managementscienceassignment
Ss field-data
Bs1 final report_templaterecovered
Ct bm measurement report
Psycho video-slides
Psycho slides-1 (1)
Psychologylor

Recently uploaded (20)

PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
master seminar digital applications in india
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Cell Types and Its function , kingdom of life
PPTX
Cell Structure & Organelles in detailed.
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Lesson notes of climatology university.
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
Updated Idioms and Phrasal Verbs in English subject
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
Complications of Minimal Access Surgery at WLH
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
History, Philosophy and sociology of education (1).pptx
master seminar digital applications in india
A systematic review of self-coping strategies used by university students to ...
Cell Types and Its function , kingdom of life
Cell Structure & Organelles in detailed.
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Final Presentation General Medicine 03-08-2024.pptx
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Final Presentation General Medicine 03-08-2024.pptx
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Lesson notes of climatology university.
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
2.FourierTransform-ShortQuestionswithAnswers.pdf
Updated Idioms and Phrasal Verbs in English subject
202450812 BayCHI UCSC-SV 20250812 v17.pptx
UNIT III MENTAL HEALTH NURSING ASSESSMENT
Orientation - ARALprogram of Deped to the Parents.pptx
Complications of Minimal Access Surgery at WLH

Ss report-2-field-data-latest

  • 1. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB 60103 - SITE SURVEYING FIELDWORK REPORT 2 TRAVERSING NAME STUDENT ID. MARKS LEE KAILYN 0320273 LIEW POH KA 0320424 DEONG KHAI KEAT 0320055 HUSNI NAIM BIN MOHD ZUHALI 0326126
  • 2. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 TABLE OF CONTENT CONTENT PAGES NO. COVER PAGE 1 TABLE OF CONTENT 2 INTRODUCTION OF TRAVERSING 3 - 5 APPARATUS USED 6 - 8 OBJECTIVE 9 FIELD DATA 10 - 11 ADJUSTED FIELD DATA 12 - 15 ADJUSTED COURSE LATITUDE & DEPARTURE 16 - 17 COMPUTATION OF STATION COORDINATES & GRAPH 18 - 19 DISCUSSION 20 - 21 REFERENCES 22 2
  • 3. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 INTRODUCTION OF TRAVERSING Traverse Surveying is a popular method of surveying. This article includes definition of traverse surveying along with its classification, errors in traversing, checks, the completed method of traversing and plotting of traverse survey. A traverse is a series of connected lines whose lengths and directions of the survey lines are measured with the help of an angle measuring instrument and a tape or chain respectively. The lines connect a series of connected points called traverse stations. The angles and distances between points are measured using different types of measuring equipment. The angles are often measured using total station or theodolite while the distances are often measured using steel tape, total station or electronic distance measurement instrument. Traversing is used in control survey to determine a network of horizontal reference points called control points. There are 2 type of Traversing a) Open Traverse An open traverse is a series of connected lines that do not intersect or form a loop. An open traverse is one which does not close on the point of the beginning. It ends at a station whose relative position is not known before. It is normally not used as there is no check on fieldwork or starting data. 3
  • 4. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 b) Closed Traverse A closed traverse is a series of connected lines whose lengths and bearings are measured off these lines (or sides), which enclose an area. A closed traverse can be used to show the shape of the perimeter of a fire or burn area. If you were to pace continuously along the sides of a closed traverse, the finishing point would be the same as the starting location. There are two types of closed traverse: i) Loop traverse: It starts and ends at the same point, forming a loop or a polygon. ii) Connecting traverse: It looks similar to open traverse, however it starts and ends at points of known position at every end of traverse. Bearing and Azimuth The direction or angle of the lines can be described by its azimuth or bearing Azimuth An azimuth is the direction measured in degrees clockwise from north on an azimuth circle. An azimuth circle consists of 360 degrees. Ninety degrees corresponds to east, 180 degrees is south, 270 degrees is west, and 360 degrees and 0 degrees mark north. 4
  • 5. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 Bearing A bearing provides a direction given as the primary compass direction (north or south), degree of angle, and an east or west designation. A bearing describes a line as heading north or south, and deflected some number of degrees toward the east or west. A bearing, therefore, will always have an angle less than 90°. It can belong to one of four quadrants: Compass Rule and Transit Rule There are two ways of adjusting the course latitude and departures during traversing. This is to do correction to the data to enable accurate result. The Compass rule is based on the assumption that all lengths we measured with equal care and all angles taken with approximately the same precision. Transit rule is the method of adjusting a traverse by the transit rule similar to the method using the compass rule. The main difference is that with the transit rule the latitude and departure corrections depend on the length of the latitude and departure of the course respectively instead of both depending on the length of the course. 5
  • 6. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 APPARATUS USED a) Theodolite A theodolite consists of a telescope mounted on a base. The telescope has a sight on the top of it that is used to align the target. The instrument has a focusing knob that is used to make the object clear. A theodolite works by combining optical plummets (or plumb bobs), a spirit (bubble level), and graduated circles to find vertical and horizontal angles in surveying. The telescope contains an eyepiece that the user looks through to find the target being sighted. The theodolite's base is threaded for easy mounting on a tripod. b) Adjustable leg-tripod A sturdy tripod in good condition is essential for obtaining accurate measurement. They provide a level base to easily mount and securely hold your instrument. The legs of tripod are adjustable and are made of wood, fiberglass or aluminium are adjustable for use in different types of surveying equipment. 6
  • 7. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 c) Levelling Rod Levelling rods can be one piece, but many are sectional and can be shortened for storage and transport or lengthened for use. Aluminum rods may be shortened by telescoping sections inside each other. It also a graduated rod used in measuring the vertical distance between a point on the ground and the line of sight of a surveyor's level. d) Optical Plummet /Tribrach In surveying, a device used in place of a plumb bob to center transits and theodolites over a given point, preferred for its steadiness in strong winds. 7
  • 8. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 e) Spirit Bubble A spirit level, bubble level or simply a level is an instrument designed to indicate whether a surface is horizontal (level) or vertical (plumb). It is used in different types of instrument by the surveyor. 8
  • 9. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 OBJECTIVE  To enhance the student knowledge learn in class about traversing procedure and apply it in the field work.  To learn the principles of running a closed field traverse.  To let students have experience in setting up and working with the instruments such as theodolite.  To enable us to learn how to analyze data collected.  To increase team working skills among the group members.  To allow us to have the ability to undertake site measurements and calculations.  To determine the error of closure and compute the accuracy of the work.  To determine the area encompassed within a boundary.  To establish the positions of boundary lines.  To determine and adjust the course of latitude and departures.  To be familiar with the various types and methods of traversing surveying for detailing.  To determine the adjusted independent coordinates of the traverse stations so that they can be plotted at the graph.  To enable us to know the precautions should be taken while using theodolite. 9
  • 10. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 FIELD DATA Station A B C D Sighted Station D B A C B D C A Stadia Reading Top 1.600 1.450 1.538 1.690 1.725 1.570 1.650 1.600 Middle 1.382 1.382 1.470 1.470 1.505 1.505 1.580 1.580 Bottom 1.163 1.315 1.403 1.253 1.285 1.435 1.515 1.165 Difference between Top and Bottom 0.437 0.135 0.135 0.437 0.440 0.135 0.135 0.435 Vertical Angle 90˚ 06’00’’ 90˚ 08’20’’ 89˚ 50’20’’ 90˚ 04’20’’ 89˚ 55’50’’ 89˚ 54’40’’ 90˚ 04’20’ 89˚ 53’40’’ 269˚ 54’00’’ 259˚ 51’20’’ 270˚ 09’40’’ 269˚ 55’20’’ 270˚ 05’00’’ 270˚ 04’20’’ 268˚ 55’40’ 270˚ 07’40’’ Average Vertical Angle 90˚ 06’00’’ 90˚ 08’30’’ 89˚ 50’20’’ 90˚ 04’30’’ 89˚ 55’25’’ 89˚ 55’10’’ 90˚ 34’20’ 89˚ 53’00’’ Average of Elevation/ Depression -06’00’’ -08’30’’ 09’40’’ -04’30’’ 04’35’’ 04’50’’ -34’20’ 07’00’’ Interior Angle 85˚18’30’’ 94˚12’45’’ 84˚16’14’’ 96˚14’38’’ 85˚19’30’’ 94˚12’11’’ 84˚15’18’’ 96˚15’34’’ Average Interior Angle 85° 19’ 00” 94° 12’ 28” 84° 15’ 46” 96° 15’ 06” 10
  • 11. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 FIELD DATA 11 Station Field Angles A 85° 19’ 00” B 94° 12’ 28” C 84° 15’ 46” D 96° 15’ 06” Total 360° 02’ 20” Raw Data Unadjusted 85˚19’00’’ 95˚15’06’’ 94˚12’28’’ 84˚15’46’ ’ D A C B (Not to scale)
  • 12. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 ANGULAR ERROR AND ANGLE ADJUSTMENTS Total Angular Error = 360°02’20” - 360° = 02’ 20” Therefore, error per angle = 0° 02’ 20” ÷ 4 = 0°0’35” per angle Station Field Angles Correction Adjusted Angles A 85° 19’ 00” 0° 0’ 35” 85° 18’ 25” B 94° 12’ 28” 0° 0’ 35” 94° 11’ 53” C 84° 15’ 46” 0° 0’ 35” 84° 15’ 11” D 96° 15’ 06” 0° 0’ 35” 96° 14’ 31” Total 360° 02’ 20” 360° 0’ 0” 12 Raw Data Adjusted 85˚18’25’’ 96˚14’31’’ 94˚11’53’’ 84˚15’11’ ’D A C B (Not to scale)
  • 13. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 CALCULATION OF HORIZONTAL DISTANCE D = K × s × cos²(θ) + C × cos(θ) Station Distance Average Distance A-D D = 100 × 0.437 × cos²(-6’00’’) + 0 × cos(- 6’00’’) = 43.6999 43.6999 + 43.4998 2 = 43.5999 D-A D = 100 × 0.435 × cos²(7’00’’) + 0 × cos(7’00’’) = 43.4998 B-A D = 100 × 0.135 × cos²(9’40’’) + 0 × cos(9’40’’) = 13.4999 13.4999 +13.4999 2 = 13.4999 A-B D = 100 × 0.135 × cos²(-8’30’’) + 0 × cos(- 8’30’’) = 13.4999 C-B D = 100 × 0.440 × cos²(4’35’’) + 0 × cos(4’35’’) = 43.9999 43.9999 +43.6999 2 = 43.8499 B-C D = 100 × 0.437 × cos²(-4’30’’) + 0 × cos(- 4’30’’) = 43.6999 D-C D = 100 × 0.135 × cos²(-34’20’’) + 0 × cos(- 34’20’’) = 13.4987 13.3987 +13.5000 2 =13.4994 C-D D = 100 × 0.135 × cos²(4’50’’) + 0 × cos(4’50’’) = 13.5000 13
  • 14. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 COMPUTING COURSE AZIMUTHS AND BEARINGS 14 A B D 85˚18’25’’ D B C 00˚29’42’’ Azimuths Bearings 85˚18’25’’ N 85˚18’25” E 85˚18’25’’ + 180˚00’00’’ + 94˚11’53’’ 359˚30’18’’ 359˚30’18’’ 180˚00’00’’ ‒ 85˚18’25’’ ‒ 94˚11’53’’ 00˚29’42’’ N 00˚29’42’’ W 359˚30’18’’ – 180˚00’00’’ 179˚30’18’’ + 84˚15’11’’ 263˚45’29’’ 263˚45’29’’ 84˚15’11’’ ‒ 00˚29’42’’ 83˚45’29’’ S 83˚45’29’’ W 263˚45’29’’ ‒ 180˚00’00’’ 83˚45’29’’ + 96˚14’31’’ 180˚00’00’’ 180˚00’00’’ 180˚00’00’’ ‒ 83˚45’29’’ ‒ 96˚14’31’’ 00˚00’00’’ S 00˚00’00’’ E 15 A - B B - C C - D D - A Line A B C 94˚11’53’’ ? 85˚18’25’’ D A C 96˚14’31’’ 83˚45’29’’
  • 15. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 Station Length Bearing Cosine, Cos β Sine, Sin β Latitude, L Cos β Departure, L Sin β A-B 13.4999 N 85°18’ 25” E 0.0818 0.9966 1.1043 13.4540 B-C 43.8499 N 0° 29’42” W 1.0000 0.0086 43.8499 -0.3771 C-D 13.4994 S 83°45’ 29”W 0.1087 0.9941 -1.467 -13.4198 D-A 43.5999 S 0°00’00” E 1.0000 0 -43.5999 0 Total 114.4491 -0.1127 -0.3429 Accuracy calculation: Accuracy = 1: (P/Ec) , typical 3000 Ec = [(sum of latitude)² + (sumof departure)²]1/2 = [ (-0.1127)² + (-0.3429)² ] 1/2 = 0.3609 Calculation : Accuracy = 1: (114.4491 /0.3609) = 1: 317 Error in departure A ∑Δx= - 0.3429 Error in latitude Ec ∑Δy = - 0.1127 Total Error 0.3609 ft A’ Therefore, the traversing is not acceptable. 15
  • 16. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 ADJUSTED COURSE LATITUDE AND DEPARTURE The compass rule : Correction = - [∑Δy] ÷ P x L or - [∑Δx] ÷ P x L LATITUDE CORRECTION The correction to the latitude of course A-B is [-0.1127÷ 114.4491] x 13.4999 = -0.01329 The correction to the latitude of course B-C is [-0.1127÷ 114.4491] x 43.8499 = -0.04318 The correction to the latitude of course C-D is [-0.1127÷ 114.4491] x 13.4994 = -0.01329 The correction the latitude of course D-A is [-0.1127÷ 114.4491] x 43.5999 = -0.04293 DEPARTURE CORRECTION The correction to the departure of course A-B is [-0.3429÷ 114.4491] x 13.4999 = -0.04045 The correction to the departure of course B-C is [-0.3429÷ 114.4491] x 43.8499 = -0.13138 The correction to the departure of course C-D is [-0.3429÷ 114.4491] x 13.4994 =-0.04045 The correction to the departure of course D-A is [-0.3429÷ 114.4491] x 43.5999 = -0.13063 16
  • 17. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 17 Station Unadjusted Correction Adjusted Latitude Departure Latitude Departure Latitude Departure A B C D A +1.1043 +43.8499 -1.467 -43.5999 +13.4540 - 0.3771 -13.4198 0 0.0133 0.0432 0.0133 0.0429 0.0404 0.1314 0.0405 0.1306 +1.1176 +43.8931 -1.4537 -43.5570 +13.4944 -0.2457 -13.3793 +0.1306 Check -0.1127 -0.3429 0.1127 0.3429 0.0000 0.0000
  • 18. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 COMPUTE STATION COORDINATES 18 Station N coordinate* Latitude E coordinate* Departure A B C D A 1000.0000 + 1.1176 1001.1176 + 43.8931 1045.0107 - 1.4537 1043.5770 - 43.5570 1000.0000 1000.0000 + 13.4944 1013.4944 - 0.2457 1013.2487 - 13.3793 999.8694 + 0.1306 1000.0000
  • 19. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 19
  • 20. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 DISCUSSION This report is for our second field work. For this field work, each group is required to have 4 people to complete the field work. This field work is to do a traversing which is closed loop traverse. Closed loop traverse is a loop traverse starts and ends at the same point, forming a closed geometric figure called a polygon which is the boundary lines of a tract land. The equipment that we utilized requires theodolite, tripod and measuring rod. The main activity we have to conduct is to setup the measuring rod at different points and use the auto level machine to calculate the angle between the measuring rods. Before we start our field work, we are required to mark four points of stations which are station A, B, C and D. After that, we are required to setup the instrument. We have to level the theodolite before we took the measurement. There’s an air bubble inside the boundary of the circle is to ensure the theodolite is on the flat surface. Next, we used the theodolite to measure the angles of the four stations as our field data. The theodolite will be placed on point A which is our starting point and started to conduct our survey. One person is assigned to hold measuring rod and required to stand at the point we fixed. One person is assigned to record down the data and the others are taking the readings for the traverse survey. The angles of the theodolite must be read from the left to the right to obtain an accurate reading. In the vision through the theodolite, we are able to receive 3 horizontal line act as marking which are top stadia, middle stadia and bottom stadia readings. This process is repeated at each of the point on the site. During measurement, the horizontal and vertical angles will be shown on the digital readout panel. We are able to get the length of the field work by subtracting the top and bottom. The total angle must be 360°. Our total angular for loop traverse is 360°02’20” and the total angular error is about 0°02’20”. Thus, we had to adjust it. There is a 0°0’35” of error in every angle we measured. Besides, we are able to calculate the error by determining the bearing. Our error in latitude is -0.1127 while our error in departure is -0.3429. The total error is 0.3609. Before we adjust our readings we get, the accuracy should be at least 1:3000 is important to be calculated to ensure the error of closure and the accuracy are acceptable. However, after carry out the second attempts for this field work, we are still unable to obtain the accurate and acceptable result. The accuracy we calculated is 317 which are unacceptable. There are some possible errors that affecting the results which caused us unable to obtain accurate and acceptable result. There might be instrument errors while doing the field work such as 20
  • 21. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 non-adjustment plate bubble. This happens when the axis of plate bubble may not be perpendicular to vertical axis. When the plate level is centered, the vertical axis may not be truly vertical. If the horizontal circle would be inclined, the angle will be measured in an inclined plane. This would cause an error. Some of the instruments have long time never send to calibrate will also cause error to the reading when obtaining. Other than that, personal error may be the possible error. The centering may not be done perfectly due to carelessness. The leveling may not be done carefully according to usual procedure. If the clamp screws are not properly fixed, the instrument may slip easily. Therefore, error would be result when obtaining the reading. Besides personal error, natural errors will also affecting the result. Natural errors might come from high temperature environment and strong wind. Hot temperature can causes error due to irregular refraction and high wind can causes vibration in the instrument and this may lead to wrong readings while doing the field work. To adjust the error exist in the latitude and departure, we are required to use the formula of the compass rule. The compass rule: Correction = - [∑Δy] ÷ P x L or - [∑Δx] ÷ P x L After the field data are adjusted, we are required to compute stations coordinates using their coordinates at a graph with assuming the coordinates of station A is (1000.000, 1000.000). Throughout this field work, it is a great experience for us to explore and to have a better understanding about the traversing. We are able to apply the technique and knowledge that we learnt during lecture class. By carry out this field work, we find out that the formula is much harder for us to understand compared to levelling. Our group has faced some problems during the field work. We carried out two attempts in this field work since the first attempt has failed to get the accurate result. However, after repeating this field work twice, we are still failed to get the accurate result. Furthermore, we have learnt the team work is very important in this field work. Through this field work, we are able to gain a lot hands on knowledge about the surveying. Thanks to our lecturer Mr. Chai for giving us the opportunity to learn and experience the hands on in levelling. We appreciate to have the opportunity to have a practical experience in site surveying. 21
  • 22. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 References 1) (Dictionary of Construction, n.d.) http://www.dictionaryofconstruction.com/definition/optical-plummet.html 2) (Ben Meadow’s, n.d.) https://www.benmeadows.com/refinfo/techfacts/techpdf/survey_equipment_1360. pdf 3) (Surveying & Measurement, n.d.) http://moodle.najah.edu/pluginfile.php/47169/mod_resource/content/0/Angles_Az imuths_Bearings.pdf 4) (Open & Closed Traverse, n.d.) http://cms.cerritos.edu/uploads/dmussaw/open%20and%20closed%20traverse.p df 5) (Fire Fighter Math, n.d.) http://www.firefightermath.org/index.php?option=com_content&view=article&id=5 8&Itemid=72 22