Outline Project Management Social and Ethical Design System Development Cycle Useful Web Sites Sample HSC Questions
Project Management Project management focuses on a project.  - a beginning  - an end   Meets established goals within cost, schedule, and quality objectives.   Coordination of a number of phases to successfully achieve identified goals.  Ref: 6, 7, 10
Project Management These phases include –   u nderstanding the problem,  p lan   d esigning solutions,  i mplementing and  t esting, evaluating and maintaining.  Ref: 4
Developing a Project Plan Planning is crucial in project management. Planning means listing in detail what is required to successfully complete the project along the three critical dimensions of - quality, time, and cost.   Ref: 6, 7
Developing a Project Plan A  project plan  is a summary of a project that specifies who, what, how and when.  It clarifies what needs to be done and helps people to understand how they fit into the project.  Ref: 6, 7, 10
Developing a Project Plan A project plan usually breaks the project into major tasks called  subprojects .   It must provide an overall schedule, the details of the subprojects and a schedule for each subproject.  It must also identify the  people, information technology  and  data/information  required by the system. Ref: 6, 7, 10
Developing a Project Plan Project goal — the  result of the project if it is successful. Goals may be broad or they may be very specific. Deliverable —a tangible item expected from a task. It may be a diagram, report, data dictionary, program or training manual. Schedule — shows  the timing of major tasks and who will do the work. The success of a new system depends on accurate time estimates for each task.  Ref: 6, 7, 10
Software Project plans are constructed using Information Management Software or Project Management Software. Information management software  helps individuals  conducting  a project to manage information and schedule tasks.  Project management software  contains most of the features of information management software. Ref: 6, 7, 10
Communication Skills Active listening  -  involves restating, reflecting and summarising    the speaker’s major ideas and feelings.  -  a ctive   listeners encourage the speaker and are    non-committal. Conflict resolution  -  solves arguments and disputes.  -  it  involves   listening to the other person’s views    and looking   at the conflict as a problem to be    s olved.   -   the aim is to create a “win-win” situation. Ref: 4, 10
Communication Skills Negotiation skills  -  negotiation is a discussion between two parties    with a goal of reaching agreement on issues. Interview techniques  -  involve careful preparation, implementation and    follow-up. Team building  -  is the process of getting a group of people    working together.   Ref: 4, 10
 
Ref: 9
Social and Ethical Design Machine-centred systems  are designed to simplify what the computer must do at the expense of participants. Human-centred systems  are those which make participants’ work as effective and as satisfying as possible. User-friendly  describes a tool that people find easy to use. System Design Ref: 1, 4, 10
Work Environment Health and safety  - eg. ergonomics - furniture, information technology, environmental factors. Changing nature of work  –This includes - deskilling, multi-skilling and in some cases redundancy. Will anyone lose their job or will new jobs be created?  Ref: 4, 10
Work Environment Ethics  is a set of beliefs we hold about what is right and wrong.  There are a number of issues involving the use of information systems that many people are concerned about.   These include - -           environmental impact -           equity and access Ref: 4, 10
Work Environment Equity  concerns  equal rights for all.  It means that all people should have equal  access  to the benefits of information technology - this includes  gender equity. In vasion of privacy  Privacy  -  computer technology allows personal information to be distributed faster and further than previously before. C ontrol (rights and privileges)   Control  is the level of direct involvement that people have in decision making.   Ref: 4, 10
Work Environment F reedom of information Individuals have the right to access information regarding themselves. C omputer crime Computer crime  can be broadly defined as any illegal or immoral activity that could not work  without the use of a  computer. C opyright Copyright  laws protect the rights of an author against cases of  piracy .  Ref: 4, 10
SDC U nderstanding the Problem P lan D esigning Solutions I mplementing  the Solution T esting, evaluating  & maintaining Change in purpose Change type  of system Change system Change use of system Problem with system U  P  D  I  T System Development Cycle Ref: 4, 10
Understanding the Problem
Preliminary Investigation A  preliminary investigation , or requirement definition, determines whether a quick fix of the existing system will solve the problem or a new system is necessary.  The project plan is created in this stage. P articipants . Participants play an important part in developing a workable system. P articipants are people involved in the planning, design and implementation.   Ref: 4, 10
Preliminary Investigation D ata collection methods Data is collected to understand the problem and to develop an appropriate solution.  interviews,  surveys,  observations and  measurements.   Ref: 4, 10
Problem Definition Provides a clear definition of the problem, which needs to be solved. Ref: 4
Ref: 9
Requirements Report The requirements report   is a statement about the need for a new system.  It outlines the aims and objectives of the new system and how it will help the organisation.  The requirement report is based on data collected from the participants. Ref: 4, 8, 10
Negotiating specifications with the client If there is a client involved who must accept the project upon completion, the specifications that define a successful outcome must be negotiated and agreed to by the client, and included as part of the contract. A client may be either  internal  or  external .  There may also be more than one client. Ref: 4, 8, 10
Prototype A prototype is a working model of an information system, built in order to understand the requirements of the system.   Used when the problem is not easily understood.  Involves a repetitive process of prototype modification and participants' feedback, until the process is understood.  Can be the basis for further system development.   Ref: 4, 8, 10
Ref: 9
Prototype Prototypes can be created from application packages that provide screen generators and report generators.  There are advantages and disadvantages in using a prototype. Ref: 4, 8, 10
Prototype - Advantages The requirements of the system more accurately reflect the needs of the  participants.   P articipants earlier  involvement - t his may  reduce the number of changes  required by the participants in the testing, evaluating and maintaining stage. T he new system is easier to create from a prototype.   Ref: 4, 8, 10
Prototype - Disadvantages T he greater involvement of the participants could impact on their work with the old system.  T he repetitive process of the prototype can be frustrating if the succeeding versions do not provide a better solution.  S uccessful prototypes can produce software that is difficult to maintain, unreliable or inadequate. This may occur if any design restrictions are not taken into account when creating the prototype. Ref: 4, 8, 10
Questions    Name the system you investigated  What was the problem with the system you investigated? Who are the participants? What data gathering methods did you use? Describe your development of the prototype.  What was the outcome of the prototype you developed?
Planning
This stage involves making decisions using the data gathered in the preliminary investigation A  constraint  is a factor that affects the system and prevents it from achieving the desired objectives.   There are different types of constraints, such as -  Planning Ref: 4, 8, 10
Feasibility Study A  feasibility study  is a short report that analyses potential solutions in terms of the known constraints and makes a recommendation.   The feasibility study briefly examines the available options, estimates costs and identifies any constraints to be considered. Ref: 4, 8, 10
Economic Feasibility Economic feasibility  compares the costs of developing the new system with the expected benefits.  A financial analyst is often asked to assess economic feasibility. Economic feasibility is also called  cost/benefit feasibility. Ref: 4, 8, 10
Technical Feasibility Technical feasibility  determines    the information technology    requirements of the new system    and the technical demands that    will be placed on the new system. Ref: 4, 10
Schedule Feasibility Schedule feasibility  determines whether time is available to implement the new system. Ref: 4, 10
Organisational Feasibility Organisational feasibility  determines whether the new system will fit into the organisation and meet the current goals and objectives.   It also determines whether the new system will have enough support from participants to be successfully implemented and whether participants can operate the system. Ref: 4, 10
Recommendation Options A feasibility study has three recommendation options  no change develop a new system investigate other solutions Ref: 4, 10
Analysis Report The details of the new system are presented, along with recommendations for design, implementation and maintenance. The analysis report contains - design specifications  a more detailed project plan   Ref: 4, 10
Risks involved Risk is the exposure to potential threats to the project.  They differ from constraints in that they are not definite but possess some likelihood of occurrence.  Risks are identified and classified as  Low Risk Medium Risk  High Risk Ref: 4, 6, 7, 10
   Questions Describe any constraints involved in the Making Decisions stage you encountered. What recommendation was advised after your submission of your Feasibility Study? Describe the most appropriate tools used in this stage of the System Development Cycle. Give reasons why.
Designing Solutions
Designing a Solution Designing a solution  is the transformation of the specifications into appropriate hardware, software and information processes.  Involves purchasing hardware, writing or purchasing software, and specifying information processes to make the system operational. Ref: 4, 10
Designing a Solution Systems analysts and programmers often use – Top-down  -  divides a large, complicated problem into a series of smaller, easier to solve problems. Step-wise refinement  - then takes each sub-problem and breaks it down even further. Solutions based on prototypes are created in this stage. Ref: 4, 5, 10
Participant development Participant development  occurs when people within the information system develop the solution.  Participants produce their own information system using readily available information technology. Tools for participant development - eg. guided processes in application packages   Ref: 4, 10
Information Technology Acquisition of hardware and software and the process of making it operational Ref: 4, 10
Design Tools Design tools are used to better understand the system and document the new system.  The tools are used to assist in explaining the operation of the new system.  Ref: 4, 10
Types of Design Tools The design tools used in the Designing Solutions stage of the System Development Cycle include -  Context diagrams Data flow diagram Decision trees Decision tables Data dictionaries
Context Diagrams Context diagrams   are used to represent entire information systems.  Ref:1, 2, 3, 4, 10   Process  Single process - a circle is used to represent the entire system.           Data Flow  An arrow is used to show the flow of data between the process and the external entities.       External Entity   Any person or organisation that provides data to the system or receives data from the system.            
Data Flow Diagram Data flow diagrams represent the information system as a number of processes that together form the single process of a context diagram.  The source of data, its flow between processes and its destination along with data generated by the system is represented. Ref:1, 2, 3, 4, 10
Data Flow Diagrams Process Ref:1, 2, 3, 4, 10 Process  Processes are an action taking place transforming inputs to outputs.         Data flow  An arrow is used to show the flow of data between the process and the external entities.       External Entity  Any person or organisation that provides data to the system or receives data from the system.         Data store  A location where data is stored. It can be in computer format, such as a diskette, or in non-computer format, such as a filing cabinet or an answering machine.      
Data Flow Diagram Example
Decision Trees A  decision tree  is a diagrammatic way of representing all possible combinations of decisions and their resulting actions.  It represents the decisions made within a system as the branches of a tree. Each branch ends with a particular action.  Ref: 3, 4, 10
Decision Trees Example Ref: 10
Data Dictionaries Data dictionaries  contain a comprehensive description of each field in the database.  This commonly includes:   field name,  number of characters (field width),  data type,  number of decimal places (if applicable) and  a description of the purpose of each field. Ref: 3, 4, 10
Data Dictionary Example
Data Dictionary Example
System Flow Charts System flowcharts are a diagrammatic way of representing both the flow of data and logic through an information system.  Ref: 3, 4, 10
System Flow Charts Ref: 3, 4, 10
System Flow Chart Example Ref: Meriden, 2001, Andrews
Screen Design Screen design for input and output of data are created. These are created using good principles of design, eg. ease of navigation, and use of consistent style. Ref: 3, 4, 10
Documentation Technical specifications  must be identified and documented prior to purchase of hardware. Documentation is an essential part of any system, as it communicates information to the developers, users and others on how the system operates and how to use it. Ref: 3, 4, 10
Technical and user documentation User documentation – used to assist people to use the computer system. Technical documentation – describes the construction of the computer system. Ref: 3, 4, 10
   Questions Describe the role of the Systems Analyst in Stage 3 of the System Development Cycle – Designing Solutions. Various tools can be used at this stage. Explain the difference between using a data flow diagram and a system flowchart. Outline the tools you have used in your project.
Implementing
Implementation Plan The project manager coordinates all the elements of a project.  The  implementation  stage delivers the new system to the participants.  Ref: 3, 4, 10
Implementation Plan Responsibilities of the Project Manager controlling work in progress to see that it is    carried out according to plan; providing feedback to those working on the    project; negotiating for materials, supplies, and  services; and resolving differences among those involved with    the project. Ref: 3, 4, 10
Conversion Methods Direct  involves the immediate change to the new system on a chosen date.  Ref: 3, 4, 5, 10 Old System New System
Conversion Methods Parallel  conversion  involves the old and new systems both working together at the same time.  Ref: 3, 4, 5, 10 Old System New System
Conversion Methods Phased conversion  involves the gradual implementation of the new system.  Old System New System Ref: 3, 4, 5, 10
Conversion Methods Pilot conversion  involves trialling the new system in a small portion of the organisation. The old system is still available if the new system fails or experiences   problems.   Pilot conversion is usually started by a keen group of participants who appreciate the benefits of the new system. Ref: 3, 4, 5, 10
Conversion Methods Pilot Conversion Ref: 3, 4, 5, 10 Old System Old System Old System New System New System New System
Implementation of the chosen conversion process Information processes are continually tested during the implementation of the system over a period of time.  Minor changes to procedures are immediately implemented. Ref: 3, 4, 5, 10
   Questions Describe the role of the Project Manager in Stage 4 of the System  Development Cycle – Implementing. Discuss the importance of training staff during this stage. Which of the conversion methods was the most appropriate for your system? Explain why.
Testing, Evaluating  and Maintaining
System Testing Testing is a way of verify the quality of the project.  Testing a system is a very important part of the implementation of a system.  Without rigorous testing, the system cannot be guaranteed to work as expected.  Tests must be designed to examine the system operation under all possible events. Ref: 3, 4, 10
Ref: 9
Hardware Tested using  - diagnostic software and  - through general operation  Backup systems should be tested by selecting files to be restored.   Ref: 3, 4, 5, 10
Software Software is tested using data that has been structured to test all decisions made within the system.  Test data  must cover all possible combinations of data that may be encountered.  It should be based on the original design specifications.   Ref: 3, 4, 5, 10
Testing and Evaluating Testing  a solution ensures that it works. Testing is carried out throughout the system development cycle.  Evaluation  determines whether the system is working as expected or whether changes are required.  Ref: 3, 4, 5, 10
Ref: 9
Maintenance Maintenance  is the modification of the system by making minor improvements. Participants may discover deficiencies in the system and suggest improvements during the operation of the system. Ref: 3, 4, 5, 10
Operation Manual An  operation manual  details procedures participants follow when using a new system.  Participants need to be instructed about and assisted with the major features and functions of the system.  Ref: 3, 4, 5, 10
Operation Manual Some of the factors for creating an  easy-to-use operation manual include:  user-friendly format and structure clear and concise instructions steps listed in point form tasks completed in the simplest way appropriate instructions for file  management    and security  screen dumps included where possible. Ref: 10
   Questions   Explain the importance of testing a new  system.       Who is involved in this stage? Describe the methods you have used in  creating an operation manual.
Useful Web Sites Board of Studies http://www.boardofstudies.nsw.edu.au/   HSC Online http://www.hsc.csu.edu.au/
References 1. Board of Studies. (1999).  IPT Examination Assessment & Reporting Supplement.  http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   2. Board of Studies. (1999).  IPT Software and Course Specifications.  http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   3. Board of Studies. (1999).  IPT Support Document  http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   4. Board of Studies. (1999).  IPT Syllabus.  http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i    5. Chivers, B. et. al. (1994).  Computing Studies - Preliminary Course.  The Jacaranda Press: Australia.    
References 6. Cotterell, M & Hughes, B (1999).  Software Project Management , International Thomson Computer Press, United Kingdom.   7. Haynes, M.E. (1989).  Project Management . Crisp Publications, California.   8. Johnstone, G. et al. (2001).  Excel HSC Information Processes and Technology – Your Step by Step Guide to HSC Success.  Pascal Press: Sydney.   9. www.offthemark.com 10. Powers, G. (2000).  HSC Information Processes & Technology.  Heinemann, Australia
Best wishes for the HSC

More Related Content

PPT
JAD Workshops
PPTX
Information Technology Project Management - part 08
PPTX
Information Technology Project Management - part 05
PPTX
Information Technology Project Management - part 01
PDF
Chapter 6
PPSX
Information Technology Project Management
PPTX
Information Technology Project Management - part 02
PPTX
Information Technology Project Management - part 10
JAD Workshops
Information Technology Project Management - part 08
Information Technology Project Management - part 05
Information Technology Project Management - part 01
Chapter 6
Information Technology Project Management
Information Technology Project Management - part 02
Information Technology Project Management - part 10

What's hot (19)

PDF
p346-glowatz
PPTX
Information Technology Project Management - part 11
DOCX
Senior ipt term4_casestudy
PPTX
Accounting System Design and Development - System Planning and Development
PPTX
Information Technology Project Management - part 07
PDF
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
PPTX
IT Business Value
DOCX
235429094 jobportal-documentation
PPTX
Information Technology Project Management - part 04
PPTX
Cpe orientation
PDF
Analysis Questionnaire - White Paper
PDF
Applying agile and lean principles to the governance of software and systems ...
DOC
Chap011
PDF
Windows XP to Windows 7 Migration Whitepaper
DOCX
P g 0 0 0 4 m a y 0 6 , 2 0 1 1
PDF
Solution Architecture And Solution Security
PPTX
Todd williams
PPSX
Project post-mortem analysis
PDF
14 voigt dsmd_ausarbeitung
p346-glowatz
Information Technology Project Management - part 11
Senior ipt term4_casestudy
Accounting System Design and Development - System Planning and Development
Information Technology Project Management - part 07
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
IT Business Value
235429094 jobportal-documentation
Information Technology Project Management - part 04
Cpe orientation
Analysis Questionnaire - White Paper
Applying agile and lean principles to the governance of software and systems ...
Chap011
Windows XP to Windows 7 Migration Whitepaper
P g 0 0 0 4 m a y 0 6 , 2 0 1 1
Solution Architecture And Solution Security
Todd williams
Project post-mortem analysis
14 voigt dsmd_ausarbeitung
Ad

Viewers also liked (8)

PPT
Women Clothes
PPTX
How to Pick the Right Visuals for Your Presentations
PPT
The case for Open Access - Open by Default
PPT
Open access right here right now - Open by default
PPT
Women Clothes
PPTX
The Impact of Openness in and Beyond Academia- Open By Default
PPS
Project management
PDF
chez parisien
Women Clothes
How to Pick the Right Visuals for Your Presentations
The case for Open Access - Open by Default
Open access right here right now - Open by default
Women Clothes
The Impact of Openness in and Beyond Academia- Open By Default
Project management
chez parisien
Ad

Similar to St josephs project management (20)

PPS
Project Work
PPTX
Presentation2
PPT
SDLC_Intro.ppt
PPT
Project management zarkovic
PPT
The information systems life cycle
PPT
Information Systems Life Cycle
PPTX
Hsc project management 2017
PPT
Proj Mgmt.ppt
PPT
Systems overview sdlc
PPT
Hsc project management
PPTX
System Analysis and Design (Health Informatics)
PPT
Management Information system Session 4.ppt
PDF
Reducing Time Spent On Requirements
PPT
System development
PPTX
Creation of Information Systems.pptx
PPT
Entre3
PPTX
Software Project Management CH1 24-10.pptx
PPTX
CIS 2303 LO2 Part 2
PPTX
lecture_29.pptx
Project Work
Presentation2
SDLC_Intro.ppt
Project management zarkovic
The information systems life cycle
Information Systems Life Cycle
Hsc project management 2017
Proj Mgmt.ppt
Systems overview sdlc
Hsc project management
System Analysis and Design (Health Informatics)
Management Information system Session 4.ppt
Reducing Time Spent On Requirements
System development
Creation of Information Systems.pptx
Entre3
Software Project Management CH1 24-10.pptx
CIS 2303 LO2 Part 2
lecture_29.pptx

Recently uploaded (20)

PDF
Indian roads congress 037 - 2012 Flexible pavement
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
advance database management system book.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
My India Quiz Book_20210205121199924.pdf
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
IGGE1 Understanding the Self1234567891011
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Indian roads congress 037 - 2012 Flexible pavement
TNA_Presentation-1-Final(SAVE)) (1).pptx
Weekly quiz Compilation Jan -July 25.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
advance database management system book.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
Virtual and Augmented Reality in Current Scenario
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
My India Quiz Book_20210205121199924.pdf
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
A powerpoint presentation on the Revised K-10 Science Shaping Paper
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
IGGE1 Understanding the Self1234567891011
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...

St josephs project management

  • 1. Information Processes & Technology Project Management St Joseph’s Catholic College
  • 2. Outline Project Management Social and Ethical Design System Development Cycle Useful Web Sites Sample HSC Questions
  • 3. Project Management Project management focuses on a project. - a beginning - an end Meets established goals within cost, schedule, and quality objectives. Coordination of a number of phases to successfully achieve identified goals. Ref: 6, 7, 10
  • 4. Project Management These phases include – u nderstanding the problem, p lan d esigning solutions, i mplementing and t esting, evaluating and maintaining. Ref: 4
  • 5. Developing a Project Plan Planning is crucial in project management. Planning means listing in detail what is required to successfully complete the project along the three critical dimensions of - quality, time, and cost. Ref: 6, 7
  • 6. Developing a Project Plan A project plan is a summary of a project that specifies who, what, how and when. It clarifies what needs to be done and helps people to understand how they fit into the project. Ref: 6, 7, 10
  • 7. Developing a Project Plan A project plan usually breaks the project into major tasks called subprojects . It must provide an overall schedule, the details of the subprojects and a schedule for each subproject. It must also identify the people, information technology and data/information required by the system. Ref: 6, 7, 10
  • 8. Developing a Project Plan Project goal — the result of the project if it is successful. Goals may be broad or they may be very specific. Deliverable —a tangible item expected from a task. It may be a diagram, report, data dictionary, program or training manual. Schedule — shows the timing of major tasks and who will do the work. The success of a new system depends on accurate time estimates for each task. Ref: 6, 7, 10
  • 9. Software Project plans are constructed using Information Management Software or Project Management Software. Information management software helps individuals conducting a project to manage information and schedule tasks.  Project management software contains most of the features of information management software. Ref: 6, 7, 10
  • 10. Communication Skills Active listening - involves restating, reflecting and summarising the speaker’s major ideas and feelings. - a ctive listeners encourage the speaker and are non-committal. Conflict resolution - solves arguments and disputes. - it involves listening to the other person’s views and looking at the conflict as a problem to be s olved. - the aim is to create a “win-win” situation. Ref: 4, 10
  • 11. Communication Skills Negotiation skills - negotiation is a discussion between two parties with a goal of reaching agreement on issues. Interview techniques - involve careful preparation, implementation and follow-up. Team building - is the process of getting a group of people working together. Ref: 4, 10
  • 12.  
  • 14. Social and Ethical Design Machine-centred systems are designed to simplify what the computer must do at the expense of participants. Human-centred systems are those which make participants’ work as effective and as satisfying as possible. User-friendly describes a tool that people find easy to use. System Design Ref: 1, 4, 10
  • 15. Work Environment Health and safety - eg. ergonomics - furniture, information technology, environmental factors. Changing nature of work –This includes - deskilling, multi-skilling and in some cases redundancy. Will anyone lose their job or will new jobs be created? Ref: 4, 10
  • 16. Work Environment Ethics is a set of beliefs we hold about what is right and wrong. There are a number of issues involving the use of information systems that many people are concerned about. These include - -          environmental impact -          equity and access Ref: 4, 10
  • 17. Work Environment Equity concerns equal rights for all. It means that all people should have equal access to the benefits of information technology - this includes gender equity. In vasion of privacy Privacy - computer technology allows personal information to be distributed faster and further than previously before. C ontrol (rights and privileges) Control is the level of direct involvement that people have in decision making. Ref: 4, 10
  • 18. Work Environment F reedom of information Individuals have the right to access information regarding themselves. C omputer crime Computer crime can be broadly defined as any illegal or immoral activity that could not work without the use of a computer. C opyright Copyright laws protect the rights of an author against cases of piracy . Ref: 4, 10
  • 19. SDC U nderstanding the Problem P lan D esigning Solutions I mplementing the Solution T esting, evaluating & maintaining Change in purpose Change type of system Change system Change use of system Problem with system U P D I T System Development Cycle Ref: 4, 10
  • 21. Preliminary Investigation A preliminary investigation , or requirement definition, determines whether a quick fix of the existing system will solve the problem or a new system is necessary. The project plan is created in this stage. P articipants . Participants play an important part in developing a workable system. P articipants are people involved in the planning, design and implementation. Ref: 4, 10
  • 22. Preliminary Investigation D ata collection methods Data is collected to understand the problem and to develop an appropriate solution. interviews, surveys, observations and measurements. Ref: 4, 10
  • 23. Problem Definition Provides a clear definition of the problem, which needs to be solved. Ref: 4
  • 25. Requirements Report The requirements report is a statement about the need for a new system. It outlines the aims and objectives of the new system and how it will help the organisation. The requirement report is based on data collected from the participants. Ref: 4, 8, 10
  • 26. Negotiating specifications with the client If there is a client involved who must accept the project upon completion, the specifications that define a successful outcome must be negotiated and agreed to by the client, and included as part of the contract. A client may be either internal or external . There may also be more than one client. Ref: 4, 8, 10
  • 27. Prototype A prototype is a working model of an information system, built in order to understand the requirements of the system. Used when the problem is not easily understood. Involves a repetitive process of prototype modification and participants' feedback, until the process is understood. Can be the basis for further system development. Ref: 4, 8, 10
  • 29. Prototype Prototypes can be created from application packages that provide screen generators and report generators. There are advantages and disadvantages in using a prototype. Ref: 4, 8, 10
  • 30. Prototype - Advantages The requirements of the system more accurately reflect the needs of the participants. P articipants earlier involvement - t his may reduce the number of changes required by the participants in the testing, evaluating and maintaining stage. T he new system is easier to create from a prototype. Ref: 4, 8, 10
  • 31. Prototype - Disadvantages T he greater involvement of the participants could impact on their work with the old system. T he repetitive process of the prototype can be frustrating if the succeeding versions do not provide a better solution. S uccessful prototypes can produce software that is difficult to maintain, unreliable or inadequate. This may occur if any design restrictions are not taken into account when creating the prototype. Ref: 4, 8, 10
  • 32. Questions  Name the system you investigated What was the problem with the system you investigated? Who are the participants? What data gathering methods did you use? Describe your development of the prototype. What was the outcome of the prototype you developed?
  • 34. This stage involves making decisions using the data gathered in the preliminary investigation A constraint is a factor that affects the system and prevents it from achieving the desired objectives. There are different types of constraints, such as - Planning Ref: 4, 8, 10
  • 35. Feasibility Study A feasibility study is a short report that analyses potential solutions in terms of the known constraints and makes a recommendation. The feasibility study briefly examines the available options, estimates costs and identifies any constraints to be considered. Ref: 4, 8, 10
  • 36. Economic Feasibility Economic feasibility compares the costs of developing the new system with the expected benefits. A financial analyst is often asked to assess economic feasibility. Economic feasibility is also called cost/benefit feasibility. Ref: 4, 8, 10
  • 37. Technical Feasibility Technical feasibility determines the information technology requirements of the new system and the technical demands that will be placed on the new system. Ref: 4, 10
  • 38. Schedule Feasibility Schedule feasibility determines whether time is available to implement the new system. Ref: 4, 10
  • 39. Organisational Feasibility Organisational feasibility determines whether the new system will fit into the organisation and meet the current goals and objectives. It also determines whether the new system will have enough support from participants to be successfully implemented and whether participants can operate the system. Ref: 4, 10
  • 40. Recommendation Options A feasibility study has three recommendation options no change develop a new system investigate other solutions Ref: 4, 10
  • 41. Analysis Report The details of the new system are presented, along with recommendations for design, implementation and maintenance. The analysis report contains - design specifications a more detailed project plan Ref: 4, 10
  • 42. Risks involved Risk is the exposure to potential threats to the project. They differ from constraints in that they are not definite but possess some likelihood of occurrence. Risks are identified and classified as Low Risk Medium Risk High Risk Ref: 4, 6, 7, 10
  • 43. Questions Describe any constraints involved in the Making Decisions stage you encountered. What recommendation was advised after your submission of your Feasibility Study? Describe the most appropriate tools used in this stage of the System Development Cycle. Give reasons why.
  • 45. Designing a Solution Designing a solution is the transformation of the specifications into appropriate hardware, software and information processes. Involves purchasing hardware, writing or purchasing software, and specifying information processes to make the system operational. Ref: 4, 10
  • 46. Designing a Solution Systems analysts and programmers often use – Top-down - divides a large, complicated problem into a series of smaller, easier to solve problems. Step-wise refinement - then takes each sub-problem and breaks it down even further. Solutions based on prototypes are created in this stage. Ref: 4, 5, 10
  • 47. Participant development Participant development occurs when people within the information system develop the solution. Participants produce their own information system using readily available information technology. Tools for participant development - eg. guided processes in application packages Ref: 4, 10
  • 48. Information Technology Acquisition of hardware and software and the process of making it operational Ref: 4, 10
  • 49. Design Tools Design tools are used to better understand the system and document the new system. The tools are used to assist in explaining the operation of the new system. Ref: 4, 10
  • 50. Types of Design Tools The design tools used in the Designing Solutions stage of the System Development Cycle include - Context diagrams Data flow diagram Decision trees Decision tables Data dictionaries
  • 51. Context Diagrams Context diagrams are used to represent entire information systems. Ref:1, 2, 3, 4, 10   Process Single process - a circle is used to represent the entire system.           Data Flow An arrow is used to show the flow of data between the process and the external entities.       External Entity Any person or organisation that provides data to the system or receives data from the system.            
  • 52. Data Flow Diagram Data flow diagrams represent the information system as a number of processes that together form the single process of a context diagram. The source of data, its flow between processes and its destination along with data generated by the system is represented. Ref:1, 2, 3, 4, 10
  • 53. Data Flow Diagrams Process Ref:1, 2, 3, 4, 10 Process Processes are an action taking place transforming inputs to outputs.         Data flow An arrow is used to show the flow of data between the process and the external entities.       External Entity Any person or organisation that provides data to the system or receives data from the system.         Data store A location where data is stored. It can be in computer format, such as a diskette, or in non-computer format, such as a filing cabinet or an answering machine.      
  • 54. Data Flow Diagram Example
  • 55. Decision Trees A decision tree is a diagrammatic way of representing all possible combinations of decisions and their resulting actions. It represents the decisions made within a system as the branches of a tree. Each branch ends with a particular action. Ref: 3, 4, 10
  • 57. Data Dictionaries Data dictionaries contain a comprehensive description of each field in the database. This commonly includes: field name, number of characters (field width), data type, number of decimal places (if applicable) and a description of the purpose of each field. Ref: 3, 4, 10
  • 60. System Flow Charts System flowcharts are a diagrammatic way of representing both the flow of data and logic through an information system. Ref: 3, 4, 10
  • 61. System Flow Charts Ref: 3, 4, 10
  • 62. System Flow Chart Example Ref: Meriden, 2001, Andrews
  • 63. Screen Design Screen design for input and output of data are created. These are created using good principles of design, eg. ease of navigation, and use of consistent style. Ref: 3, 4, 10
  • 64. Documentation Technical specifications must be identified and documented prior to purchase of hardware. Documentation is an essential part of any system, as it communicates information to the developers, users and others on how the system operates and how to use it. Ref: 3, 4, 10
  • 65. Technical and user documentation User documentation – used to assist people to use the computer system. Technical documentation – describes the construction of the computer system. Ref: 3, 4, 10
  • 66. Questions Describe the role of the Systems Analyst in Stage 3 of the System Development Cycle – Designing Solutions. Various tools can be used at this stage. Explain the difference between using a data flow diagram and a system flowchart. Outline the tools you have used in your project.
  • 68. Implementation Plan The project manager coordinates all the elements of a project. The implementation stage delivers the new system to the participants. Ref: 3, 4, 10
  • 69. Implementation Plan Responsibilities of the Project Manager controlling work in progress to see that it is carried out according to plan; providing feedback to those working on the project; negotiating for materials, supplies, and services; and resolving differences among those involved with the project. Ref: 3, 4, 10
  • 70. Conversion Methods Direct involves the immediate change to the new system on a chosen date. Ref: 3, 4, 5, 10 Old System New System
  • 71. Conversion Methods Parallel conversion involves the old and new systems both working together at the same time. Ref: 3, 4, 5, 10 Old System New System
  • 72. Conversion Methods Phased conversion involves the gradual implementation of the new system. Old System New System Ref: 3, 4, 5, 10
  • 73. Conversion Methods Pilot conversion involves trialling the new system in a small portion of the organisation. The old system is still available if the new system fails or experiences problems. Pilot conversion is usually started by a keen group of participants who appreciate the benefits of the new system. Ref: 3, 4, 5, 10
  • 74. Conversion Methods Pilot Conversion Ref: 3, 4, 5, 10 Old System Old System Old System New System New System New System
  • 75. Implementation of the chosen conversion process Information processes are continually tested during the implementation of the system over a period of time. Minor changes to procedures are immediately implemented. Ref: 3, 4, 5, 10
  • 76. Questions Describe the role of the Project Manager in Stage 4 of the System Development Cycle – Implementing. Discuss the importance of training staff during this stage. Which of the conversion methods was the most appropriate for your system? Explain why.
  • 77. Testing, Evaluating and Maintaining
  • 78. System Testing Testing is a way of verify the quality of the project. Testing a system is a very important part of the implementation of a system. Without rigorous testing, the system cannot be guaranteed to work as expected. Tests must be designed to examine the system operation under all possible events. Ref: 3, 4, 10
  • 80. Hardware Tested using - diagnostic software and - through general operation Backup systems should be tested by selecting files to be restored. Ref: 3, 4, 5, 10
  • 81. Software Software is tested using data that has been structured to test all decisions made within the system. Test data must cover all possible combinations of data that may be encountered. It should be based on the original design specifications. Ref: 3, 4, 5, 10
  • 82. Testing and Evaluating Testing a solution ensures that it works. Testing is carried out throughout the system development cycle. Evaluation determines whether the system is working as expected or whether changes are required. Ref: 3, 4, 5, 10
  • 84. Maintenance Maintenance is the modification of the system by making minor improvements. Participants may discover deficiencies in the system and suggest improvements during the operation of the system. Ref: 3, 4, 5, 10
  • 85. Operation Manual An operation manual details procedures participants follow when using a new system. Participants need to be instructed about and assisted with the major features and functions of the system. Ref: 3, 4, 5, 10
  • 86. Operation Manual Some of the factors for creating an easy-to-use operation manual include: user-friendly format and structure clear and concise instructions steps listed in point form tasks completed in the simplest way appropriate instructions for file management and security screen dumps included where possible. Ref: 10
  • 87. Questions   Explain the importance of testing a new system.      Who is involved in this stage? Describe the methods you have used in creating an operation manual.
  • 88. Useful Web Sites Board of Studies http://www.boardofstudies.nsw.edu.au/ HSC Online http://www.hsc.csu.edu.au/
  • 89. References 1. Board of Studies. (1999). IPT Examination Assessment & Reporting Supplement. http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   2. Board of Studies. (1999). IPT Software and Course Specifications. http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   3. Board of Studies. (1999). IPT Support Document http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   4. Board of Studies. (1999). IPT Syllabus. http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i   5. Chivers, B. et. al. (1994). Computing Studies - Preliminary Course. The Jacaranda Press: Australia.  
  • 90. References 6. Cotterell, M & Hughes, B (1999). Software Project Management , International Thomson Computer Press, United Kingdom.   7. Haynes, M.E. (1989). Project Management . Crisp Publications, California.   8. Johnstone, G. et al. (2001). Excel HSC Information Processes and Technology – Your Step by Step Guide to HSC Success. Pascal Press: Sydney.   9. www.offthemark.com 10. Powers, G. (2000). HSC Information Processes & Technology. Heinemann, Australia
  • 91. Best wishes for the HSC