 BASIC CONSTRUCTION
USE OF CT & CVT
MAINTANANCE CARE
BASIC WIRING DETAILS
FAILURE MODE
CT AND CVT
Construction of Current Transformer
Various Part :-
Type of construction and difference
Live Tank Design Dead Tank Design
Weight at Top Weight at bottom
Short Primary length Longer Primary length
Main Insulation at top Main insulation at bottom
Failure generally in top
chamber
Failure normally at bottom
Special precaution must be
taken to pass fault current
from top chamber to earth
Fault current passes through
the primary winding safely up
to the earthed bottom tank
Suitable for high currents
even above 2000 Amps
Suitable for currents up to
2000 Amps
Safety Point of view difference
Live Tank Design Dead Tank Design
Possibilities of fire and
blast is higher because
fault occurred at Live HV
Side Voltage level
Possibilities of fire is
less.
Dead tank CT Winding
Primary winding
Secondary WDG
Construction Details:-
Dead Tank & Live Tank Photos
Substation.ppt
Parts of CT::
CT Secondary Terminals:
Name Plate Detail:
Detail On Name Plate
Primary Terminal And CT Ratio
Nos. of Core used in CT
Rated Burden
Accuracy Class And ALF
Knee Point Voltage
Type of Cooling
Tan Delta Value
LOI / A-T No
YEAR OF MFG.
Use of CT
 For Metering. : Measurement of Current –
Which is in put quantity to meters for
measurement and display
 For Protection. : Measurement of Current –
Which is in put to relays like O/C, E/F,
Differential , Distance , Bus Bar protection
etc
Metering Core And Termination
Generally 1- St Core of CT is used for
Metering and hence having class of
accuracy 0.2 / 0.2 S / 0.5 / 1.0
1S1-1S2-1S3 are the terminal on CT
secondary Box
If we choose ratio: 1200 Amp then full
secondary winding comes in picture and
Terminals are 1S1- 1S3 Similarly For 600
Amp Terminals are 1S1-1S2
Back Up Protection Core
And Termination
This CT name plate details shows : Class of
accuracy is 5 P 10 And Burden is 15 VA
This core i.e. 2nd Core is for Back up
protection O/C And E/F relay function as in
put current.
We connect wires on 2S1- 2S2 For 600 Amp
And 2S1-2S3 For 1200 Amp.
Differential or Distance
Protection Core And Termination
Third core of This detailed CT with
Accuracy class PS:
Knee Point Voltage : 950 Volt @ 1200/ 1 A.
For 1200 /1 Amp : 3S1- 3S3
And 600 /1 Amp : 3S1- 3S2
Other Cores if available it is 4th and 5th. In CTs
of 132 KV And above class in GETCO For
Bus Bar protection Scheme all these core of
PS Cl.
What is Knee Point ?
Ferrules practice
D – FOR METERING
C – FOR BACK UP PROTECTION
A – FOR DIFFERENTIAL / DISTANCE
B – FOR BUS BAR PROTECTION
Metering CT
Metering CTs are having Secondary with
1 Amp or 5 Amp in GETCO
Why in 11 KV At 5A ?
66 KV And Above at 1 A ?
CT Ferrules at MK Box
A>> Metering Circuit :: -
R-Phase CT : R1S1- R1S2 (Metering)
Y-Phase CT : Y1S1-Y1S2 (Metering)
B-Phase CT : B1S1- B1S2 (Metering)
Pilot wire S1 And Star Point S2 Hence All
1S2 points are shorted and earthed at Yard
MK
For similar we can do for Back
up and Differential
• For Back UP Protection : “ C ” We Use
• R- Phase C 11
• Y-Phase C31
• B- Phase C51
• Star Point C71
• And For Differential / Distance : “A” We
use
• A11 , A31 , A51, A71
66 KV CT Failure – Live Tank
Bus Coupler CT – 220 KV Savar kundla:
220 kv CT failure Vartej:28-02-10
Live Tank CT Failure Photographs
Dead Tank CT Failure Photographs
Maint. Check Point
For Current Transformer :
• Checking daily for any leakage of Oil or for
corona and for abnormal noise ,or any hot
glow etc.
• Periodic Checking of IR Value and Tan
Delta of CT & Condition of Oil and
nitrogen pressure if CT Without Bellow
• Checking of Knee Point voltage and ratio
test and Secondary Wdg. Resistance
measurement .
Reasons for failure of CTs.
> Low IR Value (Failure of insulation)
>High Tan Delta Value
>Opening of secondary Wdg.
>Primary winding joint opening during
fault.
>Loose / no proper earthing connection at
tan delta point
CVT : Capacitive Voltage Transformer
Generally provided for dual purpose of
communication and for monitor line voltage
and frequency
Where Two line parallel operation either of
Generation or of other grids then checking
of Voltage / Frequency /Phase sequence
condition is essential before make it
parallel
CVT Use:
>One Line having CVT and secondary side
There will be decided voltage 110 V A.C
>This voltage is used to compare with Bus PT
and Phase sequence through
Synchronization trolley.
Basic Construction CVT
General Ckt Dia. for CVT
V1
V2
C1
C2
Secondary
Voltage
Circuit Diagram of a C.V.T
Secondary
Voltage
V2
C1
C2
Equivalent Circuit
V1
___
V2
= 1+ ___
Notes:
______
Where K- Factordepending upon losses in
Capacitors and Electro-magnetic Portion
O - Phase error change in Minutes/Hz
Maximum Output from a C V T=K(C1+C2) V2
2
C 2
C 1
Protective Spark Gap
Photograph of CVT
Maint. Care To be taken for CVT
Cleaning of porcelain insulators
Checking of secondary connections
Measurement of IR value and Tan Delta as
per OEM Recommendation
Never store in horizontal position.

More Related Content

PPTX
Design of substation
PPTX
Capacitive voltage transformer (1)
PPT
Power Transformer Differential protection
PPTX
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
PPT
Transformer design and protection
PPT
Representation of short & medium transmission lines
PPTX
Electrical Protection Schemes in detail
PPTX
Thyristor Characteristics, Two Transistor Model Of Thyristor & Thyrisror Turn...
Design of substation
Capacitive voltage transformer (1)
Power Transformer Differential protection
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Transformer design and protection
Representation of short & medium transmission lines
Electrical Protection Schemes in detail
Thyristor Characteristics, Two Transistor Model Of Thyristor & Thyrisror Turn...

What's hot (20)

PPT
Chapter 2 transmission line parameters
PDF
Testing of Transformers.
PPT
Instrument transformer CT & PT
PPTX
Transmission lines
PPTX
Fault Level Calculation
PPTX
High Frequency High Voltage AC Generation
PPTX
BREAKDOWN MECHANISM OF LIQUID DIELECTRICS (ALL METHODS))|BREAKDOWN IN LIQUIDS...
PDF
Basics of Electrical Machines
PPTX
Differential Protection Relay
PPT
Disadvantages of corona, radio interference, inductive interference between p...
PPTX
Underground cables vs overhead lines
PPTX
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
PPTX
Power system protection
PPT
Measurement of high_voltage_and_high_currentunit_iv_full_version
PPT
Fault level calculations
PDF
Power system slide notes
PPTX
Ac voltage
PPTX
Testing of transformer
PPTX
Restricted Earth Fault(REF) Protection.pptx
PDF
Chapter 2 transmission line parameters
Testing of Transformers.
Instrument transformer CT & PT
Transmission lines
Fault Level Calculation
High Frequency High Voltage AC Generation
BREAKDOWN MECHANISM OF LIQUID DIELECTRICS (ALL METHODS))|BREAKDOWN IN LIQUIDS...
Basics of Electrical Machines
Differential Protection Relay
Disadvantages of corona, radio interference, inductive interference between p...
Underground cables vs overhead lines
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
Power system protection
Measurement of high_voltage_and_high_currentunit_iv_full_version
Fault level calculations
Power system slide notes
Ac voltage
Testing of transformer
Restricted Earth Fault(REF) Protection.pptx
Ad

Similar to Substation.ppt (20)

PPTX
Basic concept of Circuit breaker, Current transformer and potential transform...
PDF
Executive summary
PPTX
Current Transformer.pptx
PDF
Current Transformers.pdf
PPT
CT design aspects - Nageswar-6
PPTX
ct pt testing...........................................
PPTX
Current transformer AS ISTRUMINTATION EQUIPMENTS
PPT
INTERFACING.ppt
PPTX
Apparatus Protection Using Relays for Engineering Students
PPTX
CURRENT TRANSFORMER.pptx
PPTX
220 KV Substation Operation & Maintenance
PPTX
Factors to be considered while selecting CT
PPTX
CT and VT.pptx
PPTX
Currentandpotentialtransformernotee.pptx
PDF
Current transformer ieema
PPTX
132kV GSS ppt
PPTX
Uttar pradesh power corporation limited
PPTX
ELECTRIC SUB-STATION IN BRIEF
PPT
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
PPTX
Instrument Transformer Presentation
Basic concept of Circuit breaker, Current transformer and potential transform...
Executive summary
Current Transformer.pptx
Current Transformers.pdf
CT design aspects - Nageswar-6
ct pt testing...........................................
Current transformer AS ISTRUMINTATION EQUIPMENTS
INTERFACING.ppt
Apparatus Protection Using Relays for Engineering Students
CURRENT TRANSFORMER.pptx
220 KV Substation Operation & Maintenance
Factors to be considered while selecting CT
CT and VT.pptx
Currentandpotentialtransformernotee.pptx
Current transformer ieema
132kV GSS ppt
Uttar pradesh power corporation limited
ELECTRIC SUB-STATION IN BRIEF
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
Instrument Transformer Presentation
Ad

Recently uploaded (20)

PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
Design Guidelines and solutions for Plastics parts
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
communication and presentation skills 01
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Feature types and data preprocessing steps
PPT
Total quality management ppt for engineering students
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Fundamentals of Mechanical Engineering.pptx
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Design Guidelines and solutions for Plastics parts
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
distributed database system" (DDBS) is often used to refer to both the distri...
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
Fundamentals of safety and accident prevention -final (1).pptx
communication and presentation skills 01
III.4.1.2_The_Space_Environment.p pdffdf
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Feature types and data preprocessing steps
Total quality management ppt for engineering students
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Visual Aids for Exploratory Data Analysis.pdf
Categorization of Factors Affecting Classification Algorithms Selection
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...

Substation.ppt

  • 1. Tranning During Visit I J.P.PANDYA I HET-MIRACLE ELECTROTECH PVT. LTD-BHAVNAGAR Welcomes to You all my Family members
  • 2.  BASIC CONSTRUCTION USE OF CT & CVT MAINTANANCE CARE BASIC WIRING DETAILS FAILURE MODE CT AND CVT
  • 3. Construction of Current Transformer Various Part :-
  • 4. Type of construction and difference Live Tank Design Dead Tank Design Weight at Top Weight at bottom Short Primary length Longer Primary length Main Insulation at top Main insulation at bottom Failure generally in top chamber Failure normally at bottom Special precaution must be taken to pass fault current from top chamber to earth Fault current passes through the primary winding safely up to the earthed bottom tank Suitable for high currents even above 2000 Amps Suitable for currents up to 2000 Amps
  • 5. Safety Point of view difference Live Tank Design Dead Tank Design Possibilities of fire and blast is higher because fault occurred at Live HV Side Voltage level Possibilities of fire is less.
  • 6. Dead tank CT Winding Primary winding Secondary WDG
  • 8. Dead Tank & Live Tank Photos
  • 13. Detail On Name Plate Primary Terminal And CT Ratio Nos. of Core used in CT Rated Burden Accuracy Class And ALF Knee Point Voltage Type of Cooling Tan Delta Value LOI / A-T No YEAR OF MFG.
  • 14. Use of CT  For Metering. : Measurement of Current – Which is in put quantity to meters for measurement and display  For Protection. : Measurement of Current – Which is in put to relays like O/C, E/F, Differential , Distance , Bus Bar protection etc
  • 15. Metering Core And Termination Generally 1- St Core of CT is used for Metering and hence having class of accuracy 0.2 / 0.2 S / 0.5 / 1.0 1S1-1S2-1S3 are the terminal on CT secondary Box If we choose ratio: 1200 Amp then full secondary winding comes in picture and Terminals are 1S1- 1S3 Similarly For 600 Amp Terminals are 1S1-1S2
  • 16. Back Up Protection Core And Termination This CT name plate details shows : Class of accuracy is 5 P 10 And Burden is 15 VA This core i.e. 2nd Core is for Back up protection O/C And E/F relay function as in put current. We connect wires on 2S1- 2S2 For 600 Amp And 2S1-2S3 For 1200 Amp.
  • 17. Differential or Distance Protection Core And Termination Third core of This detailed CT with Accuracy class PS: Knee Point Voltage : 950 Volt @ 1200/ 1 A. For 1200 /1 Amp : 3S1- 3S3 And 600 /1 Amp : 3S1- 3S2 Other Cores if available it is 4th and 5th. In CTs of 132 KV And above class in GETCO For Bus Bar protection Scheme all these core of PS Cl.
  • 18. What is Knee Point ?
  • 19. Ferrules practice D – FOR METERING C – FOR BACK UP PROTECTION A – FOR DIFFERENTIAL / DISTANCE B – FOR BUS BAR PROTECTION
  • 20. Metering CT Metering CTs are having Secondary with 1 Amp or 5 Amp in GETCO Why in 11 KV At 5A ? 66 KV And Above at 1 A ?
  • 21. CT Ferrules at MK Box A>> Metering Circuit :: - R-Phase CT : R1S1- R1S2 (Metering) Y-Phase CT : Y1S1-Y1S2 (Metering) B-Phase CT : B1S1- B1S2 (Metering) Pilot wire S1 And Star Point S2 Hence All 1S2 points are shorted and earthed at Yard MK
  • 22. For similar we can do for Back up and Differential • For Back UP Protection : “ C ” We Use • R- Phase C 11 • Y-Phase C31 • B- Phase C51 • Star Point C71 • And For Differential / Distance : “A” We use • A11 , A31 , A51, A71
  • 23. 66 KV CT Failure – Live Tank
  • 24. Bus Coupler CT – 220 KV Savar kundla:
  • 25. 220 kv CT failure Vartej:28-02-10
  • 26. Live Tank CT Failure Photographs
  • 27. Dead Tank CT Failure Photographs
  • 28. Maint. Check Point For Current Transformer : • Checking daily for any leakage of Oil or for corona and for abnormal noise ,or any hot glow etc. • Periodic Checking of IR Value and Tan Delta of CT & Condition of Oil and nitrogen pressure if CT Without Bellow • Checking of Knee Point voltage and ratio test and Secondary Wdg. Resistance measurement .
  • 29. Reasons for failure of CTs. > Low IR Value (Failure of insulation) >High Tan Delta Value >Opening of secondary Wdg. >Primary winding joint opening during fault. >Loose / no proper earthing connection at tan delta point
  • 30. CVT : Capacitive Voltage Transformer Generally provided for dual purpose of communication and for monitor line voltage and frequency Where Two line parallel operation either of Generation or of other grids then checking of Voltage / Frequency /Phase sequence condition is essential before make it parallel
  • 31. CVT Use: >One Line having CVT and secondary side There will be decided voltage 110 V A.C >This voltage is used to compare with Bus PT and Phase sequence through Synchronization trolley.
  • 33. General Ckt Dia. for CVT V1 V2 C1 C2 Secondary Voltage Circuit Diagram of a C.V.T Secondary Voltage V2 C1 C2 Equivalent Circuit V1 ___ V2 = 1+ ___ Notes: ______ Where K- Factordepending upon losses in Capacitors and Electro-magnetic Portion O - Phase error change in Minutes/Hz Maximum Output from a C V T=K(C1+C2) V2 2 C 2 C 1 Protective Spark Gap
  • 35. Maint. Care To be taken for CVT Cleaning of porcelain insulators Checking of secondary connections Measurement of IR value and Tan Delta as per OEM Recommendation Never store in horizontal position.