System Kaizen Process
“YourValueStreamImprovementCoach”
2
“Lean Production” stands for...
…the complete and through
elimination of waste to reduce the
timeline from receipt of customer
order to delivery.
...increase of efficiency and
standardization by continuous
improvements.
... a philosophy, as well
as production techniques,
for “cutting the fat” from
production processes.
...the highest quality,
lowest cost, shortest
lead time...
... customer orientation,
orientation for quality and cost
reduction.
...A business system for organizing and managing product development,
operations, suppliers, and customer relations that require less human
effort, less space, less capital, less material, and less time to make
products with fewer defects to precise customer desires.
...quick and agile as it provides the flexibility and speed to design
and produce a wide variety of products customized to specific
orders and delivered with extremely short lead times.
…the right part, in the right quantity,
at the right moment, in the right quality,
at the right place.
10/5/2016
“YourValueStreamImprovementCoach”
3
Plan, Do, Check, Act (PDCA)
An improvement cycle based on the scientific method of proposing a
change in a process, implementing the change, measuring the results,
and taking appropriate action.
The PDCA cycle has four stages:
1. Plan: Determine goals for a process and
needed changes to achieve them.
2. Do: Implement the changes.
3. Check: Evaluate the results in terms of
performance.
4. Act: Stabilize and Standardize the
change or begin the cycle again,
depending on the results.
Plan
Do
Check
Act Grasp the
Situation
Standardize
10/5/2016
“YourValueStreamImprovementCoach”
4
A one page storyboard on 11”x17”
paper, commonly known as A3-size
paper. Logic flows from the top left to
the bottom right, and each box leads
to the next one.
An A3 includes both analysis (number-
crunching) and synthesis (storytelling).
It’s a practice of getting the problem,
the analysis, the corrective actions,
and the action plan on a single sheet
of paper.
The primary purpose of the A3 is to
gain a shared understanding of critical
issues in order to solve problems and
get results.
A3 Report
Initial Condition:
Target Condition:
Implementation:
Approval
Indicators
Background / Business Case:
Project Name:
A3 Report
It’s a way of thinking.
10/5/2016
“YourValueStreamImprovementCoach”
5
A3 Report
Initial Condition:
Target Condition:
Implementation:
Approval
Indicators
Background / Business Case:
Project Name:
10/5/2016
“YourValueStreamImprovementCoach”
6
Define the Business Case
Increasing Customer
expectations require
improved quality,
delivery, and cost
Need to improve cost
competitiveness to
survive in a global
economy
- Growth/New Markets
- Inventory Turnover
- ROI Capital
-Cost Reductions /
Increase Margins
$
Be sure to link your plan to business objectives.
10/5/2016
“YourValueStreamImprovementCoach”
7
A3 – Document Business Case
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
10/5/2016
“YourValueStreamImprovementCoach”
8
The LEAN Journey
Initial
Condition
IDEAL
Condition
•100% Value Add
•0 Defects (Internal)
•One Piece
Continuous Flow
•Human Development
•Value to Society
•Hidden Waste (Problems)
•Poor Equipment Efficiency
•Poor Labor Efficiency
•High Defect Rates
•Large Batches
•Infrequent improvement
Before you can begin the journey you
must “Grasp the Initial Condition”.
10/5/2016
“YourValueStreamImprovementCoach”
9
Grasp the Initial Condition
Walk / Observe the
Value Stream(s) from
shipping to receiving.
Map the Process
- Value Stream Map
- Flow Chart
- Spaghetti Diagram
- Bubble Diagram
- Work Flow
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
Expedited
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
C
ylinder
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Cutter
Race
track 1
Race
track 2
Race
track 3
Hose
Assy 1
Hose
Assy 2
Hose
Assy 3
Crimp 1
Crimp 2
Crimp 3
Butter-
Fly 1
Butter-
Fly 2
Butter-
Fly 3
Clench
1
Clench
2
Test, Inspect,
Tape, Gauge,
And Pack1
1 x 3 x 3 x 3 x 1 x 2 x 1
= 54 different possible paths through production
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Key Process Indicators
Indicators: Current
Lead Time 8.3 days
WIP 12,168
Productivity (MH/100) 6.00
Bubble Diagram (# Paths) 54
OBC (% over ideal) 25%
Problems /
Opportunities
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Other Relevant Data
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
10/5/2016
“YourValueStreamImprovementCoach”
10
A3 – Document Initial Condition
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
Initial Condition:
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
C
yl
in
de
r
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
10/5/2016
“YourValueStreamImprovementCoach”
11
Prioritize Problems / Opportunities
Cost, Effort, Time
Impact
1 2
3 4
Start
Here
Work on High Impact, Low Effort Activities
10/5/2016
“YourValueStreamImprovementCoach”
12
The LEAN Journey
Initial
Condition
IDEAL
Condition
•100% Value Add
•0 Defects (Internal)
•One Piece
Continuous Flow
•Human Development
•Value to Society
•Hidden Waste (Problems)
•Poor Equipment Efficiency
•Poor Labor Efficiency
•High Defect Rates
•Large Batches
•Infrequent improvement
Once the Initial Condition is
thoroughly understood the next
step is to define a Target
Condition assuring a magnetic
pull towards the Ideal Condition.
Target
Condition
The Target Condition should
be a short term vision that is
attainable and measured in
days/weeks not months/years.
Initial
Condition
10/5/2016
“YourValueStreamImprovementCoach”
13
Define the Target Condition
Map the Future State
Customer
Supplier
Pacemaker
Customer Specific
Scheduling Point
Complexity Split
Fabrication #2Fabrication #1
FIFO
Cross Dock or
Supplier
Warehouse
MRP
AdP
Finished
Goods
Control
Daily
Customer Schedule
Overseas
Suppliers
MRP
AdP
Component
Control
A
Source Global Feel Local
Supplier Orders
(Weekly EDI) Customer
Orders
(Weekly EDI)
Daily
Orders
e-Kanban
3x Day
Green Loop (A Component Suppliers)
Line side “A” component
Supermarket MIN/MAX
FG Supermarket
MIN/MAX
FG located/
visualized in
manufacturing
building warehouse
ASN
O X O X O X
RM located/
visualized in
manufacturing
building warehouse
Warehouse (RM)
NAFTA
Suppliers
RM delivered to POU locations
established by value stream
(A Items) EPE Day or
Shipment Window then
strive to shorten over time
Ridged MIN/MAX
Rules – Minimum
level inventory
Cycle + Buffer +
Safety Stocks
EPEI Goal to match the
pacemaker
Ridged MIN/MAX
Rules – Minimum level
inventory
EPEI Goal to match
the pacemaker
20 Min. Loops
1 Day on hand RM
Daily Deliveries
Key Process Indicators
Indicators: Current Target Delta
Lead Time 8.3 days 4.0 days -52%
WIP 12,168 7614 -37%
Productivity
(MH/100)
6.00 4.78 -20%
Bubble Diagram
(# Paths)
54 2 -96%
OBC (% over
ideal)
25% 8% -68%
Verbal Description
• Reduce from 3 Operators to 2 in Upper
Machining
• Elimination of 106 seconds of labor in
Upper Machining
• OEE > 88% (with FWD)
• OEE >70% (w/o FWD)
Other Graphical
Analysis
Operator Balance Chart
67
60
7
0
10
20
30
40
50
60
70
80
Machining Inspect/Pack
Value-Added Waiting Takt
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
10/5/2016
“YourValueStreamImprovementCoach”
14
A3 – Document Target Condition
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
Initial Condition:
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
C
yl
in
de
r
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
Target Condition:
Customer
Supplier
Pacemaker
Customer Specific
Scheduling Point
Complexity Split
Fabrication #2Fabrication #1
FIFO
Cross Dock or
Supplier
Warehouse
MRP
AdP
Finished
Goods
Control
Daily
Customer Schedule
Overseas
Suppliers
MRP
AdP
Component
Control
A
Source Global Feel Local
Supplier Orders
(Weekly EDI) Customer
Orders
(Weekly EDI)
Daily
Orders
e-Kanban
3x Day
Green Loop (A Component Suppliers)
Line side “A” component
Supermarket MIN/MAX
FG Supermarket
MIN/MAX
FG located/
visualized in
manufacturing
building warehouse
ASN
O X O X O X
RM located/
visualized in
manufacturing
building warehouse
Warehouse (RM)
NAFTA
Suppliers
RM delivered to POU locations
established by value stream
(A Items) EPE Day or
Shipment Window then
strive to shorten over time
Ridged MIN/MAX
Rules – Minimum
level inventory
Cycle + Buffer +
Safety Stocks
EPEI Goal to match the
pacemaker
Ridged MIN/MAX
Rules – Minimum level
inventory
EPEI Goal to match
the pacemaker
20 Min. Loops
1 Day on hand RM
Daily Deliveries
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Operator Balance Chart
67
60
7
0
10
20
30
40
50
60
70
80
Machining Inspect/Pack
Value-Added Waiting Takt
• Reduce from 3 Operators to 2 in
Upper Machining
• Elimination of 106 seconds of labor
in Upper Machining
• OEE > 88% (with FWD)
• OEE >70% (w/o FWD)
10/5/2016
“YourValueStreamImprovementCoach”
15
Create an Implementation Plan
Implementation:
# Task Resp.
Person
Target
Date
Feb
05
Mar
05
Apr
05
May
05
Jun
05
Jul
05
Aug
05
Sep
05
Oct
05
Nov
05
Review Review
1 Fix Clamping to
eliminate operator
checking clamp force
Roger
Marshall
4/1/05
2 Reprogram Masco to
separate operator from
machine (PCT=88)
Grant
Glasscock
5/1/05
3 Standardize Blow-off
(PCT=77)
Brian
Zolman
3/1/05
4 Improve clamp/
unclamp speed
(PCT=75)
Roger
Marshall
4/1/05
5 Improve fixture rotation
rate (PCT=74)
Grant
Glasscock
4/1/05
6 ROI Analysis: Re-
balance Gantry (13 sec
reduction)
Grant
Glasscock
5/1/05
7 ROI Analysis: Re-
balance Masco
(PCT=70)
Matt Jacoby 5/1/05
8 ROI Analysis: Blow-off
machine (PCT=63)
Roger
Marshall
4/1/05
9 Reduce from 3 to 2
operators per shift on
Lower Machining cell
Roger
Marshall
7/1/05
10 Reduce from 3 to 2
operators per shift on
Finishing cell
Roger
Marshall
9/1/05
Task description with
specific, quantifiable
expected resultsResponsible Person
3 Standardize Blow-
off (PCT=77)
Planned Start /
Completion
- Plan Start
- Act Start
- Plan Compl.
- Act. Compl.
- ReviewPlanning:
Periodic evaluation
of progress against
planned timing and
results
Evaluation:
X- On Target
- Behind Target
- In Trouble
10/5/2016
“YourValueStreamImprovementCoach”
16
A3 – Document Implementation Plan
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
Initial Condition:
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
Cylin
de
r
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
Target Condition:
Customer
Supplier
Pacemaker
Customer Specific
Scheduling Point
Complexity Split
Fabrication #2Fabrication #1
FIFO
Cross Dock or
Supplier
Warehouse
MRP
AdP
Finished
Goods
Control
Daily
Customer Schedule
Overseas
Suppliers
MRP
AdP
Component
Control
A
Source Global Feel Local
Supplier Orders
(Weekly EDI) Customer
Orders
(Weekly EDI)
Daily
Orders
e-Kanban
3x Day
Green Loop (A Component Suppliers)
Line side “A” component
Supermarket MIN/MAX
FG Supermarket
MIN/MAX
FG located/
visualized in
manufacturing
building warehouse
ASN
O X O X O X
RM located/
visualized in
manufacturing
building warehouse
Warehouse (RM)
NAFTA
Suppliers
RM delivered to POU locations
established by value stream
(A Items) EPE Day or
Shipment Window then
strive to shorten over time
Ridged MIN/MAX
Rules – Minimum
level inventory
Cycle + Buffer +
Safety Stocks
EPEI Goal to match the
pacemaker
Ridged MIN/MAX
Rules – Minimum level
inventory
EPEI Goal to match
the pacemaker
20 Min. Loops
1 Day on hand RM
Daily Deliveries
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Operator Balance Chart
67
60
7
0
10
20
30
40
50
60
70
80
Machining Inspect/Pack
Value-Added Waiting Takt
• Reduce from 3 Operators to 2 in
Upper Machining
• Elimination of 106 seconds of labor
in Upper Machining
• OEE > 88% (with FWD)
• OEE >70% (w/o FWD)
Implementation:
Implementation:
# Task Resp.
Person
Target
Date
Feb
05
Mar
05
Apr
05
May
05
Jun
05
Jul
05
Aug
05
Sep
05
Oct
05
Nov
05
Review Review
1 Fix Clamping to
eliminate operator
checking clamp force
Roger
Marshall
4/1/05
2 ReprogramMasco to
separate operator from
machine (PCT=88)
Grant
Glasscock
5/1/05
3 Standardize Blow-off
(PCT=77)
Brian
Zolman
3/1/05
4 Improve clamp/
unclamp speed
(PCT=75)
Roger
Marshall
4/1/05
5 Improve fixture rotation
rate (PCT=74)
Grant
Glasscock
4/1/05
6 ROI Analysis: Re-
balance Gantry (13 sec
reduction)
Grant
Glasscock
5/1/05
7 ROI Analysis: Re-
balance Masco
(PCT=70)
Matt Jacoby 5/1/05
8 ROI Analysis: Blow-off
machine (PCT=63)
Roger
Marshall
4/1/05
9 Reduce from 3 to 2
operatorsper shift on
Lower Machining cell
Roger
Marshall
7/1/05
10 Reduce from 3 to 2
operatorsper shift on
Finishing cell
Roger
Marshall
9/1/05
10/5/2016
“YourValueStreamImprovementCoach”
17
Identify Expected Results
Tangible Metric
Improvements
Indicators: Current Target Delta Intangibles:
Lead Time 1.52 days .95 days -37% Less variation in the assembly
process
Lower C/O time by 66%
Similar results can be achieved on the
APOX1 and ASOX assembly lines
Labor productivity stability at a wide
range of demand
Reduced material handling and
conveyance of WIP
WIP 12,168 7614 -37%
Productivity (MH/100) 6.00 4.78 -20%
Bubble Diagram (Paths) 54 2 -96%
OBC (% over ideal) 25% 8% -68%
WIP Value $13,624 $8,525 -$5,099
Labor Cost ($/year) $352,000 $253,500 -$98,500
Tangible Cost
Improvements
Intangibles
10/5/2016
“YourValueStreamImprovementCoach”
18
A3 – Document the KPI’s and Expected Results
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
Initial Condition:
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
Cylin
de
r
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
Target Condition:
Customer
Supplier
Pacemaker
Customer Specific
Scheduling Point
Complexity Split
Fabrication #2Fabrication #1
FIFO
Cross Dock or
Supplier
Warehouse
MRP
AdP
Finished
Goods
Control
Daily
Customer Schedule
Overseas
Suppliers
MRP
AdP
Component
Control
A
Source Global Feel Local
Supplier Orders
(Weekly EDI) Customer
Orders
(Weekly EDI)
Daily
Orders
e-Kanban
3x Day
Green Loop (A Component Suppliers)
Line side “A” component
Supermarket MIN/MAX
FG Supermarket
MIN/MAX
FG located/
visualized in
manufacturing
building warehouse
ASN
O X O X O X
RM located/
visualized in
manufacturing
building warehouse
Warehouse (RM)
NAFTA
Suppliers
RM delivered to POU locations
established by value stream
(A Items) EPE Day or
Shipment Window then
strive to shorten over time
Ridged MIN/MAX
Rules – Minimum
level inventory
Cycle + Buffer +
Safety Stocks
EPEI Goal to match the
pacemaker
Ridged MIN/MAX
Rules – Minimum level
inventory
EPEI Goal to match
the pacemaker
20 Min. Loops
1 Day on hand RM
Daily Deliveries
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Operator Balance Chart
67
60
7
0
10
20
30
40
50
60
70
80
Machining Inspect/Pack
Value-Added Waiting Takt
• Reduce from 3 Operators to 2 in
Upper Machining
• Elimination of 106 seconds of labor
in Upper Machining
• OEE > 88% (with FWD)
• OEE >70% (w/o FWD)
Implementation:
Implementation:
# Task Resp.
Person
Target
Date
Feb
05
Mar
05
Apr
05
May
05
Jun
05
Jul
05
Aug
05
Sep
05
Oct
05
Nov
05
Review Review
1 Fix Clamping to
eliminate operator
checking clamp force
Roger
Marshall
4/1/05
2 ReprogramMasco to
separate operator from
machine (PCT=88)
Grant
Glasscock
5/1/05
3 Standardize Blow-off
(PCT=77)
Brian
Zolman
3/1/05
4 Improve clamp/
unclamp speed
(PCT=75)
Roger
Marshall
4/1/05
5 Improve fixture rotation
rate (PCT=74)
Grant
Glasscock
4/1/05
6 ROI Analysis: Re-
balance Gantry (13 sec
reduction)
Grant
Glasscock
5/1/05
7 ROI Analysis: Re-
balance Masco
(PCT=70)
Matt Jacoby 5/1/05
8 ROI Analysis: Blow-off
machine (PCT=63)
Roger
Marshall
4/1/05
9 Reduce from 3 to 2
operatorsper shift on
Lower Machining cell
Roger
Marshall
7/1/05
10 Reduce from 3 to 2
operatorsper shift on
Finishing cell
Roger
Marshall
9/1/05
Indicators
Indicators: Current Target Delta Intangibles:
Lead Time 1.52 days .95 days -37% Less variation in the assembly process
Lower C/O time by 66%
Similar results can be achieved on the
APOX1 andASOX assembly lines
Labor productivity stability at a wide
range of demand
Reduced material handling and
conveyance of WIP
WIP 12,168 7614 -37%
Productivity (MH/100) 6.00 4.78 -20%
Bubble Diagram (Paths) 54 2 -96%
OBC (% over ideal) 25% 8% -68%
WIP Value $13,624 $8,525 -$5,099
Labor Cost ($/year) $352,000 $253,500 -$98,500
10/5/2016
“YourValueStreamImprovementCoach”
19
Seek Project Approval
Project Team Leader
Project Team Leader:
Roger Smith
Team Members:
Jim Fisher,
Mark Johnson
Sara Lewis
John Davis
Management:
Tom Burdette
Team Members
Management
10/5/2016
“YourValueStreamImprovementCoach”
20
A3 – Document Project Approval
Background / Business Case:
Project Name: Hose Line Productivity Improvement
1. Increasing customer expectations and pressure require improvements in
quality, delivery, and cost.
2. Need to improve cost competitiveness.
Initial Condition:
CustomerSupplier
Final AssemblyFabrication #2Fabrication #1
MRP
Finished
Goods
Control
Daily
Customer Schedule
MRP
Component
Control
Supplier Orders
(Weekly EDI)
Customer
Orders
(Weekly EDI)
Daily
Orders
ASN
Warehouse
RM
IWIP
Warehouse
FG
Daily Schedule
Daily Ship
Schedule
Shuttle
Shuttle
IWIP
1
2
FTT= 98%
OEE= 70%
Scrap= 2%
Rework= 1%
Uptime= 70%
EPEI = 3 - 10 Days
FTT= 96%
OEE= 50%
Scrap= 2%
Rework= 2%
Uptime= 70%
EPEI = 2- 5 Days
FTT= 94%
OEE= 65%
Scrap= 2%
Rework= 4%
Uptime= 75%
EPEI = 1 – 2 Days
5
6
3
4
5
7
8
8
9
Expedited
10
8
20 min
1 Day 1 Day
30 min
2 Days
20 min
4 Days RM
Production Lead Time =
8.3 Days
Processing Lead Time
= 70 min. (0.6%)
Kanban Rack
KanbanRack
Kanban
Rack
HFV6
Jumper
Tube
Punch
Sort
Table
Washer Drain
Rack
Washer
Drain
Rack
FC
Bench
ToolChest
2.7L
EF1042
Bead
Checker
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008 EF009
EF001
2-Hit
EF1041
2.7
EF015
2-Hit
Cylin
de
r
Drop
Auto
Loader
2.7LJR&LH
Skive&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit LoadUnload
EFMachine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPCTable
4
5
2
2
1
1
1
5
1
5
1
4
5
1
1
1
2
2
5
Template:
Quick Connect - Red Line
Jumper - Blue Line
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Problems / Opportunities:
1. Supplier incoming quality
2. Excessive RM amounts
3. Excessive rework
4. Poor equipment availability (OEE)
5. Excessive WIP amounts
6. Excessive lead-times (Muda)
7. Multiple scheduling points (Push)
8. Group leader managing scheduling
9. Excessive logistic touches
10. Premium freight cost
Barriers:
• Supplier Quality System
• Poor OEE (59%) at Fab. 2
Operator Balance Chart
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masco Washer Inspect/Pack
Value-Added Waiting Takt
Target Condition:
Customer
Supplier
Pacemaker
Customer Specific
Scheduling Point
Complexity Split
Fabrication #2Fabrication #1
FIFO
Cross Dock or
Supplier
Warehouse
MRP
AdP
Finished
Goods
Control
Daily
Customer Schedule
Overseas
Suppliers
MRP
AdP
Component
Control
A
Source Global Feel Local
Supplier Orders
(Weekly EDI) Customer
Orders
(Weekly EDI)
Daily
Orders
e-Kanban
3x Day
Green Loop (A Component Suppliers)
Line side “A” component
Supermarket MIN/MAX
FG Supermarket
MIN/MAX
FG located/
visualized in
manufacturing
building warehouse
ASN
O X O X O X
RM located/
visualized in
manufacturing
building warehouse
Warehouse (RM)
NAFTA
Suppliers
RM delivered to POU locations
established by value stream
(A Items) EPE Day or
Shipment Window then
strive to shorten over time
Ridged MIN/MAX
Rules – Minimum
level inventory
Cycle + Buffer +
Safety Stocks
EPEI Goal to match the
pacemaker
Ridged MIN/MAX
Rules – Minimum level
inventory
EPEI Goal to match
the pacemaker
20 Min. Loops
1 Day on hand RM
Daily Deliveries
Masco
Raw
WIP
Raw
A
B
Ranso-
hofff
C
Bushing
Press
Gantry
Load
Operator Balance Chart
67
60
7
0
10
20
30
40
50
60
70
80
Machining Inspect/Pack
Value-Added Waiting Takt
• Reduce from 3 Operators to 2 in
Upper Machining
• Elimination of 106 seconds of labor
in Upper Machining
• OEE > 88% (with FWD)
• OEE >70% (w/o FWD)
Implementation:
Implementation:
# Task Resp.
Person
Target
Date
Feb
05
Mar
05
Apr
05
May
05
Jun
05
Jul
05
Aug
05
Sep
05
Oct
05
Nov
05
Review Review
1 Fix Clamping to
eliminate operator
checking clamp force
Roger
Marshall
4/1/05
2 ReprogramMasco to
separate operator from
machine (PCT=88)
Grant
Glasscock
5/1/05
3 Standardize Blow-off
(PCT=77)
Brian
Zolman
3/1/05
4 Improve clamp/
unclamp speed
(PCT=75)
Roger
Marshall
4/1/05
5 Improve fixture rotation
rate (PCT=74)
Grant
Glasscock
4/1/05
6 ROI Analysis: Re-
balance Gantry (13 sec
reduction)
Grant
Glasscock
5/1/05
7 ROI Analysis: Re-
balance Masco
(PCT=70)
Matt Jacoby 5/1/05
8 ROI Analysis: Blow-off
machine (PCT=63)
Roger
Marshall
4/1/05
9 Reduce from 3 to 2
operatorsper shift on
Lower Machining cell
Roger
Marshall
7/1/05
10 Reduce from 3 to 2
operatorsper shift on
Finishing cell
Roger
Marshall
9/1/05
Indicators
Indicators: Current Target Delta Intangibles:
Lead Time 1.52 days .95 days -37% Less variation in the assembly process
Lower C/O time by 66%
Similar results can be achieved on the
APOX1 andASOX assembly lines
Labor productivity stability at a wide
range of demand
Reduced material handling and
conveyance of WIP
WIP 12,168 7614 -37%
Productivity (MH/100) 6.00 4.78 -20%
Bubble Diagram (Paths) 54 2 -96%
OBC (% over ideal) 25% 8% -68%
WIP Value $13,624 $8,525 -$5,099
Labor Cost ($/year) $352,000 $253,500 -$98,500
Approval Project Team Leader:
Roger Smith
Team Members:
Jim Fisher,
Mark Johnson
Sara Lewis
John Davis
Management:
Tom Burdette
10/5/2016
“YourValueStreamImprovementCoach”
21
The LEAN Journey
Now its time to work the plan. As you
move forward on this journey additional
barriers will be encountered.
Initial
Condition
IDEAL
Condition
•Hidden Waste (Problems)
•Poor Equipment Efficiency
•Poor Labor Efficiency
•High Defect Rates
•Large Batches
•Infrequent improvement
Target
Condition
•100% Value Add
•0 Defects (Internal)
•One Piece
Continuous Flow
•Human Development
•Value to Society
Dodging barriers leads you away from the Ideal
Condition. Barriers must be met head-on and
eliminated!
Solutions to problems cannot involve diverting
off the path to the Ideal Condition!
There can be no shortcuts!
Barriers
Plan
Do
Check
Act
Grasp
the
Situation
10/5/2016
“YourValueStreamImprovementCoach”
22
The LEAN Journey
To achieve sustainability it is
important to stabilize and standardize
the system improvements; otherwise,
improvements will regress over time.
Initial
Condition
IDEAL
Condition
•Hidden Waste (Problems)
•Poor Equipment Efficiency
•Poor Labor Efficiency
•High Defect Rates
•Large Batches
•Infrequent improvement
•100% Value Add
•0 Defects (Internal)
•One Piece
Continuous Flow
•Human Development
•Value to Society
The sustainability of system improvements will be
achieved by the standardization and is the basis for
the next improvement steps.
The standardization allows:
•To measure and evaluate improvements.
•The exchange of best practices with similar and
equal tasks.
Target
Condition
Current
State
10/5/2016
“YourValueStreamImprovementCoach”
23
Approach
Quick wins using Lean
methodologies.
Always tie projects to
dollars. Establish
measurable benefits
expected from each
project.
Quick pace of
implementation
requires removal of
organizational and
bureaucratic barriers.
10/5/2016
“YourValueStreamImprovementCoach”
24
Process
Go to the Gemba
for data.
“Grasp the Situation”
Start where the
business need is
greatest. Select
projects that yield the
greatest impact.
A3 is a “working
document”.
“Nemawashi”.
Prepare the ground for
planting.
A consistent process is
used repeatedly.
Background / Business Case:
1. Increasing customer expectations and pressure require
improvements in quality, delivery, and cost.
2. Need to improve cost competitiveness.
Project Name: Hose Line Productivity Improvement
A3 – Document Project Approval
Initial Condition:
Cus
tom
er
Sup
plie
r Final
Asse
mbly
Fabri
cation
#2
Fabri
cation
#1
MRP
Finis
hed
Goo
ds
Cont
rol
Dail
y
Custo
mer
Sche
dule
MRP
Com
pone
nt
Cont
rol
Sup
plier
Orde
rs
(We
ekly
EDI)
Cus
tome
r
Orde
rs
(We
ekly
EDI)
Dail
y
Orde
rs
ASN
Ware
hous
e
RM
IWIP
Ware
hous
e
FG
Dai
ly Sch
edu
le
Dail
y Ship
Sch
edul
e
Shutt
le
Shutt
le
IWIP
1
2
FTT=
98%
OEE=
70%
Scrap=
2%
Rewor
k=
1%
Uptime
= 70%
EPEI
= 3 - 10
Days
FTT=
96%
OEE=
50%
Scrap=
2%
Rewor
k=
2%
Uptime
= 70%
EPEI
= 2-
5 Days
FTT=
94%
OEE=
65%
Scrap=
2%
Rewor
k=
4%
Uptime
= 75%
EPEI
= 1 – 2
Days
5
6
3
4
5
7
8
8
9
Expe
dited
10
8
20
min
1 Day
1 Day
30
min
2 Days
20
min
4 Days
RM
Produc
tion
Lead
Time
=
8.3
Days
Proces
sing
Lead
Time
= 70
min.
(0.6%)
Kanb
an
Rack
Kanb
an
Rack
Kanb
an
Rack
HFV6
Jumper
Tube
Punch
Sort
Tabl
e
Wash
er
Drain
Rack
Wash
er
Drain
Rack
FCBenc
h
Tool
Chest
2.7L
EF104
2
Valu
e
Stre
am
Map
Descri
ption
"Dana
Curren
t Future
State
Map"
Endform
Spaghetti
Diagram
SIZE
File
Name
Drawn
By:
REV
B
SHEET
1 OF
1
Bead
Checke
r
EF005
3-Hit
EF006
1-Hit
WIP
Rack
EF007
3-Hit
EF008
EF009
EF001
2-Hit
EF104
1
2.7
EF015
2-Hit
Cylinder
Drop
Auto
Loader
2.7L
JR
&LH
Skive
&Punch
Load
Unload
Electric
110V
EF004
2-Hit
EF004
2-Hit
Load
Unload
EF
Machine
EF010
Robot
Guarding
Guarding
Guarding
Robot
Controller
3
5
6
3
6
7
5
4
SPC
Table
4
5
2
2
1
1
1
5
1
5
1
4
51
1
1
2
2
5
Sepera
te
Worksh
op
Templa
te:
Quick
Connec
t - Red
Line
Jumper
- Blue
Line
Ma
sco
Ra
w
WI
P
Raw
A
B
Ra
nso-
hofff
C
Bushing
Press
Gantry
Load
Pr
ob
lem
s / Op
po
rtu
nit
ies
:
1.
Su
pp
lier inc
om
ing
qu
ality
2.
Ex
ce
ssive
RM
am
ou
nts
3.
Ex
ce
ssive
rew
ork
4.
Po
or
eq
uip
me
nt
av
ailab
ility
(O
EE
)
5.
Ex
ce
ssive
WI
P am
ou
nts
6.
Ex
ce
ssive
lea
d-t
im
es
(M
ud
a)
7.
Mu
ltip
le
sche
du
ling po
int
s (Pus
h)
8.
Gr
ou
p lea
de
r ma
na
gin
g sche
du
ling
9.
Ex
ce
ssive
log
istic tou
ch
es
10
. Prem
ium
fre
igh
t co
st
Barriers
:
•
Supplier Quality System
•
Poor OE
E (59
%)
at Fab. 2
Ope
rato
r Bala
nce
Cha
rt
26
52
60
54
28
20
0
10
20
30
40
50
60
70
80
90
Masc
o
Was
her
Insp
ect/P
ack
Valu
e-Ad
ded
Wait
ing
Takt
Target Condition:
Cus
tom
er
Sup
plie
r
Pace
make
r
Custo
mer
Spec
ific
Sche
duling
Point
Comp
lexity
Split
Fabri
cation
#2
Fabri
cation
#1
FIF
O
Cross
Dock
or
Supp
lier
Ware
hous
e
MRP
AdP
Finis
hed
Goo
ds
Cont
rol
Dail
y
Custo
mer
Sche
dule
Over
seas
Supp
liers
MRP
AdP
Com
pone
nt
Cont
rol
A
Sourc
e Globa
l Feel
Loca
l
Sup
plier
Orde
rs
(We
ekly
EDI)
Cus
tome
r
Orde
rs
(We
ekly
EDI)
Dail
y
Orde
rs
e-Ka
nban
3x
Day
Gree
n Loop
(A
Comp
onen
t Supp
liers)
Line
side
“A”
com
pone
nt
Sup
erm
arke
t MIN
/MA
X
FG
Sup
erm
arke
t
MIN
/MA
X
FG
locat
ed/
visua
lized
in
man
ufac
turin
g
build
ing
ware
hous
e
ASN
O X O X O X
RM
locat
ed/
visua
lized
in
man
ufac
turin
g
build
ing
ware
hous
e
Ware
hous
e (RM)
NAFT
A
Supp
liers
RM
deliv
ered
to
POU
locat
ions
esta
blish
ed
by
value
strea
m
(A
Items)
EPE
Day
or
Shipm
ent
Windo
w then
strive
to
shorten
over
time
Ridged
MIN/M
AX
Rules
– Minimu
m
level
invento
ry
Cycle
+ Buffer
+
Safety
Stocks
EPEI
Goal
to
match
the
pacem
aker
Ridged
MIN/M
AX
Rules
– Minimu
m
level
invento
ry
EPEI
Goal
to
match
the
pacem
aker
20
Min.
Loops
1 Day
on
hand
RM
Daily
Deliver
ies
Ma
sco
Ra
w
WI
P
Ra
w
A
B
Ra
nso-
hofff
C
Bu
shing
Press
Ga
ntr
y
Load
Ope
rato
r Bal
anc
e Cha
rt
67
60
7
0
10
20
30
40
50
60
70
80
Mac
hini
ng
Insp
ect/
Pac
k
Val
ue-A
dde
d
Wa
itin
g
Tak
t
•
Reduce
from 3 Opera
tors to 2 in Upper
Ma
chining
•
Elimination of 106 seconds of labor
in Upper
Ma
chining
•
OE
E > 88%
(with
FW
D)
•
OE
E >70%
(w/o FW
D)
Implementation:
Implem
entation:
#
Task
Re
sp.
Person
Target
Da
te
Feb
05
Ma
r
05
Ap
r
05
Ma
y
05
Jun
05
Jul
05
Au
g
05
Sep
05
Oc
t
05
No
v
05
Re
vie
w
Re
vie
w
1
Fix Clam
pin
g to
eliminate opera
tor
checkin
g cla
mp
force
Ro
ger
Ma
rshall
4/1
/05
2
Re
programMa
sco to
separate op
era
tor
from
ma
chine
(PCT
=88)
Grant
Glasscock
5/1
/05
3
Standardize
Blow
-off
(PCT
=77)
Brian
Zo
lman
3/1
/05
4
Improve cla
mp
/
uncla
mp
speed
(PCT
=75)
Ro
ger
Ma
rshall
4/1
/05
5
Improve fixture rotation
rate (PCT
=74)
Grant
Glasscock
4/1
/05
6
RO
I An
aly
sis
: Re
-
balan
ce
Ga
ntry (13 sec
reduction)
Grant
Glasscock
5/1
/05
7
RO
I An
aly
sis
: Re
-
balan
ce
Ma
sco
(PCT
=70)
Ma
tt Jacoby
5/1
/05
8
RO
I An
aly
sis
: Blow
-off
ma
chine
(PCT
=63)
Ro
ger
Ma
rshall
4/1
/05
9
Re
duce
fro
m3 to 2
op
erato
rsper shift on
Lowe
r Ma
chining
cell
Ro
ger
Ma
rshall
7/1
/05
10
Re
duce
fro
m3 to 2
op
erato
rsper shift on
Finishing
cell
Ro
ger
Ma
rshall
9/1
/05
Indicators
Indicators:
Current
Target
Delta
Intangibles:
Lead
Tim
e
1.5
2 days
.95
days
-37%
Less variation in the assembly
process
Lowe
rC/O tim
e by
66%
Similarresults can be
achieved
on
the
AP
OX
1 andAS
OX
assembly
lines
Laborproductivity sta
bility at a wide
range of demand
Re
duced mate
rial handling and
conveyance of WIP
WIP
12,16
8
7614
-37%
Productivity (MH/100)
6.0
0
4.7
8
-20%
Bu
bble Diagram (Path
s)
54
2
-96%
OB
C (%
over ide
al)
25%
8%
-68%
WIP Value
$13,6
24
$8,52
5
-$5,0
99
LaborCo
st ($/ye
ar)
$352,00
0
$253,50
0
-$98,50
0
Approval
Proje
ct Team
Leader:
Ro
ger Sm
ith
Team
Me
mb
ers:
Jim
Fis
her,
John Da
vis
Ma
rk Johnson
Scott Eric
Sara Lewis
Ma
nageme
nt:
Tom
Bu
rdette
Plan
Do
Check
Act Grasp the
Situation
Standardize
10/5/2016

More Related Content

PPTX
Rapid Site Assessment June 27 2010
PPTX
Rapid Site Assessment June 27 2010
PPTX
The hidden factory by JULIAN KALAC
PDF
Batch & Queue vs Lean Continuous Flow
PPTX
Introduction to Kaizen V3.0 (EGY).2
PDF
Lean Six Sigma Mistake-Proofing Process Training Module
PPTX
PPTX
Statistical quality control
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
The hidden factory by JULIAN KALAC
Batch & Queue vs Lean Continuous Flow
Introduction to Kaizen V3.0 (EGY).2
Lean Six Sigma Mistake-Proofing Process Training Module
Statistical quality control

What's hot (14)

PPTX
Statistical quality control
PDF
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
PPTX
How to implement Single minute exchange of die
PPTX
Statistical Quality control
PDF
Service Design and the joy of prototyping operating models
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PPTX
Spc training
PDF
PROCESS CAPABILITY
PDF
UCSD Class: Lean Office
PPTX
Statistical quality control
PPT
Ppt On S.Q.C.
PPT
Office Lean Sample
PDF
Eliminating Critical Quality Defects at a Component Manufacturer
PDF
Error-Proofing in Office & Service Environments
Statistical quality control
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
How to implement Single minute exchange of die
Statistical Quality control
Service Design and the joy of prototyping operating models
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
Spc training
PROCESS CAPABILITY
UCSD Class: Lean Office
Statistical quality control
Ppt On S.Q.C.
Office Lean Sample
Eliminating Critical Quality Defects at a Component Manufacturer
Error-Proofing in Office & Service Environments
Ad

Viewers also liked (13)

PPTX
Kaizenpresentation
PPT
Lean & kaizen
PPTX
System Kaizen Process Feb 6 2011
PPT
Kaizen Victor Pan
PPT
Benefits of kaizen
PPT
Conducting Kaizen Events
PPT
Lean Production
PPT
Kaizen
PPT
Kaizen Ppt
PPTX
Kaizen Seminar Presentation
PPT
Kaizen Philosophy
PDF
Kaizen training
PDF
Kaizen Ppt
Kaizenpresentation
Lean & kaizen
System Kaizen Process Feb 6 2011
Kaizen Victor Pan
Benefits of kaizen
Conducting Kaizen Events
Lean Production
Kaizen
Kaizen Ppt
Kaizen Seminar Presentation
Kaizen Philosophy
Kaizen training
Kaizen Ppt
Ad

Similar to System Kaizen Approach May 2015 (20)

PPTX
Value Stream Mapping ( Lean manufacturing )
PPT
VSM (Méthode HOSHIN)
PPT
Uop ops-571-final-exam-guide- april-2018--new
PPT
Value Stream Analysis
PDF
OPS 571 HELP You can do it--ops571help.com
PDF
OPS 571 GENIUS You can do it--ops571genius.com
PPT
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
PPT
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
PPT
Six sigma case study-a good approach with example
PPTX
Supply Chain Basic
PDF
OpenText Live: Modeling your business processes to new ways of working
PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
PPT
3. capacity planning
PDF
UOPOPS571 You can do it--uopops571.com
PPT
Asq int lss
PPT
Value stream mapping - Future State
PPTX
Houston Presentation, April 2, 2014, Modified
PDF
Building a Lean Business System
PPTX
13. value stream mapping
Value Stream Mapping ( Lean manufacturing )
VSM (Méthode HOSHIN)
Uop ops-571-final-exam-guide- april-2018--new
Value Stream Analysis
OPS 571 HELP You can do it--ops571help.com
OPS 571 GENIUS You can do it--ops571genius.com
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
Six sigma case study-a good approach with example
Supply Chain Basic
OpenText Live: Modeling your business processes to new ways of working
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
3. capacity planning
UOPOPS571 You can do it--uopops571.com
Asq int lss
Value stream mapping - Future State
Houston Presentation, April 2, 2014, Modified
Building a Lean Business System
13. value stream mapping

More from exerciselean (9)

DOCX
Exercise Lean LLC_revised Brochure July 11 2011
PPTX
F119 Team_Report_out_Sept 10, 2009
PPT
Tpm Presentation
XLS
Kaizen System Diagnosis(1)
PPTX
8 Wastes - getting LEAN
PPTX
Setup Reduction Workshop
PPT
A3 Report Out Kitting Project June 1, 2009
PPT
Standardized Work
PPT
Smed Training Model Trainer Instructions[1]
Exercise Lean LLC_revised Brochure July 11 2011
F119 Team_Report_out_Sept 10, 2009
Tpm Presentation
Kaizen System Diagnosis(1)
8 Wastes - getting LEAN
Setup Reduction Workshop
A3 Report Out Kitting Project June 1, 2009
Standardized Work
Smed Training Model Trainer Instructions[1]

System Kaizen Approach May 2015

  • 1.  Lean Production  PDCA  A3  Business Case  Initial Condition  Target Condition  Implementation  Indicators  Approval System Kaizen Process
  • 2. “YourValueStreamImprovementCoach” 2 “Lean Production” stands for... …the complete and through elimination of waste to reduce the timeline from receipt of customer order to delivery. ...increase of efficiency and standardization by continuous improvements. ... a philosophy, as well as production techniques, for “cutting the fat” from production processes. ...the highest quality, lowest cost, shortest lead time... ... customer orientation, orientation for quality and cost reduction. ...A business system for organizing and managing product development, operations, suppliers, and customer relations that require less human effort, less space, less capital, less material, and less time to make products with fewer defects to precise customer desires. ...quick and agile as it provides the flexibility and speed to design and produce a wide variety of products customized to specific orders and delivered with extremely short lead times. …the right part, in the right quantity, at the right moment, in the right quality, at the right place. 10/5/2016
  • 3. “YourValueStreamImprovementCoach” 3 Plan, Do, Check, Act (PDCA) An improvement cycle based on the scientific method of proposing a change in a process, implementing the change, measuring the results, and taking appropriate action. The PDCA cycle has four stages: 1. Plan: Determine goals for a process and needed changes to achieve them. 2. Do: Implement the changes. 3. Check: Evaluate the results in terms of performance. 4. Act: Stabilize and Standardize the change or begin the cycle again, depending on the results. Plan Do Check Act Grasp the Situation Standardize 10/5/2016
  • 4. “YourValueStreamImprovementCoach” 4 A one page storyboard on 11”x17” paper, commonly known as A3-size paper. Logic flows from the top left to the bottom right, and each box leads to the next one. An A3 includes both analysis (number- crunching) and synthesis (storytelling). It’s a practice of getting the problem, the analysis, the corrective actions, and the action plan on a single sheet of paper. The primary purpose of the A3 is to gain a shared understanding of critical issues in order to solve problems and get results. A3 Report Initial Condition: Target Condition: Implementation: Approval Indicators Background / Business Case: Project Name: A3 Report It’s a way of thinking. 10/5/2016
  • 5. “YourValueStreamImprovementCoach” 5 A3 Report Initial Condition: Target Condition: Implementation: Approval Indicators Background / Business Case: Project Name: 10/5/2016
  • 6. “YourValueStreamImprovementCoach” 6 Define the Business Case Increasing Customer expectations require improved quality, delivery, and cost Need to improve cost competitiveness to survive in a global economy - Growth/New Markets - Inventory Turnover - ROI Capital -Cost Reductions / Increase Margins $ Be sure to link your plan to business objectives. 10/5/2016
  • 7. “YourValueStreamImprovementCoach” 7 A3 – Document Business Case Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. 10/5/2016
  • 8. “YourValueStreamImprovementCoach” 8 The LEAN Journey Initial Condition IDEAL Condition •100% Value Add •0 Defects (Internal) •One Piece Continuous Flow •Human Development •Value to Society •Hidden Waste (Problems) •Poor Equipment Efficiency •Poor Labor Efficiency •High Defect Rates •Large Batches •Infrequent improvement Before you can begin the journey you must “Grasp the Initial Condition”. 10/5/2016
  • 9. “YourValueStreamImprovementCoach” 9 Grasp the Initial Condition Walk / Observe the Value Stream(s) from shipping to receiving. Map the Process - Value Stream Map - Flow Chart - Spaghetti Diagram - Bubble Diagram - Work Flow CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days Expedited 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit C ylinder Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Cutter Race track 1 Race track 2 Race track 3 Hose Assy 1 Hose Assy 2 Hose Assy 3 Crimp 1 Crimp 2 Crimp 3 Butter- Fly 1 Butter- Fly 2 Butter- Fly 3 Clench 1 Clench 2 Test, Inspect, Tape, Gauge, And Pack1 1 x 3 x 3 x 3 x 1 x 2 x 1 = 54 different possible paths through production Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Key Process Indicators Indicators: Current Lead Time 8.3 days WIP 12,168 Productivity (MH/100) 6.00 Bubble Diagram (# Paths) 54 OBC (% over ideal) 25% Problems / Opportunities CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Other Relevant Data Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt 10/5/2016
  • 10. “YourValueStreamImprovementCoach” 10 A3 – Document Initial Condition Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Initial Condition: CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit C yl in de r Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt 10/5/2016
  • 11. “YourValueStreamImprovementCoach” 11 Prioritize Problems / Opportunities Cost, Effort, Time Impact 1 2 3 4 Start Here Work on High Impact, Low Effort Activities 10/5/2016
  • 12. “YourValueStreamImprovementCoach” 12 The LEAN Journey Initial Condition IDEAL Condition •100% Value Add •0 Defects (Internal) •One Piece Continuous Flow •Human Development •Value to Society •Hidden Waste (Problems) •Poor Equipment Efficiency •Poor Labor Efficiency •High Defect Rates •Large Batches •Infrequent improvement Once the Initial Condition is thoroughly understood the next step is to define a Target Condition assuring a magnetic pull towards the Ideal Condition. Target Condition The Target Condition should be a short term vision that is attainable and measured in days/weeks not months/years. Initial Condition 10/5/2016
  • 13. “YourValueStreamImprovementCoach” 13 Define the Target Condition Map the Future State Customer Supplier Pacemaker Customer Specific Scheduling Point Complexity Split Fabrication #2Fabrication #1 FIFO Cross Dock or Supplier Warehouse MRP AdP Finished Goods Control Daily Customer Schedule Overseas Suppliers MRP AdP Component Control A Source Global Feel Local Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders e-Kanban 3x Day Green Loop (A Component Suppliers) Line side “A” component Supermarket MIN/MAX FG Supermarket MIN/MAX FG located/ visualized in manufacturing building warehouse ASN O X O X O X RM located/ visualized in manufacturing building warehouse Warehouse (RM) NAFTA Suppliers RM delivered to POU locations established by value stream (A Items) EPE Day or Shipment Window then strive to shorten over time Ridged MIN/MAX Rules – Minimum level inventory Cycle + Buffer + Safety Stocks EPEI Goal to match the pacemaker Ridged MIN/MAX Rules – Minimum level inventory EPEI Goal to match the pacemaker 20 Min. Loops 1 Day on hand RM Daily Deliveries Key Process Indicators Indicators: Current Target Delta Lead Time 8.3 days 4.0 days -52% WIP 12,168 7614 -37% Productivity (MH/100) 6.00 4.78 -20% Bubble Diagram (# Paths) 54 2 -96% OBC (% over ideal) 25% 8% -68% Verbal Description • Reduce from 3 Operators to 2 in Upper Machining • Elimination of 106 seconds of labor in Upper Machining • OEE > 88% (with FWD) • OEE >70% (w/o FWD) Other Graphical Analysis Operator Balance Chart 67 60 7 0 10 20 30 40 50 60 70 80 Machining Inspect/Pack Value-Added Waiting Takt Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load 10/5/2016
  • 14. “YourValueStreamImprovementCoach” 14 A3 – Document Target Condition Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Initial Condition: CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit C yl in de r Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt Target Condition: Customer Supplier Pacemaker Customer Specific Scheduling Point Complexity Split Fabrication #2Fabrication #1 FIFO Cross Dock or Supplier Warehouse MRP AdP Finished Goods Control Daily Customer Schedule Overseas Suppliers MRP AdP Component Control A Source Global Feel Local Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders e-Kanban 3x Day Green Loop (A Component Suppliers) Line side “A” component Supermarket MIN/MAX FG Supermarket MIN/MAX FG located/ visualized in manufacturing building warehouse ASN O X O X O X RM located/ visualized in manufacturing building warehouse Warehouse (RM) NAFTA Suppliers RM delivered to POU locations established by value stream (A Items) EPE Day or Shipment Window then strive to shorten over time Ridged MIN/MAX Rules – Minimum level inventory Cycle + Buffer + Safety Stocks EPEI Goal to match the pacemaker Ridged MIN/MAX Rules – Minimum level inventory EPEI Goal to match the pacemaker 20 Min. Loops 1 Day on hand RM Daily Deliveries Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Operator Balance Chart 67 60 7 0 10 20 30 40 50 60 70 80 Machining Inspect/Pack Value-Added Waiting Takt • Reduce from 3 Operators to 2 in Upper Machining • Elimination of 106 seconds of labor in Upper Machining • OEE > 88% (with FWD) • OEE >70% (w/o FWD) 10/5/2016
  • 15. “YourValueStreamImprovementCoach” 15 Create an Implementation Plan Implementation: # Task Resp. Person Target Date Feb 05 Mar 05 Apr 05 May 05 Jun 05 Jul 05 Aug 05 Sep 05 Oct 05 Nov 05 Review Review 1 Fix Clamping to eliminate operator checking clamp force Roger Marshall 4/1/05 2 Reprogram Masco to separate operator from machine (PCT=88) Grant Glasscock 5/1/05 3 Standardize Blow-off (PCT=77) Brian Zolman 3/1/05 4 Improve clamp/ unclamp speed (PCT=75) Roger Marshall 4/1/05 5 Improve fixture rotation rate (PCT=74) Grant Glasscock 4/1/05 6 ROI Analysis: Re- balance Gantry (13 sec reduction) Grant Glasscock 5/1/05 7 ROI Analysis: Re- balance Masco (PCT=70) Matt Jacoby 5/1/05 8 ROI Analysis: Blow-off machine (PCT=63) Roger Marshall 4/1/05 9 Reduce from 3 to 2 operators per shift on Lower Machining cell Roger Marshall 7/1/05 10 Reduce from 3 to 2 operators per shift on Finishing cell Roger Marshall 9/1/05 Task description with specific, quantifiable expected resultsResponsible Person 3 Standardize Blow- off (PCT=77) Planned Start / Completion - Plan Start - Act Start - Plan Compl. - Act. Compl. - ReviewPlanning: Periodic evaluation of progress against planned timing and results Evaluation: X- On Target - Behind Target - In Trouble 10/5/2016
  • 16. “YourValueStreamImprovementCoach” 16 A3 – Document Implementation Plan Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Initial Condition: CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit Cylin de r Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt Target Condition: Customer Supplier Pacemaker Customer Specific Scheduling Point Complexity Split Fabrication #2Fabrication #1 FIFO Cross Dock or Supplier Warehouse MRP AdP Finished Goods Control Daily Customer Schedule Overseas Suppliers MRP AdP Component Control A Source Global Feel Local Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders e-Kanban 3x Day Green Loop (A Component Suppliers) Line side “A” component Supermarket MIN/MAX FG Supermarket MIN/MAX FG located/ visualized in manufacturing building warehouse ASN O X O X O X RM located/ visualized in manufacturing building warehouse Warehouse (RM) NAFTA Suppliers RM delivered to POU locations established by value stream (A Items) EPE Day or Shipment Window then strive to shorten over time Ridged MIN/MAX Rules – Minimum level inventory Cycle + Buffer + Safety Stocks EPEI Goal to match the pacemaker Ridged MIN/MAX Rules – Minimum level inventory EPEI Goal to match the pacemaker 20 Min. Loops 1 Day on hand RM Daily Deliveries Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Operator Balance Chart 67 60 7 0 10 20 30 40 50 60 70 80 Machining Inspect/Pack Value-Added Waiting Takt • Reduce from 3 Operators to 2 in Upper Machining • Elimination of 106 seconds of labor in Upper Machining • OEE > 88% (with FWD) • OEE >70% (w/o FWD) Implementation: Implementation: # Task Resp. Person Target Date Feb 05 Mar 05 Apr 05 May 05 Jun 05 Jul 05 Aug 05 Sep 05 Oct 05 Nov 05 Review Review 1 Fix Clamping to eliminate operator checking clamp force Roger Marshall 4/1/05 2 ReprogramMasco to separate operator from machine (PCT=88) Grant Glasscock 5/1/05 3 Standardize Blow-off (PCT=77) Brian Zolman 3/1/05 4 Improve clamp/ unclamp speed (PCT=75) Roger Marshall 4/1/05 5 Improve fixture rotation rate (PCT=74) Grant Glasscock 4/1/05 6 ROI Analysis: Re- balance Gantry (13 sec reduction) Grant Glasscock 5/1/05 7 ROI Analysis: Re- balance Masco (PCT=70) Matt Jacoby 5/1/05 8 ROI Analysis: Blow-off machine (PCT=63) Roger Marshall 4/1/05 9 Reduce from 3 to 2 operatorsper shift on Lower Machining cell Roger Marshall 7/1/05 10 Reduce from 3 to 2 operatorsper shift on Finishing cell Roger Marshall 9/1/05 10/5/2016
  • 17. “YourValueStreamImprovementCoach” 17 Identify Expected Results Tangible Metric Improvements Indicators: Current Target Delta Intangibles: Lead Time 1.52 days .95 days -37% Less variation in the assembly process Lower C/O time by 66% Similar results can be achieved on the APOX1 and ASOX assembly lines Labor productivity stability at a wide range of demand Reduced material handling and conveyance of WIP WIP 12,168 7614 -37% Productivity (MH/100) 6.00 4.78 -20% Bubble Diagram (Paths) 54 2 -96% OBC (% over ideal) 25% 8% -68% WIP Value $13,624 $8,525 -$5,099 Labor Cost ($/year) $352,000 $253,500 -$98,500 Tangible Cost Improvements Intangibles 10/5/2016
  • 18. “YourValueStreamImprovementCoach” 18 A3 – Document the KPI’s and Expected Results Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Initial Condition: CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit Cylin de r Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt Target Condition: Customer Supplier Pacemaker Customer Specific Scheduling Point Complexity Split Fabrication #2Fabrication #1 FIFO Cross Dock or Supplier Warehouse MRP AdP Finished Goods Control Daily Customer Schedule Overseas Suppliers MRP AdP Component Control A Source Global Feel Local Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders e-Kanban 3x Day Green Loop (A Component Suppliers) Line side “A” component Supermarket MIN/MAX FG Supermarket MIN/MAX FG located/ visualized in manufacturing building warehouse ASN O X O X O X RM located/ visualized in manufacturing building warehouse Warehouse (RM) NAFTA Suppliers RM delivered to POU locations established by value stream (A Items) EPE Day or Shipment Window then strive to shorten over time Ridged MIN/MAX Rules – Minimum level inventory Cycle + Buffer + Safety Stocks EPEI Goal to match the pacemaker Ridged MIN/MAX Rules – Minimum level inventory EPEI Goal to match the pacemaker 20 Min. Loops 1 Day on hand RM Daily Deliveries Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Operator Balance Chart 67 60 7 0 10 20 30 40 50 60 70 80 Machining Inspect/Pack Value-Added Waiting Takt • Reduce from 3 Operators to 2 in Upper Machining • Elimination of 106 seconds of labor in Upper Machining • OEE > 88% (with FWD) • OEE >70% (w/o FWD) Implementation: Implementation: # Task Resp. Person Target Date Feb 05 Mar 05 Apr 05 May 05 Jun 05 Jul 05 Aug 05 Sep 05 Oct 05 Nov 05 Review Review 1 Fix Clamping to eliminate operator checking clamp force Roger Marshall 4/1/05 2 ReprogramMasco to separate operator from machine (PCT=88) Grant Glasscock 5/1/05 3 Standardize Blow-off (PCT=77) Brian Zolman 3/1/05 4 Improve clamp/ unclamp speed (PCT=75) Roger Marshall 4/1/05 5 Improve fixture rotation rate (PCT=74) Grant Glasscock 4/1/05 6 ROI Analysis: Re- balance Gantry (13 sec reduction) Grant Glasscock 5/1/05 7 ROI Analysis: Re- balance Masco (PCT=70) Matt Jacoby 5/1/05 8 ROI Analysis: Blow-off machine (PCT=63) Roger Marshall 4/1/05 9 Reduce from 3 to 2 operatorsper shift on Lower Machining cell Roger Marshall 7/1/05 10 Reduce from 3 to 2 operatorsper shift on Finishing cell Roger Marshall 9/1/05 Indicators Indicators: Current Target Delta Intangibles: Lead Time 1.52 days .95 days -37% Less variation in the assembly process Lower C/O time by 66% Similar results can be achieved on the APOX1 andASOX assembly lines Labor productivity stability at a wide range of demand Reduced material handling and conveyance of WIP WIP 12,168 7614 -37% Productivity (MH/100) 6.00 4.78 -20% Bubble Diagram (Paths) 54 2 -96% OBC (% over ideal) 25% 8% -68% WIP Value $13,624 $8,525 -$5,099 Labor Cost ($/year) $352,000 $253,500 -$98,500 10/5/2016
  • 19. “YourValueStreamImprovementCoach” 19 Seek Project Approval Project Team Leader Project Team Leader: Roger Smith Team Members: Jim Fisher, Mark Johnson Sara Lewis John Davis Management: Tom Burdette Team Members Management 10/5/2016
  • 20. “YourValueStreamImprovementCoach” 20 A3 – Document Project Approval Background / Business Case: Project Name: Hose Line Productivity Improvement 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Initial Condition: CustomerSupplier Final AssemblyFabrication #2Fabrication #1 MRP Finished Goods Control Daily Customer Schedule MRP Component Control Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders ASN Warehouse RM IWIP Warehouse FG Daily Schedule Daily Ship Schedule Shuttle Shuttle IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rework= 1% Uptime= 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rework= 2% Uptime= 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rework= 4% Uptime= 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expedited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Production Lead Time = 8.3 Days Processing Lead Time = 70 min. (0.6%) Kanban Rack KanbanRack Kanban Rack HFV6 Jumper Tube Punch Sort Table Washer Drain Rack Washer Drain Rack FC Bench ToolChest 2.7L EF1042 Bead Checker EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF1041 2.7 EF015 2-Hit Cylin de r Drop Auto Loader 2.7LJR&LH Skive&Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit LoadUnload EFMachine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPCTable 4 5 2 2 1 1 1 5 1 5 1 4 5 1 1 1 2 2 5 Template: Quick Connect - Red Line Jumper - Blue Line Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Problems / Opportunities: 1. Supplier incoming quality 2. Excessive RM amounts 3. Excessive rework 4. Poor equipment availability (OEE) 5. Excessive WIP amounts 6. Excessive lead-times (Muda) 7. Multiple scheduling points (Push) 8. Group leader managing scheduling 9. Excessive logistic touches 10. Premium freight cost Barriers: • Supplier Quality System • Poor OEE (59%) at Fab. 2 Operator Balance Chart 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masco Washer Inspect/Pack Value-Added Waiting Takt Target Condition: Customer Supplier Pacemaker Customer Specific Scheduling Point Complexity Split Fabrication #2Fabrication #1 FIFO Cross Dock or Supplier Warehouse MRP AdP Finished Goods Control Daily Customer Schedule Overseas Suppliers MRP AdP Component Control A Source Global Feel Local Supplier Orders (Weekly EDI) Customer Orders (Weekly EDI) Daily Orders e-Kanban 3x Day Green Loop (A Component Suppliers) Line side “A” component Supermarket MIN/MAX FG Supermarket MIN/MAX FG located/ visualized in manufacturing building warehouse ASN O X O X O X RM located/ visualized in manufacturing building warehouse Warehouse (RM) NAFTA Suppliers RM delivered to POU locations established by value stream (A Items) EPE Day or Shipment Window then strive to shorten over time Ridged MIN/MAX Rules – Minimum level inventory Cycle + Buffer + Safety Stocks EPEI Goal to match the pacemaker Ridged MIN/MAX Rules – Minimum level inventory EPEI Goal to match the pacemaker 20 Min. Loops 1 Day on hand RM Daily Deliveries Masco Raw WIP Raw A B Ranso- hofff C Bushing Press Gantry Load Operator Balance Chart 67 60 7 0 10 20 30 40 50 60 70 80 Machining Inspect/Pack Value-Added Waiting Takt • Reduce from 3 Operators to 2 in Upper Machining • Elimination of 106 seconds of labor in Upper Machining • OEE > 88% (with FWD) • OEE >70% (w/o FWD) Implementation: Implementation: # Task Resp. Person Target Date Feb 05 Mar 05 Apr 05 May 05 Jun 05 Jul 05 Aug 05 Sep 05 Oct 05 Nov 05 Review Review 1 Fix Clamping to eliminate operator checking clamp force Roger Marshall 4/1/05 2 ReprogramMasco to separate operator from machine (PCT=88) Grant Glasscock 5/1/05 3 Standardize Blow-off (PCT=77) Brian Zolman 3/1/05 4 Improve clamp/ unclamp speed (PCT=75) Roger Marshall 4/1/05 5 Improve fixture rotation rate (PCT=74) Grant Glasscock 4/1/05 6 ROI Analysis: Re- balance Gantry (13 sec reduction) Grant Glasscock 5/1/05 7 ROI Analysis: Re- balance Masco (PCT=70) Matt Jacoby 5/1/05 8 ROI Analysis: Blow-off machine (PCT=63) Roger Marshall 4/1/05 9 Reduce from 3 to 2 operatorsper shift on Lower Machining cell Roger Marshall 7/1/05 10 Reduce from 3 to 2 operatorsper shift on Finishing cell Roger Marshall 9/1/05 Indicators Indicators: Current Target Delta Intangibles: Lead Time 1.52 days .95 days -37% Less variation in the assembly process Lower C/O time by 66% Similar results can be achieved on the APOX1 andASOX assembly lines Labor productivity stability at a wide range of demand Reduced material handling and conveyance of WIP WIP 12,168 7614 -37% Productivity (MH/100) 6.00 4.78 -20% Bubble Diagram (Paths) 54 2 -96% OBC (% over ideal) 25% 8% -68% WIP Value $13,624 $8,525 -$5,099 Labor Cost ($/year) $352,000 $253,500 -$98,500 Approval Project Team Leader: Roger Smith Team Members: Jim Fisher, Mark Johnson Sara Lewis John Davis Management: Tom Burdette 10/5/2016
  • 21. “YourValueStreamImprovementCoach” 21 The LEAN Journey Now its time to work the plan. As you move forward on this journey additional barriers will be encountered. Initial Condition IDEAL Condition •Hidden Waste (Problems) •Poor Equipment Efficiency •Poor Labor Efficiency •High Defect Rates •Large Batches •Infrequent improvement Target Condition •100% Value Add •0 Defects (Internal) •One Piece Continuous Flow •Human Development •Value to Society Dodging barriers leads you away from the Ideal Condition. Barriers must be met head-on and eliminated! Solutions to problems cannot involve diverting off the path to the Ideal Condition! There can be no shortcuts! Barriers Plan Do Check Act Grasp the Situation 10/5/2016
  • 22. “YourValueStreamImprovementCoach” 22 The LEAN Journey To achieve sustainability it is important to stabilize and standardize the system improvements; otherwise, improvements will regress over time. Initial Condition IDEAL Condition •Hidden Waste (Problems) •Poor Equipment Efficiency •Poor Labor Efficiency •High Defect Rates •Large Batches •Infrequent improvement •100% Value Add •0 Defects (Internal) •One Piece Continuous Flow •Human Development •Value to Society The sustainability of system improvements will be achieved by the standardization and is the basis for the next improvement steps. The standardization allows: •To measure and evaluate improvements. •The exchange of best practices with similar and equal tasks. Target Condition Current State 10/5/2016
  • 23. “YourValueStreamImprovementCoach” 23 Approach Quick wins using Lean methodologies. Always tie projects to dollars. Establish measurable benefits expected from each project. Quick pace of implementation requires removal of organizational and bureaucratic barriers. 10/5/2016
  • 24. “YourValueStreamImprovementCoach” 24 Process Go to the Gemba for data. “Grasp the Situation” Start where the business need is greatest. Select projects that yield the greatest impact. A3 is a “working document”. “Nemawashi”. Prepare the ground for planting. A consistent process is used repeatedly. Background / Business Case: 1. Increasing customer expectations and pressure require improvements in quality, delivery, and cost. 2. Need to improve cost competitiveness. Project Name: Hose Line Productivity Improvement A3 – Document Project Approval Initial Condition: Cus tom er Sup plie r Final Asse mbly Fabri cation #2 Fabri cation #1 MRP Finis hed Goo ds Cont rol Dail y Custo mer Sche dule MRP Com pone nt Cont rol Sup plier Orde rs (We ekly EDI) Cus tome r Orde rs (We ekly EDI) Dail y Orde rs ASN Ware hous e RM IWIP Ware hous e FG Dai ly Sch edu le Dail y Ship Sch edul e Shutt le Shutt le IWIP 1 2 FTT= 98% OEE= 70% Scrap= 2% Rewor k= 1% Uptime = 70% EPEI = 3 - 10 Days FTT= 96% OEE= 50% Scrap= 2% Rewor k= 2% Uptime = 70% EPEI = 2- 5 Days FTT= 94% OEE= 65% Scrap= 2% Rewor k= 4% Uptime = 75% EPEI = 1 – 2 Days 5 6 3 4 5 7 8 8 9 Expe dited 10 8 20 min 1 Day 1 Day 30 min 2 Days 20 min 4 Days RM Produc tion Lead Time = 8.3 Days Proces sing Lead Time = 70 min. (0.6%) Kanb an Rack Kanb an Rack Kanb an Rack HFV6 Jumper Tube Punch Sort Tabl e Wash er Drain Rack Wash er Drain Rack FCBenc h Tool Chest 2.7L EF104 2 Valu e Stre am Map Descri ption "Dana Curren t Future State Map" Endform Spaghetti Diagram SIZE File Name Drawn By: REV B SHEET 1 OF 1 Bead Checke r EF005 3-Hit EF006 1-Hit WIP Rack EF007 3-Hit EF008 EF009 EF001 2-Hit EF104 1 2.7 EF015 2-Hit Cylinder Drop Auto Loader 2.7L JR &LH Skive &Punch Load Unload Electric 110V EF004 2-Hit EF004 2-Hit Load Unload EF Machine EF010 Robot Guarding Guarding Guarding Robot Controller 3 5 6 3 6 7 5 4 SPC Table 4 5 2 2 1 1 1 5 1 5 1 4 51 1 1 2 2 5 Sepera te Worksh op Templa te: Quick Connec t - Red Line Jumper - Blue Line Ma sco Ra w WI P Raw A B Ra nso- hofff C Bushing Press Gantry Load Pr ob lem s / Op po rtu nit ies : 1. Su pp lier inc om ing qu ality 2. Ex ce ssive RM am ou nts 3. Ex ce ssive rew ork 4. Po or eq uip me nt av ailab ility (O EE ) 5. Ex ce ssive WI P am ou nts 6. Ex ce ssive lea d-t im es (M ud a) 7. Mu ltip le sche du ling po int s (Pus h) 8. Gr ou p lea de r ma na gin g sche du ling 9. Ex ce ssive log istic tou ch es 10 . Prem ium fre igh t co st Barriers : • Supplier Quality System • Poor OE E (59 %) at Fab. 2 Ope rato r Bala nce Cha rt 26 52 60 54 28 20 0 10 20 30 40 50 60 70 80 90 Masc o Was her Insp ect/P ack Valu e-Ad ded Wait ing Takt Target Condition: Cus tom er Sup plie r Pace make r Custo mer Spec ific Sche duling Point Comp lexity Split Fabri cation #2 Fabri cation #1 FIF O Cross Dock or Supp lier Ware hous e MRP AdP Finis hed Goo ds Cont rol Dail y Custo mer Sche dule Over seas Supp liers MRP AdP Com pone nt Cont rol A Sourc e Globa l Feel Loca l Sup plier Orde rs (We ekly EDI) Cus tome r Orde rs (We ekly EDI) Dail y Orde rs e-Ka nban 3x Day Gree n Loop (A Comp onen t Supp liers) Line side “A” com pone nt Sup erm arke t MIN /MA X FG Sup erm arke t MIN /MA X FG locat ed/ visua lized in man ufac turin g build ing ware hous e ASN O X O X O X RM locat ed/ visua lized in man ufac turin g build ing ware hous e Ware hous e (RM) NAFT A Supp liers RM deliv ered to POU locat ions esta blish ed by value strea m (A Items) EPE Day or Shipm ent Windo w then strive to shorten over time Ridged MIN/M AX Rules – Minimu m level invento ry Cycle + Buffer + Safety Stocks EPEI Goal to match the pacem aker Ridged MIN/M AX Rules – Minimu m level invento ry EPEI Goal to match the pacem aker 20 Min. Loops 1 Day on hand RM Daily Deliver ies Ma sco Ra w WI P Ra w A B Ra nso- hofff C Bu shing Press Ga ntr y Load Ope rato r Bal anc e Cha rt 67 60 7 0 10 20 30 40 50 60 70 80 Mac hini ng Insp ect/ Pac k Val ue-A dde d Wa itin g Tak t • Reduce from 3 Opera tors to 2 in Upper Ma chining • Elimination of 106 seconds of labor in Upper Ma chining • OE E > 88% (with FW D) • OE E >70% (w/o FW D) Implementation: Implem entation: # Task Re sp. Person Target Da te Feb 05 Ma r 05 Ap r 05 Ma y 05 Jun 05 Jul 05 Au g 05 Sep 05 Oc t 05 No v 05 Re vie w Re vie w 1 Fix Clam pin g to eliminate opera tor checkin g cla mp force Ro ger Ma rshall 4/1 /05 2 Re programMa sco to separate op era tor from ma chine (PCT =88) Grant Glasscock 5/1 /05 3 Standardize Blow -off (PCT =77) Brian Zo lman 3/1 /05 4 Improve cla mp / uncla mp speed (PCT =75) Ro ger Ma rshall 4/1 /05 5 Improve fixture rotation rate (PCT =74) Grant Glasscock 4/1 /05 6 RO I An aly sis : Re - balan ce Ga ntry (13 sec reduction) Grant Glasscock 5/1 /05 7 RO I An aly sis : Re - balan ce Ma sco (PCT =70) Ma tt Jacoby 5/1 /05 8 RO I An aly sis : Blow -off ma chine (PCT =63) Ro ger Ma rshall 4/1 /05 9 Re duce fro m3 to 2 op erato rsper shift on Lowe r Ma chining cell Ro ger Ma rshall 7/1 /05 10 Re duce fro m3 to 2 op erato rsper shift on Finishing cell Ro ger Ma rshall 9/1 /05 Indicators Indicators: Current Target Delta Intangibles: Lead Tim e 1.5 2 days .95 days -37% Less variation in the assembly process Lowe rC/O tim e by 66% Similarresults can be achieved on the AP OX 1 andAS OX assembly lines Laborproductivity sta bility at a wide range of demand Re duced mate rial handling and conveyance of WIP WIP 12,16 8 7614 -37% Productivity (MH/100) 6.0 0 4.7 8 -20% Bu bble Diagram (Path s) 54 2 -96% OB C (% over ide al) 25% 8% -68% WIP Value $13,6 24 $8,52 5 -$5,0 99 LaborCo st ($/ye ar) $352,00 0 $253,50 0 -$98,50 0 Approval Proje ct Team Leader: Ro ger Sm ith Team Me mb ers: Jim Fis her, John Da vis Ma rk Johnson Scott Eric Sara Lewis Ma nageme nt: Tom Bu rdette Plan Do Check Act Grasp the Situation Standardize 10/5/2016