TECHNICAL FEASIBILITY
 A business is considered technically and

operationally feasible if it has the necessary
expertise, infrastructure and capital to develop,
install, operate and maintain the proposed
system, and that by establishing such a system, the
business will be able to deliver goods or services
at a profit.
 When considering a new business, it is important to
consider if there is sufficient access to resources. One
of the primary reasons that new business fails is
under-capitalisation - not enough money to keep
the business going from startup until it starts to make
a profit. This can lead to a lack of resources.
WHAT SHOULD BE DONE?
1. SELECT
 THE PRODUCT (S) &/OR SERVICE (S)
 THE MANUFACTURING/PRODUCTION PROCESS
 THE CAPACITY & DESIGN
 THE SUPPLIES

 THE LOCATION
 THE LAY OUT
 THE STRUCTURES SPECIFICATIONS

 THE RAW MATERIALS & THEIR SOURCES
2. DETERMINE
 THE QUANTITY & QUALITY OF THE PRODUCT (S)






& SERVICE (S) TO BE PRODUCED
THE LABOR NEEDED, BOTH SKILLED &
UNSKILLED
THE UTILITIES REQUIRED
THE WASTE DISPOSAL METHOD
THE TRANSPORTATION NECESSARY
3. PROVIDE
 ESTIMATES OF THE TOTAL PROJECT COST, &

ENUMERATE THE MAJOR ITEMS OF CAPITAL
COST
4. LIST DOWN IN DETAIL
 THE ESTIMATED PRODUCTION & OVER HEAD

COSTS THAT WILL GO INTO OPERATING THE
PROPOSED PROJECT
5. TAKE INTO CONSIDERATION
 THE MAJOR TECHNOLOGICAL DEVELOPMENT IN

THE INDUSTRY WHICH MAY AFFECT THE
COMMERCIAL OR TECHNICAL SOUNDNESS OF
THE PROJECT.
THE TECHNICAL STUDY IS PRESENTED BY
DESCRIBING & MAKING NECESSARY
CALCULATIONS FOR THE FOLLOWING:
A. THE PRODUCT(S)/SERVICE(S)
 THIS PORTION DESCRIBES THE PRODUCTS OR

SERVICES TO BE PRODUCED/PROVIDED & SOLD.
 WHICH SPECIFIES
 THE PRODUCTS’ PHYSICAL, MECHANICAL, &

CHEMICAL PROPERTIES
 THEIR VARIOUS USES, BOTH AS FINISHED GOODS
& INDUSTRIAL INPUTS.
B. MANUFACTURING/ PRODUCTION
PROCESS
 THE SELECTED MANUFACTURING/PRODUCTION

PROCESS MUST BE DESCRIBED SIMPLY & CLEARLY,
PREFERABLY WITH THE AID OF FLOW CHARTS AND
DIAGRAMS.
 THE ALTERNATIVE PROCESSES & THE WAY THEY
COMPARE WITH THE CHOSEN PROCESS MUST BE
MENTIONED.
 THE ANALYSIS SHOULD FURTHER TOUCH ON THE
MANUFACTURING/PRODUCTION PROCESSES USED IN
EXISTING BUSINESSES WITH THE SAME OR SIMILAR
ACTIVITY, BOTH DOMESTIC & FOREIGN.
 LICENSING AGREEMENTS & PATENTS SHOULD ALSO
BE REVIEWED.
C. SIZE OF THE BUSINESS & PRODUCTION
SCHEDULES
 MINIMUM & MAXIMUM RATED CAPACITY
 FIXED COSTS
 ACTUAL CAPACITY UTILIZATION
 THE NUMBER OF SHIFTS PER DAY

 NUMBER OF OPERATING DAYS PER YEAR
D.PRODUCTION SCHEDULES
 THE EXPECTED GROWTH IN MARKET SHARE
 THE AVAILABILITY OF FINANCING FOR POSSIBLE

EXPANSION
 THE AVAILABILITY OF MORE RAW MATERIALS
 THE LEVEL OF UTILIZATION OF PLANT CAPACITY
E. MACHINERY & EQUIPMENT
 IDENTIFIED & INDIVIDUALLY LISTED ACCDG TO

TYPE & USE
 SPECIFICATIONS, CAPACITIES & COSTS MUST BE
DESCRIBED IN DETAIL
 THE ORIGIN OF THE MACHINERY & EQUIPMENT,
WHETHER LOCAL OR IMPORTED
 THE MANNER OF & COST OF TRANSPORTING
THEM MUST BE INDICATED
E. MACHINERY & EQUIPMENT
 What type of equipment and technology will the business








need to produce its product/service?
What costs are involved to purchase and set up the
equipment? What are the costs involved in the ongoing
running of the equipment?
EQUIPMENT SUPPLIERS:
Who are the potential suppliers of the equipment?
Where are they located?
What sort of service and warranties do they provide?
How long will it take to acquire the equipment and begin
operations?
F. LOCATION
 A THOROUGH & COMPARATIVE ANALYSIS FOR EACH

POTENTIAL LOCATION SHOULD BE MADE TO DETERMINE
THE MOST IDEAL SITE.
 IT HAS TO CONSIDER THE FOLLOWING FACTORS:
 THE ACCESSIBILITY TO, & AVAILABILITY OF, RAW MATERIAL





SOURCES
THE AVAILABILITY OF CHEAP OR MODERATELY-PRICED
UTILITIES SUCH AS POWER, WATER, OR FUEL
THE COMBINED COST OF TRANSPORTING RAW MATERIALS &
FUEL TO THE SITE
THE PROXIMITY TO DISTRIBUTING OUTLETS
THE AVAILABILITY OF SKILLED & UNSKILLED LABOR

 MAPS & CHARTS OF THE PROPOSED SITE MUST BE

INCLUDED
G. LAYOUT
 THE LAYOUT SHOULD BE CLEARLY DEPICTED

THROUGH DIAGRAMS & DESCRIPTIONS.
 A GOOD LAYOUT IS CHARACTERIZED BY
 MINIMUM MATERIAL HANDLING

 EFFECTIVE SPACE UTILIZATION
 SMOOTH WORK FLOW
 SAFE & CONDUCIVE WORKING AREA FOR THE

WORKERS
 SAFETY AND SANITATION FACILITIES, &
 FLEXIBILITY OF ARRANGEMENTS
H. BUILDING & FACILITIES
 What are possible locations for the facility (office/manufacturing









plant)?
What size facility is needed?
What are the costs involved in the building? Do you need to fit it
out? How much will it cost to get all necessary utilities
connected?
Does the proposed location have adequate access to
infrastructure and services such as highways, railway and
utilities?
Will you need to build your own facility, or purchase an existing
one?
Where will the facility be located in relation to your customers?
Who will be responsibile for transport of goods between the
facility and the market? What are the costs involved?
H. BUILDING & FACILITIES
 THE SITE, TYPE, & COSTS OF THE BUILDING AND

LAND, AS ENVISIONED IN THE PROJECT, SHOULD
ACCURATELY BE PRESENTED.
 THE CONSTRUCTION COST OF THE BUILDING &
FACILITIES SHOULD BE PRESENTED AS ADAPTED
TO THE MACHINERY & EQUIPMENT THAT WILL
BE USED IN THE PROJECT.
 LAND IMPROVEMENTS SUCH AS ROADS,
DRAINAGE FACILITIES, ETC. & THEIR RESPECTIVE
COSTS SHOULD BE COMPUTED & INCLUDED.
I. RAW MATERIALS & SUPPLIES
 THE REQUIRED RAW MATERIALS SHOULD BE LISTED

DOWN AND THE BASIS FOR THEIR SELECTION MUST
PRESENTED.
 DESCRIPTIONS AND SPECIFICATIONS ON THEIR
PHYSICAL, MECHANICAL, AND CHEMICAL
PROPERTIES MUST ALSO BE GIVEN.
 CURRENT AND PROSPECTIVE COST OF RAW
MATERIALS, THE AVAILABILITY AND CONTINUITY OF
SUPPLY, AND THE CURRENT PROSPECTIVE SOURCES
SHOULD ALSO BE INCLUDED.
 THE VOLUME REQUIRED AT VARIOUS PHASES OF
OPERATIONS MUST BE CLEARLY PRESENTED.
J. UTILITIES
 THIS PORTION DESCRIBES THE AMOUNT, COST,

AND SOURCES OF ELECTRICITY, FUEL, WATER,
AND/OR STEAM REQUIRED.
 THIS MUST BE DETERMINED IN RELATION TO
THE PRODUCTION SCHEDULE AND CAPACITY
UTILIZATION DEFINED. ALTERNATIVE SOURCES
OF THESE UTILITIES AND THE FEASIBILITY OF
THEIR USE MUST ALSO BE DESCRIBED.
K. WASTE DISPOSAL
 A DESCRIPTION OF THE QUANTITY, MANNER OF

DISPOSAL, AND THE COST INVOLVED IN DOING
AWAY WITH EXPECTED WASTE FROM
PRODUCTION IS NECESSARY.
 THE ANALYSIS MUST BE EXPANDED TO
CONSIDER THE POSSIBILITIES OF FURTHER
USING THESE WASTES.
L. PRODUCTION COST
 THE MONETARY ASPECT OF ALL THE

PRODUCTION PLANS IS PUT INTO PERSPECTIVE.
 HOW MUCH DOES IT COST TO PRODUCE ONE

UNIT OF OUTPUT?

 TO ARRIVE AT THIS, THE FF MUST BE

DETERMINED:
 RAW MATERIAL COSTS
 LABOR COST
 OVERHEAD COST( FIXED COST), OPERATING COSTS

(VARIABLE COSTS)
 OTHER PERTINENT COSTS
M. LABOR REQUIREMENT
 THE VARIOUS JOBS AND FUNCTIONS NECESSARY FOR THE

OPERATIONAL STAGE MUST BE DESCRIBED.
 FOR COSTING, LABOR IS GENERALLY CLASSIFIED INTO
THREE TYPES:
 DIRECT
 INDIRECT
 ADMINISTRATIVE

 THE NUMBER OF WORKERS TO BE EMPLOYED FOR EACH





JOB CLASSIFICATION
THE PAY SCALES
EMPLOYEES DEVELOPMENT PROGRAMS
THE ORGANIZATION SET-UP
THE AGGREGATE LABOR COSTS
Technical feasibility of a project
Technical feasibility of a project
WORLDS MOST BEAUTIFUL HOTEL
MOST AMAZING CASTLE (THE POTALA PALACE )
WORLDS AMAZING LUXURY YATCH
Technical feasibility of a project
TRUMPH HOTEL
Technical feasibility of a project
TOWER OF THE DUBAI MARINAS
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
Technical feasibility of a project
STILL NOT CONVINCED?
Technical feasibility of a project
Technical feasibility of a project
THAT’S ALL!!!
 THANKS AND GOD BLESS YOU!!!

More Related Content

PPT
Project appraisal and Analysis
PPTX
Business ethics (Strategic Management)
PPT
technology diffusion
PPTX
Strategy Implementation and Control
PPTX
Functions of production operation management
PPTX
Methods Of plant Location
DOCX
Questionnaire on employee satisfaction
PPTX
Case Study of a Young Entrepreneur
Project appraisal and Analysis
Business ethics (Strategic Management)
technology diffusion
Strategy Implementation and Control
Functions of production operation management
Methods Of plant Location
Questionnaire on employee satisfaction
Case Study of a Young Entrepreneur

What's hot (20)

PPTX
Project Management- Unit III
PPTX
Social responsibility of business
PPTX
Corporate Social Responsibility and Stakeholders effect
PPTX
Facility Location Planning
PPTX
Technology acquisition & absorption
PPTX
Entrepreneurship development
PPSX
Business environment ppt
DOC
Concept of production
PPTX
Feasibility Report
PPT
Technology absorption & diffusion
PPTX
Project formulation (1)
PPT
Methods or Techniques of Technology Forecasting
PPTX
Social audit
PDF
Generation & Screening of Project Idea
PPTX
HR Supply forecasting
PPT
The role of creativity in entrepreneurship
PPTX
Emerging trends in employee and labour welfare in india
PPTX
Life cycle of an entrpreneural venture
PPTX
CSR Policy of ONGC and Oil India Ltd
PDF
ความเข้ากันได้เชิงกลยุทธ์ Strategic fit
Project Management- Unit III
Social responsibility of business
Corporate Social Responsibility and Stakeholders effect
Facility Location Planning
Technology acquisition & absorption
Entrepreneurship development
Business environment ppt
Concept of production
Feasibility Report
Technology absorption & diffusion
Project formulation (1)
Methods or Techniques of Technology Forecasting
Social audit
Generation & Screening of Project Idea
HR Supply forecasting
The role of creativity in entrepreneurship
Emerging trends in employee and labour welfare in india
Life cycle of an entrpreneural venture
CSR Policy of ONGC and Oil India Ltd
ความเข้ากันได้เชิงกลยุทธ์ Strategic fit
Ad

Viewers also liked (14)

PPTX
4. technical feasibility
PPTX
Decision making and technical feasibility
PPT
Ch5 technical feasibility study
PPTX
1. what is a feasibility study
PDF
Project planning and feasibility study
PDF
The Business Plan: Feasibility Study for Entrepreneurs
DOC
Sample contents of a completed feasibility study
PPT
Feasibility Study
DOCX
Software requirements specification of Library Management System
PDF
Feasibility Study (Veggie Bread)
DOCX
Feasibility study(technical aspect)
PPTX
Feasibility report -basic concepts with example
DOCX
Library Management System
PDF
Library mangement system project srs documentation.doc
4. technical feasibility
Decision making and technical feasibility
Ch5 technical feasibility study
1. what is a feasibility study
Project planning and feasibility study
The Business Plan: Feasibility Study for Entrepreneurs
Sample contents of a completed feasibility study
Feasibility Study
Software requirements specification of Library Management System
Feasibility Study (Veggie Bread)
Feasibility study(technical aspect)
Feasibility report -basic concepts with example
Library Management System
Library mangement system project srs documentation.doc
Ad

Similar to Technical feasibility of a project (20)

PDF
Shiva consultancy textech general proposal
PPTX
Plant location and lay out planning
PPTX
Plant location and lay out planning
PPT
Reverse Logistics 1231517780834828 2
PPT
Reverse Logistics
DOCX
Ron Below Operations Management Resume
PPTX
Plant site selection and layout
PPTX
Detailed project report
PPT
OSS - Creating & Justifying Differentiation
PPTX
Plant location and Layout
PPTX
operation management.pptx It is a detailed view
PPTX
Dpr
PPTX
Scale up of industrial microbial processes
PPT
(CAPACITY PLANNIG)
PPTX
SCM metrics.pptx
DOCX
Production checklist for biotech startups
PPT
6. project evaluation
PPTX
Heathrow terminal
PPTX
Episode 27 : Project Management Costs
PPTX
Episode 27 : Project Management Costs
Shiva consultancy textech general proposal
Plant location and lay out planning
Plant location and lay out planning
Reverse Logistics 1231517780834828 2
Reverse Logistics
Ron Below Operations Management Resume
Plant site selection and layout
Detailed project report
OSS - Creating & Justifying Differentiation
Plant location and Layout
operation management.pptx It is a detailed view
Dpr
Scale up of industrial microbial processes
(CAPACITY PLANNIG)
SCM metrics.pptx
Production checklist for biotech startups
6. project evaluation
Heathrow terminal
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs

More from Bikramjit Singh (20)

PPTX
Global structure
PPT
Global human resource management
PPTX
Leadership
DOCX
leadership
DOCX
Global business
PPT
Cultural_differences
PPT
International negotiations & Cross culture Communication
PPT
International HRM
PPTX
HRM Interventions
DOC
Export procedure-and-documentation
DOCX
Export promotion capital goods scheme
DOCX
Exim policy 1992 97
DOCX
Market entry strategies in foreign market
DOC
What are the two major constituents of india money market
PPTX
Venture capital
PPTX
R egulatory framework_of_fin._servcs in india
PPTX
Mutual funds[1]
PPT
Merchant banking
PPTX
PPTX
Foreign exchange market
Global structure
Global human resource management
Leadership
leadership
Global business
Cultural_differences
International negotiations & Cross culture Communication
International HRM
HRM Interventions
Export procedure-and-documentation
Export promotion capital goods scheme
Exim policy 1992 97
Market entry strategies in foreign market
What are the two major constituents of india money market
Venture capital
R egulatory framework_of_fin._servcs in india
Mutual funds[1]
Merchant banking
Foreign exchange market

Recently uploaded (20)

PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PPTX
5 Stages of group development guide.pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
How to Get Funding for Your Trucking Business
PDF
Types of control:Qualitative vs Quantitative
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Training And Development of Employee .pdf
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Business model innovation report 2022.pdf
PPT
Data mining for business intelligence ch04 sharda
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
WRN_Investor_Presentation_August 2025.pdf
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
340036916-American-Literature-Literary-Period-Overview.ppt
HR Introduction Slide (1).pptx on hr intro
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
New Microsoft PowerPoint Presentation - Copy.pptx
5 Stages of group development guide.pptx
Euro SEO Services 1st 3 General Updates.docx
COST SHEET- Tender and Quotation unit 2.pdf
How to Get Funding for Your Trucking Business
Types of control:Qualitative vs Quantitative
Lecture (1)-Introduction.pptx business communication
Training And Development of Employee .pdf
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
unit 1 COST ACCOUNTING AND COST SHEET
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Business model innovation report 2022.pdf
Data mining for business intelligence ch04 sharda
DOC-20250806-WA0002._20250806_112011_0000.pdf

Technical feasibility of a project

  • 2.  A business is considered technically and operationally feasible if it has the necessary expertise, infrastructure and capital to develop, install, operate and maintain the proposed system, and that by establishing such a system, the business will be able to deliver goods or services at a profit.  When considering a new business, it is important to consider if there is sufficient access to resources. One of the primary reasons that new business fails is under-capitalisation - not enough money to keep the business going from startup until it starts to make a profit. This can lead to a lack of resources.
  • 4. 1. SELECT  THE PRODUCT (S) &/OR SERVICE (S)  THE MANUFACTURING/PRODUCTION PROCESS  THE CAPACITY & DESIGN  THE SUPPLIES  THE LOCATION  THE LAY OUT  THE STRUCTURES SPECIFICATIONS  THE RAW MATERIALS & THEIR SOURCES
  • 5. 2. DETERMINE  THE QUANTITY & QUALITY OF THE PRODUCT (S)     & SERVICE (S) TO BE PRODUCED THE LABOR NEEDED, BOTH SKILLED & UNSKILLED THE UTILITIES REQUIRED THE WASTE DISPOSAL METHOD THE TRANSPORTATION NECESSARY
  • 6. 3. PROVIDE  ESTIMATES OF THE TOTAL PROJECT COST, & ENUMERATE THE MAJOR ITEMS OF CAPITAL COST
  • 7. 4. LIST DOWN IN DETAIL  THE ESTIMATED PRODUCTION & OVER HEAD COSTS THAT WILL GO INTO OPERATING THE PROPOSED PROJECT
  • 8. 5. TAKE INTO CONSIDERATION  THE MAJOR TECHNOLOGICAL DEVELOPMENT IN THE INDUSTRY WHICH MAY AFFECT THE COMMERCIAL OR TECHNICAL SOUNDNESS OF THE PROJECT.
  • 9. THE TECHNICAL STUDY IS PRESENTED BY DESCRIBING & MAKING NECESSARY CALCULATIONS FOR THE FOLLOWING:
  • 10. A. THE PRODUCT(S)/SERVICE(S)  THIS PORTION DESCRIBES THE PRODUCTS OR SERVICES TO BE PRODUCED/PROVIDED & SOLD.  WHICH SPECIFIES  THE PRODUCTS’ PHYSICAL, MECHANICAL, & CHEMICAL PROPERTIES  THEIR VARIOUS USES, BOTH AS FINISHED GOODS & INDUSTRIAL INPUTS.
  • 11. B. MANUFACTURING/ PRODUCTION PROCESS  THE SELECTED MANUFACTURING/PRODUCTION PROCESS MUST BE DESCRIBED SIMPLY & CLEARLY, PREFERABLY WITH THE AID OF FLOW CHARTS AND DIAGRAMS.  THE ALTERNATIVE PROCESSES & THE WAY THEY COMPARE WITH THE CHOSEN PROCESS MUST BE MENTIONED.  THE ANALYSIS SHOULD FURTHER TOUCH ON THE MANUFACTURING/PRODUCTION PROCESSES USED IN EXISTING BUSINESSES WITH THE SAME OR SIMILAR ACTIVITY, BOTH DOMESTIC & FOREIGN.  LICENSING AGREEMENTS & PATENTS SHOULD ALSO BE REVIEWED.
  • 12. C. SIZE OF THE BUSINESS & PRODUCTION SCHEDULES  MINIMUM & MAXIMUM RATED CAPACITY  FIXED COSTS  ACTUAL CAPACITY UTILIZATION  THE NUMBER OF SHIFTS PER DAY  NUMBER OF OPERATING DAYS PER YEAR
  • 13. D.PRODUCTION SCHEDULES  THE EXPECTED GROWTH IN MARKET SHARE  THE AVAILABILITY OF FINANCING FOR POSSIBLE EXPANSION  THE AVAILABILITY OF MORE RAW MATERIALS  THE LEVEL OF UTILIZATION OF PLANT CAPACITY
  • 14. E. MACHINERY & EQUIPMENT  IDENTIFIED & INDIVIDUALLY LISTED ACCDG TO TYPE & USE  SPECIFICATIONS, CAPACITIES & COSTS MUST BE DESCRIBED IN DETAIL  THE ORIGIN OF THE MACHINERY & EQUIPMENT, WHETHER LOCAL OR IMPORTED  THE MANNER OF & COST OF TRANSPORTING THEM MUST BE INDICATED
  • 15. E. MACHINERY & EQUIPMENT  What type of equipment and technology will the business       need to produce its product/service? What costs are involved to purchase and set up the equipment? What are the costs involved in the ongoing running of the equipment? EQUIPMENT SUPPLIERS: Who are the potential suppliers of the equipment? Where are they located? What sort of service and warranties do they provide? How long will it take to acquire the equipment and begin operations?
  • 16. F. LOCATION  A THOROUGH & COMPARATIVE ANALYSIS FOR EACH POTENTIAL LOCATION SHOULD BE MADE TO DETERMINE THE MOST IDEAL SITE.  IT HAS TO CONSIDER THE FOLLOWING FACTORS:  THE ACCESSIBILITY TO, & AVAILABILITY OF, RAW MATERIAL     SOURCES THE AVAILABILITY OF CHEAP OR MODERATELY-PRICED UTILITIES SUCH AS POWER, WATER, OR FUEL THE COMBINED COST OF TRANSPORTING RAW MATERIALS & FUEL TO THE SITE THE PROXIMITY TO DISTRIBUTING OUTLETS THE AVAILABILITY OF SKILLED & UNSKILLED LABOR  MAPS & CHARTS OF THE PROPOSED SITE MUST BE INCLUDED
  • 17. G. LAYOUT  THE LAYOUT SHOULD BE CLEARLY DEPICTED THROUGH DIAGRAMS & DESCRIPTIONS.  A GOOD LAYOUT IS CHARACTERIZED BY  MINIMUM MATERIAL HANDLING  EFFECTIVE SPACE UTILIZATION  SMOOTH WORK FLOW  SAFE & CONDUCIVE WORKING AREA FOR THE WORKERS  SAFETY AND SANITATION FACILITIES, &  FLEXIBILITY OF ARRANGEMENTS
  • 18. H. BUILDING & FACILITIES  What are possible locations for the facility (office/manufacturing       plant)? What size facility is needed? What are the costs involved in the building? Do you need to fit it out? How much will it cost to get all necessary utilities connected? Does the proposed location have adequate access to infrastructure and services such as highways, railway and utilities? Will you need to build your own facility, or purchase an existing one? Where will the facility be located in relation to your customers? Who will be responsibile for transport of goods between the facility and the market? What are the costs involved?
  • 19. H. BUILDING & FACILITIES  THE SITE, TYPE, & COSTS OF THE BUILDING AND LAND, AS ENVISIONED IN THE PROJECT, SHOULD ACCURATELY BE PRESENTED.  THE CONSTRUCTION COST OF THE BUILDING & FACILITIES SHOULD BE PRESENTED AS ADAPTED TO THE MACHINERY & EQUIPMENT THAT WILL BE USED IN THE PROJECT.  LAND IMPROVEMENTS SUCH AS ROADS, DRAINAGE FACILITIES, ETC. & THEIR RESPECTIVE COSTS SHOULD BE COMPUTED & INCLUDED.
  • 20. I. RAW MATERIALS & SUPPLIES  THE REQUIRED RAW MATERIALS SHOULD BE LISTED DOWN AND THE BASIS FOR THEIR SELECTION MUST PRESENTED.  DESCRIPTIONS AND SPECIFICATIONS ON THEIR PHYSICAL, MECHANICAL, AND CHEMICAL PROPERTIES MUST ALSO BE GIVEN.  CURRENT AND PROSPECTIVE COST OF RAW MATERIALS, THE AVAILABILITY AND CONTINUITY OF SUPPLY, AND THE CURRENT PROSPECTIVE SOURCES SHOULD ALSO BE INCLUDED.  THE VOLUME REQUIRED AT VARIOUS PHASES OF OPERATIONS MUST BE CLEARLY PRESENTED.
  • 21. J. UTILITIES  THIS PORTION DESCRIBES THE AMOUNT, COST, AND SOURCES OF ELECTRICITY, FUEL, WATER, AND/OR STEAM REQUIRED.  THIS MUST BE DETERMINED IN RELATION TO THE PRODUCTION SCHEDULE AND CAPACITY UTILIZATION DEFINED. ALTERNATIVE SOURCES OF THESE UTILITIES AND THE FEASIBILITY OF THEIR USE MUST ALSO BE DESCRIBED.
  • 22. K. WASTE DISPOSAL  A DESCRIPTION OF THE QUANTITY, MANNER OF DISPOSAL, AND THE COST INVOLVED IN DOING AWAY WITH EXPECTED WASTE FROM PRODUCTION IS NECESSARY.  THE ANALYSIS MUST BE EXPANDED TO CONSIDER THE POSSIBILITIES OF FURTHER USING THESE WASTES.
  • 23. L. PRODUCTION COST  THE MONETARY ASPECT OF ALL THE PRODUCTION PLANS IS PUT INTO PERSPECTIVE.  HOW MUCH DOES IT COST TO PRODUCE ONE UNIT OF OUTPUT?  TO ARRIVE AT THIS, THE FF MUST BE DETERMINED:  RAW MATERIAL COSTS  LABOR COST  OVERHEAD COST( FIXED COST), OPERATING COSTS (VARIABLE COSTS)  OTHER PERTINENT COSTS
  • 24. M. LABOR REQUIREMENT  THE VARIOUS JOBS AND FUNCTIONS NECESSARY FOR THE OPERATIONAL STAGE MUST BE DESCRIBED.  FOR COSTING, LABOR IS GENERALLY CLASSIFIED INTO THREE TYPES:  DIRECT  INDIRECT  ADMINISTRATIVE  THE NUMBER OF WORKERS TO BE EMPLOYED FOR EACH     JOB CLASSIFICATION THE PAY SCALES EMPLOYEES DEVELOPMENT PROGRAMS THE ORGANIZATION SET-UP THE AGGREGATE LABOR COSTS
  • 28. MOST AMAZING CASTLE (THE POTALA PALACE )
  • 33. TOWER OF THE DUBAI MARINAS
  • 53. THAT’S ALL!!!  THANKS AND GOD BLESS YOU!!!