ServerChoice provide secure managed hosting, private cloud and
collocation services to leading Internet-dependent organisations. Known for
their highly resilient approach, ServerChoice faced several challenges when
they decided to develop a brown-field site to house their new “SC-2” data
centre in Welwyn Garden City.
CASE STUDY
Thamesgate Build Energy Efficient
Data Centre for ServerChoice
1
Call us today
on 0800 210 0088 to discover more
about what we can do for you
or visit thamesgate.com
thamesgatebuilding power and energy solutions
CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice
SERVERCHOICE
Welwyn Garden City “SC-2”
Data Centre
ServerChoice already ran an existing Tier
2+ standard data centre, SC-1, at a site
elsewhere in Hertfordshire and wanted to build
a new data centre to meet demand for their
growing services. The new SC-2 data centre was
to go beyond this and be truly world-class, by
being built to Tier 4 standards. These types of
facilities incorporate higher levels of resilience in
critical power, cooling and data systems and are
more complex and expensive to build.
In addition to wanting a design that could be
certified as a Tier 4 data centre, ServerChoice
also targeted an energy efficiency of 1.2 PUE
(power usage effectiveness) at full load. This
would give ServerChoice the ability to offer
clients the highest resilience level whilst making
SC-2 one of the most energy-efficient data
centres in the UK.
To meet these challenges, ServerChoice had to
find a data centre infrastructure company who
could both innovate and deliver the project
on-time and to budget. Following a market
review, ServerChoice appointed the Thamesgate
Group as their main contractor.
Thamesgate worked with Tony Woodley,
ServerChoice’s Data Centre Manager, to
complete a full design appraisal before
committing to a final proposal for the new
building. The project included a number of
innovative solutions to problems presented
by the existing building infrastructure, and
how to accommodate the PUE and future
expansion targets.
2
Call us today
on 0800 210 0088 to discover more
about what we can do for you
or visit thamesgate.com
thamesgatebuilding power and energy solutions
CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice
Power Resilience and
Energy Efficiency
To provide resilience for the electrical and IT
infrastructure, dual AC supplies and an N+1
redundant architecture were adopted for all
critical services. New LV switchgear was
installed, fed from the existing sub-station
incomer but with the facility to run from a second
sub-station incomer at a later date.
A 550kVA Elcos generator was installed
upstream of two high-efficiency 200kVA Riello
Master Plus UPS systems to provide resilient
power. The Riello UPS modules were connected
in an N+1 parallel-redundant configuration,
sharing the load through decentralised control.
If one UPS failed or was taken out of circuit for
maintenance, the other UPS would automatically
power the load.
The standby generator provides emergency
backup should the mains power supply fail - to
support the UPS, cooling system and lighting.
The generator was supplied with a 72 hour fuel
tank and the UPS have a 10-minute battery.
The new LV Switchgear was designed to
accommodate future generator expansion
through a bolt-on panel. The switchgear
included A and B sections with internal Bus Bars
connected via a Bus Coupler. This allowed the
switchgear to provide dual power feeds (A and B)
to the UPS systems and cooling system.
The Bus Coupler could be opened as needed
and extra supplies connected. The UPS design
itself was also future-proofed: the configuration
allowed for further Riello Master Plus UPS to be
added, providing two separate UPS groups (A
and B) as the data centre expanded.
Maintenance and electrical testing facilities were
also designed into the switchgear, allowing each
section to be switched out of service without
disruption to the load.
Call us today
on 0800 210 0088 to discover more
about what we can do for you
or visit thamesgate.com
thamesgatebuilding power and energy solutions
CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice
3
Notes:
The Tier-classification was developed by the Uptime
Institute to classify the level of operational resilience offered
by a data centre. For more information see:
http://uptimeinstitute.com/TierCertification/
Space Optimisation and
Cooling Efficiency
State-of-the-art cooling was built-into the SC-2
data centre, optimising space and energy
usage. The design team calculated that nine
CRAC (computer room air conditioner) units
would be sufficient to cool up to five pods, each
containing 16 server racks.
Each of the CRACs was supplied power from
a static changeover switch. This could
automatically select between dual power feeds
(A or B) from the new switchgear to guarantee
electrical supply resilience. An additional CRAC
unit was installed to provide N+1 capacity to the
overall cooling system.
A raised computer-room floor, common in many
data centres, was not an option at SC-2. The
building had solid concrete floors and so the
decision was taken to use the hot-aisle
containment system as a key return channel
for the cooling system.
The design relied on the CRAC units flooding
cool air into the server room. This was drawn into
the server racks and then vented into the
‘hot-aisle’ corridor. From here the warm air was
fed into the ceiling void to create a segregated
hot-air return to the CRAC units. The cooling
design ensured the server racks received cool air
from the bottom of the rack to the top, removing
any ‘hot-spots’ and optimising the return
temperature to the CRAC units for maximum
efficiency.
The ceiling void was also used for the cable
containment system (Cat6 data cabling and fibre
infrastructure). Each pod was supplied with
‘top-entry’ connections from the ceiling
containment, which in turn housed the AC
electrical supplies and the structured data and
fibre cabling. The design provided cable diversity
within the routes, and sufficient distance from
the hot-air-flow return to the CRACs.
In addition to the UPS and generators,
Thamesgate were also responsible for the
design and installation of energy-efficient
lighting, complete with presence detection, and
the fire protection system (employing VESDA
early-warning air sampling and FM200 gas
suppression system).
The project was completed to time and budget,
with Tony Woodley commenting:
“I am very happy with the work Thamesgate
provided. They proved themselves to be
knowledgeable, professional, and didn’t sell
us anything we didn’t need. They worked hard
and made honest recommendations; always
looking to save us money. ServerChoice already
have plans for the next phase of the data centre
expansion, and we look forward to working with
Thamesgate again soon.”
Nick Watkins, MD of Thamesgate commented:
“Working closely with Tony on this project was a
pleasure from start to finish. He was insistent that
cost savings were never made at the expense
of the quality of materials used, and so we were
able to deliver a first-class data centre that all of
us here at Thamesgate are very proud of.”
Call us today
on 0800 210 0088 to discover more
about what we can do for you
or visit thamesgate.com
thamesgatebuilding power and energy solutions
CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice
4

More Related Content

PDF
Wellmont Health System - Improving Data Center Efficiency
PDF
The Future Of Data Center Critical Power - GP100 eBook
PDF
What If You Never Had to Balance a Load Again? GP100: Balanced Load. Unparall...
PDF
Denison university success story schneider electric
PPTX
AccuSine pfv+
PPTX
Improving your PUE while consolidating into an existing live data center
PPT
Data Center Server Rack Strategies
PDF
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Wellmont Health System - Improving Data Center Efficiency
The Future Of Data Center Critical Power - GP100 eBook
What If You Never Had to Balance a Load Again? GP100: Balanced Load. Unparall...
Denison university success story schneider electric
AccuSine pfv+
Improving your PUE while consolidating into an existing live data center
Data Center Server Rack Strategies
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...

What's hot (20)

PPTX
Data Center Efficiency Workshop 2016
PPTX
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
PDF
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
PDF
Overcoming Rack Power Limits with Virtual Power Systems Dynamic Redundancy an...
PPTX
Smart Energy in the Data Center
PDF
Bringing Sustainable Efficiency to Wind Power
PPTX
Virtual Power Systems - Intelligent Control of Energy (ICE) and Software Defi...
PPT
Data Center Power Strategies
PDF
Preparing for Distributed Energy Resources
PDF
High Effiency Power Solutions for Next Generation Small Cell Networks - An El...
PDF
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
PPT
Data Center Energy Efficiency Best Practices
PDF
0908 Olofson Hi Lighted Project List With Brief Scopes
PDF
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
PPT
Restoring jamaica’s power after a natural disaster
PDF
[Case study] Green Mountain Power: Reducing the duration of outages
PDF
Underground Self-Healing Solution
PDF
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
PDF
Microgrid & renewable integration at burbank water & power
PDF
Feasibility and optimal design of a hybrid power system for rural electrifica...
Data Center Efficiency Workshop 2016
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
Overcoming Rack Power Limits with Virtual Power Systems Dynamic Redundancy an...
Smart Energy in the Data Center
Bringing Sustainable Efficiency to Wind Power
Virtual Power Systems - Intelligent Control of Energy (ICE) and Software Defi...
Data Center Power Strategies
Preparing for Distributed Energy Resources
High Effiency Power Solutions for Next Generation Small Cell Networks - An El...
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
Data Center Energy Efficiency Best Practices
0908 Olofson Hi Lighted Project List With Brief Scopes
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
Restoring jamaica’s power after a natural disaster
[Case study] Green Mountain Power: Reducing the duration of outages
Underground Self-Healing Solution
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
Microgrid & renewable integration at burbank water & power
Feasibility and optimal design of a hybrid power system for rural electrifica...
Ad

Similar to Thamesgate :Build Energy Efficient Data Centre for Server Choice (20)

PPT
Alan Crosswell Canarie20090304
PDF
Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications ...
PDF
White Paper-Data Centers Design Decisions
DOCX
Eficiencia Data Center
PDF
Brian Patterson: Reinventing Building Power
PDF
Combining TSI Inverters and Fuel Cells
PPTX
Aged Data Center Infrastructure.pptx
PDF
Vertical Leaflet _ Datacenters_en-us_V1
PDF
Don Talend Uninterruptible Power Supply Article
PDF
MIG 5th Data Centre Summit 2016 PTS Presentation v1
PDF
Equipped for Continuity
PDF
Don Talend Uninterruptible Power Supply article
PDF
How to Overcome 11 Challenges for Small IT Environments
DOCX
Telecom tower carbon footprint IoT Case Study
PDF
DCD_FOCUS on POWER Article
PPT
Green ICT
PDF
Intergate Manhattan brochure 0115
PDF
meraki_whitepaper_ms_ethernet_power_study (1)
PPTX
Data Center Optimization with Avocent MergePoint Infrastructure Explorer (AMIE)
PDF
Case Study ATS Jackson Federal Building
Alan Crosswell Canarie20090304
Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications ...
White Paper-Data Centers Design Decisions
Eficiencia Data Center
Brian Patterson: Reinventing Building Power
Combining TSI Inverters and Fuel Cells
Aged Data Center Infrastructure.pptx
Vertical Leaflet _ Datacenters_en-us_V1
Don Talend Uninterruptible Power Supply Article
MIG 5th Data Centre Summit 2016 PTS Presentation v1
Equipped for Continuity
Don Talend Uninterruptible Power Supply article
How to Overcome 11 Challenges for Small IT Environments
Telecom tower carbon footprint IoT Case Study
DCD_FOCUS on POWER Article
Green ICT
Intergate Manhattan brochure 0115
meraki_whitepaper_ms_ethernet_power_study (1)
Data Center Optimization with Avocent MergePoint Infrastructure Explorer (AMIE)
Case Study ATS Jackson Federal Building
Ad

Recently uploaded (20)

PPTX
Amazon (Business Studies) management studies
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
A Brief Introduction About Julia Allison
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPT
Chapter four Project-Preparation material
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
How to Get Funding for Your Trucking Business
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
Amazon (Business Studies) management studies
WRN_Investor_Presentation_August 2025.pdf
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Chapter 5_Foreign Exchange Market in .pdf
A Brief Introduction About Julia Allison
Euro SEO Services 1st 3 General Updates.docx
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Reconciliation AND MEMORANDUM RECONCILATION
Chapter four Project-Preparation material
Power and position in leadershipDOC-20250808-WA0011..pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Nidhal Samdaie CV - International Business Consultant
Roadmap Map-digital Banking feature MB,IB,AB
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
How to Get Funding for Your Trucking Business
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
340036916-American-Literature-Literary-Period-Overview.ppt

Thamesgate :Build Energy Efficient Data Centre for Server Choice

  • 1. ServerChoice provide secure managed hosting, private cloud and collocation services to leading Internet-dependent organisations. Known for their highly resilient approach, ServerChoice faced several challenges when they decided to develop a brown-field site to house their new “SC-2” data centre in Welwyn Garden City. CASE STUDY Thamesgate Build Energy Efficient Data Centre for ServerChoice 1 Call us today on 0800 210 0088 to discover more about what we can do for you or visit thamesgate.com thamesgatebuilding power and energy solutions CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice SERVERCHOICE
  • 2. Welwyn Garden City “SC-2” Data Centre ServerChoice already ran an existing Tier 2+ standard data centre, SC-1, at a site elsewhere in Hertfordshire and wanted to build a new data centre to meet demand for their growing services. The new SC-2 data centre was to go beyond this and be truly world-class, by being built to Tier 4 standards. These types of facilities incorporate higher levels of resilience in critical power, cooling and data systems and are more complex and expensive to build. In addition to wanting a design that could be certified as a Tier 4 data centre, ServerChoice also targeted an energy efficiency of 1.2 PUE (power usage effectiveness) at full load. This would give ServerChoice the ability to offer clients the highest resilience level whilst making SC-2 one of the most energy-efficient data centres in the UK. To meet these challenges, ServerChoice had to find a data centre infrastructure company who could both innovate and deliver the project on-time and to budget. Following a market review, ServerChoice appointed the Thamesgate Group as their main contractor. Thamesgate worked with Tony Woodley, ServerChoice’s Data Centre Manager, to complete a full design appraisal before committing to a final proposal for the new building. The project included a number of innovative solutions to problems presented by the existing building infrastructure, and how to accommodate the PUE and future expansion targets. 2 Call us today on 0800 210 0088 to discover more about what we can do for you or visit thamesgate.com thamesgatebuilding power and energy solutions CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice
  • 3. Power Resilience and Energy Efficiency To provide resilience for the electrical and IT infrastructure, dual AC supplies and an N+1 redundant architecture were adopted for all critical services. New LV switchgear was installed, fed from the existing sub-station incomer but with the facility to run from a second sub-station incomer at a later date. A 550kVA Elcos generator was installed upstream of two high-efficiency 200kVA Riello Master Plus UPS systems to provide resilient power. The Riello UPS modules were connected in an N+1 parallel-redundant configuration, sharing the load through decentralised control. If one UPS failed or was taken out of circuit for maintenance, the other UPS would automatically power the load. The standby generator provides emergency backup should the mains power supply fail - to support the UPS, cooling system and lighting. The generator was supplied with a 72 hour fuel tank and the UPS have a 10-minute battery. The new LV Switchgear was designed to accommodate future generator expansion through a bolt-on panel. The switchgear included A and B sections with internal Bus Bars connected via a Bus Coupler. This allowed the switchgear to provide dual power feeds (A and B) to the UPS systems and cooling system. The Bus Coupler could be opened as needed and extra supplies connected. The UPS design itself was also future-proofed: the configuration allowed for further Riello Master Plus UPS to be added, providing two separate UPS groups (A and B) as the data centre expanded. Maintenance and electrical testing facilities were also designed into the switchgear, allowing each section to be switched out of service without disruption to the load. Call us today on 0800 210 0088 to discover more about what we can do for you or visit thamesgate.com thamesgatebuilding power and energy solutions CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice 3 Notes: The Tier-classification was developed by the Uptime Institute to classify the level of operational resilience offered by a data centre. For more information see: http://uptimeinstitute.com/TierCertification/
  • 4. Space Optimisation and Cooling Efficiency State-of-the-art cooling was built-into the SC-2 data centre, optimising space and energy usage. The design team calculated that nine CRAC (computer room air conditioner) units would be sufficient to cool up to five pods, each containing 16 server racks. Each of the CRACs was supplied power from a static changeover switch. This could automatically select between dual power feeds (A or B) from the new switchgear to guarantee electrical supply resilience. An additional CRAC unit was installed to provide N+1 capacity to the overall cooling system. A raised computer-room floor, common in many data centres, was not an option at SC-2. The building had solid concrete floors and so the decision was taken to use the hot-aisle containment system as a key return channel for the cooling system. The design relied on the CRAC units flooding cool air into the server room. This was drawn into the server racks and then vented into the ‘hot-aisle’ corridor. From here the warm air was fed into the ceiling void to create a segregated hot-air return to the CRAC units. The cooling design ensured the server racks received cool air from the bottom of the rack to the top, removing any ‘hot-spots’ and optimising the return temperature to the CRAC units for maximum efficiency. The ceiling void was also used for the cable containment system (Cat6 data cabling and fibre infrastructure). Each pod was supplied with ‘top-entry’ connections from the ceiling containment, which in turn housed the AC electrical supplies and the structured data and fibre cabling. The design provided cable diversity within the routes, and sufficient distance from the hot-air-flow return to the CRACs. In addition to the UPS and generators, Thamesgate were also responsible for the design and installation of energy-efficient lighting, complete with presence detection, and the fire protection system (employing VESDA early-warning air sampling and FM200 gas suppression system). The project was completed to time and budget, with Tony Woodley commenting: “I am very happy with the work Thamesgate provided. They proved themselves to be knowledgeable, professional, and didn’t sell us anything we didn’t need. They worked hard and made honest recommendations; always looking to save us money. ServerChoice already have plans for the next phase of the data centre expansion, and we look forward to working with Thamesgate again soon.” Nick Watkins, MD of Thamesgate commented: “Working closely with Tony on this project was a pleasure from start to finish. He was insistent that cost savings were never made at the expense of the quality of materials used, and so we were able to deliver a first-class data centre that all of us here at Thamesgate are very proud of.” Call us today on 0800 210 0088 to discover more about what we can do for you or visit thamesgate.com thamesgatebuilding power and energy solutions CASE STUDY | Thamesgate Build Energy Efficient Data Centre for ServerChoice 4