SlideShare a Scribd company logo
The
Extreme Programming
Model Damian Gordon
The
Extreme Programming
Model Damian Gordon
Contents
1. Overview
2. Details
3. Advantages
4. Disadvantages
5. Interesting
6. Reflection
7. Review
8. Summary
The Extreme Programming (XP) Model
1. Overview
Overview
• The “Extreme Programming (XP) Model” is a
model that represents one method as to how
software can be developed.
Timeline of Methodologies
6
1950s Code & Fix
1960s Design-Code-Test-Maintain
1970s Waterfall Model
1980s Spiral Model
1990s Rapid Application Development, V Model
2000s Agile Methods
Timeline of Methodologies
7
1950s Code & Fix
1960s Design-Code-Test-Maintain
1970s Waterfall Model
1980s Spiral Model
1990s Rapid Application Development, V Model
2000s Agile Methods
Overview
8
Overview
• Extreme Programming (XP) was created by
Kent Beck during his work on the C3 project.
• Beck became the C3 project leader in 1996
and began to refine the development
methodology used in the project
• He wrote a book on the methodology,
published in October 1999, called Extreme
Programming Explained.
9
Reference
• Beck, K. (1999) “Extreme Programming
Explained: Embrace Change”. Addison-Wesley,
ISBN 978-0321278654.
Kent Beck
• Born in 1961.
• an American software
engineer and the creator
of Extreme Programming
• was one of the 17 original
signatories of the Agile
Manifesto
• the leading proponent of
Test-Driven Development
2. Details
Extreme Programming (XP)
Extreme Programming (XP)
• The key assumption of XP is:
Extreme Programming (XP)
• The key assumption of XP is:
Embrace Change
Extreme Programming (XP)
• Start with the Planning Game:
• The game is a meeting that occurs once per iteration,
typically once a week. The planning process is
divided into two parts:
– Release Planning: This is focused on determining what
requirements are included in which near-term releases,
and when they should be delivered. The customers and
developers are both part of this.
– Iteration Planning: This plans the activities and tasks of the
developers. In this process the customer is not involved.
Extreme Programming (XP)
• This is done by:
– Emphasis on continuous feedback from the customer
– Short iterations
– Design and redesign
– Coding and testing frequently
– Eliminating defects early, thus reducing costs
– Keeping the customer involved throughout the
development
– Delivering working product to the customer
Extreme Programming (XP)
• Management-Practices
– On-Site Customer: A central customer contact must always be
accessible in order to clarify requirements and questions
directly.
– Planning Game: Projects, in accordance with XP, run iteratively
(repeatedly) and incrementally (gradually build on each other).
The contents of the next step are planned before each iteration.
All project members (incl. the customer) participate.
– Short Releases: New deliveries should be made at short
intervals. Consequently, customers receive the required
functions quicker and can therefore give feedback on the
development quicker.
12 Practices of XP
Extreme Programming (XP)
• Management-Practices
– On-Site Customer: A central customer contact must always be
accessible in order to clarify requirements and questions
directly.
– Planning Game: Projects, in accordance with XP, run iteratively
(repeatedly) and incrementally (gradually build on each other).
The contents of the next step are planned before each iteration.
All project members (incl. the customer) participate.
– Short Releases: New deliveries should be made at short
intervals. Consequently, customers receive the required
functions quicker and can therefore give feedback on the
development quicker.
Extreme Programming (XP)
• Team-Practices
– Metaphor: Only a few clear metaphors should describe the system
being developed so that the nitty-gritty of the system is clear to all of
the project members.
– Collective Ownership: The whole team is responsible for the system,
not individuals. Each developer must have access to all lines of code so
that each developer is able to take over the task of another developer.
– Continuous Integration: All changes to the system are integrated
promptly so that not too many dependencies between changes occur.
– Coding Standards: Regarding the common responsibility for the code,
there should be a given common standard for writing the code.
– Sustainable Pace: XP builds on the creativity of the individual project
members. This creativity cannot be achieved if the project team
constantly works overtime. Overtime is to be avoided.
Extreme Programming (XP)
• Programming-Practices
– Testing: All developments must be tested.
– Simple Design: The system should be designed as simply
as possible so that it is easier to understand, modify and
test.
– Refactoring: As soon as it becomes necessary to alter the
structure of the system, it should be implemented.
– Pair Programming: There are always two developers sitting
in front of a computer in order to increase the quality and
transfer the knowledge better.
Extreme Programming (XP)
• Project are broken down into 1-2 week
iterations.
• If changes occur in the middle of an iteration,
the team are capable of reacting to them, as
long as the team hasn’t started work on a
particular feature.
• Extreme Programming teams work in a strict
priority order. Features to be developed are
prioritized by the customer.
Extreme Programming (XP)
• Design
– Writing unit tests before programming and
keeping all of the tests running at all times. The
unit tests are automated and eliminates defects
early, thus reducing the costs.
– Starting with a simple design just enough to code
the features at hand and redesigning when
required.
Extreme Programming (XP)
• Design: User Stories
Extreme Programming (XP)
• Development
– Programming in pairs (called pair programming),
with two programmers at one screen, taking turns
to use the keyboard. While one of them is at the
keyboard, the other constantly reviews and
provides inputs.
– Integrating and testing the whole system several
times a day.
Extreme Programming (XP)
• Pair Programming
– two programmers work together at one
workstation.
– One, the driver, writes code while the other, the
observer or navigator, reviews each line of code
as it is typed in.
– The two programmers switch roles frequently.
Extreme Programming (XP)
• Pair Programming
– While reviewing, the observer also considers the
"strategic" direction of the work, coming up with
ideas for improvements and likely future problems
to address.
– This frees the driver to focus all of their attention
on the "tactical" aspects of completing the current
task, using the observer as a safety net and guide.
Extreme Programming (XP)
• Pair Programming
– Pair programming increases the man-hours
required to deliver code compared to
programmers working individually from up to
between 15% and 100%.
– However, the resulting code has about 15% fewer
defects.
Extreme Programming (XP)
• Production
– Putting a minimal working system into the
production quickly and upgrading it whenever
required.
– Keeping the customer involved all the time and
obtaining constant feedback.
Extreme Programming (XP)
3. Advantages
Advantages
• Large project are divided into manageable
amounts
Advantages
• Reduced costs and time required for project
realization.
Advantages
• Extreme Programming teams save lots of
money because they don’t use too much
documentation.
Advantages
• Simplicity is another advantage of Extreme
Programming projects.
Advantages
• XP is reduces the risks related to
programming. Normally programming
depends a lot on individuals key team
members. In XP, Using module structure, and
pair programing XP spreads the risk and
mitigate the dependence on individuals
Advantages
• In software simplicity always brings quality
and contributes the robustness. By bringing
simplicity, XP manages to create faster
software with less defects.
Test driven development at the coding stage
and the customer UAT validation leads to
successful development completion.
4. Disadvantages
Disadvantages
• Extreme Programming is focused on the code
rather than on design.
Disadvantages
• XP requires a detailed planning from the start
due to changing costs & scope
Disadvantages
• XP doesn't measure/plan Quality Assurance of
coding.
Disadvantages
• To convince developers to accept this tough
practice is not always easy. It requires more
discipline in the team and devotion of your
customers. Project management might
experience difficulties related with
the practice that changes during the life
cycle.
Disadvantages
• XP is practiced with pair programming which
might usually lead to too much duplication of
codes and data.
5. Interesting
Interesting
• XP engineering practices include things like
test-driven development, automated testing,
pair programming, simple design, and
refactoring.
Interesting
• XP says that the only truly important product
of the system development process is code.
Interesting
• Coding can also help to communicate
thoughts about programming problems. A
programmer dealing with a complex
programming problem, or finding it hard to
explain the solution to fellow programmers,
might code it in a simplified manner and use
the code to demonstrate what she means.
Interesting
• System-wide integration testing is
encouraged, initially, as a weekly activity, for
early detection of incompatible interfaces, to
reconnect before the separate sections
diverged widely from coherent functionality.
Interesting
• Listening is a key element of XP, programmers
must listen to what the customers need the
system to do, what "business logic" is needed.
Interesting
• XP is still evolving, assimilating more lessons
from experiences in the field. In the second
edition of Extreme Programming Explained,
five years after the first edition, Beck added
more values and practices and differentiated
between primary and corollary practices.
Interesting
There are other versions of the Model:
6. Reflections
Reflections
• XP is very useful when we have:
– Dynamically changing software requirements
– Risks caused by fixed time projects using new
technology
– Small, co-located extended development team
– The technology you are using allows for
automated unit and functional tests
Reflections
• XP sees communication as a vital aspect of
development, and most people agree that
face to face conversation is the best form of
communication, so XP suggests that the team
sit together in the same space without
barriers to communication, such as cubicle
walls.
Reflections
• XP tells you to build in some slack, the idea
behind slack is to add some low priority tasks
or stories in your weekly and quarterly cycles
that can be dropped if the team gets behind
on more important tasks or stories.
Reflections
• XP focuses on practice excellence. The method
prescribes a small number of absolutely
essential practices and encourages teams to
perform those practices as good as they
possibly can, almost to the extreme.
Reflections
7. Review
Review
• What did we learn?
8. Summary
Summary
The Extreme Programming (XP) Model

More Related Content

PPT
extreme Programming
PDF
Introduction to Extreme Programming
PDF
Normalization in DBMS
PPTX
Risk Management
PDF
Portfolio Management in an Agile World - Rick Austin
PDF
5. ch 4-principles that guide practice
PPTX
Python Flow Control
PDF
Chapter 2 program-security
extreme Programming
Introduction to Extreme Programming
Normalization in DBMS
Risk Management
Portfolio Management in an Agile World - Rick Austin
5. ch 4-principles that guide practice
Python Flow Control
Chapter 2 program-security

What's hot (20)

PPTX
PPTX
Software development life cycle (SDLC)
PDF
software engineering
PPTX
Introduction to Scrum.ppt
PPTX
Software Project Management ppt
PDF
Agile software development
PPTX
Extreme Programming
PPTX
Software Engineering
PPTX
Software process
PPT
Agile software development
PPTX
Software project management- Software Engineering
PPT
Rad model
PDF
Software project management
PPTX
Software Configuration Management (SCM)
PPTX
Agile Methodology PPT
PPTX
PPTX
Prototype model
PPT
Formal Specification in Software Engineering SE9
PPTX
Software project management
Software development life cycle (SDLC)
software engineering
Introduction to Scrum.ppt
Software Project Management ppt
Agile software development
Extreme Programming
Software Engineering
Software process
Agile software development
Software project management- Software Engineering
Rad model
Software project management
Software Configuration Management (SCM)
Agile Methodology PPT
Prototype model
Formal Specification in Software Engineering SE9
Software project management
Ad

Viewers also liked (14)

PPT
Universal Design for Learning: Differentiated Instruction
PPTX
Introduction to Python programming
PPTX
Object-Orientated Design
PPTX
Python: Multiple Inheritance
PPTX
Python: Polymorphism
PPTX
Python: The Iterator Pattern
PPTX
Python: Manager Objects
PPTX
Creating Objects in Python
PPTX
Python: Design Patterns
PPTX
Python: Modules and Packages
PPTX
Python: Access Control
PPTX
Python: Basic Inheritance
PPTX
Python: Third-Party Libraries
PPTX
Python: Migrating from Procedural to Object-Oriented Programming
Universal Design for Learning: Differentiated Instruction
Introduction to Python programming
Object-Orientated Design
Python: Multiple Inheritance
Python: Polymorphism
Python: The Iterator Pattern
Python: Manager Objects
Creating Objects in Python
Python: Design Patterns
Python: Modules and Packages
Python: Access Control
Python: Basic Inheritance
Python: Third-Party Libraries
Python: Migrating from Procedural to Object-Oriented Programming
Ad

Similar to The Extreme Programming (XP) Model (20)

PDF
eXtreme programming (XP) - An Overview
PPTX
Extreme programming
PPTX
Extreme programming (xp)
PPT
Chap 3 - Agile - XP.ppt
PPTX
Lecture3.se.pptx
PPT
XP O.ppt
PPTX
3. Agile Process and Extreme Programming.pptx
PPTX
Software engineering presentation for CS
PPT
Twelve practices of XP_Se lect5 btech
PPT
Agile Development | Agile Process Models
PPTX
Xp methadology
PPTX
Agile
DOC
Jun 08 - PMWT Featured Paper -Tarabykin - XP PAPER - FINAL
PDF
Extreme Programming 1st.pdf
PPTX
Agile Values, Principles and Practices
PPTX
Introduction to Software Engineering
PPT
Agile development, software engineering
PDF
L5555555555555555555555 Agile Scrum Framework.pdf
PDF
Software Engineering an Introduction
PPTX
SPM 11 SOFTWARE PROJECT MANAGEMENT RESOURCES
eXtreme programming (XP) - An Overview
Extreme programming
Extreme programming (xp)
Chap 3 - Agile - XP.ppt
Lecture3.se.pptx
XP O.ppt
3. Agile Process and Extreme Programming.pptx
Software engineering presentation for CS
Twelve practices of XP_Se lect5 btech
Agile Development | Agile Process Models
Xp methadology
Agile
Jun 08 - PMWT Featured Paper -Tarabykin - XP PAPER - FINAL
Extreme Programming 1st.pdf
Agile Values, Principles and Practices
Introduction to Software Engineering
Agile development, software engineering
L5555555555555555555555 Agile Scrum Framework.pdf
Software Engineering an Introduction
SPM 11 SOFTWARE PROJECT MANAGEMENT RESOURCES

More from Damian T. Gordon (20)

PPTX
Introduction to Prompts and Prompt Engineering
PPTX
Introduction to Vibe Coding and Vibe Engineering
PPTX
TRIZ: Theory of Inventive Problem Solving
PPTX
Some Ethical Considerations of AI and GenAI
PPTX
Some Common Errors that Generative AI Produces
PPTX
The Use of Data and Datasets in Data Science
PPTX
A History of Different Versions of Microsoft Windows
PPTX
Writing an Abstract: A Question-based Approach
PPTX
Using GenAI for Universal Design for Learning
DOC
A CheckSheet for Inclusive Software Design
PPTX
A History of Versions of the Apple MacOS
PPTX
68 Ways that Data Science and AI can help address the UN Sustainability Goals
PPTX
Copyright and Creative Commons Considerations
PPTX
Exam Preparation: Some Ideas and Suggestions
PPTX
Studying and Notetaking: Some Suggestions
PPTX
The Growth Mindset: Explanations and Activities
PPTX
Hyperparameter Tuning in Neural Networks
PPTX
Early 20th Century Modern Art: Movements and Artists
PPTX
An Introduction to Generative Artificial Intelligence
PPTX
An Introduction to Green Computing with a fun quiz.
Introduction to Prompts and Prompt Engineering
Introduction to Vibe Coding and Vibe Engineering
TRIZ: Theory of Inventive Problem Solving
Some Ethical Considerations of AI and GenAI
Some Common Errors that Generative AI Produces
The Use of Data and Datasets in Data Science
A History of Different Versions of Microsoft Windows
Writing an Abstract: A Question-based Approach
Using GenAI for Universal Design for Learning
A CheckSheet for Inclusive Software Design
A History of Versions of the Apple MacOS
68 Ways that Data Science and AI can help address the UN Sustainability Goals
Copyright and Creative Commons Considerations
Exam Preparation: Some Ideas and Suggestions
Studying and Notetaking: Some Suggestions
The Growth Mindset: Explanations and Activities
Hyperparameter Tuning in Neural Networks
Early 20th Century Modern Art: Movements and Artists
An Introduction to Generative Artificial Intelligence
An Introduction to Green Computing with a fun quiz.

Recently uploaded (20)

PPTX
Cell Structure & Organelles in detailed.
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PPTX
Pharma ospi slides which help in ospi learning
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
Pre independence Education in Inndia.pdf
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
TR - Agricultural Crops Production NC III.pdf
PDF
Complications of Minimal Access Surgery at WLH
PDF
Basic Mud Logging Guide for educational purpose
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
master seminar digital applications in india
PDF
Classroom Observation Tools for Teachers
PDF
Insiders guide to clinical Medicine.pdf
PPTX
Cell Types and Its function , kingdom of life
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Cell Structure & Organelles in detailed.
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
Pharma ospi slides which help in ospi learning
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Pre independence Education in Inndia.pdf
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
TR - Agricultural Crops Production NC III.pdf
Complications of Minimal Access Surgery at WLH
Basic Mud Logging Guide for educational purpose
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
STATICS OF THE RIGID BODIES Hibbelers.pdf
master seminar digital applications in india
Classroom Observation Tools for Teachers
Insiders guide to clinical Medicine.pdf
Cell Types and Its function , kingdom of life
Microbial diseases, their pathogenesis and prophylaxis
Final Presentation General Medicine 03-08-2024.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF

The Extreme Programming (XP) Model

  • 1. The Extreme Programming Model Damian Gordon The Extreme Programming Model Damian Gordon
  • 2. Contents 1. Overview 2. Details 3. Advantages 4. Disadvantages 5. Interesting 6. Reflection 7. Review 8. Summary
  • 5. Overview • The “Extreme Programming (XP) Model” is a model that represents one method as to how software can be developed.
  • 6. Timeline of Methodologies 6 1950s Code & Fix 1960s Design-Code-Test-Maintain 1970s Waterfall Model 1980s Spiral Model 1990s Rapid Application Development, V Model 2000s Agile Methods
  • 7. Timeline of Methodologies 7 1950s Code & Fix 1960s Design-Code-Test-Maintain 1970s Waterfall Model 1980s Spiral Model 1990s Rapid Application Development, V Model 2000s Agile Methods
  • 9. Overview • Extreme Programming (XP) was created by Kent Beck during his work on the C3 project. • Beck became the C3 project leader in 1996 and began to refine the development methodology used in the project • He wrote a book on the methodology, published in October 1999, called Extreme Programming Explained. 9
  • 10. Reference • Beck, K. (1999) “Extreme Programming Explained: Embrace Change”. Addison-Wesley, ISBN 978-0321278654.
  • 11. Kent Beck • Born in 1961. • an American software engineer and the creator of Extreme Programming • was one of the 17 original signatories of the Agile Manifesto • the leading proponent of Test-Driven Development
  • 14. Extreme Programming (XP) • The key assumption of XP is:
  • 15. Extreme Programming (XP) • The key assumption of XP is: Embrace Change
  • 16. Extreme Programming (XP) • Start with the Planning Game: • The game is a meeting that occurs once per iteration, typically once a week. The planning process is divided into two parts: – Release Planning: This is focused on determining what requirements are included in which near-term releases, and when they should be delivered. The customers and developers are both part of this. – Iteration Planning: This plans the activities and tasks of the developers. In this process the customer is not involved.
  • 17. Extreme Programming (XP) • This is done by: – Emphasis on continuous feedback from the customer – Short iterations – Design and redesign – Coding and testing frequently – Eliminating defects early, thus reducing costs – Keeping the customer involved throughout the development – Delivering working product to the customer
  • 18. Extreme Programming (XP) • Management-Practices – On-Site Customer: A central customer contact must always be accessible in order to clarify requirements and questions directly. – Planning Game: Projects, in accordance with XP, run iteratively (repeatedly) and incrementally (gradually build on each other). The contents of the next step are planned before each iteration. All project members (incl. the customer) participate. – Short Releases: New deliveries should be made at short intervals. Consequently, customers receive the required functions quicker and can therefore give feedback on the development quicker.
  • 20. Extreme Programming (XP) • Management-Practices – On-Site Customer: A central customer contact must always be accessible in order to clarify requirements and questions directly. – Planning Game: Projects, in accordance with XP, run iteratively (repeatedly) and incrementally (gradually build on each other). The contents of the next step are planned before each iteration. All project members (incl. the customer) participate. – Short Releases: New deliveries should be made at short intervals. Consequently, customers receive the required functions quicker and can therefore give feedback on the development quicker.
  • 21. Extreme Programming (XP) • Team-Practices – Metaphor: Only a few clear metaphors should describe the system being developed so that the nitty-gritty of the system is clear to all of the project members. – Collective Ownership: The whole team is responsible for the system, not individuals. Each developer must have access to all lines of code so that each developer is able to take over the task of another developer. – Continuous Integration: All changes to the system are integrated promptly so that not too many dependencies between changes occur. – Coding Standards: Regarding the common responsibility for the code, there should be a given common standard for writing the code. – Sustainable Pace: XP builds on the creativity of the individual project members. This creativity cannot be achieved if the project team constantly works overtime. Overtime is to be avoided.
  • 22. Extreme Programming (XP) • Programming-Practices – Testing: All developments must be tested. – Simple Design: The system should be designed as simply as possible so that it is easier to understand, modify and test. – Refactoring: As soon as it becomes necessary to alter the structure of the system, it should be implemented. – Pair Programming: There are always two developers sitting in front of a computer in order to increase the quality and transfer the knowledge better.
  • 23. Extreme Programming (XP) • Project are broken down into 1-2 week iterations. • If changes occur in the middle of an iteration, the team are capable of reacting to them, as long as the team hasn’t started work on a particular feature. • Extreme Programming teams work in a strict priority order. Features to be developed are prioritized by the customer.
  • 24. Extreme Programming (XP) • Design – Writing unit tests before programming and keeping all of the tests running at all times. The unit tests are automated and eliminates defects early, thus reducing the costs. – Starting with a simple design just enough to code the features at hand and redesigning when required.
  • 25. Extreme Programming (XP) • Design: User Stories
  • 26. Extreme Programming (XP) • Development – Programming in pairs (called pair programming), with two programmers at one screen, taking turns to use the keyboard. While one of them is at the keyboard, the other constantly reviews and provides inputs. – Integrating and testing the whole system several times a day.
  • 27. Extreme Programming (XP) • Pair Programming – two programmers work together at one workstation. – One, the driver, writes code while the other, the observer or navigator, reviews each line of code as it is typed in. – The two programmers switch roles frequently.
  • 28. Extreme Programming (XP) • Pair Programming – While reviewing, the observer also considers the "strategic" direction of the work, coming up with ideas for improvements and likely future problems to address. – This frees the driver to focus all of their attention on the "tactical" aspects of completing the current task, using the observer as a safety net and guide.
  • 29. Extreme Programming (XP) • Pair Programming – Pair programming increases the man-hours required to deliver code compared to programmers working individually from up to between 15% and 100%. – However, the resulting code has about 15% fewer defects.
  • 30. Extreme Programming (XP) • Production – Putting a minimal working system into the production quickly and upgrading it whenever required. – Keeping the customer involved all the time and obtaining constant feedback.
  • 33. Advantages • Large project are divided into manageable amounts
  • 34. Advantages • Reduced costs and time required for project realization.
  • 35. Advantages • Extreme Programming teams save lots of money because they don’t use too much documentation.
  • 36. Advantages • Simplicity is another advantage of Extreme Programming projects.
  • 37. Advantages • XP is reduces the risks related to programming. Normally programming depends a lot on individuals key team members. In XP, Using module structure, and pair programing XP spreads the risk and mitigate the dependence on individuals
  • 38. Advantages • In software simplicity always brings quality and contributes the robustness. By bringing simplicity, XP manages to create faster software with less defects. Test driven development at the coding stage and the customer UAT validation leads to successful development completion.
  • 40. Disadvantages • Extreme Programming is focused on the code rather than on design.
  • 41. Disadvantages • XP requires a detailed planning from the start due to changing costs & scope
  • 42. Disadvantages • XP doesn't measure/plan Quality Assurance of coding.
  • 43. Disadvantages • To convince developers to accept this tough practice is not always easy. It requires more discipline in the team and devotion of your customers. Project management might experience difficulties related with the practice that changes during the life cycle.
  • 44. Disadvantages • XP is practiced with pair programming which might usually lead to too much duplication of codes and data.
  • 46. Interesting • XP engineering practices include things like test-driven development, automated testing, pair programming, simple design, and refactoring.
  • 47. Interesting • XP says that the only truly important product of the system development process is code.
  • 48. Interesting • Coding can also help to communicate thoughts about programming problems. A programmer dealing with a complex programming problem, or finding it hard to explain the solution to fellow programmers, might code it in a simplified manner and use the code to demonstrate what she means.
  • 49. Interesting • System-wide integration testing is encouraged, initially, as a weekly activity, for early detection of incompatible interfaces, to reconnect before the separate sections diverged widely from coherent functionality.
  • 50. Interesting • Listening is a key element of XP, programmers must listen to what the customers need the system to do, what "business logic" is needed.
  • 51. Interesting • XP is still evolving, assimilating more lessons from experiences in the field. In the second edition of Extreme Programming Explained, five years after the first edition, Beck added more values and practices and differentiated between primary and corollary practices.
  • 52. Interesting There are other versions of the Model:
  • 54. Reflections • XP is very useful when we have: – Dynamically changing software requirements – Risks caused by fixed time projects using new technology – Small, co-located extended development team – The technology you are using allows for automated unit and functional tests
  • 55. Reflections • XP sees communication as a vital aspect of development, and most people agree that face to face conversation is the best form of communication, so XP suggests that the team sit together in the same space without barriers to communication, such as cubicle walls.
  • 56. Reflections • XP tells you to build in some slack, the idea behind slack is to add some low priority tasks or stories in your weekly and quarterly cycles that can be dropped if the team gets behind on more important tasks or stories.
  • 57. Reflections • XP focuses on practice excellence. The method prescribes a small number of absolutely essential practices and encourages teams to perform those practices as good as they possibly can, almost to the extreme.
  • 60. Review • What did we learn?

Editor's Notes

  • #17: The purpose of the Planning Game is to guide the product into delivery. Instead of predicting the exact dates of when deliverables will be needed and produced, which is difficult to do, it aims to "steer the project" into delivery using a straightforward approach.