SlideShare a Scribd company logo
Methods and Tools that have
 potential to improve PPE
        compliance

    PDSA tools – “Do”
“DO” step of the PDSA cycle


 Carry out the plan
 Collect the data
 Begin analysis of the data
“Do” and Implementation
 According to the Institute for Healthcare
  Improvement, this next step is to test a
  change in the real work setting.
 The Plan-Do-Study-Act (PDSA): planning it,
  trying it, observing the results, and acting on
  what is learned.



Adapted from:
  http://www.ihi.org/knowledge/Pages/HowtoImprove/ScienceofImpro
  vementTestingChanges.aspx
Reasons to test change...according to IHI

   To increase your belief that the change will result in
      improvement.
     To decide which of several proposed changes will
      lead to the desired improvement.
     To evaluate how much improvement can be expected
      from the change.
     To decide whether the proposed change will work in
      the actual environment of interest.
     To decide which combinations of changes will have
      the desired effects on the important measures of
      quality.
     To evaluate costs, social impact, and side effects from
      a proposed change.
     To minimize resistance upon implementation.
Models and tools that could be used
in this process:


 STAR
 5 S’s
 Communication
 Coaching
The 5 S’s Tool
 SORT: Sort through items, keep only what is
    needed, and dispose of what is not.
   STRAIGHTEN: Orderliness.
   SHINE: Cleanliness. The cleaning process allows
    us to inspect and expose abnormal or failure
    conditions that affect quality.
   STANDARDIZE: Create rules to monitor first 3
    S’s.
   SUSTAIN: Self discipline. Maintaining a stabilized
    work place is an ongoing process.
The 5 S’s




            www.clinicalmicrosystem.org
http://www.clinicalmicrosystem.org/materials/worksheet
s/
How this tool can be used to ensure
PPE compliance


 The 5 S tool can be used to implement change
  and essentially trim the fat on a program/study
 Through the use of this tool the PDSA cycle is
  more effective and ensures the continued
  success of the rest of the cycle.
STAR model

S Separateness or
 differences.
T Talking and listening
 (“tuning”).
A Action opportunities.
R Reason to work together.
STAR model
How this tool can be used to ensure
PPE compliance


S   Separateness or differences.
T   Talking and listening (“tuning”).
A   Action opportunities.
R   Reason to work together.

More Related Content

PPTX
Plan do-study-act
PPTX
PDCA quality improvement
PPT
PDCA Cycle
PPTX
Deming’s PDCA and Constant Learning
PDF
PDCA: Plan-Do-Check-Act
PPS
Intro to Plan Do Check Act
PPTX
Presentation
PDF
Continuous improvement: the Deming Wheel (PDCA)
Plan do-study-act
PDCA quality improvement
PDCA Cycle
Deming’s PDCA and Constant Learning
PDCA: Plan-Do-Check-Act
Intro to Plan Do Check Act
Presentation
Continuous improvement: the Deming Wheel (PDCA)

What's hot (20)

PDF
PDCA A Cycle to Better
PPT
PDCA(slides)
PPTX
An introduction to the PDCA cycle
PPT
PDCA & Tools
PPTX
How pdca cycle used in context of TQM
PPTX
Quality Improvement Methodologies and Tools
PDF
PDCA Cycle In Quality Management And Problem Solving PowerPoint Presentation ...
PPSX
Pdsa tell me_more
PDF
The Deming Cycle; Plan Do Check Act
PPTX
Quality Improvement Models: PDSA
PPT
PPTX
Deming Cycle
PPTX
How to solve problems (or at least try) with 8D
PPTX
Plan do-check-act
PPT
086 pcda problemsolving training
PDF
PDSA Theory Burst by the Weitzman Institute
PPTX
Application of pdca for dp2
PDCA A Cycle to Better
PDCA(slides)
An introduction to the PDCA cycle
PDCA & Tools
How pdca cycle used in context of TQM
Quality Improvement Methodologies and Tools
PDCA Cycle In Quality Management And Problem Solving PowerPoint Presentation ...
Pdsa tell me_more
The Deming Cycle; Plan Do Check Act
Quality Improvement Models: PDSA
Deming Cycle
How to solve problems (or at least try) with 8D
Plan do-check-act
086 pcda problemsolving training
PDSA Theory Burst by the Weitzman Institute
Application of pdca for dp2
Ad

Viewers also liked (19)

PPT
7. els materials i les seves aplicacions
PDF
Global South Development Magazine July 2011
PDF
Popplet
PPTX
Casting a Wider Net(work)
PDF
программа адаптация
DOC
Comp skill 1
PPT
Pollution agenda project
PDF
Bad Boy Beacon MAR 2012
DOCX
лабораторная 6(1)
PPTX
Prøve
PDF
Holiday Slide PDF
DOCX
.Net projects 2011 by core ieeeprojects.com
PDF
справочный материал 3 4 и 5 листы
PDF
Un fatto umano - Bibliografia - Giffone / Longo / Parodi
PPTX
Digital creative presentation
PDF
E brochure grandworld
PPTX
Power Point Software
DOC
Переработка древесных
PPT
M1
7. els materials i les seves aplicacions
Global South Development Magazine July 2011
Popplet
Casting a Wider Net(work)
программа адаптация
Comp skill 1
Pollution agenda project
Bad Boy Beacon MAR 2012
лабораторная 6(1)
Prøve
Holiday Slide PDF
.Net projects 2011 by core ieeeprojects.com
справочный материал 3 4 и 5 листы
Un fatto umano - Bibliografia - Giffone / Longo / Parodi
Digital creative presentation
E brochure grandworld
Power Point Software
Переработка древесных
M1
Ad

Similar to Tools pdsa (20)

PPT
Rapid Cycle Improvement 2009
PPTX
QI theories relevant to PPE compliance
PPTX
PDSA - Niharika Dubey.pptx
PDF
7 s4 i model for improvement final
PPT
PDSA-Cycles-Delon PDSA-Cycles-Delon PDSA-Cycles-Delon
PPTX
SAFE 1 - Introducing Quality Improvement - a presentation.pptx
PPTX
PDCA Cycle
DOCX
Hand Hygiene Quality Improvement
PDF
Ab cs of-pdca
PDF
Pdsa Www.Hqc.Sk.Ca Download
PDF
Modelfor Improvement
PDF
The Model For Improvement
PPT
Sceqr quality improvementprocesses
PPTX
The Model for Quality Improvement Presentation
PPTX
Models of Quality in healthcare*********
PPTX
Six sigma- PPE - Jade
PPTX
Six sigma ppe - jade
PDF
Psp mpc topic-07
PPTX
Primary Care Collaborative 2
PPTX
Improving services, leading change – implementing change in rapid cycles
Rapid Cycle Improvement 2009
QI theories relevant to PPE compliance
PDSA - Niharika Dubey.pptx
7 s4 i model for improvement final
PDSA-Cycles-Delon PDSA-Cycles-Delon PDSA-Cycles-Delon
SAFE 1 - Introducing Quality Improvement - a presentation.pptx
PDCA Cycle
Hand Hygiene Quality Improvement
Ab cs of-pdca
Pdsa Www.Hqc.Sk.Ca Download
Modelfor Improvement
The Model For Improvement
Sceqr quality improvementprocesses
The Model for Quality Improvement Presentation
Models of Quality in healthcare*********
Six sigma- PPE - Jade
Six sigma ppe - jade
Psp mpc topic-07
Primary Care Collaborative 2
Improving services, leading change – implementing change in rapid cycles

More from lexie_daryan (7)

PPTX
What if no one is interested in Quality Improvement when we get home?
PPTX
Topic 9 ethical considerations
PPTX
How do we measure PPE compliance?
PPTX
Medication errors powerpoint
PPTX
What is leadership? Definitions and models
PPTX
How do people learn in the workplace?
PPTX
Quality improvement - Jess and Alex
What if no one is interested in Quality Improvement when we get home?
Topic 9 ethical considerations
How do we measure PPE compliance?
Medication errors powerpoint
What is leadership? Definitions and models
How do people learn in the workplace?
Quality improvement - Jess and Alex

Recently uploaded (20)

DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
IFRS Notes in your pocket for study all the time
PDF
How to Get Business Funding for Small Business Fast
PDF
How to Get Funding for Your Trucking Business
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
Training And Development of Employee .pdf
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Types of control:Qualitative vs Quantitative
PPT
Chapter four Project-Preparation material
PPTX
5 Stages of group development guide.pptx
unit 1 COST ACCOUNTING AND COST SHEET
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
MSPs in 10 Words - Created by US MSP Network
Power and position in leadershipDOC-20250808-WA0011..pdf
New Microsoft PowerPoint Presentation - Copy.pptx
Euro SEO Services 1st 3 General Updates.docx
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
IFRS Notes in your pocket for study all the time
How to Get Business Funding for Small Business Fast
How to Get Funding for Your Trucking Business
Reconciliation AND MEMORANDUM RECONCILATION
ICG2025_ICG 6th steering committee 30-8-24.pptx
Training And Development of Employee .pdf
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Nidhal Samdaie CV - International Business Consultant
Types of control:Qualitative vs Quantitative
Chapter four Project-Preparation material
5 Stages of group development guide.pptx

Tools pdsa

  • 1. Methods and Tools that have potential to improve PPE compliance PDSA tools – “Do”
  • 2. “DO” step of the PDSA cycle  Carry out the plan  Collect the data  Begin analysis of the data
  • 3. “Do” and Implementation  According to the Institute for Healthcare Improvement, this next step is to test a change in the real work setting.  The Plan-Do-Study-Act (PDSA): planning it, trying it, observing the results, and acting on what is learned. Adapted from: http://www.ihi.org/knowledge/Pages/HowtoImprove/ScienceofImpro vementTestingChanges.aspx
  • 4. Reasons to test change...according to IHI  To increase your belief that the change will result in improvement.  To decide which of several proposed changes will lead to the desired improvement.  To evaluate how much improvement can be expected from the change.  To decide whether the proposed change will work in the actual environment of interest.  To decide which combinations of changes will have the desired effects on the important measures of quality.  To evaluate costs, social impact, and side effects from a proposed change.  To minimize resistance upon implementation.
  • 5. Models and tools that could be used in this process:  STAR  5 S’s  Communication  Coaching
  • 6. The 5 S’s Tool  SORT: Sort through items, keep only what is needed, and dispose of what is not.  STRAIGHTEN: Orderliness.  SHINE: Cleanliness. The cleaning process allows us to inspect and expose abnormal or failure conditions that affect quality.  STANDARDIZE: Create rules to monitor first 3 S’s.  SUSTAIN: Self discipline. Maintaining a stabilized work place is an ongoing process.
  • 7. The 5 S’s www.clinicalmicrosystem.org
  • 9. How this tool can be used to ensure PPE compliance  The 5 S tool can be used to implement change and essentially trim the fat on a program/study  Through the use of this tool the PDSA cycle is more effective and ensures the continued success of the rest of the cycle.
  • 10. STAR model S Separateness or differences. T Talking and listening (“tuning”). A Action opportunities. R Reason to work together.
  • 12. How this tool can be used to ensure PPE compliance S Separateness or differences. T Talking and listening (“tuning”). A Action opportunities. R Reason to work together.

Editor's Notes

  • #3: “DO” step of the PDSA cycle includes: Carrying out the planCollecting the dataAnd Beginning analysis of the dataEssentially the “Do” step is the central step in a PDSA cycle, and requires time to evaluate and reflect on the cycle or study to ensure efficiency, as well as ensuring that we are essentially on the right track and make changes where we see is necessary.
  • #4: http://www.ihi.org/knowledge/Pages/HowtoImprove/ScienceofImprovementTestingChanges.aspxAccording to the Institute for Healthcare Improvement; once a team has set an aim, established its membership, and developed measures to determine whether a change leads to an improvement, the next step is to test a change in the real work setting, and this is where implementation of the model is important.
  • #5: Institute for Healthcare Improvement. (2011). Science of Improvement: Testing Changes. Retrieved from: http://www.ihi.org/knowledge/Pages/HowtoImprove/ScienceofImprovementTestingChanges.aspxReasons to test change according to the Institute for Healthcare Improvement.....In order to increase your belief that the change will result in improvement. To decide which of several proposed changes will lead to the desired improvement. To evaluate how much improvement can be expected from the change. To decide whether the proposed change will work in the actual environment of interest. To decide which combinations of changes will have the desired effects on the important measures of quality. To evaluate costs, social impact, and side effects from a proposed change. To minimize resistance upon implementation. After testing a change on a small scale, learning from each test, and refining the change through several PDSA cycles, the change is ready for implementation on a broader scale-for example, for an entire pilot population or on an entire unit.
  • #6: So models and tools that could be used in this process include the STAR model, the 5 S’s model, communication and coaching.The STAR and 5 S models I will be explaining in further detail a little later. Communication can be used as part of the “do” process when following the PDSA model, communicating to the people involved in the study; what needs to be completed in order to achieve the desired results. Communication would also be helpful in discussing what those involved or participating in the study have found themselves and their feedback. Coaching involves reflecting on the feedback received and providing further education, support and training where deemed necessary and where needed. In a case study whereby a hospital used a PDSA study to implement patient feedback forms, in the DO section, they implemented the following questions….“What did you observe? Here you will write down observations you have during your implementation. This may include how the patients react, how the doctors react, how the nurses react, how it fit in with your system or flow of the patient visit. You will ask, “Did everything go as planned?” “Did I have to modify the plan?””Taken from:PDSA directions and examples. http://www.ihi.org/knowledge/Pages/Tools/PlanDoStudyActWorksheet.aspx 
  • #7: Microsystem Academy. (2011). Worksheets. Retrieved from: http://www.clinicalmicrosystem.org/materials/worksheets/The 5 S’s tool was originally taken from the Japanese words: seiri, seiton, seiso, seiketsu and shitsuke, which roughly translate to Sort, Straighten, Shine, Standardise and Sustain. This model originally comes from the Lean model, but can be used and applied within PDSA.SORT: Includes sorting through items, keeping only what is needed, and disposing of what is not. STRAIGHTEN : Includes orderliness of the process and the model. SHINE: Includes cleanliness. The cleaning process allows us to inspect and expose abnormal or failure conditions that affect quality.STANDARDIZE: includes creating rules to monitor the first 3 S’s.SUSTAIN: includes self discipline and a stabilized work place.
  • #8: The Dartmouth Institute. (2011). Microsystems at a glance.Retrieved from www.clinicalmicrosystem.org. This is a diagram of the model and its steps…“The 5S’s essentially come together to create a continuous process for improving the work environment and eliminating waste or “muda”.And…MUDA means activity without value.”
  • #9: http://www.clinicalmicrosystem.org/materials/worksheets/This is a worksheet that can be used to evaluate and improve a process through the use of the 5 S’s model, with before and after evaluations collected.
  • #10: The 5 S tool can be used to implement change and essentially trim the fat on a program.Through the use of this tool the PDSA cycle is more effective and ensures the continued success of the rest of the cycle. So the use of this tool for PPE compliance could include…SORT: Would include sorting through items for the study, keeping only what is needed, what works well and is easiest to implement and disposing of what is not. STRAIGHTEN : Would include ensuring the process is efficient, time efficient and works well. SHINE: Inspecting and exposing abnormal or failure conditions that affect quality within the studySTANDARDIZE: Creating rules or guidelines to monitor the first 3 S’s.SUSTAIN: Includes testing the model and ensuring it will still be valid and worthwhile.
  • #11: Zimmerman, B.J. (1998). Exploring Generative Relationships  S T A R. York UniversityThe STAR model stands for separateness, tuning, action, reason to work together. So….S   Separateness or differences.  There needs to be differences in the background, skills, perspectives, or training of the parties. T   Talking and listening (“tuning”).  There needs to be real opportunities to talk and listen to each other with permission to challenge the status quo, sacred cows or implicit assumptions of the context.  Opportunities for reflection allow the parties to grow and learn. A Action opportunities.  The parties need to be able to act together to co-create something new. R Reason to work together.   The parties need to have a reason to share resources, ideas or to act as allies even if only for a short period. 
  • #12: So this is a pictorial demonstration of the STAR model, and so as you can see trust is the centre of the model and is important to ensure the team is able to work together to form a common goal.
  • #13: The use of the STAR model would be beneficial in ensuring PPE compliance as S   Separateness or differences – ensuring that there are different professionals reflecting on the current PDSA cycle  T   Talking and listening:“tuning into one another” – allowing people to reflect on the ongoing study in a safe environment and responding appropriately to the ideas and thoughts that come up.  A Action opportunities: being able to work together towards the safety goals requiredR Reason to work together: so the reason to work together would be towards the common goal of completing the cycle and ensuring PPE compliance.