QUALITY TPM KAIZEN TQM TQM - TQM capitalizes on the involvement of management, workforce, suppliers, and even customers, in order to meet or exceed customer expectations. TPM - TPM (Total Productive Maintenance) is a maintenance philosophy designed to integrate equipment maintenance into the manufacturing process. The goal of any TPM program is to eliminate losses tied to equipment maintenance. KAIZEN -Kaizen means Continual Improvements. No one can dispute value of the improvement. Kaizen philosophy is based on the fact that our life - be it working-life, social-life, or home life - needs to be constantly improved. You must enlighten yourself on Kaizen and apply in all walks of life.
TOTAL QUALITY MANAGEMENT T Q M
Introduction Total  –  Made up of the whole(or) Complete. Quality  – Degree of Excellence a product or service provides to the customer in present and future. Management  – Act , art, or manner of handling , controlling, directing, etc. TQM  is the art of managing the whole  to achieve excellence.
Total Quality Management (TQM) is a  management  strategy aimed at embedding  awareness  of  quality  in all organizational processes.
TQM requires that the company maintain this  quality standard  in all aspects of its business.  This requires ensuring that things are done right the first time and that defects and waste are eliminated from operations.
What is Quality CONTINUOUS SATISFACTION OF CUSTOMER REQUIREMENT. Q=P/E I.E Q HAS TO BE > 1  Q-QUALITY, P-PERFORMANCE, E-EXPECTATION QUALITY RELATES TO  perfection, delighting or pleasing the customer, eliminating waste,  doing it right the first time, and/or consistency.
Attributes FITNESS FOR USE  IS THE ABILITY OF A GOOD OR SERVICE TO MEET CUSTOMER NEEDS. QUALITY OF CONFORMANCE  IS THE EXTENT TO WHICH A PROCESS IS ABLE TO DELIVER OUTPUT THAT CONFIRMS TO DESIGN SPECIFICATIONS. SPECIFICATIONS  ARE TARGETS AND TOLERANCES DETERMINED BY DESIGNERS OF GOODS AND SERVICES. QUALITY CONTROL  MEANS ENSURING CONSISTENCY IN PROCESSES TO ACHIEVE CONFORMANCE. SERVICE  QUALITY IS CONSISTENTLY MEETING OR EXCEEDING CUSTOMER EXPECTATIONS
Evolution of quality Era 1900  1920  1940  1960  1980  1990  2000 Craftsman Foreman Inspection SQC TQC TQM TQC &CWQC  Co-wide quality control Evolution Years
Evolution of quality –Means & Focus 1975   1980  1985  1990  1995  2000 Operation Customers Innovations Quality of Work life Quality Circle Productivity Employee Involvement Quality Employees Empowerment Total Quality Self Directed Teams TQC/TQM Self Directed/ Managed Teams
Kano’s Model
Umbrella Model of TQM SPC JIT TEI Kaizen Quality Assurance Problem- Solving tools Customer Satisfaction Taguchi Methods
Basic Approach A committed and involved management to provide long-term  top - to - bottom organizational support. An unwavering focus on the customer, both internally and externally.  Effective involvement and utilization  of the  entire work force.
Basic Approach Continuous improvement of  the business and production process. Treating supplier as partners.  Establish performance measures for the processes.
New and Old Cultures Quality Element  TQM Definition -Product  Customer Priorities -Service &Cost  Quality Decisions- Short   Long  Emphasis- Detection  Prevention
New and Old Cultures Errors-  Operations  System Responsibility-  QC   Every Body  Problem  Solving -  Managers  Teams Procurement-  Price  Partners/JIT Manager’s Role-  Plan  Delegate  Assign  Coach  Enforce  Mentor
Real Life TQM has being  implemented in  TVS Group Boeing Aircraft Reliance  Tata  L & T  HMT
QUALITY GURUS - American
QUALITY GURUS - Japanese
Plan: study current situation Do: implement plan on trial basis Study: determine if trial is working correctly Act: standardize improvements The Deming Cycle
Chain Reaction Improve Quality Provide jobs and more jobs Costs decrease because of less rework, fewer mistakes, delays, better use of time & materials Productivity Improves Stay in business Capture market with better quality and price
Deming’s 14 Points Create a vision and demonstrate commitment Long-term vision Companies purpose is to serve their customers and employees, not simply for profit Invest in innovation, training, research Improve competitive position Top management is responsible for this Effective leadership begins with commitment
Quota-driven, adversarial management won’t work That ignores importance of quality improvement Labor and management have to cooperate to improve the customers’ satisfaction Keep training people – turnover does exist 3 . Understand Inspection Routine inspection – let someone else fix it Increases costs in the end (no rework in services) Inspect your own work and fix it 2.  Learn the New Philosophy
4.  Don’t Buy on the Cost per Part Basis Don’t buy from several for competition Increases variability Work with suppliers in long-term relationships Improve quality with your suppliers Also get volume discounts, fewer setups Supplier-customer bond
5.  Improve Constantly and Forever Reduce causes of variation Engage all employees  How to do jobs more efficiently More effectively Continuous Process Improvement now is mandatory
6.  Institute Training People are a valuable resource and want to do a good job They need training to know how to do a good job Invest in their future Training should include tools for Diagnosing Analyzing Solving  quality problems Identify improvement opportunities
7.  Institute Leadership The job of management is  leadership , not  supervision . If supervisors don’t know the job, they can’t lead Focus on getting product “out the door” Good supervisors are coaches, not prison guards
8. Drive Out Fear Managers and workers must have mutual respect, 2 way communication Pointing out quality problems and will everybody will work effectively
9. Optimize the Efforts of Teams People have to understand what customers want No barrires should be there between R&D, Sales, Admin, Production…. Team should tackle the problem
10. Eliminate Exhortations Do you work better with a poster on the wall? Slogans assume quality problems caused by people Deming thinks the system is responsible for problems Workers demoralized when they cannot fix defects, and yet are held accountable Workers’ attempts to fix problems only cause more variation
11. Eliminate Numeric Quotas They do not encourage improvement If you do improve it, they’ll just raise the quota Risk of missing quotas Once you meet the standard, why try harder? Arbitrary (random) goals are demoralizing without a plan of how you can reach those goals Variability in system year-to-year Use statistical method to improve quality
12. Remove Barriers to Pride in Workmanship People are treated like a commodity Work nights to make up for cut positions Don’t make your people compete against each other Behavior driven by what boss wants, not Quality
13 Education & Self-Improvement Not job-specific Many benefits, some specific to job, others broader An org not only need good people but also people who improve with education
14. Commitment from Top  Accomplish the Transformation Start the cultural change with top management People will be skeptical until they start to see change
MANAGING QUALITY
CORE CONCEPT OF TQM Quality for profit  Right first time Acceptable Quality levels Cost of quality  Failure Cost  costs caused by defective parts, products, or faulty services  . Internal - failures discovered during production (e.g. rework, problems, material/product losses, downtime)  . External - failures discovered after delivery (e.g. warranty, returned goods, liability claims, penalties)  Appraisal Cost  costs of activities designed to ensure quality or uncover defects (e.g. in-line inspection, final inspection, field testing, crash test dummies, crumpled cars)  Prevention cost  costs of preventing defects from occurring (e.g. training, working with vendors, quality control procedures, quality improvement programs, extra attention in design and production)  Hidden cost  Potential lost sale, scrap not reported, cost of design or software change due to quality reason)
STRATEGIC QUALITY MANAGEMENT
PRODUCT PROCESS SYSTEM PEOPLE LEADERSHIP FIVE PILLARS OF TQM Effectiveness Hard Aspect Suitability  Soft Aspect Confluence
TOTAL PRODUCTIVE MAINTENANCE T P M
1. TPM definition (1) A company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness Total all employees are involved it aims to eliminate all accidents, defects and breakdowns Productive actions are performed while production goes on troubles for production are minimized Maintenance keep in good condition repair, clean, lubricate
1. TPM definition (2) TPM combines the traditionally American practice of preventive maintenance with Total Quality Control and Total Employee Involvement, to create a culture where operators develop ownership of their equipment, and become full partners with Maintenance, Engineering and Management to assure equipment operates properly everyday.
2. Origins of TPM Dr. Deming introduced statistical analysis and used the resulting data to control quality during manufacturing (TQM) Some general concepts of TQM did not work well in the maintenance environment The need to go further than preventive maintenance was quickly recognized by those companies who were committed to TQM Maintenance became an integral part of TQM in the early 90’s
3. TPM principles Increase Overall Equipment Effectiveness (OEE) Improve existing planned maintenance systems The operator is the best condition monitor Provide training to upgrade operations and maintenance skills Involve everyone and utilize cross-functional teamwork
4. Eight major pillars of TPM Education and training Safety and environmental management Autonomous Maintenance Planned Maintenance Equipment and process improvement Early management of new equipment Process quality management TPM in the office
4. Eight major pillars of TPM Autonomous Maintenance (1) Train the operators to close the gap between them and the maintenance staff, making it easier for both to work as one team Change the equipment so the operator can identify any abnormal conditions and measure deterioration before it affects the process or leads to a failure
4. Eight major pillars of TPM 4.1. Autonomous Maintenance (2) 7 steps  are implemented to progressively increase operators knowledge, participation and responsibility for their equipment 1. Perform initial cleaning and inspection 2. Countermeasures for the causes and effects of dirt and dust 3. Establish cleaning and lubrication standards 4. Conduct general inspection training 5. Carry out equipment inspection checks 6. Workplace management and control 7. Continuous improvement
4. Eight major pillars of TPM 4.2. Equipment and process improvement Objective : maximize efficiency by eliminating waste and manufacturing losses Manufacturing losses are categorized into 13 big losses: Equipment losses (6) Manpower losses (4) Material losses (3)
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.1. Equipment losses Downtime  loss Speed loss Quality loss Equipment failure / breakdowns Set-up / adjustments Minor stopping / idling Reduced speed Process errors Rework / scrap
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.2. Manpower and material losses Manpower losses Material  losses Cleaning and checking Waiting instructions Waiting quality confirmation Material yield Energy losses Waiting materials Consumable material losses
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) OEE figures are determined by combining the availability and performance of your equipment with the quality of parts made OEE measures the efficiency of the machine during its planned loading time. Planned downtime does not effect the OEE figure.
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability Downtime loss Speed loss Performance Quality Yield Quality loss
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability =  time available for production - downtime time available for production Performance =  ideal cycle time x number of parts produced   operating time Quality Yield =  total number of parts produced - defect number  total number of parts produced
4. Eight major pillars of TPM 4.3. Planned maintenance Objective : establish Preventative and Predictive Maintenance systems for equipment and tooling Natural life cycle of individual machine elements must be achieved Correct operation Correct set-up Cleaning Lubrication Retightening Feedback and repair of minor defects Quality spare parts
4. Eight major pillars of TPM 4.4. Early Management of new equipment Objective:  establish systems to shorten  new product or equipment development start-up, commissioning and stabilization time for quality and efficiency New equipment needs to be: easy to operate easy to clean easy to maintain and reliable have quick set-up times operate at the lowest life cycle cost
4. Eight major pillars of TPM 4.5. Process Quality Management Definition:  a process for controlling the condition of equipment components that affect variability in product quality Objective:  to set and maintain conditions to accomplish zero defects Quality rate  has a direct correlation with material conditions equipment precision production methods process parameters
4. Eight major pillars of TPM 4.6. TPM in administrative and support departments Administrative and support departments can be seen as process plants whose principal tasks are to collect, process, and distribute information Process analysis should be applied to streamline information flow
4. Eight major pillars of TPM 4.7. Education and training TPM  is a continuous learning process. 2 major components soft skills  training: how to work as teams, diversity training and  communication skills technical  training: upgrading problem-solving and equipment- related skills
4. Eight major pillars of TPM 4.8. Safety and environmental management Assuring safety and preventing adverse environmental impacts are important priorities in any TPM effort
5. TPM implementation 3 requirements for fundamental improvement Increasing motivation: changing peoples attitudes Increasing competency and peoples skills Improving the work environment, so that it supports the establishment of a program for implementing TPM
5. TPM Implementation 12 steps Preparation Kick-off Implementation Announcement to introduce TPM Introductory education campaign for the workforce TPM Promotion (special committees) Establish basic TPM policies and goals Preparation and Formulation of a master plan Develop an equipment management program Develop a planned maintenance program Develop an autonomous maintenance program Increase skills of production and maintenance personnel Perfect TPM implementation and raise TPM levels Stabilization Develop early equipment management program Invite customers, affiliated companies and subcontractors
5. TPM Implementation 5.1. Announce top management’s decision to introduce TPM State TPM objectives in a company newsletter Place articles on TPM in the company newspaper
5. TPM Implementation 5.2. Introductory education campaign Seminars for managers Slide presentations for all employees
5. TPM Implementation 5.3. TPM Promotion   Special committees at every level to promote TPM Newsletters Articles Videos Posters
5. TPM Implementation 5.4. Establish basic TPM policies and goals Analyze existing conditions Set goals Predict results
5. TPM Implementation 5.5. Preparation and Formulation of a master plan   A master plan lays out your goals, what you will do to achieve them and when you will achieve them Detailed plans for each pillar have to be prepared
5. TPM Implementation 5.6. TPM kick-off   The main kick-off to TPM should take the form of a formal presentation with all the  employees attending This opportunity can be used to gain the full support of the employees Invite external customers, affiliated and subcontracting companies
5. TPM Implementation 5.7. Develop an equipment management program (1) The tools of Total Quality Management and Continuous Improvement are applied to the management and improvement of equipment Form project teams Select model equipment identify equipment problems analyze equipment problems develop solutions and proposals for improvement
5. TPM Implementation 5.7. Develop an equipment management program (2) Typical membership of a team five to seven operators a maintenance person a technical expert Tools Pareto Cause & effect Root cause Methods Analysis
5. TPM Implementation 5.8. Develop a planned maintenance  program   Set up plans and schedules to carry out work on equipment before it breaks down, in order to extend the life of the equipment  Include periodic and predictive maintenance Include management of spare parts and tools
5. TPM Implementation   5.8. Develop a autonomous maintenance  program   A handing-over of maintenance tasks from specialized maintenance personnel to production operators Promote the seven steps Tasks to hand over cleaning lubricating inspecting set-up and adjustment
5. TPM Implementation 5.10. Increase skills of production and maintenance personnel The training sessions must be planned shortly after the kick-off presentation. 2 major components soft skills training technical training Train leaders together Have leaders share information with group members
5. TPM Implementation 5.11. Develop early equipment management program(1)   The principle of designing for maintenance prevention can be applied to new products, and to new and existing machines. New products  must be designed so that they can be easily produced on new or existing machines New machines  must be designed for easier operations, changeover and maintenance
5. TPM Implementation 5.11. Develop early equipment management program(2)   Existing machines : analyze historical records for trends of types of failures frequency of component failures root causes of failures determine how to eliminate the problem and reduce maintenance through an equipment design change or by changing the process
5. TPM Implementation 5.12. Perfect TPM implementation and raise TPM levels Evaluate for the PM Award: The Japanese Institute for Productive Maintenance runs the annual PM Excellence Award. They provide a checklist for companies applying for the award. Set higher goals
6. TPM Benefits Increased equipment productivity Reduced equipment downtime Increased plant capacity Lower maintenance and production costs Approaching zero equipment-caused defects Enhanced job satisfaction Increased Return On Investment
Production Methods & Kaizen
Production Methods & Kaizen
Production Methods
Efficiency Any production method relies on efficiency – this can be viewed in different ways: Productivity  – a measurement of output per unit of the factor used (labour, capital or land) Total Output Productivity = ------------------- Units of Factor Technical Efficiency  – output produced using the fewest possible inputs Productive Efficiency  – output produced at the lowest possible cost
Efficiency Production decisions involve deciding methods for new production runs and analysis of existing methods. Decisions may include: Substitute machinery for labour?  Use of new technology?  Organisation of the production layout?  Change of production method?
Production Methods The choice of production method and the factor inputs depends on such things as: the nature of the product  factor costs  the scale of  production
Production Decisions Which method? Type of Product One-Off Order? Mass Market product? Batch? Market size and  Segment Factor Costs –  Land, Labour and  Capital Complexity of design
Production Methods Job Production  – One-off production -  each item might have particular specifications Flow Production  – suitable for mass market products that are identical Batch Production  – each stage of the production process has an operation completed on it before moving on to the next stage – allows modifications to be made to products that otherwise are the same
Production Methods Which is more efficient? Operation 1 2 3 4 5 6 7 8 9 10 11 Finished Product
Production Methods Operation 1 1a 1b 1c 1d 2a 2b 2c 3a 3b 3c 3d 4 Finished product Or this?
Production Methods Or this? Cell 1 Cell 2 Cell 3 Finished Product Finished Product Finished Product
Production Methods Answer – it could be any of them! The design of the production space can influence: Output levels Factor use Efficiency Cost levels Quality assurance procedures
Kaizen (Continuous Improvement)
Kaizen (Continuous Improvement) Japanese concept – not made redundant by the decline of the Japanese economy which may be due to other institutional factors! Focus on gradual and continuous improvement A whole business philosophy Importance of EVERYONE buying into the concept and the vision
Kaizen Great attention paid to customer requirements and needs Efficient stock control methods help reduce costs and improve cash-flow Flexible working practices and empowerment – help increase efficiency, reduce costs and improve motivation Leadership seen as vital. Ability to communicate a clear vision, take people along with the vision and to think about where the company needs to be in 5, 10, 15 and 20 years time Fundamental principles – often characterised as ‘lean production’ – reducing waste, zero defects, high quality control measures at all stages Punctuality in all aspects – delivery, supply, manufacture, etc.
Kaizen Training COMPETING IN THE MARKETPLACE “ What factors are important to the customer?” John Deere -  Supplier Development
Kaizen Training TIME: The single best indicator of competitiveness Customer Lead Time / Delivery Time Working to reduce or minimize each of these times can make your company more valuable to both its internal and external customers. Set-up or Change-over Time Product Development Time Manufacturing Cycle Time
Kaizen Training Shrinking  Lead Times Reducing the overall time from receiving the order to delivering the product makes your company more responsive to the customer.  This can become the deciding factor when the customer makes their selection. As can be seen, manufacturing is only one part of the entire process.  Inputting, processing, and issuing orders is an area for improvement, as well as, assembly, loading and delivery to the customer` Order Lead Times Manufacturing Lead Times Delivery Lead Times Manufacturing Lead Times Order Lead Times Delivery Lead Times
Kaizen Training Where’s the Time in Lead Time This timeline represents an overall lead-time, with very little time spent on adding value to the product. Improvement Efforts Concentrated on reducing VA time, with no attention given to NVA.  Results of Common Improvement efforts, did not improve response time.  VA time is reduced, but, the costs for those improvements in lead time was substantial. Common Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1% Non-Value Added Time (NVA) 99% of Total Lead time VA 1/2 %
Kaizen Training Where’s the Time in Lead Time When we look at attacking the NVA Activities in the Timeline and compare that to the original timeline: This shows a 5X improvement in lead time Great Job!! Greatest Opportunities are actually here! NVA Time 95% of Total Lead time VA 5% Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1%
Kaizen Training Different Types of Activities Being able to tell the difference between NVA and VA activities is an important step in the Improvement Process. Value Added Activity (VA)  An activity that changes raw material to meet customer expectations. Non Value Added  Activity (NVA)  Those activities that take time, or occupy space but do not add to the value of the product. You must ask yourselves “Would you as a customer be willing to pay for any NVA activity being performed to that NEW 4x4 Pickup you just ordered?”
Kaizen Training Some examples NVA Activities: Walking Waiting on machine cycle Transporting parts Generating useless reports THE GOAL IS TO ELIMINATE THE NON-VALUE ADDED ACTIVITIES. Unnecessary motion Unnecessary stock on hand
KAIZEN A definition: Destroy, in our minds, the concepts and techniques of manufacturing that we practice today. Create a vision of what our production system and manufacturing techniques should be. Carry out that Vision by breaking through the status quo. We must avoid the urge to discover more sophisticated and technological solutions to tasks we shouldn’t be doing at all.
Kaizen Training Basic Rules for Change Keep an open mind to change No such thing as a dumb question or idea  Avoid spending money (Capital expense should be a last resort) Think about how to do it, NOT why it can’t be done Maintain a positive attitude Don’t’ make excuses & question current practices Just do it!! Have Fun!!!
Kaizen Training The 5S Housekeeping Standards First Step towards Continuos Improvement The aim of 5S is to create an atmosphere to keep a clean, organized, safe and efficient workplace for everyone. The foundation for the practice of  5S, comes from a Japanese program derived from these words,  seiri, seiton, seiso, seiketsu   and  shitsuke .  The 5S’s are a conventional approach towards maintaining and improving the work place.  The following words have been chosen for the 5S acronym’s. Sort Sustain Sanitize (Safety) Straighten Sweep
Kaizen Training Meaning of the 5S’s Sort Straighten Sweep (Scrubbing clean) Examine everything at the workplace & identify what is needed and what can be discarded Organizing the way things are put away with efficiency, quality, and safety in mind.  Need to decide where and how things should be put away and what rules should be obeyed to insure that it is maintained.  Sweeping, scrubbing and cleaning of the building, machines, fixtures & tools so that all areas of the workplace are neat & tidy.  This leads to early detection of mechanical problems before they become major breakdowns. Machines cry!
Kaizen Training Sanitize  (Safety) Sustain (Standardize) Meaning of the 5S’s Insuring that each workplace is properly designed for safety.  This is to protect every member from the dangers during the performance of their assigned tasks. Developing the practice necessary to continually participate in the 5S process.  This requires that each of the S’s become a personal habit.  This is the most difficult of the 5S’s, but it is the most important factor in achieving long term success.  Establishing routines and procedures for maintaining and improving on the first four (S’s), incorporating visual management tools.
Kaizen Training WASTE
Kaizen Training Do MORE with LESS Waste Productivity Staffing Productivity
SHIFT MINDSET CURRENT THINKING REQUIRED  THINKING WASTE NOT DEFINED REACT TO LARGE EXAMPLES REACTIVE IMPROVEMENT WASTE IS "TANGIBLE” IDENTIFY MANY SMALL OPPORTUNITIES -LEADS TO LARGE OVERALL CHAGE CONTINUOUS IMPROVEMENT WASTE TYPES  OF WASTE Correction Processing Motion Waiting Inventory Transportation Over-  Production
1.  Transportation  - Transporting   1.  Transportation  - Carrying  farther than necessary or   Tools to Point of Use temporarily locating, filing, stacking and moving parts (people, paper, information) is waste. 2.  Correction  - Doing something  2.  Correction  - Redo an Activity over is waste.   Because of Error  3.  Overproduction  - Generating  3.  Overproduction  - Number of  excess paper or information, or  Copies generating information or paper too soon in a process is waste.  Definition  Example ELEMENTS OF WASTE
4.  Motion  - Unnecessary work  4.  Motion  - Tools in drawers movements are a form of waste. 5.  Waiting  - Waiting for people,  5.  Waiting  - Meetings to start  paper and information is waste -  it stops work. 6.  Inventory  - Too much of  6.  Inventory  - Supplies anything is waste. 7.  Processing  - this is waste in  7.  Processing  - Typed when the process itself.  Redundant  handwritten would be  activities   sufficient Definition  Example ELEMENTS OF WASTE
Kaizen Training Standards Enforce Inspect . Stabilize Identify Waste Improve Problem Solve Standardize Process requires ongoing inspection and enforcement to ensure “Standardized Work” is being followed Process does not  improve  automatically - Following standards  will  only maintain, not improve, the process. - Improvement focuses on the entire process.
 
 
 
 
 
TQM 1- Pareto chart      2- Histogram       3- Fish Bone      4- Flow Chart       5-Check points    6- Scatter Diagram       7- Control Charts 8- Activity Network Diagram      9- Affinity diagram      10- Interrelationship Diagram      11- Matrix Diagram       12- Priorities Matrix      13- Process Decision  14- Tree Diagram PROCESS 15- Root cause analysis      16- Five Whys      17- PDCA-PDSA      18- SIPOC      19- FMEA   INNVATION & CREATIVITY 1- Creative thinking      2- Brainstorming      3- Mind Mapping      4- Analogies     5- Lateral thinking      6- Triz      7- SCAMPER LEAN SIX SIGMA 1- Anova                     2- balanced-scorecard               3- Capability   4-Chi-Square                        5-Kanban                        7-Mistake-proofing                    9-One-Piece-Flow   10-Priorities-matrix                                              11-Quick-Changeover 12-project-selection                  13-Regression                           17-Statistical-Process-Control                                             19-Total-Productive-Maintenance                      
Thank You Please visit  http://anubhamaurya.blogspot.com/

More Related Content

PPT
Concurrent engineering
PPTX
PPTX
MRP I and MRP II
PPT
Poka yoke
PPTX
Maintenance management
PPT
TPM 8 Pillars
PPTX
Poka Yoke Final Ppt
PPT
Lean manufacturing
Concurrent engineering
MRP I and MRP II
Poka yoke
Maintenance management
TPM 8 Pillars
Poka Yoke Final Ppt
Lean manufacturing

What's hot (20)

PPTX
Six sigma in manufacturing industry
PDF
Poka yoke (mistake proofing)
PPT
Toyota production system
PPTX
BASIC OF TOYOTA PRODUCTION SYSTEM
PPTX
MRP exercises
PPTX
Functions of production planning and control
PPTX
7. work study and method measurement
PPT
Jurans triology ppt
PPTX
Quality dimensions for BMS
PPT
Work Study
PPT
Method study
PPTX
tpm (total productive maintenance)
PPT
world-class-manufacturing
PPTX
A training on 3 m’s in lean management
PDF
Introduction to Quality Engineering / Quality Control
PPTX
ZERO DEFECTS
PPTX
TPM - Total Productive Maintenance
PPTX
Benchmarking TQM
Six sigma in manufacturing industry
Poka yoke (mistake proofing)
Toyota production system
BASIC OF TOYOTA PRODUCTION SYSTEM
MRP exercises
Functions of production planning and control
7. work study and method measurement
Jurans triology ppt
Quality dimensions for BMS
Work Study
Method study
tpm (total productive maintenance)
world-class-manufacturing
A training on 3 m’s in lean management
Introduction to Quality Engineering / Quality Control
ZERO DEFECTS
TPM - Total Productive Maintenance
Benchmarking TQM
Ad

Similar to Tqm tpm kaizen (20)

PPTX
total quality management
PPTX
DOCX
Why tqm
PPT
Achieving Superior Quality
PPTX
Total Qulity Management
PPTX
Basic concepts of Total Quality Management
PPT
Total quality management
PPT
Quality Management and Customer Relations
PPT
Tqm r esearch ppt final
PPTX
TQM (Total Quality Management)
PPT
Ge6757 unit 1
PPT
Introduction to Quality Project Management.ppt
PDF
heizer_om12_ch06 Managing Quality.pptx.pdf
PPTX
PPTX
PPT
Quality manegment
PPTX
intro to total-quality-management
total quality management
Why tqm
Achieving Superior Quality
Total Qulity Management
Basic concepts of Total Quality Management
Total quality management
Quality Management and Customer Relations
Tqm r esearch ppt final
TQM (Total Quality Management)
Ge6757 unit 1
Introduction to Quality Project Management.ppt
heizer_om12_ch06 Managing Quality.pptx.pdf
Quality manegment
intro to total-quality-management
Ad

More from Anubha Walia (20)

PPTX
Facilitation skills by prism philosophy
PDF
PRISM Philosophy - Training Consultancy Academy
PDF
Future careers 2022
PDF
Prism Trainings and Consultancy
PDF
Business etiquette-Prism philosophy
PDF
Prism Philosophy for Organisation Development
PDF
Time management-Prism philosophy
PDF
Change Management
PDF
HORENSO PDCA by Anubha Walia
PDF
Training Effectiveness
PDF
Leadership & Communication
PPT
YELLOW BELT - 6 SIGMA PROGRAM
PPT
Innovation for HR role
PPT
Team & Communication Training Program
PPTX
Prism training
PPTX
Group dynamics
PPT
TQM TPM
PPT
TQM QFD
PPT
Prism Philosophy Trainings and Consultancy
PPTX
PRISM Trainings and Consultancy
Facilitation skills by prism philosophy
PRISM Philosophy - Training Consultancy Academy
Future careers 2022
Prism Trainings and Consultancy
Business etiquette-Prism philosophy
Prism Philosophy for Organisation Development
Time management-Prism philosophy
Change Management
HORENSO PDCA by Anubha Walia
Training Effectiveness
Leadership & Communication
YELLOW BELT - 6 SIGMA PROGRAM
Innovation for HR role
Team & Communication Training Program
Prism training
Group dynamics
TQM TPM
TQM QFD
Prism Philosophy Trainings and Consultancy
PRISM Trainings and Consultancy

Recently uploaded (20)

PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Trump Administration's workforce development strategy
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
RMMM.pdf make it easy to upload and study
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
Lesson notes of climatology university.
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
Cell Structure & Organelles in detailed.
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
GDM (1) (1).pptx small presentation for students
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Microbial diseases, their pathogenesis and prophylaxis
Orientation - ARALprogram of Deped to the Parents.pptx
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Supply Chain Operations Speaking Notes -ICLT Program
Trump Administration's workforce development strategy
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
RMMM.pdf make it easy to upload and study
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Chinmaya Tiranga quiz Grand Finale.pdf
Lesson notes of climatology university.
O5-L3 Freight Transport Ops (International) V1.pdf
O7-L3 Supply Chain Operations - ICLT Program
Module 4: Burden of Disease Tutorial Slides S2 2025
Cell Structure & Organelles in detailed.
Final Presentation General Medicine 03-08-2024.pptx
Final Presentation General Medicine 03-08-2024.pptx
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
GDM (1) (1).pptx small presentation for students

Tqm tpm kaizen

  • 2. QUALITY TPM KAIZEN TQM TQM - TQM capitalizes on the involvement of management, workforce, suppliers, and even customers, in order to meet or exceed customer expectations. TPM - TPM (Total Productive Maintenance) is a maintenance philosophy designed to integrate equipment maintenance into the manufacturing process. The goal of any TPM program is to eliminate losses tied to equipment maintenance. KAIZEN -Kaizen means Continual Improvements. No one can dispute value of the improvement. Kaizen philosophy is based on the fact that our life - be it working-life, social-life, or home life - needs to be constantly improved. You must enlighten yourself on Kaizen and apply in all walks of life.
  • 4. Introduction Total – Made up of the whole(or) Complete. Quality – Degree of Excellence a product or service provides to the customer in present and future. Management – Act , art, or manner of handling , controlling, directing, etc. TQM is the art of managing the whole to achieve excellence.
  • 5. Total Quality Management (TQM) is a management strategy aimed at embedding awareness of quality in all organizational processes.
  • 6. TQM requires that the company maintain this quality standard in all aspects of its business. This requires ensuring that things are done right the first time and that defects and waste are eliminated from operations.
  • 7. What is Quality CONTINUOUS SATISFACTION OF CUSTOMER REQUIREMENT. Q=P/E I.E Q HAS TO BE > 1 Q-QUALITY, P-PERFORMANCE, E-EXPECTATION QUALITY RELATES TO perfection, delighting or pleasing the customer, eliminating waste, doing it right the first time, and/or consistency.
  • 8. Attributes FITNESS FOR USE IS THE ABILITY OF A GOOD OR SERVICE TO MEET CUSTOMER NEEDS. QUALITY OF CONFORMANCE IS THE EXTENT TO WHICH A PROCESS IS ABLE TO DELIVER OUTPUT THAT CONFIRMS TO DESIGN SPECIFICATIONS. SPECIFICATIONS ARE TARGETS AND TOLERANCES DETERMINED BY DESIGNERS OF GOODS AND SERVICES. QUALITY CONTROL MEANS ENSURING CONSISTENCY IN PROCESSES TO ACHIEVE CONFORMANCE. SERVICE QUALITY IS CONSISTENTLY MEETING OR EXCEEDING CUSTOMER EXPECTATIONS
  • 9. Evolution of quality Era 1900 1920 1940 1960 1980 1990 2000 Craftsman Foreman Inspection SQC TQC TQM TQC &CWQC Co-wide quality control Evolution Years
  • 10. Evolution of quality –Means & Focus 1975 1980 1985 1990 1995 2000 Operation Customers Innovations Quality of Work life Quality Circle Productivity Employee Involvement Quality Employees Empowerment Total Quality Self Directed Teams TQC/TQM Self Directed/ Managed Teams
  • 12. Umbrella Model of TQM SPC JIT TEI Kaizen Quality Assurance Problem- Solving tools Customer Satisfaction Taguchi Methods
  • 13. Basic Approach A committed and involved management to provide long-term top - to - bottom organizational support. An unwavering focus on the customer, both internally and externally. Effective involvement and utilization of the entire work force.
  • 14. Basic Approach Continuous improvement of the business and production process. Treating supplier as partners. Establish performance measures for the processes.
  • 15. New and Old Cultures Quality Element TQM Definition -Product Customer Priorities -Service &Cost Quality Decisions- Short Long Emphasis- Detection Prevention
  • 16. New and Old Cultures Errors- Operations System Responsibility- QC Every Body Problem Solving - Managers Teams Procurement- Price Partners/JIT Manager’s Role- Plan Delegate Assign Coach Enforce Mentor
  • 17. Real Life TQM has being implemented in TVS Group Boeing Aircraft Reliance Tata L & T HMT
  • 18. QUALITY GURUS - American
  • 19. QUALITY GURUS - Japanese
  • 20. Plan: study current situation Do: implement plan on trial basis Study: determine if trial is working correctly Act: standardize improvements The Deming Cycle
  • 21. Chain Reaction Improve Quality Provide jobs and more jobs Costs decrease because of less rework, fewer mistakes, delays, better use of time & materials Productivity Improves Stay in business Capture market with better quality and price
  • 22. Deming’s 14 Points Create a vision and demonstrate commitment Long-term vision Companies purpose is to serve their customers and employees, not simply for profit Invest in innovation, training, research Improve competitive position Top management is responsible for this Effective leadership begins with commitment
  • 23. Quota-driven, adversarial management won’t work That ignores importance of quality improvement Labor and management have to cooperate to improve the customers’ satisfaction Keep training people – turnover does exist 3 . Understand Inspection Routine inspection – let someone else fix it Increases costs in the end (no rework in services) Inspect your own work and fix it 2. Learn the New Philosophy
  • 24. 4. Don’t Buy on the Cost per Part Basis Don’t buy from several for competition Increases variability Work with suppliers in long-term relationships Improve quality with your suppliers Also get volume discounts, fewer setups Supplier-customer bond
  • 25. 5. Improve Constantly and Forever Reduce causes of variation Engage all employees How to do jobs more efficiently More effectively Continuous Process Improvement now is mandatory
  • 26. 6. Institute Training People are a valuable resource and want to do a good job They need training to know how to do a good job Invest in their future Training should include tools for Diagnosing Analyzing Solving quality problems Identify improvement opportunities
  • 27. 7. Institute Leadership The job of management is leadership , not supervision . If supervisors don’t know the job, they can’t lead Focus on getting product “out the door” Good supervisors are coaches, not prison guards
  • 28. 8. Drive Out Fear Managers and workers must have mutual respect, 2 way communication Pointing out quality problems and will everybody will work effectively
  • 29. 9. Optimize the Efforts of Teams People have to understand what customers want No barrires should be there between R&D, Sales, Admin, Production…. Team should tackle the problem
  • 30. 10. Eliminate Exhortations Do you work better with a poster on the wall? Slogans assume quality problems caused by people Deming thinks the system is responsible for problems Workers demoralized when they cannot fix defects, and yet are held accountable Workers’ attempts to fix problems only cause more variation
  • 31. 11. Eliminate Numeric Quotas They do not encourage improvement If you do improve it, they’ll just raise the quota Risk of missing quotas Once you meet the standard, why try harder? Arbitrary (random) goals are demoralizing without a plan of how you can reach those goals Variability in system year-to-year Use statistical method to improve quality
  • 32. 12. Remove Barriers to Pride in Workmanship People are treated like a commodity Work nights to make up for cut positions Don’t make your people compete against each other Behavior driven by what boss wants, not Quality
  • 33. 13 Education & Self-Improvement Not job-specific Many benefits, some specific to job, others broader An org not only need good people but also people who improve with education
  • 34. 14. Commitment from Top Accomplish the Transformation Start the cultural change with top management People will be skeptical until they start to see change
  • 36. CORE CONCEPT OF TQM Quality for profit Right first time Acceptable Quality levels Cost of quality Failure Cost costs caused by defective parts, products, or faulty services . Internal - failures discovered during production (e.g. rework, problems, material/product losses, downtime) . External - failures discovered after delivery (e.g. warranty, returned goods, liability claims, penalties) Appraisal Cost costs of activities designed to ensure quality or uncover defects (e.g. in-line inspection, final inspection, field testing, crash test dummies, crumpled cars) Prevention cost costs of preventing defects from occurring (e.g. training, working with vendors, quality control procedures, quality improvement programs, extra attention in design and production) Hidden cost Potential lost sale, scrap not reported, cost of design or software change due to quality reason)
  • 38. PRODUCT PROCESS SYSTEM PEOPLE LEADERSHIP FIVE PILLARS OF TQM Effectiveness Hard Aspect Suitability Soft Aspect Confluence
  • 40. 1. TPM definition (1) A company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness Total all employees are involved it aims to eliminate all accidents, defects and breakdowns Productive actions are performed while production goes on troubles for production are minimized Maintenance keep in good condition repair, clean, lubricate
  • 41. 1. TPM definition (2) TPM combines the traditionally American practice of preventive maintenance with Total Quality Control and Total Employee Involvement, to create a culture where operators develop ownership of their equipment, and become full partners with Maintenance, Engineering and Management to assure equipment operates properly everyday.
  • 42. 2. Origins of TPM Dr. Deming introduced statistical analysis and used the resulting data to control quality during manufacturing (TQM) Some general concepts of TQM did not work well in the maintenance environment The need to go further than preventive maintenance was quickly recognized by those companies who were committed to TQM Maintenance became an integral part of TQM in the early 90’s
  • 43. 3. TPM principles Increase Overall Equipment Effectiveness (OEE) Improve existing planned maintenance systems The operator is the best condition monitor Provide training to upgrade operations and maintenance skills Involve everyone and utilize cross-functional teamwork
  • 44. 4. Eight major pillars of TPM Education and training Safety and environmental management Autonomous Maintenance Planned Maintenance Equipment and process improvement Early management of new equipment Process quality management TPM in the office
  • 45. 4. Eight major pillars of TPM Autonomous Maintenance (1) Train the operators to close the gap between them and the maintenance staff, making it easier for both to work as one team Change the equipment so the operator can identify any abnormal conditions and measure deterioration before it affects the process or leads to a failure
  • 46. 4. Eight major pillars of TPM 4.1. Autonomous Maintenance (2) 7 steps are implemented to progressively increase operators knowledge, participation and responsibility for their equipment 1. Perform initial cleaning and inspection 2. Countermeasures for the causes and effects of dirt and dust 3. Establish cleaning and lubrication standards 4. Conduct general inspection training 5. Carry out equipment inspection checks 6. Workplace management and control 7. Continuous improvement
  • 47. 4. Eight major pillars of TPM 4.2. Equipment and process improvement Objective : maximize efficiency by eliminating waste and manufacturing losses Manufacturing losses are categorized into 13 big losses: Equipment losses (6) Manpower losses (4) Material losses (3)
  • 48. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.1. Equipment losses Downtime loss Speed loss Quality loss Equipment failure / breakdowns Set-up / adjustments Minor stopping / idling Reduced speed Process errors Rework / scrap
  • 49. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.2. Manpower and material losses Manpower losses Material losses Cleaning and checking Waiting instructions Waiting quality confirmation Material yield Energy losses Waiting materials Consumable material losses
  • 50. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) OEE figures are determined by combining the availability and performance of your equipment with the quality of parts made OEE measures the efficiency of the machine during its planned loading time. Planned downtime does not effect the OEE figure.
  • 51. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability Downtime loss Speed loss Performance Quality Yield Quality loss
  • 52. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability = time available for production - downtime time available for production Performance = ideal cycle time x number of parts produced operating time Quality Yield = total number of parts produced - defect number total number of parts produced
  • 53. 4. Eight major pillars of TPM 4.3. Planned maintenance Objective : establish Preventative and Predictive Maintenance systems for equipment and tooling Natural life cycle of individual machine elements must be achieved Correct operation Correct set-up Cleaning Lubrication Retightening Feedback and repair of minor defects Quality spare parts
  • 54. 4. Eight major pillars of TPM 4.4. Early Management of new equipment Objective: establish systems to shorten new product or equipment development start-up, commissioning and stabilization time for quality and efficiency New equipment needs to be: easy to operate easy to clean easy to maintain and reliable have quick set-up times operate at the lowest life cycle cost
  • 55. 4. Eight major pillars of TPM 4.5. Process Quality Management Definition: a process for controlling the condition of equipment components that affect variability in product quality Objective: to set and maintain conditions to accomplish zero defects Quality rate has a direct correlation with material conditions equipment precision production methods process parameters
  • 56. 4. Eight major pillars of TPM 4.6. TPM in administrative and support departments Administrative and support departments can be seen as process plants whose principal tasks are to collect, process, and distribute information Process analysis should be applied to streamline information flow
  • 57. 4. Eight major pillars of TPM 4.7. Education and training TPM is a continuous learning process. 2 major components soft skills training: how to work as teams, diversity training and communication skills technical training: upgrading problem-solving and equipment- related skills
  • 58. 4. Eight major pillars of TPM 4.8. Safety and environmental management Assuring safety and preventing adverse environmental impacts are important priorities in any TPM effort
  • 59. 5. TPM implementation 3 requirements for fundamental improvement Increasing motivation: changing peoples attitudes Increasing competency and peoples skills Improving the work environment, so that it supports the establishment of a program for implementing TPM
  • 60. 5. TPM Implementation 12 steps Preparation Kick-off Implementation Announcement to introduce TPM Introductory education campaign for the workforce TPM Promotion (special committees) Establish basic TPM policies and goals Preparation and Formulation of a master plan Develop an equipment management program Develop a planned maintenance program Develop an autonomous maintenance program Increase skills of production and maintenance personnel Perfect TPM implementation and raise TPM levels Stabilization Develop early equipment management program Invite customers, affiliated companies and subcontractors
  • 61. 5. TPM Implementation 5.1. Announce top management’s decision to introduce TPM State TPM objectives in a company newsletter Place articles on TPM in the company newspaper
  • 62. 5. TPM Implementation 5.2. Introductory education campaign Seminars for managers Slide presentations for all employees
  • 63. 5. TPM Implementation 5.3. TPM Promotion Special committees at every level to promote TPM Newsletters Articles Videos Posters
  • 64. 5. TPM Implementation 5.4. Establish basic TPM policies and goals Analyze existing conditions Set goals Predict results
  • 65. 5. TPM Implementation 5.5. Preparation and Formulation of a master plan A master plan lays out your goals, what you will do to achieve them and when you will achieve them Detailed plans for each pillar have to be prepared
  • 66. 5. TPM Implementation 5.6. TPM kick-off The main kick-off to TPM should take the form of a formal presentation with all the employees attending This opportunity can be used to gain the full support of the employees Invite external customers, affiliated and subcontracting companies
  • 67. 5. TPM Implementation 5.7. Develop an equipment management program (1) The tools of Total Quality Management and Continuous Improvement are applied to the management and improvement of equipment Form project teams Select model equipment identify equipment problems analyze equipment problems develop solutions and proposals for improvement
  • 68. 5. TPM Implementation 5.7. Develop an equipment management program (2) Typical membership of a team five to seven operators a maintenance person a technical expert Tools Pareto Cause & effect Root cause Methods Analysis
  • 69. 5. TPM Implementation 5.8. Develop a planned maintenance program Set up plans and schedules to carry out work on equipment before it breaks down, in order to extend the life of the equipment Include periodic and predictive maintenance Include management of spare parts and tools
  • 70. 5. TPM Implementation 5.8. Develop a autonomous maintenance program A handing-over of maintenance tasks from specialized maintenance personnel to production operators Promote the seven steps Tasks to hand over cleaning lubricating inspecting set-up and adjustment
  • 71. 5. TPM Implementation 5.10. Increase skills of production and maintenance personnel The training sessions must be planned shortly after the kick-off presentation. 2 major components soft skills training technical training Train leaders together Have leaders share information with group members
  • 72. 5. TPM Implementation 5.11. Develop early equipment management program(1) The principle of designing for maintenance prevention can be applied to new products, and to new and existing machines. New products must be designed so that they can be easily produced on new or existing machines New machines must be designed for easier operations, changeover and maintenance
  • 73. 5. TPM Implementation 5.11. Develop early equipment management program(2) Existing machines : analyze historical records for trends of types of failures frequency of component failures root causes of failures determine how to eliminate the problem and reduce maintenance through an equipment design change or by changing the process
  • 74. 5. TPM Implementation 5.12. Perfect TPM implementation and raise TPM levels Evaluate for the PM Award: The Japanese Institute for Productive Maintenance runs the annual PM Excellence Award. They provide a checklist for companies applying for the award. Set higher goals
  • 75. 6. TPM Benefits Increased equipment productivity Reduced equipment downtime Increased plant capacity Lower maintenance and production costs Approaching zero equipment-caused defects Enhanced job satisfaction Increased Return On Investment
  • 79. Efficiency Any production method relies on efficiency – this can be viewed in different ways: Productivity – a measurement of output per unit of the factor used (labour, capital or land) Total Output Productivity = ------------------- Units of Factor Technical Efficiency – output produced using the fewest possible inputs Productive Efficiency – output produced at the lowest possible cost
  • 80. Efficiency Production decisions involve deciding methods for new production runs and analysis of existing methods. Decisions may include: Substitute machinery for labour? Use of new technology? Organisation of the production layout? Change of production method?
  • 81. Production Methods The choice of production method and the factor inputs depends on such things as: the nature of the product factor costs the scale of production
  • 82. Production Decisions Which method? Type of Product One-Off Order? Mass Market product? Batch? Market size and Segment Factor Costs – Land, Labour and Capital Complexity of design
  • 83. Production Methods Job Production – One-off production - each item might have particular specifications Flow Production – suitable for mass market products that are identical Batch Production – each stage of the production process has an operation completed on it before moving on to the next stage – allows modifications to be made to products that otherwise are the same
  • 84. Production Methods Which is more efficient? Operation 1 2 3 4 5 6 7 8 9 10 11 Finished Product
  • 85. Production Methods Operation 1 1a 1b 1c 1d 2a 2b 2c 3a 3b 3c 3d 4 Finished product Or this?
  • 86. Production Methods Or this? Cell 1 Cell 2 Cell 3 Finished Product Finished Product Finished Product
  • 87. Production Methods Answer – it could be any of them! The design of the production space can influence: Output levels Factor use Efficiency Cost levels Quality assurance procedures
  • 89. Kaizen (Continuous Improvement) Japanese concept – not made redundant by the decline of the Japanese economy which may be due to other institutional factors! Focus on gradual and continuous improvement A whole business philosophy Importance of EVERYONE buying into the concept and the vision
  • 90. Kaizen Great attention paid to customer requirements and needs Efficient stock control methods help reduce costs and improve cash-flow Flexible working practices and empowerment – help increase efficiency, reduce costs and improve motivation Leadership seen as vital. Ability to communicate a clear vision, take people along with the vision and to think about where the company needs to be in 5, 10, 15 and 20 years time Fundamental principles – often characterised as ‘lean production’ – reducing waste, zero defects, high quality control measures at all stages Punctuality in all aspects – delivery, supply, manufacture, etc.
  • 91. Kaizen Training COMPETING IN THE MARKETPLACE “ What factors are important to the customer?” John Deere - Supplier Development
  • 92. Kaizen Training TIME: The single best indicator of competitiveness Customer Lead Time / Delivery Time Working to reduce or minimize each of these times can make your company more valuable to both its internal and external customers. Set-up or Change-over Time Product Development Time Manufacturing Cycle Time
  • 93. Kaizen Training Shrinking Lead Times Reducing the overall time from receiving the order to delivering the product makes your company more responsive to the customer. This can become the deciding factor when the customer makes their selection. As can be seen, manufacturing is only one part of the entire process. Inputting, processing, and issuing orders is an area for improvement, as well as, assembly, loading and delivery to the customer` Order Lead Times Manufacturing Lead Times Delivery Lead Times Manufacturing Lead Times Order Lead Times Delivery Lead Times
  • 94. Kaizen Training Where’s the Time in Lead Time This timeline represents an overall lead-time, with very little time spent on adding value to the product. Improvement Efforts Concentrated on reducing VA time, with no attention given to NVA. Results of Common Improvement efforts, did not improve response time. VA time is reduced, but, the costs for those improvements in lead time was substantial. Common Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1% Non-Value Added Time (NVA) 99% of Total Lead time VA 1/2 %
  • 95. Kaizen Training Where’s the Time in Lead Time When we look at attacking the NVA Activities in the Timeline and compare that to the original timeline: This shows a 5X improvement in lead time Great Job!! Greatest Opportunities are actually here! NVA Time 95% of Total Lead time VA 5% Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1%
  • 96. Kaizen Training Different Types of Activities Being able to tell the difference between NVA and VA activities is an important step in the Improvement Process. Value Added Activity (VA) An activity that changes raw material to meet customer expectations. Non Value Added Activity (NVA) Those activities that take time, or occupy space but do not add to the value of the product. You must ask yourselves “Would you as a customer be willing to pay for any NVA activity being performed to that NEW 4x4 Pickup you just ordered?”
  • 97. Kaizen Training Some examples NVA Activities: Walking Waiting on machine cycle Transporting parts Generating useless reports THE GOAL IS TO ELIMINATE THE NON-VALUE ADDED ACTIVITIES. Unnecessary motion Unnecessary stock on hand
  • 98. KAIZEN A definition: Destroy, in our minds, the concepts and techniques of manufacturing that we practice today. Create a vision of what our production system and manufacturing techniques should be. Carry out that Vision by breaking through the status quo. We must avoid the urge to discover more sophisticated and technological solutions to tasks we shouldn’t be doing at all.
  • 99. Kaizen Training Basic Rules for Change Keep an open mind to change No such thing as a dumb question or idea Avoid spending money (Capital expense should be a last resort) Think about how to do it, NOT why it can’t be done Maintain a positive attitude Don’t’ make excuses & question current practices Just do it!! Have Fun!!!
  • 100. Kaizen Training The 5S Housekeeping Standards First Step towards Continuos Improvement The aim of 5S is to create an atmosphere to keep a clean, organized, safe and efficient workplace for everyone. The foundation for the practice of 5S, comes from a Japanese program derived from these words, seiri, seiton, seiso, seiketsu and shitsuke . The 5S’s are a conventional approach towards maintaining and improving the work place. The following words have been chosen for the 5S acronym’s. Sort Sustain Sanitize (Safety) Straighten Sweep
  • 101. Kaizen Training Meaning of the 5S’s Sort Straighten Sweep (Scrubbing clean) Examine everything at the workplace & identify what is needed and what can be discarded Organizing the way things are put away with efficiency, quality, and safety in mind. Need to decide where and how things should be put away and what rules should be obeyed to insure that it is maintained. Sweeping, scrubbing and cleaning of the building, machines, fixtures & tools so that all areas of the workplace are neat & tidy. This leads to early detection of mechanical problems before they become major breakdowns. Machines cry!
  • 102. Kaizen Training Sanitize (Safety) Sustain (Standardize) Meaning of the 5S’s Insuring that each workplace is properly designed for safety. This is to protect every member from the dangers during the performance of their assigned tasks. Developing the practice necessary to continually participate in the 5S process. This requires that each of the S’s become a personal habit. This is the most difficult of the 5S’s, but it is the most important factor in achieving long term success. Establishing routines and procedures for maintaining and improving on the first four (S’s), incorporating visual management tools.
  • 104. Kaizen Training Do MORE with LESS Waste Productivity Staffing Productivity
  • 105. SHIFT MINDSET CURRENT THINKING REQUIRED THINKING WASTE NOT DEFINED REACT TO LARGE EXAMPLES REACTIVE IMPROVEMENT WASTE IS "TANGIBLE” IDENTIFY MANY SMALL OPPORTUNITIES -LEADS TO LARGE OVERALL CHAGE CONTINUOUS IMPROVEMENT WASTE TYPES OF WASTE Correction Processing Motion Waiting Inventory Transportation Over- Production
  • 106. 1. Transportation - Transporting 1. Transportation - Carrying farther than necessary or Tools to Point of Use temporarily locating, filing, stacking and moving parts (people, paper, information) is waste. 2. Correction - Doing something 2. Correction - Redo an Activity over is waste. Because of Error 3. Overproduction - Generating 3. Overproduction - Number of excess paper or information, or Copies generating information or paper too soon in a process is waste. Definition Example ELEMENTS OF WASTE
  • 107. 4. Motion - Unnecessary work 4. Motion - Tools in drawers movements are a form of waste. 5. Waiting - Waiting for people, 5. Waiting - Meetings to start paper and information is waste - it stops work. 6. Inventory - Too much of 6. Inventory - Supplies anything is waste. 7. Processing - this is waste in 7. Processing - Typed when the process itself. Redundant handwritten would be activities sufficient Definition Example ELEMENTS OF WASTE
  • 108. Kaizen Training Standards Enforce Inspect . Stabilize Identify Waste Improve Problem Solve Standardize Process requires ongoing inspection and enforcement to ensure “Standardized Work” is being followed Process does not improve automatically - Following standards will only maintain, not improve, the process. - Improvement focuses on the entire process.
  • 109.  
  • 110.  
  • 111.  
  • 112.  
  • 113.  
  • 114. TQM 1- Pareto chart      2- Histogram      3- Fish Bone      4- Flow Chart      5-Check points   6- Scatter Diagram      7- Control Charts 8- Activity Network Diagram      9- Affinity diagram      10- Interrelationship Diagram      11- Matrix Diagram      12- Priorities Matrix      13- Process Decision 14- Tree Diagram PROCESS 15- Root cause analysis      16- Five Whys      17- PDCA-PDSA      18- SIPOC      19- FMEA INNVATION & CREATIVITY 1- Creative thinking      2- Brainstorming      3- Mind Mapping      4- Analogies     5- Lateral thinking      6- Triz      7- SCAMPER LEAN SIX SIGMA 1- Anova                    2- balanced-scorecard              3- Capability 4-Chi-Square                       5-Kanban                       7-Mistake-proofing                   9-One-Piece-Flow 10-Priorities-matrix                                             11-Quick-Changeover 12-project-selection                 13-Regression                          17-Statistical-Process-Control                                            19-Total-Productive-Maintenance                     
  • 115. Thank You Please visit http://anubhamaurya.blogspot.com/