SUBMITTED TO:PROF. R.K. MATHUR SIR
MECHANICAL DEPTT

SUBMITTED BY:SURAJ KUMAR
MECHANICAL ENGG
ROLL- 10901281303
















ACKNOWLEDGEMENT
INTRODUCTION
HISTORY OF CHITRANJAN LOCOMOTIVES
QUALITY POLICY
ENVIRONMENTAL POLICY
ACTIONS ADOPTED
LAYOUT OF CLW
ROOF
DRIVER CABIN
MACHINE ROOM
UNDERFRAME
BOGIE
ASSEMBLY ROOM
PHOTO GALLERY
THANK YOU


I feel satisfied in preparing the project on CLW. It was a great
experience at CLW in training duration. I SURAJ KUMAR
student of BHAGWANT UNIVERSITY, sincerely thanks various
department of CLW for the assistance provided to me in
preparing the report during industrial training. I thank to my
department $ college who has given permission to go for
industrial training in CLW.



Thanking You








Chittaranjan Locomotive Works (CLW) is the dream of the nation’s
visionaries, coming true. The planners of the Nation with their deep
insight and foresight set to build a Loco building Factory in West
Bengal and CLW is that vision, coming true. On the 9th of January
1948, survey of the proposed area was done.
It is the only major Electric Locomotive builder in the country. It is
situated just at the Border of West Bengal and Jharkhand and is at
about 32 km from Asansol and 237 kms from Kolkata.
The Workshop has an area of 18.34 Sq. Km. The issue of setting up a
loco building unit continued to be under active consideration of the
Central legislature and in the late thirties, a committee consisting of
M/s. Humphries and Shrinivasan was appointed to investigate the
possibility of establishing a locomotive manufacturing unit and to
consider its economic viability.
The loco works was initially established for production of 120 average
sized steam locomotives with the capacity to manufacture 50 spare
boilers.
Training ppt on clw 2011
LOKMANYA 5
The production of Electric Locomotives commenced in 1961. In the
process, fifteen versions of electric locomotives were produced by CLW and
the latest in that series is the freight locomotive WAG-7 and
passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first
Prime Minister of India, commissioned the first 1500 V dc Locomotive
named “LOKMANYA” on the 14th October, 1961. The production of
25 kV ac loco commenced on 16th November, 1963. The first Electric
Loco turned out from CLW, christened as “BIDHAN” was a Broad
Gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with
maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the
horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed
from 80 Km/h to 160 km/h. CLW also built 25 kV ac/1500 V dc, ac/dc
Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT
on Western Railway.


CLW is an ISO-9001 unit and has a well-established quality
system. The loco works of CLW obtained its
ISO-9001certification on 13.07.96 while the ISO-9002: 1994
certification for Steel Foundry was obtained on 08.08.1996. Up
gradation to ISO 9001:2001 for both Loco Works and Steel
Foundry was completed on 25.09.2003. First Surveillance Audit
was conducted during 06.10.2004 to 08.10.2004 and the Second
Surveillance Audit was conducted during 06.09.05 to 09.09.05.
Renewal audit was conducted from 28th August to 30th
August, 2006. It is worth mentioning that CLW acquired
ISO- 9001:2008 certificate on 22nd Oct 2009 for another three
years for our commitment to Quality Management system.








Improved Environmental Management System, prevention of
pollution and continuous improvement of environment
performance.
Compliance with relevant environmental legislation and
requirements as determined by appropriate regulatory and
other corporate bodies.
Conservation of natural resources and implementation of
fundamentals of waste management.
Setting environmental objectives and Targets and monitoring
progress for sustainable development.
Ensure awareness of all employees and contractors regarding
their environmental roles and responsibilities.









Waste generated in Shops have been reduced by 5% from the previous
year by improvement of operational procedures.
Air Pollution Control Device has been installed in Integrated Paint
Shop to reduce air pollution.
Dust collector has been installed in Sand Plant/SF for reduction of air
pollution.
To reduce air pollution, stack height of D.G.sets in Central Power
House has been increased.
Air Pollution Control Device has been installed at GEC Arc Furnaces in
Steel Foundry.
Consumption of water in plant area has been reduced by 5% by
arresting major leakages and provision of water meters have been
made for regular monitoring of water consumption.
New Sewage Treatment Plant (Bio-filter Plant) has been commissioned
and under operation for improvement of effluent quality before
discharge to surface inland and nearby water bodies.
ROOF
DRIVER’S

CABIN
MACHINE ROOM
UNDER FRAME
BOGIE
PANTOGRAPH
RESISTER

HARMONIC FILTER
SURGE ARRESTER
TRANSDUCER
MAIN CIRCUIT BREAKER
ROOF LINE













DRIVER DESK
LAMP FOR DRIVER $ ASS.DRIVER DESK SHEAT
ENERGY FLASHER LIGHT
PENUMATIC HORN (H.T,L.T)
PANEL( A,B,C,D)
WIPER MOTOR
HORN LEVER
PARK BRAKE GAUGE
SPEEDOMETER
EMERGENCY BRAKE COCK
SWITCHS- SANDING, BRAKE RELEASE,VIGILLANCE
 RESEVAIR:::::450Lt.=2/240lt

=1 in WAG-9/9H

240Lt.-4 in WAP7/WAG5
 TRACTION COVERTER 1$2
 AUXILLARY CONVERTER BOX 1$2
 BLOWERS
 OIL COOLING UNIT
 AUXILLARY COMPRESSOR
 PRI PANNEL/TRIPLATE PANNEL
MAIN

COMPRESSER
CIRCUIT BRAKER BATTERY
BATTERY BOX
MAIN TRANSFORMER
 SAND

BOX
 WHEEL
 BOGIE FRAME
 WHEEL SET
 SPRING—PRIMARY/SECONDERY
 BRAKE SET
 DAMPER—
PRIMARY/SECONDARY/HORIZONTAL/V
ERTICAL
Training ppt on clw 2011
Training ppt on clw 2011
Training ppt on clw 2011
Training ppt on clw 2011
Training ppt on clw 2011
STEAM ENGINE

ELECTRIC ENGINE

DIESEL ENGINE
Training ppt on clw 2011

More Related Content

PPTX
CLW ANKAN PRESENTATION - Copy.pptx
PDF
clw , chittaranjan locomotive works vocational training project (without wate...
PDF
Project report of vocational training at Chittaranjan locomotive workshop
DOCX
CHITTARANJANLOCOMOTIVES WORKS
DOCX
electrical locomotive report for final students
PPTX
POH,BTC BHUSAWAL AND INTRO TO SIGNALLING
DOCX
electric loco shed lalllguda
DOCX
Electric Loco Shed, Tughlakabad, New Delhi
CLW ANKAN PRESENTATION - Copy.pptx
clw , chittaranjan locomotive works vocational training project (without wate...
Project report of vocational training at Chittaranjan locomotive workshop
CHITTARANJANLOCOMOTIVES WORKS
electrical locomotive report for final students
POH,BTC BHUSAWAL AND INTRO TO SIGNALLING
electric loco shed lalllguda
Electric Loco Shed, Tughlakabad, New Delhi

What's hot (20)

PPTX
Niraj ppt
PPTX
PPT ON ELECTRIC LOCO SHED
DOCX
Sandeep
PDF
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
DOCX
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
DOC
Summer training report on electric loco shed
PPTX
Abes engineering college ghaziabad
PPTX
CLW VOCATIONAL TRAINING REPORT- 2018
PPTX
Governor
PPT
Brijeh yadav ppt
PDF
Chittaranjan locomotives works
PDF
Indian Railway Diesel shed Training report
DOCX
Kanchrapara Railway workshop Project(Short)
PDF
Diesel loco shed
PDF
Summer Training Report, DLW Varanasi
PDF
An overview of vocational training in CLW
DOCX
LOCO TRAINING REPORT
DOCX
Railay internship report
DOC
Main report
Niraj ppt
PPT ON ELECTRIC LOCO SHED
Sandeep
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
Summer training report on electric loco shed
Abes engineering college ghaziabad
CLW VOCATIONAL TRAINING REPORT- 2018
Governor
Brijeh yadav ppt
Chittaranjan locomotives works
Indian Railway Diesel shed Training report
Kanchrapara Railway workshop Project(Short)
Diesel loco shed
Summer Training Report, DLW Varanasi
An overview of vocational training in CLW
LOCO TRAINING REPORT
Railay internship report
Main report
Ad

Viewers also liked (20)

PPTX
Chittaranjan locomotive works (Summer Training Report)
PPTX
Balanced Three-Phase Grid Supply for Traction Power
DOC
Ankit updated Resume
PPTX
Eeg 3 phase_electrical
DOCX
Resume-Guru rajan
PPT
Lesson 1 fundamentals eee
DOCX
Design & fabrication of Power generating system from speed breakers
PPTX
IND-2012-169 SBS Hathur -Water management system and Environment Protection
PPT
HAK IP pres (2).xlsx
PPTX
Accident Investigation
PPT
Electrical by speed braker
PPT
ZDC - general Introduction
PDF
Hotspot analysis of accident spots in bhubaneswar using qgis
PPT
Phd Successful Approach
PPTX
Design & Fabrication of Road Power Generator2
PPTX
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
PPTX
Thesis Writing Proposal
PPT
Structural Health Monitoring
PDF
Basics Of Automobile
Chittaranjan locomotive works (Summer Training Report)
Balanced Three-Phase Grid Supply for Traction Power
Ankit updated Resume
Eeg 3 phase_electrical
Resume-Guru rajan
Lesson 1 fundamentals eee
Design & fabrication of Power generating system from speed breakers
IND-2012-169 SBS Hathur -Water management system and Environment Protection
HAK IP pres (2).xlsx
Accident Investigation
Electrical by speed braker
ZDC - general Introduction
Hotspot analysis of accident spots in bhubaneswar using qgis
Phd Successful Approach
Design & Fabrication of Road Power Generator2
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
Thesis Writing Proposal
Structural Health Monitoring
Basics Of Automobile
Ad

Similar to Training ppt on clw 2011 (20)

PPTX
indian railways chittranjan locomotive works ppt
PPTX
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
DOCX
project report on water supply works under supervision of indian railways
DOCX
Dlw locomotive workshop
DOC
Anish report
PPSX
OES PPT
PDF
Projectreportofvtatclw 140320010037-phpapp01
DOCX
training reoprt.docx
PDF
Indian Railways - Rail Wheel Factory Report
DOC
curriculum vitae
PDF
TAS MRS LAS COLONY.pdf
DOC
My Cv 05-2014
DOCX
DLW WORKSHOP , VARANSI
PDF
Industrial visit Report
PDF
DLW, Varanasi Summer Training Report- CIVIL Branch
DOCX
Vijayakanth CV_ 27 Oct 15
PPTX
Authorised Pumpset Original Equipment Menufacturer
PPTX
Masters Distributors of KBL Process Pumps.
PDF
diesel locomotive works training report by somesh dwivedi
PDF
Project Report on railway workshop Jhansi
indian railways chittranjan locomotive works ppt
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
project report on water supply works under supervision of indian railways
Dlw locomotive workshop
Anish report
OES PPT
Projectreportofvtatclw 140320010037-phpapp01
training reoprt.docx
Indian Railways - Rail Wheel Factory Report
curriculum vitae
TAS MRS LAS COLONY.pdf
My Cv 05-2014
DLW WORKSHOP , VARANSI
Industrial visit Report
DLW, Varanasi Summer Training Report- CIVIL Branch
Vijayakanth CV_ 27 Oct 15
Authorised Pumpset Original Equipment Menufacturer
Masters Distributors of KBL Process Pumps.
diesel locomotive works training report by somesh dwivedi
Project Report on railway workshop Jhansi

More from 27suraj (7)

PPTX
Smoothness Running of Train on Uneven Tracks With the Help of Air Spring
PPTX
To Reduce the Maintenance Cost in Transportation System by Using Air Spring
DOC
production ,development and management
DOC
production, development and management
DOCX
Abstract nanotechnology
DOCX
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
DOCX
Abstract nanotechnology
Smoothness Running of Train on Uneven Tracks With the Help of Air Spring
To Reduce the Maintenance Cost in Transportation System by Using Air Spring
production ,development and management
production, development and management
Abstract nanotechnology
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
Abstract nanotechnology

Recently uploaded (20)

PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
Virtual and Augmented Reality in Current Scenario
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Trump Administration's workforce development strategy
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
Hazard Identification & Risk Assessment .pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Empowerment Technology for Senior High School Guide
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Virtual and Augmented Reality in Current Scenario
A powerpoint presentation on the Revised K-10 Science Shaping Paper
What if we spent less time fighting change, and more time building what’s rig...
Trump Administration's workforce development strategy
TNA_Presentation-1-Final(SAVE)) (1).pptx
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Hazard Identification & Risk Assessment .pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Introduction to pro and eukaryotes and differences.pptx
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
History, Philosophy and sociology of education (1).pptx
Empowerment Technology for Senior High School Guide
Unit 4 Computer Architecture Multicore Processor.pptx
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
AI-driven educational solutions for real-life interventions in the Philippine...

Training ppt on clw 2011

  • 1. SUBMITTED TO:PROF. R.K. MATHUR SIR MECHANICAL DEPTT SUBMITTED BY:SURAJ KUMAR MECHANICAL ENGG ROLL- 10901281303
  • 2.                ACKNOWLEDGEMENT INTRODUCTION HISTORY OF CHITRANJAN LOCOMOTIVES QUALITY POLICY ENVIRONMENTAL POLICY ACTIONS ADOPTED LAYOUT OF CLW ROOF DRIVER CABIN MACHINE ROOM UNDERFRAME BOGIE ASSEMBLY ROOM PHOTO GALLERY THANK YOU
  • 3.  I feel satisfied in preparing the project on CLW. It was a great experience at CLW in training duration. I SURAJ KUMAR student of BHAGWANT UNIVERSITY, sincerely thanks various department of CLW for the assistance provided to me in preparing the report during industrial training. I thank to my department $ college who has given permission to go for industrial training in CLW.  Thanking You
  • 4.     Chittaranjan Locomotive Works (CLW) is the dream of the nation’s visionaries, coming true. The planners of the Nation with their deep insight and foresight set to build a Loco building Factory in West Bengal and CLW is that vision, coming true. On the 9th of January 1948, survey of the proposed area was done. It is the only major Electric Locomotive builder in the country. It is situated just at the Border of West Bengal and Jharkhand and is at about 32 km from Asansol and 237 kms from Kolkata. The Workshop has an area of 18.34 Sq. Km. The issue of setting up a loco building unit continued to be under active consideration of the Central legislature and in the late thirties, a committee consisting of M/s. Humphries and Shrinivasan was appointed to investigate the possibility of establishing a locomotive manufacturing unit and to consider its economic viability. The loco works was initially established for production of 120 average sized steam locomotives with the capacity to manufacture 50 spare boilers.
  • 7. The production of Electric Locomotives commenced in 1961. In the process, fifteen versions of electric locomotives were produced by CLW and the latest in that series is the freight locomotive WAG-7 and passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first Prime Minister of India, commissioned the first 1500 V dc Locomotive named “LOKMANYA” on the 14th October, 1961. The production of 25 kV ac loco commenced on 16th November, 1963. The first Electric Loco turned out from CLW, christened as “BIDHAN” was a Broad Gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed from 80 Km/h to 160 km/h. CLW also built 25 kV ac/1500 V dc, ac/dc Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT on Western Railway.
  • 8.  CLW is an ISO-9001 unit and has a well-established quality system. The loco works of CLW obtained its ISO-9001certification on 13.07.96 while the ISO-9002: 1994 certification for Steel Foundry was obtained on 08.08.1996. Up gradation to ISO 9001:2001 for both Loco Works and Steel Foundry was completed on 25.09.2003. First Surveillance Audit was conducted during 06.10.2004 to 08.10.2004 and the Second Surveillance Audit was conducted during 06.09.05 to 09.09.05. Renewal audit was conducted from 28th August to 30th August, 2006. It is worth mentioning that CLW acquired ISO- 9001:2008 certificate on 22nd Oct 2009 for another three years for our commitment to Quality Management system.
  • 9.      Improved Environmental Management System, prevention of pollution and continuous improvement of environment performance. Compliance with relevant environmental legislation and requirements as determined by appropriate regulatory and other corporate bodies. Conservation of natural resources and implementation of fundamentals of waste management. Setting environmental objectives and Targets and monitoring progress for sustainable development. Ensure awareness of all employees and contractors regarding their environmental roles and responsibilities.
  • 10.        Waste generated in Shops have been reduced by 5% from the previous year by improvement of operational procedures. Air Pollution Control Device has been installed in Integrated Paint Shop to reduce air pollution. Dust collector has been installed in Sand Plant/SF for reduction of air pollution. To reduce air pollution, stack height of D.G.sets in Central Power House has been increased. Air Pollution Control Device has been installed at GEC Arc Furnaces in Steel Foundry. Consumption of water in plant area has been reduced by 5% by arresting major leakages and provision of water meters have been made for regular monitoring of water consumption. New Sewage Treatment Plant (Bio-filter Plant) has been commissioned and under operation for improvement of effluent quality before discharge to surface inland and nearby water bodies.
  • 13.            DRIVER DESK LAMP FOR DRIVER $ ASS.DRIVER DESK SHEAT ENERGY FLASHER LIGHT PENUMATIC HORN (H.T,L.T) PANEL( A,B,C,D) WIPER MOTOR HORN LEVER PARK BRAKE GAUGE SPEEDOMETER EMERGENCY BRAKE COCK SWITCHS- SANDING, BRAKE RELEASE,VIGILLANCE
  • 14.  RESEVAIR:::::450Lt.=2/240lt =1 in WAG-9/9H  240Lt.-4 in WAP7/WAG5  TRACTION COVERTER 1$2  AUXILLARY CONVERTER BOX 1$2  BLOWERS  OIL COOLING UNIT  AUXILLARY COMPRESSOR  PRI PANNEL/TRIPLATE PANNEL
  • 16.  SAND BOX  WHEEL  BOGIE FRAME  WHEEL SET  SPRING—PRIMARY/SECONDERY  BRAKE SET  DAMPER— PRIMARY/SECONDARY/HORIZONTAL/V ERTICAL