LOADING CHART
LOADING CHART
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
UNIT-IV PRODUCTION SCHEDULING        .ppt
MATERIAL REQUIRMENTS PLANNING (MRP)
MATERIAL REQUIRMENTS PLANNING (MRP)

It converts master schedule in to a final product
It converts master schedule in to a final product
INFORMATION NEEDED FOR MRP:
INFORMATION NEEDED FOR MRP:
1.
1. Demand for all products
Demand for all products
2.
2. Items for finished goods
Items for finished goods
3.
3. Safety stock requirements
Safety stock requirements
INPUTS TO MRP:
INPUTS TO MRP:
1.
1. Master production schedule
Master production schedule
2.
2. Bill of materials file
Bill of materials file
3.
3. Inventory record file
Inventory record file
MRP STRUCTURE
MRP STRUCTURE
1.
1. MASTER PRODUCTION SCHEDULE
MASTER PRODUCTION SCHEDULE
1.
1. Sale or distribution during specific period
Sale or distribution during specific period

INPUTS TO MPS:
INPUTS TO MPS:

Market requirements
Market requirements

Production plan to aggregate planning
Production plan to aggregate planning

Resources available
Resources available

BILL OF MATERIALS:
BILL OF MATERIALS:

How many, each of them used.
How many, each of them used.

INVENTORY RECORD FILE:
INVENTORY RECORD FILE:

Item master data segment
Item master data segment

Inventory status
Inventory status

Subsidiary data segment
Subsidiary data segment
BENEFITS OF MRP
BENEFITS OF MRP
 Reduce inventory levels
Reduce inventory levels
 Reduce production lead time
Reduce production lead time

Improve product quality
Improve product quality
 Better production schedule
Better production schedule
 Better machine utilisation
Better machine utilisation
DISPATCHING AND
DISPATCHING AND
EXPEDITING
EXPEDITING

DISPATCHING
DISPATCHING
 Setting productive activities in motion
Setting productive activities in motion

Accordingly with previous planned time and
Accordingly with previous planned time and
sequence
sequence
DISPATCHING ACTIVITIES
DISPATCHING ACTIVITIES
1.
1. Movement of material from store
Movement of material from store
2.
2. Issue of tool orders
Issue of tool orders
3.
3. Issue of job orders
Issue of job orders
4.
4. Issue of time tickets
Issue of time tickets
5.
5. Issue of inspection orders
Issue of inspection orders
6.
6. Issue of move orders
Issue of move orders
COMMON FORMS USED IN
COMMON FORMS USED IN
DISPATCHING (8mark)
DISPATCHING (8mark)
1.
1. Material requisitions
Material requisitions
1.
1. Issuing material from store
Issuing material from store
2.
2. No material issue without written requisitions
No material issue without written requisitions
2.
2. Job cards/ tickets
Job cards/ tickets
1.
1. Worker identity for a material
Worker identity for a material
2.
2. Recording the production progress
Recording the production progress
3.
3. Labour cards / tickets
Labour cards / tickets
1.
1. It is knows as wage payment cards
It is knows as wage payment cards
2.
2. Usually job and labour cards are combines
Usually job and labour cards are combines
4.
4. Move cards/ tickets
Move cards/ tickets
1.
1. Movement of material between operations
Movement of material between operations
5.
5. Inspection cards / tickets
Inspection cards / tickets
1.
1. Report the quantity of work passed / rejected
Report the quantity of work passed / rejected
6.
6. Tool and gauge tickets
Tool and gauge tickets
1.
1. To issue any tool under requirements
To issue any tool under requirements
DISPATCHING RULES
DISPATCHING RULES
1.
1. FCFS (First Come First Serve)
FCFS (First Come First Serve)
2.
2. SOT (Shortest Operation Time)
SOT (Shortest Operation Time)
3.
3. Earliest due dates
Earliest due dates
4.
4. STR (Slack Time Remaining)
STR (Slack Time Remaining)
5.
5. STR/OR (Slack Time Remaining per Operation)
STR/OR (Slack Time Remaining per Operation)
6.
6. CR (Critical Ratio)
CR (Critical Ratio)
7.
7. QR (Queue ratio)
QR (Queue ratio)
EXPEDITING
EXPEDITING
(PROGRESSING)
(PROGRESSING)
 Expediting:
Expediting:

Also known as follow – up or progressing
Also known as follow – up or progressing
 Plan till job is completed
Plan till job is completed
 FUNCTIONS OF EXPEDITING:
FUNCTIONS OF EXPEDITING:

Status reporting
Status reporting
 Attending holds-ups
Attending holds-ups
 Modifying the production plans
Modifying the production plans

Co-ordinating with purchase
Co-ordinating with purchase

More Related Content

PPT
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PPT
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PPT
PPC - Unit IV - PRODUCTION SCHEDULING
PPT
UNIT-IV.ppt
PPT
PPC - Unit IV - PRODUCTION SCHEDULING
PPT
UNIT-IV.ppt
PPT
Production scheduling
PPT
Production scheduling
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PPC - Unit IV - PRODUCTION SCHEDULING
UNIT-IV.ppt
PPC - Unit IV - PRODUCTION SCHEDULING
UNIT-IV.ppt
Production scheduling
Production scheduling

Similar to UNIT-IV PRODUCTION SCHEDULING .ppt (20)

PPT
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
PPT
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
PPT
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
PPT
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
PPT
PPC- Unit V - INVENTORY CONTROL AND RECENT TRENDS IN PPC
PPT
UNIT-V.ppt
PPT
PPC- Unit V - INVENTORY CONTROL AND RECENT TRENDS IN PPC
PPT
UNIT-V.ppt
PPT
Inventory control and recent trends in ppc
PPT
Inventory control and recent trends in ppc
PPT
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
PPT
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
PPT
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
PPT
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
PPT
Production cycle
PPT
Production cycle
PPT
UNIT-I INTRODUCTION OF PRODUCTION PLANNING AND CONTROL.ppt
PPT
UNIT-I INTRODUCTION OF PRODUCTION PLANNING AND CONTROL.ppt
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
UNIT-V INVENTORY CONTROL AND RECENT TRENDS IN PPC.ppt
PPC- Unit V - INVENTORY CONTROL AND RECENT TRENDS IN PPC
UNIT-V.ppt
PPC- Unit V - INVENTORY CONTROL AND RECENT TRENDS IN PPC
UNIT-V.ppt
Inventory control and recent trends in ppc
Inventory control and recent trends in ppc
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
UNIT-III PRODUCT PLANNING AND PROCESS PLANNING.ppt
Production cycle
Production cycle
UNIT-I INTRODUCTION OF PRODUCTION PLANNING AND CONTROL.ppt
UNIT-I INTRODUCTION OF PRODUCTION PLANNING AND CONTROL.ppt
Ad

More from arivazhaganrajangam (20)

PPTX
UHV UNIT-5 IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON P...
PPTX
UHV Unit - 4 HARMONY IN THE NATURE AND EXISTENCE.pptx
PPTX
UHV UNIT-3 HARMONY IN THE FAMILY AND SOCIETY.pptx
PPTX
UHV unit-2 HARMONY IN THE HUMAN BEING .pptx
PPTX
UHV UNIT-I INTRODUCTION TO VALUE EDUCATION.pptx
PPTX
UNIT-II WORK STUDY .pptx
PPTX
unit 5 ELECTRIC AND HYBRID VEHICLES .pptx
PPTX
Unit 4 STEERING, BRAKES AND SUSPENSION SYSTEM .pptx
PPTX
Unit 3 TRANSMISSION SYSTEMS.........pptx
PPTX
Unit 2 ENGINE AUXILIARY SYSTEMS .........
PPTX
Unit 1 VEHICLE STRUCTURE AND ENGINES.pptx
PPTX
Unit-IV.pptx
PPT
UNIT - I.ppt
PPTX
Unit-III.pptx
PPTX
Unit-II ppe.pptx
PPTX
Unit-V.pptx
PPT
PPT
Heat transfer modes
PPT
Heat exchanger lecture ppt
UHV UNIT-5 IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON P...
UHV Unit - 4 HARMONY IN THE NATURE AND EXISTENCE.pptx
UHV UNIT-3 HARMONY IN THE FAMILY AND SOCIETY.pptx
UHV unit-2 HARMONY IN THE HUMAN BEING .pptx
UHV UNIT-I INTRODUCTION TO VALUE EDUCATION.pptx
UNIT-II WORK STUDY .pptx
unit 5 ELECTRIC AND HYBRID VEHICLES .pptx
Unit 4 STEERING, BRAKES AND SUSPENSION SYSTEM .pptx
Unit 3 TRANSMISSION SYSTEMS.........pptx
Unit 2 ENGINE AUXILIARY SYSTEMS .........
Unit 1 VEHICLE STRUCTURE AND ENGINES.pptx
Unit-IV.pptx
UNIT - I.ppt
Unit-III.pptx
Unit-II ppe.pptx
Unit-V.pptx
Heat transfer modes
Heat exchanger lecture ppt
Ad

Recently uploaded (20)

PDF
737-MAX_SRG.pdf student reference guides
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPT
Total quality management ppt for engineering students
PDF
Design Guidelines and solutions for Plastics parts
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
737-MAX_SRG.pdf student reference guides
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Categorization of Factors Affecting Classification Algorithms Selection
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
August 2025 - Top 10 Read Articles in Network Security & Its Applications
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Total quality management ppt for engineering students
Design Guidelines and solutions for Plastics parts
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Fundamentals of safety and accident prevention -final (1).pptx
Fundamentals of Mechanical Engineering.pptx
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Management Information system : MIS-e-Business Systems.pptx
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
distributed database system" (DDBS) is often used to refer to both the distri...

UNIT-IV PRODUCTION SCHEDULING .ppt

  • 1. KONGUNADU COLLEGE OF ENGINEERING AND TECHNOLOGY (AUTONOMOUS) NAMAKKAL- TRICHY MAIN ROAD, THOTTIAM, TRICHY DEPARTMENT OF MECHANICAL ENGINEERING 20ME808PE - PRODUCTION PLANNING AND CONTROL UNIT – IV PRODUCTION SCHEDULING
  • 18. MATERIAL REQUIRMENTS PLANNING (MRP) MATERIAL REQUIRMENTS PLANNING (MRP)  It converts master schedule in to a final product It converts master schedule in to a final product INFORMATION NEEDED FOR MRP: INFORMATION NEEDED FOR MRP: 1. 1. Demand for all products Demand for all products 2. 2. Items for finished goods Items for finished goods 3. 3. Safety stock requirements Safety stock requirements INPUTS TO MRP: INPUTS TO MRP: 1. 1. Master production schedule Master production schedule 2. 2. Bill of materials file Bill of materials file 3. 3. Inventory record file Inventory record file
  • 20. 1. 1. MASTER PRODUCTION SCHEDULE MASTER PRODUCTION SCHEDULE 1. 1. Sale or distribution during specific period Sale or distribution during specific period  INPUTS TO MPS: INPUTS TO MPS:  Market requirements Market requirements  Production plan to aggregate planning Production plan to aggregate planning  Resources available Resources available  BILL OF MATERIALS: BILL OF MATERIALS:  How many, each of them used. How many, each of them used.  INVENTORY RECORD FILE: INVENTORY RECORD FILE:  Item master data segment Item master data segment  Inventory status Inventory status  Subsidiary data segment Subsidiary data segment
  • 21. BENEFITS OF MRP BENEFITS OF MRP  Reduce inventory levels Reduce inventory levels  Reduce production lead time Reduce production lead time  Improve product quality Improve product quality  Better production schedule Better production schedule  Better machine utilisation Better machine utilisation
  • 22. DISPATCHING AND DISPATCHING AND EXPEDITING EXPEDITING  DISPATCHING DISPATCHING  Setting productive activities in motion Setting productive activities in motion  Accordingly with previous planned time and Accordingly with previous planned time and sequence sequence
  • 23. DISPATCHING ACTIVITIES DISPATCHING ACTIVITIES 1. 1. Movement of material from store Movement of material from store 2. 2. Issue of tool orders Issue of tool orders 3. 3. Issue of job orders Issue of job orders 4. 4. Issue of time tickets Issue of time tickets 5. 5. Issue of inspection orders Issue of inspection orders 6. 6. Issue of move orders Issue of move orders
  • 24. COMMON FORMS USED IN COMMON FORMS USED IN DISPATCHING (8mark) DISPATCHING (8mark) 1. 1. Material requisitions Material requisitions 1. 1. Issuing material from store Issuing material from store 2. 2. No material issue without written requisitions No material issue without written requisitions 2. 2. Job cards/ tickets Job cards/ tickets 1. 1. Worker identity for a material Worker identity for a material 2. 2. Recording the production progress Recording the production progress 3. 3. Labour cards / tickets Labour cards / tickets 1. 1. It is knows as wage payment cards It is knows as wage payment cards 2. 2. Usually job and labour cards are combines Usually job and labour cards are combines
  • 25. 4. 4. Move cards/ tickets Move cards/ tickets 1. 1. Movement of material between operations Movement of material between operations 5. 5. Inspection cards / tickets Inspection cards / tickets 1. 1. Report the quantity of work passed / rejected Report the quantity of work passed / rejected 6. 6. Tool and gauge tickets Tool and gauge tickets 1. 1. To issue any tool under requirements To issue any tool under requirements
  • 26. DISPATCHING RULES DISPATCHING RULES 1. 1. FCFS (First Come First Serve) FCFS (First Come First Serve) 2. 2. SOT (Shortest Operation Time) SOT (Shortest Operation Time) 3. 3. Earliest due dates Earliest due dates 4. 4. STR (Slack Time Remaining) STR (Slack Time Remaining) 5. 5. STR/OR (Slack Time Remaining per Operation) STR/OR (Slack Time Remaining per Operation) 6. 6. CR (Critical Ratio) CR (Critical Ratio) 7. 7. QR (Queue ratio) QR (Queue ratio)
  • 27. EXPEDITING EXPEDITING (PROGRESSING) (PROGRESSING)  Expediting: Expediting:  Also known as follow – up or progressing Also known as follow – up or progressing  Plan till job is completed Plan till job is completed  FUNCTIONS OF EXPEDITING: FUNCTIONS OF EXPEDITING:  Status reporting Status reporting  Attending holds-ups Attending holds-ups  Modifying the production plans Modifying the production plans  Co-ordinating with purchase Co-ordinating with purchase