SlideShare a Scribd company logo
PRODUCTION SCHEDULING
PRODUCTION SCHEDULING
UNIT - IV
MATERIAL REQUIRMENTS PLANNING (MRP)
MATERIAL REQUIRMENTS PLANNING (MRP)

It converts master schedule in to a final product
It converts master schedule in to a final product
INFORMATION NEEDED FOR MRP:
INFORMATION NEEDED FOR MRP:
1.
1. Demand for all products
Demand for all products
2.
2. Items for finished goods
Items for finished goods
3.
3. Safety stock requirements
Safety stock requirements
INPUTS TO MRP:
INPUTS TO MRP:
1.
1. Master production schedule
Master production schedule
2.
2. Bill of materials file
Bill of materials file
3.
3. Inventory record file
Inventory record file
MRP STRUCTURE
MRP STRUCTURE
1.
1. MASTER PRODUCTION SCHEDULE
MASTER PRODUCTION SCHEDULE
1.
1. Sale or distribution during specific period
Sale or distribution during specific period

INPUTS TO MPS:
INPUTS TO MPS:

Market requirements
Market requirements

Production plan to aggregate planning
Production plan to aggregate planning

Resources available
Resources available

BILL OF MATERIALS:
BILL OF MATERIALS:

How many, each of them used.
How many, each of them used.

INVENTORY RECORD FILE:
INVENTORY RECORD FILE:

Item master data segment
Item master data segment

Inventory status
Inventory status

Subsidiary data segment
Subsidiary data segment
BENEFITS OF MRP
BENEFITS OF MRP
 Reduce inventory levels
Reduce inventory levels
 Reduce production lead time
Reduce production lead time

Improve product quality
Improve product quality
 Better production schedule
Better production schedule
 Better machine utilisation
Better machine utilisation
DISPATCHING AND
DISPATCHING AND
EXPEDITING
EXPEDITING

DISPATCHING
DISPATCHING
 Setting productive activities in motion
Setting productive activities in motion

Accordingly with previous planned time and
Accordingly with previous planned time and
sequence
sequence
DISPATCHING ACTIVITIES
DISPATCHING ACTIVITIES
1.
1. Movement of material from store
Movement of material from store
2.
2. Issue of tool orders
Issue of tool orders
3.
3. Issue of job orders
Issue of job orders
4.
4. Issue of time tickets
Issue of time tickets
5.
5. Issue of inspection orders
Issue of inspection orders
6.
6. Issue of move orders
Issue of move orders
COMMON FORMS USED IN
COMMON FORMS USED IN
DISPATCHING (8mark)
DISPATCHING (8mark)
1.
1. Material requisitions
Material requisitions
1.
1. Issuing material from store
Issuing material from store
2.
2. No material issue without written requisitions
No material issue without written requisitions
2.
2. Job cards/ tickets
Job cards/ tickets
1.
1. Worker identity for a material
Worker identity for a material
2.
2. Recording the production progress
Recording the production progress
3.
3. Labour cards / tickets
Labour cards / tickets
1.
1. It is knows as wage payment cards
It is knows as wage payment cards
2.
2. Usually job and labour cards are combines
Usually job and labour cards are combines
4.
4. Move cards/ tickets
Move cards/ tickets
1.
1. Movement of material between operations
Movement of material between operations
5.
5. Inspection cards / tickets
Inspection cards / tickets
1.
1. Report the quantity of work passed / rejected
Report the quantity of work passed / rejected
6.
6. Tool and gauge tickets
Tool and gauge tickets
1.
1. To issue any tool under requirements
To issue any tool under requirements
DISPATCHING RULES
DISPATCHING RULES
1.
1. FCFS (First Come First Serve)
FCFS (First Come First Serve)
2.
2. SOT (Shortest Operation Time)
SOT (Shortest Operation Time)
3.
3. Earliest due dates
Earliest due dates
4.
4. STR (Slack Time Remaining)
STR (Slack Time Remaining)
5.
5. STR/OR (Slack Time Remaining per Operation)
STR/OR (Slack Time Remaining per Operation)
6.
6. CR (Critical Ratio)
CR (Critical Ratio)
7.
7. QR (Queue ratio)
QR (Queue ratio)
EXPEDITING
EXPEDITING
(PROGRESSING)
(PROGRESSING)
 Expediting:
Expediting:

Also known as follow – up or progressing
Also known as follow – up or progressing
 Plan till job is completed
Plan till job is completed
 FUNCTIONS OF EXPEDITING:
FUNCTIONS OF EXPEDITING:

Status reporting
Status reporting
 Attending holds-ups
Attending holds-ups
 Modifying the production plans
Modifying the production plans

Co-ordinating with purchase
Co-ordinating with purchase
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING
PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING

More Related Content

PPT
UNIT-IV.ppt
PPT
PPC - Unit IV - PRODUCTION SCHEDULING
PPT
UNIT-IV PRODUCTION SCHEDULING .ppt
PPT
Production scheduling
PPTX
Unit 3 Manufacturing system design
PPTX
L-2 ME 307 Manish Hassani Topic Forecasting Routing Scheduling Dispatching.pptx
PDF
Lecture 12_Enterprise Resourse Planning.pdf
PPTX
Master Scheduling and Material Requirement
UNIT-IV.ppt
PPC - Unit IV - PRODUCTION SCHEDULING
UNIT-IV PRODUCTION SCHEDULING .ppt
Production scheduling
Unit 3 Manufacturing system design
L-2 ME 307 Manish Hassani Topic Forecasting Routing Scheduling Dispatching.pptx
Lecture 12_Enterprise Resourse Planning.pdf
Master Scheduling and Material Requirement

Similar to PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING (20)

PPTX
PPTX
REDUCTION OF WASTAGES THROUGH PPC TECHNIQUES
PPT
PPTX
Routing and scheduling
PPT
Heizer om10 ch14
PPTX
Mrp ppt.
PPTX
Production management
PPT
14.hr_om11_ch14_GE_Material Requirements Planning (MRP).ppt
PPTX
MRP and ERP
PPTX
heizer_om12_ch014 final (1).pptx
DOCX
Prepare Raw material notes (AutoRecovered).docx
PPT
Ch16 mrp
PPTX
Mrp structure
PPTX
Presentation2 mrp
PPTX
MATERIAL REQUIREMENTS PLANNING (MRP)
PPT
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
PPTX
Mrp
PPTX
7_production-activity-control.pptx
PPT
Material Resource Planning
REDUCTION OF WASTAGES THROUGH PPC TECHNIQUES
Routing and scheduling
Heizer om10 ch14
Mrp ppt.
Production management
14.hr_om11_ch14_GE_Material Requirements Planning (MRP).ppt
MRP and ERP
heizer_om12_ch014 final (1).pptx
Prepare Raw material notes (AutoRecovered).docx
Ch16 mrp
Mrp structure
Presentation2 mrp
MATERIAL REQUIREMENTS PLANNING (MRP)
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
Mrp
7_production-activity-control.pptx
Material Resource Planning
Ad

More from karthik R (20)

PPT
PRODUCTION PLANNING AND CONTROL-UNIT III PRODUCT PLANNING AND PROCESS PLANNING
PPT
PRODUCTION PLANNING AND CONTROL--UNIT II WORK STUDY
PPT
PRODUCTION PLANNING AND CONTROL--UNIT-I- INTRODUCTION to PPC
PPT
DYNAMICS OF MACHINES.ppt
PPT
GOVERNOR .ppt
PPT
UNIT-I Turning Moment.ppt
PPT
FORCED VIBRATION.ppt
PPT
FREE VIBRATION.ppt
PPT
BALANCING OF ROTATING MASSES.ppt
PPT
TORSIONAL VIBRATIONS.ppt
PPTX
Forced vibration-.pptx
PPT
BALANCING OF RECIPROCATING MASSES.ppt
PPT
Programmable logic Controlller ppt
PPT
PROGRAMMABLE PERIPHERAL INTERFCAE.ppt
PPT
MECHATRONICS UNIT 5.ppt
PPTX
8085 MICROPROCESSOR.pptx
PPT
MECHATRONICS Unit-5-Motor.ppt
PPT
temp,light, proxy Sensor with videos.ppt
PPT
Unit 1.ppt
PPT
Sensor and transducers.ppt
PRODUCTION PLANNING AND CONTROL-UNIT III PRODUCT PLANNING AND PROCESS PLANNING
PRODUCTION PLANNING AND CONTROL--UNIT II WORK STUDY
PRODUCTION PLANNING AND CONTROL--UNIT-I- INTRODUCTION to PPC
DYNAMICS OF MACHINES.ppt
GOVERNOR .ppt
UNIT-I Turning Moment.ppt
FORCED VIBRATION.ppt
FREE VIBRATION.ppt
BALANCING OF ROTATING MASSES.ppt
TORSIONAL VIBRATIONS.ppt
Forced vibration-.pptx
BALANCING OF RECIPROCATING MASSES.ppt
Programmable logic Controlller ppt
PROGRAMMABLE PERIPHERAL INTERFCAE.ppt
MECHATRONICS UNIT 5.ppt
8085 MICROPROCESSOR.pptx
MECHATRONICS Unit-5-Motor.ppt
temp,light, proxy Sensor with videos.ppt
Unit 1.ppt
Sensor and transducers.ppt
Ad

Recently uploaded (20)

PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PPTX
Current and future trends in Computer Vision.pptx
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
Design Guidelines and solutions for Plastics parts
PPTX
introduction to high performance computing
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
communication and presentation skills 01
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
R24 SURVEYING LAB MANUAL for civil enggi
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Automation-in-Manufacturing-Chapter-Introduction.pdf
Nature of X-rays, X- Ray Equipment, Fluoroscopy
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Current and future trends in Computer Vision.pptx
distributed database system" (DDBS) is often used to refer to both the distri...
Fundamentals of safety and accident prevention -final (1).pptx
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Design Guidelines and solutions for Plastics parts
introduction to high performance computing
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
communication and presentation skills 01
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf

PRODUCTION PLANNING AND CONTROL--UNIT IV PRODUCTION SCHEDULING

  • 2. MATERIAL REQUIRMENTS PLANNING (MRP) MATERIAL REQUIRMENTS PLANNING (MRP)  It converts master schedule in to a final product It converts master schedule in to a final product INFORMATION NEEDED FOR MRP: INFORMATION NEEDED FOR MRP: 1. 1. Demand for all products Demand for all products 2. 2. Items for finished goods Items for finished goods 3. 3. Safety stock requirements Safety stock requirements INPUTS TO MRP: INPUTS TO MRP: 1. 1. Master production schedule Master production schedule 2. 2. Bill of materials file Bill of materials file 3. 3. Inventory record file Inventory record file
  • 4. 1. 1. MASTER PRODUCTION SCHEDULE MASTER PRODUCTION SCHEDULE 1. 1. Sale or distribution during specific period Sale or distribution during specific period  INPUTS TO MPS: INPUTS TO MPS:  Market requirements Market requirements  Production plan to aggregate planning Production plan to aggregate planning  Resources available Resources available  BILL OF MATERIALS: BILL OF MATERIALS:  How many, each of them used. How many, each of them used.  INVENTORY RECORD FILE: INVENTORY RECORD FILE:  Item master data segment Item master data segment  Inventory status Inventory status  Subsidiary data segment Subsidiary data segment
  • 5. BENEFITS OF MRP BENEFITS OF MRP  Reduce inventory levels Reduce inventory levels  Reduce production lead time Reduce production lead time  Improve product quality Improve product quality  Better production schedule Better production schedule  Better machine utilisation Better machine utilisation
  • 6. DISPATCHING AND DISPATCHING AND EXPEDITING EXPEDITING  DISPATCHING DISPATCHING  Setting productive activities in motion Setting productive activities in motion  Accordingly with previous planned time and Accordingly with previous planned time and sequence sequence
  • 7. DISPATCHING ACTIVITIES DISPATCHING ACTIVITIES 1. 1. Movement of material from store Movement of material from store 2. 2. Issue of tool orders Issue of tool orders 3. 3. Issue of job orders Issue of job orders 4. 4. Issue of time tickets Issue of time tickets 5. 5. Issue of inspection orders Issue of inspection orders 6. 6. Issue of move orders Issue of move orders
  • 8. COMMON FORMS USED IN COMMON FORMS USED IN DISPATCHING (8mark) DISPATCHING (8mark) 1. 1. Material requisitions Material requisitions 1. 1. Issuing material from store Issuing material from store 2. 2. No material issue without written requisitions No material issue without written requisitions 2. 2. Job cards/ tickets Job cards/ tickets 1. 1. Worker identity for a material Worker identity for a material 2. 2. Recording the production progress Recording the production progress 3. 3. Labour cards / tickets Labour cards / tickets 1. 1. It is knows as wage payment cards It is knows as wage payment cards 2. 2. Usually job and labour cards are combines Usually job and labour cards are combines
  • 9. 4. 4. Move cards/ tickets Move cards/ tickets 1. 1. Movement of material between operations Movement of material between operations 5. 5. Inspection cards / tickets Inspection cards / tickets 1. 1. Report the quantity of work passed / rejected Report the quantity of work passed / rejected 6. 6. Tool and gauge tickets Tool and gauge tickets 1. 1. To issue any tool under requirements To issue any tool under requirements
  • 10. DISPATCHING RULES DISPATCHING RULES 1. 1. FCFS (First Come First Serve) FCFS (First Come First Serve) 2. 2. SOT (Shortest Operation Time) SOT (Shortest Operation Time) 3. 3. Earliest due dates Earliest due dates 4. 4. STR (Slack Time Remaining) STR (Slack Time Remaining) 5. 5. STR/OR (Slack Time Remaining per Operation) STR/OR (Slack Time Remaining per Operation) 6. 6. CR (Critical Ratio) CR (Critical Ratio) 7. 7. QR (Queue ratio) QR (Queue ratio)
  • 11. EXPEDITING EXPEDITING (PROGRESSING) (PROGRESSING)  Expediting: Expediting:  Also known as follow – up or progressing Also known as follow – up or progressing  Plan till job is completed Plan till job is completed  FUNCTIONS OF EXPEDITING: FUNCTIONS OF EXPEDITING:  Status reporting Status reporting  Attending holds-ups Attending holds-ups  Modifying the production plans Modifying the production plans  Co-ordinating with purchase Co-ordinating with purchase