International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1817
Value Analysis of a Rubber Hose Moulding and Assembly Line: A Case
Study
Pranish M. Naoghare1, Atul R. More2, Sandip S. Patil3
1,2Student,Dept. of Mechanical Engineering, Guru Gobind Singh College of Engineering & Research Centre
(GCOERC), Nashik, Maharashtra, India
3Professor,Dept. of Mechanical Engineering, Guru Gobind Singh College of Engineering & Research Centre
(GCOERC), Nashik, Maharashtra, India
----------------------------------------------------------------------***--------------------------------------------------------------------
Abstract - At present, the competition between the
companies is leading to a constant battle for adequatemarket
share. This is not only done by reducing the prices, but by
constantly bringing new innovations in different fields of the
company so that the value for a product or an entity is
increased. The new concepts or ideas may come from the
company itself or from any externalsource. Themainobjective
of Value Analysis(VA) is to find and eliminate all the
characteristics of a product or service which are of no real
value to the customer. Thus VA ensures a better product or
service for the customer at minimum costs compared to
replacing the product with less favorable alternative. This
paper focuses on the case study on process optimization for
rubber hose moulding and assembly through value analysis.
Key Words: Value Analysis, Takt Time, Assembly Line
Balancing, ECRS, Throughput time
1.INTRODUCTION
Value can be given as the relationship between perceived
benefits and perceived costs: Value = Benefits / Cost. In
order to increase the value, the organization has to improve
the value : cost ratio. When the value is provided at high
price, the perceived value may be low. This value can be
increased by using tools like Value Analysis[1]. VA is the
process of reducing costs in a development project. This
process is achieved by assessing materials, processes and or
products and offering alternatives. The outcome should
result in reduced cost but without compromising the quality
of the design[2].
2. VA METHODOLOGY
The VA methodology (or the “job plan”) can be appliedtoany
subject or problem. The VA job plan divides the task being
studied into functions. The job plan is normally organized by
a value team leader. It is conductedineightsequentialphases
as follows:
i. Orientation Phase: Refine the problem and prepare
for the value study.
ii. Information Phase: Finalize the scopeoftheissuesto
be addressed, targets for improvement, and
evaluation factors while building cohesion among
team members.
iii. Function Analysis Phase: Identify the most beneficial
areas for study.
iv. Creative Phase: Develop a large number of ideas for
alternative ways to perform each function selected
for further study.
v. Evaluation Phase: Refine andselectthebestideasfor
development into specific value-improvement
recommendations.
vi. Development Phase: Determine the “best”
alternatives for presentation to the decision-maker.
vii. Presentation Phase: Obtainacommitmenttofollowa
course of action for initiating an alternative.
viii. Implementation Phase: Obtain final approval of the
proposal and facilitate its implementation.[3]
3. LITERATURE SURVEY
Amit Narwal, (2015) et.al. studied a case on the concept of
value analysis in sheet metal. By Value analysis of the parts,
the group produces the same parts at the cheaper cost from
their competitors in market.[4]
Marjan Leber, (2014) et. al. discussed the development of
new product on the basis of value analysis and conjoint
analysis. Implementation of such methodsresultedinstrong
reduction in cost inside a company.[5]
Ignacio Cariaga, (2007) et. al.studiestheintegrationof value
analysis and quality function development or evaluation
design alternatives. This framework enabled to: 1) Elicit
customer requirements through the use of FAST.,2) Relate
various design options to each customer requirement
through the use of QFD, 3)Provide a decision support
environment to assist in selecting the most suitable
alternative.[6]
4. VALUE ANALYSIS TOOLS AND TECHNIQUES
i. Role of Kaizen and Poka Yoke:
KAIZEN-. It can be defined as the improvementwhichmaybe
one-time or continuous, large or small. Kaizen is to be done
on daily basis so as to increase the productivity.[7]
POKA YOKE is a Japanese term that means "mistake
proofing". A poka-yoke is not a process but a concept that
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1818
helps the operator to avoid mistakes. It is used to eliminate
product defects by preventing, correcting, or drawing
attention to human errors as they occur.[8]
ii. Takt time:
Takt timeis the average timebetween the startofproduction
of two successive units on a production line,thistimeissetas
per the rate of customer demand.
Takt time can be determined with the formula:
T = Ta / D
Where
T = Takt time, e.g. (work time between two consecutive
units)
Ta = Net time available to work, e.g. (work time per period)
D = Demand (customer demand), e.g. (units required per
period) [9]
iii. Assembly line balancing
Assembly line balancing is concernedwithredistributingand
rearranging of the work to the workers in an assembly line.
The main goal is to minimizethe idle timeof the workersand
to increase the utilization of resources, labor and machines.
[10]
iv. Cycle time:
Cycle time is the total time required for the completion of a
process. Cycle time includes process time, during which a
particular operation is done on the unit, and delay time,
during which a unit has to wait so that next operation is
started.[11]
v. Multiple activity charts:
Multiple activity charts are used to understand the
relationship between the workers and their associated
equipment. The activities of each subject are recorded,
normally as blocks in tabular form withacommontimescale.
They serve as useful devices to assist in the redistribution
and balancing of workloads.[12]
vi. ECRS:
In generatingpracticalideasforimprovement,acommonand
practical framework ECRS is used, which stands for the
following:
Eliminate
Combine
Rearrange
Simplify
 Eliminate
In this step, all the unnecessary activities, non-value
added activities are identified and are immediately
eliminated..
 Combine
In this step, the activities which cannot be eliminated are
combined.
 Rearrange
Work can also be rearranged. This rearrangement can be
either in terms of order of operations, layout of the
assembly line.
 Simplify
And, a good rule of thumb regardless of the situation is to
simplify anyway. Of course, wewanttoEliminatefirstbut,
if not, then Combine, Rearrange, and Simplify will be
helpful.[13]
vii. Flow process chart:
The flow process chart is the graphical and symbolic
representation of the various activities or operations or
movements performed during a process.Itisusedtoidentify
the unnecessary activities, movements and eliminate them,
thus makes the process more efficient.[14]
viii. Throughput time
The amount of time required to turn raw materials into
completed productiscalledthroughputtime.Thethroughput
time or manufacturing cycle time is made up of process time,
inspection time, move time, and queue time.[15]
5. CASE STUDY
5.1 Company Background
INNOVA RUBBERS PVT. LTD. is located at Ambad, Nashik,
Maharashtra. The industry is one of the technological leader
in designing and manufacturingofautomotiveandindustrial
rubber moulded and rubber to metal bonded anti-vibration
parts. The industry produces silent block bushes, engine
mountsandtransmissionmounts,propellershaftmountings,
torsional vibrational dampers, bare rubber parts, control
arms, etc.
5.2 Implementation
Here value analysis was done to optimize the rubber hose
moulding and assembly line. This hose assembly consists of
two parts made of two different rubbers, namely EPDM and
VAMMAC. The main processes involved in this production
are: injection moulding of the rubber parts, post curing of
VAMMAC rubber part, assembly and packing. Respective
raw rubber is feed to the injection moulding machine. The
rubber is melted by the heating mechanism in the machine
as is then sent to the mould cavity through runners. After
allowing the rubber to cure in the mould for some time, the
mould is opened and the rubber parts are removed. EPDM
rubber is directly sent to assembly with the post-cured
VAMMAC rubber parts, while the VAMMAC rubber from the
moulding machine is sent to post curing in a post curing
oven for 4 hrs. At the assembly line various operations like
hole drilling, ID cleaning, thread cleaning, whistle pin
painting are done and is then assembled and packed.
For the implementation of value analysis, data was collected
regarding number of operations taking place, time required
for each operation, number of operators on the line. With
this a line balancing chart was drawn.
From the data collected and the line balancing chart
problems were found out, they were as follows:
i. More WIP Inventory at every stage
ii. Shortage at Customer end
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1819
iii. Multiple moulding station engaged for production
iv. Less output per man
v. More throughput time
vi. Frequent incidences of assembly line stoppage.
Chart -1: Line balancing chart - Before
vii. More space utilization
viii. Excess material handling
Taking note of these problems various brainstorming
sessions were taken. Various ideas/ alternatives were put
forth, of which the team leader selected. These were:
i. Reducing the labor force.
A total of 11 workers were required over the entire
production line.Thiswouldcausemoreexpenditure
on the workers in terms of salary. By reduction of
workers there would be less investment on the
labors and this would led to saving of capital.
ii. Combining of operations.
As the workforce was to be reduced combining of
operations was necessary. In this multiple
operations were done by a worker.
iii. Combining the moulding of the rubber hose on
single injection moulding machine.
The rubber hose assembly consists of two rubber
part together. Each rubber part was produced on
different machines. But productionofboththe parts
on single machine would result in elimination of
one injection moulding machine.
iv. Changing the internal design of the post curing
oven.
One of the rubber part requires a post curing of 4
hrs. This is done in post curing oven. Its capacity
was of 160 units. The internal design was further
modified which resulted in accommodation of 216
units. By which the productivity increased.
6. RESULTS
By implementation of the above ideas, the results obtained
were as follows:
i. Better line balancing
By combining the operations, reducing the number
of operators on the production line and also
reducing the takt time resulted in simplified line
balancing.
Chart -2: Line balancing chart- After
ii. Reduced Throughput time ratio
By combining the moulding on single machine and
modifying the internal design of the oven, the ratio
of throughput time required totheideal throughput
time was reduced from 22 to 2.76, i.e., by 87.4%.
iii. Reduced Space Utilization ratio
Due to the rearrangement of the machines,theratio
of actual space utilized to the minimum space
required was reduced from 2.79 to 1.37, i.e., by
50.89%.
iv. Reduced material handing ratio
Due to simplification of the workplace layout, the
ratio of the actual working width to the minimum
working width was reduced from 2.93 to 1.41,i.e.,
by 51.8%.
v. Increase in productivity of each operator
Before, the output per man was only 100 units,
while after the implementation; the outputperman
was increased to 350 units. This increased the
productivity of each worker by 250%.
7. CONCLUSION
Value analysis is a systematic effort to improve upon cost
and performance of product produced. It examines the
materials, processes, information systems, and the flow of
materials involved. While we strive to implement the
different VA tools, we realize that the years of experience in
product design and development is very essential toachieve
the desired objective. VA tools and techniques if applied
properly, with trained and experienced resources will
provide an extremely powerful suite to improve
productivity, lower cost, improve quality and also shorten
the time-to-market. This paper showed the implementation
of value analysis in a production line which led to reduction
in labor resulting in reduced investments. Also it help in
reducing the space utilization,material handling, throughput
time and lastly increase in the productivity. Value analysis
thus helps realize substantial company-wideimprovements,
thereby delivering significant competitive advantage.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1820
REFERENCES
[1] Value (Marketing),
https://en.wikipedia.org/wiki/Value_(marketing)
[2] Ajitanath Patil, Cost reduction of a product through
value analysis and value engineering, QuEST Global
services, Copyright 2010.
[3] Jay Mandelbaum,Danny L. Reed, Value Engineering
Handbook, Institute for defense analyses, September
2006.
[4] A. Narwal, K. Lamba, “Case Study on the Concept of
Value analysis in Sheet Metal,” International Journal of
Enhanced Research in Science, Technology &
Engineering, Vol. 4 Issue 12, December-2015, pp.64-71.
[5] M. Leber, M. Bastic, M. Mavric, A. Ivanisevic, “Value
Analysis as an Integral Part Of New Product
Development,” Procedia Engineering 69, 2014, pp. 90-
98, doi:10.1016/j.proeng.2014.02.207
[6] I. Cariaga, T. El-Diraby, H. Osman,“Integrating Value
Analysis And Quality function Deployment for
Evaluating Design Alternatives,” Journal ofConstruction
Engineering and Management, October 2007, pp. 761-
770,doi:10.1061/(ASCE)0733-9364(2007)133:10(761)
[7] Kaizen Method- Management Library,
www.vectorstudy.com/theories/kaizen
[8] Poka-yoke-Wikipedia,
https://en.wikipedia.org/wiki/Poka-yoke
[9] Takt time- Wikipedia,
https://en.wikipedia.org/wiki/Takt_time
[10] Line Balancing, Cycle Tiem, Takt Time, Assembly/
Workload Balance & Man-Machine-Setup-Time,
http://www.sixleansigma.com/index.php/wiki/lean/lin
e-balancing-cycle-time-takt-time-assembly-workload-
balance-man-macjine-setup-time/
[11] Cycle Time- iSixSigma,
https://www.isixsigma.com/dictionary/cycle-time/
[12] Multiple activity charts: Blackwell Reference Online,
http://www.blackwellreference.com/public/tocnode?id
=g9780631233176_chunk_g978140511096917_ss12-1
[13] Eliminate-Combine-Rearrange-Simplify-Work Analysis
Sheet, http://www.shmula.com/eliminate-combine-
rearrange-simplify-work-analysis-sheet/10340/
[14] Flow process chart- Wikipedia,
https://en.wikipedia.org/wiki/Flow_process_chart
[15] Throughput Time/manufacturingcycleTime-definition,
Explanation,
http://www.accountingexplaination.com/throughput_ti
me.html

More Related Content

PDF
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
PDF
Improvement of Productivity Using Value Stream Mapping
PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
PDF
Application of value stream mapping tool to reduce wastes in bearing industry
PDF
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
PDF
vignesh conference
PDF
Improvement of Process and Product Layout for Metro Coach using Craft Method...
PPTX
Method study(abhishekkumar)
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
Improvement of Productivity Using Value Stream Mapping
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Application of value stream mapping tool to reduce wastes in bearing industry
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
vignesh conference
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Method study(abhishekkumar)

What's hot (18)

PDF
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
PDF
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
PDF
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
PDF
Ppc 2 m and 16m
PDF
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
PDF
Iss 9
PDF
Ppc 2mark answer
PPT
Line Balancing In Garments Industry
DOCX
Application of industrial engineering techniques in garments production
PDF
Value stream mapping
PDF
A Case Study on Productivity Improvement of Assembly line using VSM Methodology
PDF
International Journal of Engineering Research and Development
PDF
IRJET- Value Analysis for Cost Saving in Mechanical Pencil Manufacturing: A C...
DOCX
line balancing in garment industry
PDF
Joined document 24_5
PDF
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
PDF
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
PDF
Case Study: Mass Production in Small Scale Industries
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
Ppc 2 m and 16m
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
Iss 9
Ppc 2mark answer
Line Balancing In Garments Industry
Application of industrial engineering techniques in garments production
Value stream mapping
A Case Study on Productivity Improvement of Assembly line using VSM Methodology
International Journal of Engineering Research and Development
IRJET- Value Analysis for Cost Saving in Mechanical Pencil Manufacturing: A C...
line balancing in garment industry
Joined document 24_5
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
Case Study: Mass Production in Small Scale Industries
Ad

Similar to Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study (20)

PDF
IRJET- Enhance the Capacity of Outer Tube Machining Cell
PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
PDF
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
PDF
Improvement of Process and Product Layout for Metro Coach using Craft Method...
PDF
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
PDF
Line Balancing and facility optimization of Machine Shop with Work Study and ...
PDF
IRJET- Daily Updates on Construction Sites Progress
PDF
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
PDF
Guidelines industrial engineering
PDF
Application of Industrial Engineering to increase the productivity of an E-Ri...
PDF
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
PDF
IRJET- Single Minute Exchange of Dies (SMED) Concept
DOC
MHCCV_02-08-16
PPTX
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
PDF
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
PDF
IRJET- Final Modeling and Prototype & Analysis of Hydraulic Scissor Lift
PDF
Vave two wheelers
PDF
A case study on productivity improvement of wearing insert and cutting ring
PDF
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
DOCX
Process Planning and cost Estimation (Regulation 2021) Third year Elective Pa...
IRJET- Enhance the Capacity of Outer Tube Machining Cell
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
Improvement of Process and Product Layout for Metro Coach using Craft Method...
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET- Daily Updates on Construction Sites Progress
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Guidelines industrial engineering
Application of Industrial Engineering to increase the productivity of an E-Ri...
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
IRJET- Single Minute Exchange of Dies (SMED) Concept
MHCCV_02-08-16
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Final Modeling and Prototype & Analysis of Hydraulic Scissor Lift
Vave two wheelers
A case study on productivity improvement of wearing insert and cutting ring
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
Process Planning and cost Estimation (Regulation 2021) Third year Elective Pa...
Ad

More from IRJET Journal (20)

PDF
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
PDF
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
PDF
Kiona – A Smart Society Automation Project
PDF
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
PDF
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
PDF
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
PDF
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
PDF
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
PDF
BRAIN TUMOUR DETECTION AND CLASSIFICATION
PDF
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
PDF
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
PDF
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
PDF
Breast Cancer Detection using Computer Vision
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
Kiona – A Smart Society Automation Project
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
BRAIN TUMOUR DETECTION AND CLASSIFICATION
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
Breast Cancer Detection using Computer Vision
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...

Recently uploaded (20)

PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
Java Basics-Introduction and program control
PDF
Computer System Architecture 3rd Edition-M Morris Mano.pdf
DOC
T Pandian CV Madurai pandi kokkaf illaya
PPTX
Measurement Uncertainty and Measurement System analysis
PPTX
mechattonicsand iotwith sensor and actuator
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Feature types and data preprocessing steps
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Software Engineering and software moduleing
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
First part_B-Image Processing - 1 of 2).pdf
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Amdahl’s law is explained in the above power point presentations
Java Basics-Introduction and program control
Computer System Architecture 3rd Edition-M Morris Mano.pdf
T Pandian CV Madurai pandi kokkaf illaya
Measurement Uncertainty and Measurement System analysis
mechattonicsand iotwith sensor and actuator
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
distributed database system" (DDBS) is often used to refer to both the distri...
Feature types and data preprocessing steps
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Module 8- Technological and Communication Skills.pptx
Management Information system : MIS-e-Business Systems.pptx
Software Engineering and software moduleing
Exploratory_Data_Analysis_Fundamentals.pdf
Information Storage and Retrieval Techniques Unit III
First part_B-Image Processing - 1 of 2).pdf
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...

Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1817 Value Analysis of a Rubber Hose Moulding and Assembly Line: A Case Study Pranish M. Naoghare1, Atul R. More2, Sandip S. Patil3 1,2Student,Dept. of Mechanical Engineering, Guru Gobind Singh College of Engineering & Research Centre (GCOERC), Nashik, Maharashtra, India 3Professor,Dept. of Mechanical Engineering, Guru Gobind Singh College of Engineering & Research Centre (GCOERC), Nashik, Maharashtra, India ----------------------------------------------------------------------***-------------------------------------------------------------------- Abstract - At present, the competition between the companies is leading to a constant battle for adequatemarket share. This is not only done by reducing the prices, but by constantly bringing new innovations in different fields of the company so that the value for a product or an entity is increased. The new concepts or ideas may come from the company itself or from any externalsource. Themainobjective of Value Analysis(VA) is to find and eliminate all the characteristics of a product or service which are of no real value to the customer. Thus VA ensures a better product or service for the customer at minimum costs compared to replacing the product with less favorable alternative. This paper focuses on the case study on process optimization for rubber hose moulding and assembly through value analysis. Key Words: Value Analysis, Takt Time, Assembly Line Balancing, ECRS, Throughput time 1.INTRODUCTION Value can be given as the relationship between perceived benefits and perceived costs: Value = Benefits / Cost. In order to increase the value, the organization has to improve the value : cost ratio. When the value is provided at high price, the perceived value may be low. This value can be increased by using tools like Value Analysis[1]. VA is the process of reducing costs in a development project. This process is achieved by assessing materials, processes and or products and offering alternatives. The outcome should result in reduced cost but without compromising the quality of the design[2]. 2. VA METHODOLOGY The VA methodology (or the “job plan”) can be appliedtoany subject or problem. The VA job plan divides the task being studied into functions. The job plan is normally organized by a value team leader. It is conductedineightsequentialphases as follows: i. Orientation Phase: Refine the problem and prepare for the value study. ii. Information Phase: Finalize the scopeoftheissuesto be addressed, targets for improvement, and evaluation factors while building cohesion among team members. iii. Function Analysis Phase: Identify the most beneficial areas for study. iv. Creative Phase: Develop a large number of ideas for alternative ways to perform each function selected for further study. v. Evaluation Phase: Refine andselectthebestideasfor development into specific value-improvement recommendations. vi. Development Phase: Determine the “best” alternatives for presentation to the decision-maker. vii. Presentation Phase: Obtainacommitmenttofollowa course of action for initiating an alternative. viii. Implementation Phase: Obtain final approval of the proposal and facilitate its implementation.[3] 3. LITERATURE SURVEY Amit Narwal, (2015) et.al. studied a case on the concept of value analysis in sheet metal. By Value analysis of the parts, the group produces the same parts at the cheaper cost from their competitors in market.[4] Marjan Leber, (2014) et. al. discussed the development of new product on the basis of value analysis and conjoint analysis. Implementation of such methodsresultedinstrong reduction in cost inside a company.[5] Ignacio Cariaga, (2007) et. al.studiestheintegrationof value analysis and quality function development or evaluation design alternatives. This framework enabled to: 1) Elicit customer requirements through the use of FAST.,2) Relate various design options to each customer requirement through the use of QFD, 3)Provide a decision support environment to assist in selecting the most suitable alternative.[6] 4. VALUE ANALYSIS TOOLS AND TECHNIQUES i. Role of Kaizen and Poka Yoke: KAIZEN-. It can be defined as the improvementwhichmaybe one-time or continuous, large or small. Kaizen is to be done on daily basis so as to increase the productivity.[7] POKA YOKE is a Japanese term that means "mistake proofing". A poka-yoke is not a process but a concept that
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1818 helps the operator to avoid mistakes. It is used to eliminate product defects by preventing, correcting, or drawing attention to human errors as they occur.[8] ii. Takt time: Takt timeis the average timebetween the startofproduction of two successive units on a production line,thistimeissetas per the rate of customer demand. Takt time can be determined with the formula: T = Ta / D Where T = Takt time, e.g. (work time between two consecutive units) Ta = Net time available to work, e.g. (work time per period) D = Demand (customer demand), e.g. (units required per period) [9] iii. Assembly line balancing Assembly line balancing is concernedwithredistributingand rearranging of the work to the workers in an assembly line. The main goal is to minimizethe idle timeof the workersand to increase the utilization of resources, labor and machines. [10] iv. Cycle time: Cycle time is the total time required for the completion of a process. Cycle time includes process time, during which a particular operation is done on the unit, and delay time, during which a unit has to wait so that next operation is started.[11] v. Multiple activity charts: Multiple activity charts are used to understand the relationship between the workers and their associated equipment. The activities of each subject are recorded, normally as blocks in tabular form withacommontimescale. They serve as useful devices to assist in the redistribution and balancing of workloads.[12] vi. ECRS: In generatingpracticalideasforimprovement,acommonand practical framework ECRS is used, which stands for the following: Eliminate Combine Rearrange Simplify  Eliminate In this step, all the unnecessary activities, non-value added activities are identified and are immediately eliminated..  Combine In this step, the activities which cannot be eliminated are combined.  Rearrange Work can also be rearranged. This rearrangement can be either in terms of order of operations, layout of the assembly line.  Simplify And, a good rule of thumb regardless of the situation is to simplify anyway. Of course, wewanttoEliminatefirstbut, if not, then Combine, Rearrange, and Simplify will be helpful.[13] vii. Flow process chart: The flow process chart is the graphical and symbolic representation of the various activities or operations or movements performed during a process.Itisusedtoidentify the unnecessary activities, movements and eliminate them, thus makes the process more efficient.[14] viii. Throughput time The amount of time required to turn raw materials into completed productiscalledthroughputtime.Thethroughput time or manufacturing cycle time is made up of process time, inspection time, move time, and queue time.[15] 5. CASE STUDY 5.1 Company Background INNOVA RUBBERS PVT. LTD. is located at Ambad, Nashik, Maharashtra. The industry is one of the technological leader in designing and manufacturingofautomotiveandindustrial rubber moulded and rubber to metal bonded anti-vibration parts. The industry produces silent block bushes, engine mountsandtransmissionmounts,propellershaftmountings, torsional vibrational dampers, bare rubber parts, control arms, etc. 5.2 Implementation Here value analysis was done to optimize the rubber hose moulding and assembly line. This hose assembly consists of two parts made of two different rubbers, namely EPDM and VAMMAC. The main processes involved in this production are: injection moulding of the rubber parts, post curing of VAMMAC rubber part, assembly and packing. Respective raw rubber is feed to the injection moulding machine. The rubber is melted by the heating mechanism in the machine as is then sent to the mould cavity through runners. After allowing the rubber to cure in the mould for some time, the mould is opened and the rubber parts are removed. EPDM rubber is directly sent to assembly with the post-cured VAMMAC rubber parts, while the VAMMAC rubber from the moulding machine is sent to post curing in a post curing oven for 4 hrs. At the assembly line various operations like hole drilling, ID cleaning, thread cleaning, whistle pin painting are done and is then assembled and packed. For the implementation of value analysis, data was collected regarding number of operations taking place, time required for each operation, number of operators on the line. With this a line balancing chart was drawn. From the data collected and the line balancing chart problems were found out, they were as follows: i. More WIP Inventory at every stage ii. Shortage at Customer end
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1819 iii. Multiple moulding station engaged for production iv. Less output per man v. More throughput time vi. Frequent incidences of assembly line stoppage. Chart -1: Line balancing chart - Before vii. More space utilization viii. Excess material handling Taking note of these problems various brainstorming sessions were taken. Various ideas/ alternatives were put forth, of which the team leader selected. These were: i. Reducing the labor force. A total of 11 workers were required over the entire production line.Thiswouldcausemoreexpenditure on the workers in terms of salary. By reduction of workers there would be less investment on the labors and this would led to saving of capital. ii. Combining of operations. As the workforce was to be reduced combining of operations was necessary. In this multiple operations were done by a worker. iii. Combining the moulding of the rubber hose on single injection moulding machine. The rubber hose assembly consists of two rubber part together. Each rubber part was produced on different machines. But productionofboththe parts on single machine would result in elimination of one injection moulding machine. iv. Changing the internal design of the post curing oven. One of the rubber part requires a post curing of 4 hrs. This is done in post curing oven. Its capacity was of 160 units. The internal design was further modified which resulted in accommodation of 216 units. By which the productivity increased. 6. RESULTS By implementation of the above ideas, the results obtained were as follows: i. Better line balancing By combining the operations, reducing the number of operators on the production line and also reducing the takt time resulted in simplified line balancing. Chart -2: Line balancing chart- After ii. Reduced Throughput time ratio By combining the moulding on single machine and modifying the internal design of the oven, the ratio of throughput time required totheideal throughput time was reduced from 22 to 2.76, i.e., by 87.4%. iii. Reduced Space Utilization ratio Due to the rearrangement of the machines,theratio of actual space utilized to the minimum space required was reduced from 2.79 to 1.37, i.e., by 50.89%. iv. Reduced material handing ratio Due to simplification of the workplace layout, the ratio of the actual working width to the minimum working width was reduced from 2.93 to 1.41,i.e., by 51.8%. v. Increase in productivity of each operator Before, the output per man was only 100 units, while after the implementation; the outputperman was increased to 350 units. This increased the productivity of each worker by 250%. 7. CONCLUSION Value analysis is a systematic effort to improve upon cost and performance of product produced. It examines the materials, processes, information systems, and the flow of materials involved. While we strive to implement the different VA tools, we realize that the years of experience in product design and development is very essential toachieve the desired objective. VA tools and techniques if applied properly, with trained and experienced resources will provide an extremely powerful suite to improve productivity, lower cost, improve quality and also shorten the time-to-market. This paper showed the implementation of value analysis in a production line which led to reduction in labor resulting in reduced investments. Also it help in reducing the space utilization,material handling, throughput time and lastly increase in the productivity. Value analysis thus helps realize substantial company-wideimprovements, thereby delivering significant competitive advantage.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1820 REFERENCES [1] Value (Marketing), https://en.wikipedia.org/wiki/Value_(marketing) [2] Ajitanath Patil, Cost reduction of a product through value analysis and value engineering, QuEST Global services, Copyright 2010. [3] Jay Mandelbaum,Danny L. Reed, Value Engineering Handbook, Institute for defense analyses, September 2006. [4] A. Narwal, K. Lamba, “Case Study on the Concept of Value analysis in Sheet Metal,” International Journal of Enhanced Research in Science, Technology & Engineering, Vol. 4 Issue 12, December-2015, pp.64-71. [5] M. Leber, M. Bastic, M. Mavric, A. Ivanisevic, “Value Analysis as an Integral Part Of New Product Development,” Procedia Engineering 69, 2014, pp. 90- 98, doi:10.1016/j.proeng.2014.02.207 [6] I. Cariaga, T. El-Diraby, H. Osman,“Integrating Value Analysis And Quality function Deployment for Evaluating Design Alternatives,” Journal ofConstruction Engineering and Management, October 2007, pp. 761- 770,doi:10.1061/(ASCE)0733-9364(2007)133:10(761) [7] Kaizen Method- Management Library, www.vectorstudy.com/theories/kaizen [8] Poka-yoke-Wikipedia, https://en.wikipedia.org/wiki/Poka-yoke [9] Takt time- Wikipedia, https://en.wikipedia.org/wiki/Takt_time [10] Line Balancing, Cycle Tiem, Takt Time, Assembly/ Workload Balance & Man-Machine-Setup-Time, http://www.sixleansigma.com/index.php/wiki/lean/lin e-balancing-cycle-time-takt-time-assembly-workload- balance-man-macjine-setup-time/ [11] Cycle Time- iSixSigma, https://www.isixsigma.com/dictionary/cycle-time/ [12] Multiple activity charts: Blackwell Reference Online, http://www.blackwellreference.com/public/tocnode?id =g9780631233176_chunk_g978140511096917_ss12-1 [13] Eliminate-Combine-Rearrange-Simplify-Work Analysis Sheet, http://www.shmula.com/eliminate-combine- rearrange-simplify-work-analysis-sheet/10340/ [14] Flow process chart- Wikipedia, https://en.wikipedia.org/wiki/Flow_process_chart [15] Throughput Time/manufacturingcycleTime-definition, Explanation, http://www.accountingexplaination.com/throughput_ti me.html