 Waste: Anything other than the exact
amount of
equipment, materials, parts, space, and
workers' efforts that are absolutely essential to
add value to a product.
 This is: Everything that increases production
costs without adding value to what is being
produced.
 Value-Added: Anything that the customer
wants and is willing to pay for it.
 Non-Value-Added: Anything that the
customer doesn't wants and won’t pay for it.
Types of Waste in Production
1. Overproduction.
2. Wait Time.
3. Transportation waste.
4. Processing waste.
5. Motion/Movement waste.
6. Inventory waste.
7. Defects waste.
Overproduction
 Producing more products than is needed,
faster than needed or before they are needed is
a waste.
 Adding extra units to the quantity needed “just in
case” or building to a pre-defined lot or batch size
is also wasteful.
Consequences of Over-
Production
 Loss of Production Control.
 Fixing rejects becomes a low priority.
 Increased Mix-ups, mistakes and confusion.
 Valuable time and resources consumed
(wasted) building products that are not a
priority.
Overproduction Causes
 Poor Planning Process.
 “Just-in-case” instead of “Just-in-time” production.
 Poor communications between departments.
 Low Capability Processes, that are unable of
producing the quantity and/or quality required in a
consistent basis.
 Prolonged setup and cycle times.
 Sub-optimization caused by local optimization
(Processes that benefits a single department’s
interests against the organization’s interests).
 Low equipment reliability.
Wait Time
 Wait time waste occurs when a worker cannot
proceed with the next task in a process.
 There are workers waiting and doing nothing
(wasting their time or making others waste theirs)
while others workload is excessive.
Wait Time causes
 Lack of an adequate maintenance.
 Need of proper tools or materials.
 Lengthy setup times.
 Lack of cross training.
 Lack of SOP or undocumented work methods.
 Production bottle necks.
 Irregular distribution of training.
Consequences of Wait Time
waste
 Personnel that cost doing nothing (adding no
value).
 Delays that lead to overtime to conclude what was
programmed.
 Costs due to inefficient processes that exceed the
standard costs.
 Loss of motivation; Low morale.
Transportation Waste
 Any material movement that does not
directly support immediate production.
 When product is transported to a place other
than the next process location or, the next
process is not located adjacent to the current
one.
Examples of Transportation
waste
 Units are parked off the production floor to gather
a “full lot” for a batch operation.
 Production Lots that are sent off to the other side
of the plant for the next process step.
 This can occur, either between operations or
within an operation where workstations are not
properly laid off.
 Containers that are too big and difficult to open or
close.
 Excess of material handling equipment. Lift-trucks
that travel empty.
Transportation waste causes
 Improper Facility Layout
 Large buffers .
 Large lot purchasing or processing.
 Poor production planning.
 Poor scheduling.
 Poor work place organization.
Processing waste
 Any unnecessary step, either production or
communication, that adds no value to a
product or service.
 Occurs when we execute an operations, and
the customer is not willing to pay for what is
being done.
Processing waste causes
 Lack of a concurrent design.
 Processes poorly documented (Lack of
SOP’s).
 Lack of customer input concerning
requirements.
 Poor configuration control.
 Quality Standards not related to customer
needs.
 Redundant inspections and approvals.
Consequences of Processing
waste
 Time spent building a feature that is irrelevant
to the customer and that the customer will not
pay for.
 Additional costs for materials used in excess.
 Lack of control because improper use of
design documents.
 Products that either, exceed the requirements
of the customer or fail to comply with them.
Motion/Movement waste
 Anymovement of people which does not
contribute to add value to the product or
service.
 Persons moving from one place to another
create a false impression of being working,
while in reality, are doing nothing. They are
costing while adding no value.
Consequences of
Motion/Movement waste
 Employees move from one workstation to
another, doing nothing.
 They are unnecessary trips.
 No value is added during this process.
 Include time spent looking for parts, tools,
fixtures, etc.
 Include time spent going to/froma warehouse.
Motion/Movement waste
Causes
 Ineffective Layouts (equipment, office and
plant).
 Lack of Visual controls.
 Poor Process Documentation.
 Poor work place organization.
Inventory waste
 Any supply (Materials or Goods) in excess of
what is required to deliver products in a Just-
In-Time manner.
 These parts will need to be
processed, moved, counted, stored, etc. Will add
to costs and can not be shipped to our customers.
Inventory waste causes
 Poor sales forecasting (Demand Forecasting).
 Long lead times (set-up and cycle times).
 Poor inventory planning.
 Poor inventory tracking.
 Unbalanced production processes.
 Processes that can not produce the required
quantity or quality of products in a consistent
manner.
 Suppliers that can not supply the required quantity
or quality of products in a consistent manner.
Consequences of Inventory
waste
 Large lot purchases of raw materials, only to
be stored for weeks or months.
 Very large WIP’s inventories.
 Low inventory turnover. Need of large working
capital to finance inventories.
 Damaged Products.
 Obsolete products.
Defects waste
 Costs due to sorting, repairing and/or repairing
products.
 Include cost of materials scrapped due to defects.
 Also consist in the cost of goods returned by
customers, recall campaigns.
 Recycling part of the products is also a waste.
Defects waste causes
 Too many product models.
 High inventory levels.
 Inadequate tools/equipment.
 Poor employee training.
 Poor layouts.
 Unnecessary handling.
 Poor process documentation.
 Processes that can not produce the required quantity
or quality of products in a consistent manner.
 Suppliers that can not supply the required quantity or
quality of products in a consistent manner.
Consequences of Defects
waste
 Excessive processing costs.
 Many additional non-value-added processes
or operations.
 Additional quality control inspections needed.
 Damaged relations with customers.

More Related Content

PPT
Identify 7 Wastes
PPTX
7 Types of Muda
PPTX
7 waste in the production
PPTX
Seven wastes of lean operations management
PPT
Kanban Pull System
PPTX
Types of layout
PPTX
Ian's 7 wastes of production
PDF
The Seven Wastes
Identify 7 Wastes
7 Types of Muda
7 waste in the production
Seven wastes of lean operations management
Kanban Pull System
Types of layout
Ian's 7 wastes of production
The Seven Wastes

What's hot (20)

PPTX
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
PPTX
Method study
PPTX
Lean manufacturing
PPT
16 lean manufacturing
PPSX
Types of waste - lean Concept Krishna Heda
PPT
Lean manufacturing overview
PPT
PPTX
Lean manufacturing ppt
PPT
Storemanagement
PPT
Method Study
PPTX
Lean manufacturing
PPT
Lean Manufacturing - An Overview
PPT
TPM 8 Pillars
PPTX
Lean manufacturing basics
PPT
Recording techniques used in method study ppt
PPTX
Lean Manufacturing Tools
PPT
Lean Manufacturing Training
PPTX
8 Wastes of Lean
PPT
Perceiving Muda
PPTX
5S Implementation Presentation
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
Method study
Lean manufacturing
16 lean manufacturing
Types of waste - lean Concept Krishna Heda
Lean manufacturing overview
Lean manufacturing ppt
Storemanagement
Method Study
Lean manufacturing
Lean Manufacturing - An Overview
TPM 8 Pillars
Lean manufacturing basics
Recording techniques used in method study ppt
Lean Manufacturing Tools
Lean Manufacturing Training
8 Wastes of Lean
Perceiving Muda
5S Implementation Presentation
Ad

Viewers also liked (14)

PDF
Alternate Transportation and Green Cities
PPT
Green transport for a showcase city
PDF
Green initiatives in transportation - Some Swedish examples
PPT
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...
PPTX
Motor vehicles and environmental pollutions
PPTX
Clean bin slides [repaired]
PPTX
Green transportation melissa kaye quilalang
PPS
Green Transport
PPT
Green transportation
PDF
Sustainable, multimodal & green transport corridors
PDF
Sustainable Transport and Green Fuel Types
PPTX
Sustainable Transportation
PPTX
Green vehicles ppt
PPTX
Green transportation
Alternate Transportation and Green Cities
Green transport for a showcase city
Green initiatives in transportation - Some Swedish examples
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...
Motor vehicles and environmental pollutions
Clean bin slides [repaired]
Green transportation melissa kaye quilalang
Green Transport
Green transportation
Sustainable, multimodal & green transport corridors
Sustainable Transport and Green Fuel Types
Sustainable Transportation
Green vehicles ppt
Green transportation
Ad

Similar to Waste in production (20)

PPT
Lean Waste
PPTX
Gagan toyota jit_production_mgmt
PDF
LEAN Digital Assignment
PDF
Lean manufacturing
PDF
Seven wastes
PDF
Seven wastes
PDF
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
PPTX
Lean startup
PPTX
Work_Measurement_introduction_of_Work_Study.pptx
PPTX
Lean manufanturing
PPTX
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
PPT
F.I.T. Deployment Sheets Handout
PPT
Toyota Production System & 7 Muda
PDF
Lean Manufacturing 101
PPTX
Presentation1.pptx preventing and eliminating muda
PPTX
Preventing and eliminating muda and waste
PDF
1729664598765_LEAN SYSTEM SUISTANABLE - WASTES OF LEAN
PPT
PDF
Elimination of Wastssssssssssssssssse.pdf
PPT
Lean management and six sigma
Lean Waste
Gagan toyota jit_production_mgmt
LEAN Digital Assignment
Lean manufacturing
Seven wastes
Seven wastes
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
Lean startup
Work_Measurement_introduction_of_Work_Study.pptx
Lean manufanturing
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
F.I.T. Deployment Sheets Handout
Toyota Production System & 7 Muda
Lean Manufacturing 101
Presentation1.pptx preventing and eliminating muda
Preventing and eliminating muda and waste
1729664598765_LEAN SYSTEM SUISTANABLE - WASTES OF LEAN
Elimination of Wastssssssssssssssssse.pdf
Lean management and six sigma

More from Prosenjit Banerjee (8)

PPTX
Buyer's Decision Making while purchasing a refrigerator
PPT
PPTX
A statistical Analysis of Malls(Customers)
PPTX
Kramer’s pharmaceutical case study
PPTX
Intoduction to Financial maanagement
PPTX
PPTX
Multiple Uneven Cashflow
PPTX
Cost Classification(fixed cost and variable cost) and BEP
Buyer's Decision Making while purchasing a refrigerator
A statistical Analysis of Malls(Customers)
Kramer’s pharmaceutical case study
Intoduction to Financial maanagement
Multiple Uneven Cashflow
Cost Classification(fixed cost and variable cost) and BEP

Recently uploaded (20)

DOCX
573137875-Attendance-Management-System-original
PDF
Structs to JSON How Go Powers REST APIs.pdf
PDF
composite construction of structures.pdf
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
573137875-Attendance-Management-System-original
Structs to JSON How Go Powers REST APIs.pdf
composite construction of structures.pdf
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
CH1 Production IntroductoryConcepts.pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
bas. eng. economics group 4 presentation 1.pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Model Code of Practice - Construction Work - 21102022 .pdf
Embodied AI: Ushering in the Next Era of Intelligent Systems
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Strings in CPP - Strings in C++ are sequences of characters used to store and...
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Operating System & Kernel Study Guide-1 - converted.pdf

Waste in production

  • 2.  Waste: Anything other than the exact amount of equipment, materials, parts, space, and workers' efforts that are absolutely essential to add value to a product.  This is: Everything that increases production costs without adding value to what is being produced.  Value-Added: Anything that the customer wants and is willing to pay for it.  Non-Value-Added: Anything that the customer doesn't wants and won’t pay for it.
  • 3. Types of Waste in Production 1. Overproduction. 2. Wait Time. 3. Transportation waste. 4. Processing waste. 5. Motion/Movement waste. 6. Inventory waste. 7. Defects waste.
  • 4. Overproduction  Producing more products than is needed, faster than needed or before they are needed is a waste.  Adding extra units to the quantity needed “just in case” or building to a pre-defined lot or batch size is also wasteful.
  • 5. Consequences of Over- Production  Loss of Production Control.  Fixing rejects becomes a low priority.  Increased Mix-ups, mistakes and confusion.  Valuable time and resources consumed (wasted) building products that are not a priority.
  • 6. Overproduction Causes  Poor Planning Process.  “Just-in-case” instead of “Just-in-time” production.  Poor communications between departments.  Low Capability Processes, that are unable of producing the quantity and/or quality required in a consistent basis.  Prolonged setup and cycle times.  Sub-optimization caused by local optimization (Processes that benefits a single department’s interests against the organization’s interests).  Low equipment reliability.
  • 7. Wait Time  Wait time waste occurs when a worker cannot proceed with the next task in a process.  There are workers waiting and doing nothing (wasting their time or making others waste theirs) while others workload is excessive.
  • 8. Wait Time causes  Lack of an adequate maintenance.  Need of proper tools or materials.  Lengthy setup times.  Lack of cross training.  Lack of SOP or undocumented work methods.  Production bottle necks.  Irregular distribution of training.
  • 9. Consequences of Wait Time waste  Personnel that cost doing nothing (adding no value).  Delays that lead to overtime to conclude what was programmed.  Costs due to inefficient processes that exceed the standard costs.  Loss of motivation; Low morale.
  • 10. Transportation Waste  Any material movement that does not directly support immediate production.  When product is transported to a place other than the next process location or, the next process is not located adjacent to the current one.
  • 11. Examples of Transportation waste  Units are parked off the production floor to gather a “full lot” for a batch operation.  Production Lots that are sent off to the other side of the plant for the next process step.  This can occur, either between operations or within an operation where workstations are not properly laid off.  Containers that are too big and difficult to open or close.  Excess of material handling equipment. Lift-trucks that travel empty.
  • 12. Transportation waste causes  Improper Facility Layout  Large buffers .  Large lot purchasing or processing.  Poor production planning.  Poor scheduling.  Poor work place organization.
  • 13. Processing waste  Any unnecessary step, either production or communication, that adds no value to a product or service.  Occurs when we execute an operations, and the customer is not willing to pay for what is being done.
  • 14. Processing waste causes  Lack of a concurrent design.  Processes poorly documented (Lack of SOP’s).  Lack of customer input concerning requirements.  Poor configuration control.  Quality Standards not related to customer needs.  Redundant inspections and approvals.
  • 15. Consequences of Processing waste  Time spent building a feature that is irrelevant to the customer and that the customer will not pay for.  Additional costs for materials used in excess.  Lack of control because improper use of design documents.  Products that either, exceed the requirements of the customer or fail to comply with them.
  • 16. Motion/Movement waste  Anymovement of people which does not contribute to add value to the product or service.  Persons moving from one place to another create a false impression of being working, while in reality, are doing nothing. They are costing while adding no value.
  • 17. Consequences of Motion/Movement waste  Employees move from one workstation to another, doing nothing.  They are unnecessary trips.  No value is added during this process.  Include time spent looking for parts, tools, fixtures, etc.  Include time spent going to/froma warehouse.
  • 18. Motion/Movement waste Causes  Ineffective Layouts (equipment, office and plant).  Lack of Visual controls.  Poor Process Documentation.  Poor work place organization.
  • 19. Inventory waste  Any supply (Materials or Goods) in excess of what is required to deliver products in a Just- In-Time manner.  These parts will need to be processed, moved, counted, stored, etc. Will add to costs and can not be shipped to our customers.
  • 20. Inventory waste causes  Poor sales forecasting (Demand Forecasting).  Long lead times (set-up and cycle times).  Poor inventory planning.  Poor inventory tracking.  Unbalanced production processes.  Processes that can not produce the required quantity or quality of products in a consistent manner.  Suppliers that can not supply the required quantity or quality of products in a consistent manner.
  • 21. Consequences of Inventory waste  Large lot purchases of raw materials, only to be stored for weeks or months.  Very large WIP’s inventories.  Low inventory turnover. Need of large working capital to finance inventories.  Damaged Products.  Obsolete products.
  • 22. Defects waste  Costs due to sorting, repairing and/or repairing products.  Include cost of materials scrapped due to defects.  Also consist in the cost of goods returned by customers, recall campaigns.  Recycling part of the products is also a waste.
  • 23. Defects waste causes  Too many product models.  High inventory levels.  Inadequate tools/equipment.  Poor employee training.  Poor layouts.  Unnecessary handling.  Poor process documentation.  Processes that can not produce the required quantity or quality of products in a consistent manner.  Suppliers that can not supply the required quantity or quality of products in a consistent manner.