Advanced Planning from Standard MPS/MRP Darren Swindells Hills Industries Limited 16 August 2010 The most comprehensive Oracle applications & technology content under one roof
The Situation JDE (rel. 8.10)being implemented as ERP solution across Hills Group  Orrcon had unique requirement and was next! Product manufactured in  Cycles  at Orrcon Budget and time-frame would not allow an off-the-shelf ‘APS’ solution
About Orrcon – Racing Team .. Oh, and on the side we make steel pipe & tube as well …
About Orrcon – Tube Mills Manufacturers of steel Pipe & Tube  Large division of Hills Industries Limited Local manufacturing in Brisbane, Adelaide & Wollongong
About Orrcon – Make in Cycles Set-up time is significant Each change of profile incurs set-up To reduce downtime – roll groups of products once every 4 weeks
About Orrcon – Changeovers Full-Changeover 1/4-Changeover 1/2-Changeover
Problem with Standard MPS/MRP R3483  (Master Planning Schedule-Multi-Plant) Plans Work Orders for  Date of Need   (& Demand is dated daily) Orrcon groups Planned WOs into pre-published  Rolling Cycles  for each Product Family Only make each product once per Cycle
The Solution – Create MPS/MRP Cycles – Step 1 (Buyer Number) Link each Item Number to a Cycle using the ‘Buyer Number’ Buyer 201 = Cycle 1  Buyer 202 = Cycle 2 Buyer 203 = Cycle 3 Buyer 204 = Cycle 4
The Solution – Create MPS/MRP Cycles – Step 2 (Cycle B/Ps) Create ‘Branch Plants’ for each Cycle B/P 241=Cycle 1 B/P 242=Cycle 2 B/P 243=Cycle 3 B/P 244=Cycle 4
The Solution – Create MPS/MRP Cycles – Step 3 (Cycle Calendars) Create ‘Shop Floor Calendars’ for each Cycle B/P 241=Cycle 1 B/P 242=Cycle 2 B/P 243=Cycle 3 B/P 244=Cycle 4 ‘ W’ Working Day  -  only  in one week from Cycle
The Solution – Create MPS/MRP Cycles – Step 4  (Create MPS Versions) Create versions of MPS that are linked with ‘Branch Plant’ Shop-floor Calendars for each Cycle One version for each Cycle Continued …
The Solution – Create MPS/MRP Cycles – Step 4  (Create MPS Versions) Data Selections  (only select items that belong to the Cycle) MCU = Cycle SFC (to get records) BUYR = Cycle group from  Item Branch Continued …
The Solution – Create MPS/MRP Cycles – Step 4  (Create MPS Versions) Processing Options  (call Shop-Floor Calendar for Cycle) Multi-Facility Tab 1. Date Branch = Cycle Branch Plant MPS then uses the Shop Floor Calendar from this Branch Plant This is what makes the Cycles possible! Continued … Date Branch This was actually designed to reduce processing time when Multi-Facility MPS/MRP was generated – however it also achieves Cycle Planning when used for this Work-Around
The Solution – Create MPS/MRP Cycles – Step 5 (Generate MPS) Generate MPS (R3483) Note:  ALL  Cycles are generated each week – to create correct projected requirements for components
The Solution – Create MPS/MRP Cycles – Step 6  (Detailed Message Review) Planned Order Messages now group so each product is only made once per week in Detailed Message Review Note: Request Date Changes from 30/08/10 to 29/09/10 – jump of 4 weeks
Summary Work-around: using R3483 ‘Date Branch’ feature designed to save Processing Time to achieve some ‘APS’ functionality of grouping Item production into correct weekly buckets Requires set-up of Branch Plants, Shop-Floor Calendars and one MPS/MRP version for each Cycle Can also be used for Manufacturing AND Purchasing ACHIEVES OBJECTIVE = one setup for each product family every 4 weeks
Questions?
Tell us what you think… http://feedback.insync10.com.au

More Related Content

PPTX
SAP PP Routing
PPTX
MRP, MPS, Bill of Material, Numericals
PPTX
Material requirement planning (mrp)
PPTX
MATERIAL REQUIREMENTS PLANNING (MRP)
PPTX
Sap pp org
PPT
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
PPT
Operations Management Material Requirements Planning (MRP)
PPTX
Managing production across supply chain
SAP PP Routing
MRP, MPS, Bill of Material, Numericals
Material requirement planning (mrp)
MATERIAL REQUIREMENTS PLANNING (MRP)
Sap pp org
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
Operations Management Material Requirements Planning (MRP)
Managing production across supply chain

What's hot (20)

PPT
Mrp 1 deepak 12mt07ind009
PPT
Equiptplan 2010
PPTX
Mrp structure
PPT
Material Requisite Planning
PPT
Ch16 mrp
PPTX
Sap mm ppt
PPT
PPC-ALL UNITS-PPT
PPTX
Plantlocationandlayoutplanning
PPT
PPT
Unit 4
PPTX
Bill of material
PPTX
Unit 1 PPC
PPT
Plant location and_site_selection
PPT
Plant location
PPT
PRODUCTION PLANNING AND CONTROL-Unit 3
DOCX
SAP SD Training Course Outline
PPT
Unit 3
PDF
Chapter 2 Plant Location
DOC
sikkemamateria0119
PPTX
Material Requirement and Planning
Mrp 1 deepak 12mt07ind009
Equiptplan 2010
Mrp structure
Material Requisite Planning
Ch16 mrp
Sap mm ppt
PPC-ALL UNITS-PPT
Plantlocationandlayoutplanning
Unit 4
Bill of material
Unit 1 PPC
Plant location and_site_selection
Plant location
PRODUCTION PLANNING AND CONTROL-Unit 3
SAP SD Training Course Outline
Unit 3
Chapter 2 Plant Location
sikkemamateria0119
Material Requirement and Planning
Ad

Viewers also liked (20)

PPTX
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
PDF
What Is Rough Cut Capacity Planning?
PPTX
Master_thesis_defense_public
PPTX
Capacity Requirement Planning, Rough Cut Capacity Planning
PPTX
small and effective ppt on master production schedule
PPTX
Master Production Scheduling (MPS)
PPTX
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
PPSX
Material management control power point presentation
PPT
Capacity Management
PPT
(Mrp 1) Prsntation Slides
PPTX
Microsoft Dynamics NAV 2016 - "A users guide"
PPT
Material Resource Planning
PPT
Capacity planning
PPTX
Materials management ppt
PPTX
Production Planning and Control
PPT
Material requirement planning presentation
PPTX
Supply Chain Management in ERP
PPT
Capacity Requirement Planning
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
What Is Rough Cut Capacity Planning?
Master_thesis_defense_public
Capacity Requirement Planning, Rough Cut Capacity Planning
small and effective ppt on master production schedule
Master Production Scheduling (MPS)
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
Material management control power point presentation
Capacity Management
(Mrp 1) Prsntation Slides
Microsoft Dynamics NAV 2016 - "A users guide"
Material Resource Planning
Capacity planning
Materials management ppt
Production Planning and Control
Material requirement planning presentation
Supply Chain Management in ERP
Capacity Requirement Planning
Ad

Similar to Advanced Planning from Standard MPS/MRP (20)

DOCX
SCM 304 Supply Chain Management Material Requirements .docx
PPTX
Operations Management Classroom Presentation
PPTX
S2019302018 m saqib nawaz mps
PDF
What is master production schedule
PPTX
MRP and Planning Overview
PPTX
MPS.pptx
PPTX
MASTER PRODUCTION SCHEDULE (MPS).pptx
PPT
Ch17 Mrp
PPTX
MRP Theory: Master Schedule, Bill of Material and Lead Times
PPT
Input to MRP
PPT
Manufacturing planning & control (mpc) system
PPTX
Mba om 09_resource_planning
PPTX
MRP and ERP
PPTX
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
PDF
PDF
Sap MRP materials requirements planning
PDF
Manufacturing ERP Software
PPTX
Material resource planning
PPT
Mrp ii
PPTX
Material requirement planning - Production and Operation Management
SCM 304 Supply Chain Management Material Requirements .docx
Operations Management Classroom Presentation
S2019302018 m saqib nawaz mps
What is master production schedule
MRP and Planning Overview
MPS.pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
Ch17 Mrp
MRP Theory: Master Schedule, Bill of Material and Lead Times
Input to MRP
Manufacturing planning & control (mpc) system
Mba om 09_resource_planning
MRP and ERP
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
Sap MRP materials requirements planning
Manufacturing ERP Software
Material resource planning
Mrp ii
Material requirement planning - Production and Operation Management

More from InSync Conference (20)

PDF
Frank munz oracle fusion middleware and aws cloud services in sync11
PDF
Pythian MySQL - database for the web based economy
PPT
IBM and Oracle Joint Solution Centre
PDF
In Sync Running Apps On Oracle
PPTX
P6 analytics
PDF
Upk presentation insync
PPT
Oracle Fusion Middleware for JD Edwards
PPT
In sync10 grc_suite
PDF
In sync10 cliffgodwin-ebs-final
PDF
In sync10 cliffgodwin-appskeynote-final
PDF
Mnod linsync10 oba
PDF
D linsync10 ofa5yrs
PDF
D linsync10 fusaapps
PPT
Optim Insync10 Paul Griffin presentation
PPT
Nswh Insync 2010 Ammar Customer Presentation
PPT
Insync10 IBM JDE Sol Ed Announcement
PPTX
InSync10 Implement JDE Financial Analytics and Make Better Decisions
POT
Life after upgrading to r12
PDF
Ebs operational reporting at santos evaluation, selection & implementation
Frank munz oracle fusion middleware and aws cloud services in sync11
Pythian MySQL - database for the web based economy
IBM and Oracle Joint Solution Centre
In Sync Running Apps On Oracle
P6 analytics
Upk presentation insync
Oracle Fusion Middleware for JD Edwards
In sync10 grc_suite
In sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-appskeynote-final
Mnod linsync10 oba
D linsync10 ofa5yrs
D linsync10 fusaapps
Optim Insync10 Paul Griffin presentation
Nswh Insync 2010 Ammar Customer Presentation
Insync10 IBM JDE Sol Ed Announcement
InSync10 Implement JDE Financial Analytics and Make Better Decisions
Life after upgrading to r12
Ebs operational reporting at santos evaluation, selection & implementation

Recently uploaded (20)

PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Empowerment Technology for Senior High School Guide
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Trump Administration's workforce development strategy
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
HVAC Specification 2024 according to central public works department
PDF
International_Financial_Reporting_Standa.pdf
PPTX
Computer Architecture Input Output Memory.pptx
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PPTX
Virtual and Augmented Reality in Current Scenario
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
IGGE1 Understanding the Self1234567891011
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Empowerment Technology for Senior High School Guide
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Trump Administration's workforce development strategy
History, Philosophy and sociology of education (1).pptx
Chinmaya Tiranga quiz Grand Finale.pdf
Environmental Education MCQ BD2EE - Share Source.pdf
HVAC Specification 2024 according to central public works department
International_Financial_Reporting_Standa.pdf
Computer Architecture Input Output Memory.pptx
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Virtual and Augmented Reality in Current Scenario
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
IGGE1 Understanding the Self1234567891011
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf

Advanced Planning from Standard MPS/MRP

  • 1. Advanced Planning from Standard MPS/MRP Darren Swindells Hills Industries Limited 16 August 2010 The most comprehensive Oracle applications & technology content under one roof
  • 2. The Situation JDE (rel. 8.10)being implemented as ERP solution across Hills Group Orrcon had unique requirement and was next! Product manufactured in Cycles at Orrcon Budget and time-frame would not allow an off-the-shelf ‘APS’ solution
  • 3. About Orrcon – Racing Team .. Oh, and on the side we make steel pipe & tube as well …
  • 4. About Orrcon – Tube Mills Manufacturers of steel Pipe & Tube Large division of Hills Industries Limited Local manufacturing in Brisbane, Adelaide & Wollongong
  • 5. About Orrcon – Make in Cycles Set-up time is significant Each change of profile incurs set-up To reduce downtime – roll groups of products once every 4 weeks
  • 6. About Orrcon – Changeovers Full-Changeover 1/4-Changeover 1/2-Changeover
  • 7. Problem with Standard MPS/MRP R3483 (Master Planning Schedule-Multi-Plant) Plans Work Orders for Date of Need (& Demand is dated daily) Orrcon groups Planned WOs into pre-published Rolling Cycles for each Product Family Only make each product once per Cycle
  • 8. The Solution – Create MPS/MRP Cycles – Step 1 (Buyer Number) Link each Item Number to a Cycle using the ‘Buyer Number’ Buyer 201 = Cycle 1 Buyer 202 = Cycle 2 Buyer 203 = Cycle 3 Buyer 204 = Cycle 4
  • 9. The Solution – Create MPS/MRP Cycles – Step 2 (Cycle B/Ps) Create ‘Branch Plants’ for each Cycle B/P 241=Cycle 1 B/P 242=Cycle 2 B/P 243=Cycle 3 B/P 244=Cycle 4
  • 10. The Solution – Create MPS/MRP Cycles – Step 3 (Cycle Calendars) Create ‘Shop Floor Calendars’ for each Cycle B/P 241=Cycle 1 B/P 242=Cycle 2 B/P 243=Cycle 3 B/P 244=Cycle 4 ‘ W’ Working Day - only in one week from Cycle
  • 11. The Solution – Create MPS/MRP Cycles – Step 4 (Create MPS Versions) Create versions of MPS that are linked with ‘Branch Plant’ Shop-floor Calendars for each Cycle One version for each Cycle Continued …
  • 12. The Solution – Create MPS/MRP Cycles – Step 4 (Create MPS Versions) Data Selections (only select items that belong to the Cycle) MCU = Cycle SFC (to get records) BUYR = Cycle group from Item Branch Continued …
  • 13. The Solution – Create MPS/MRP Cycles – Step 4 (Create MPS Versions) Processing Options (call Shop-Floor Calendar for Cycle) Multi-Facility Tab 1. Date Branch = Cycle Branch Plant MPS then uses the Shop Floor Calendar from this Branch Plant This is what makes the Cycles possible! Continued … Date Branch This was actually designed to reduce processing time when Multi-Facility MPS/MRP was generated – however it also achieves Cycle Planning when used for this Work-Around
  • 14. The Solution – Create MPS/MRP Cycles – Step 5 (Generate MPS) Generate MPS (R3483) Note: ALL Cycles are generated each week – to create correct projected requirements for components
  • 15. The Solution – Create MPS/MRP Cycles – Step 6 (Detailed Message Review) Planned Order Messages now group so each product is only made once per week in Detailed Message Review Note: Request Date Changes from 30/08/10 to 29/09/10 – jump of 4 weeks
  • 16. Summary Work-around: using R3483 ‘Date Branch’ feature designed to save Processing Time to achieve some ‘APS’ functionality of grouping Item production into correct weekly buckets Requires set-up of Branch Plants, Shop-Floor Calendars and one MPS/MRP version for each Cycle Can also be used for Manufacturing AND Purchasing ACHIEVES OBJECTIVE = one setup for each product family every 4 weeks
  • 18. Tell us what you think… http://feedback.insync10.com.au

Editor's Notes

  • #4: Mark Winterbottom (Frosty) & Steven Richards
  • #5: LARGE PIPE & TUBE *(OIL, GAS, WATER) Eurabedella (NSW ) – water pipe-lines | STRUCTURAL | PRECISION tube
  • #7: Explain Cycles: purpose to do setups once per family in monthly grouping. Minimise setup time (downtime).
  • #8: Rolling cycles are published to customers - | rolling cycle allows planned WO’s into future to project demand for Paint, Steel etc in Cycles (so not delivered and sitting around for 3 weeks until used – paint goes off – etc)
  • #9: APOLOGISE for not showing as a live demo – but watching an MRP generation run is only exciting to narrow group of people  NOTE: Buyer field is used as it is available on MPS data selection and not used for Manufactured item. Reverse for Purchased item (I.e. use Planner Number for Cycle)
  • #12: Note – MPS is called from menu by Planning Staff – they follow steps on menu (Step 1 Cycle 1 tasks etc) – they follow one set for each of 4 weeks then start again
  • #15: Explain: per normal outcome of MPS generating when there are Non-Working days in the SFC, MPS will delay any past due requirements until the next W day, and bring forward requirements between then and the next W day
  • #16: Processing from this point on is same as usual after normal MPS generation … RECAP – this same process works for MPS and MRP level for Manufactured AND Purchased Items