International Journal of Civil Engineering and Technology (IJCIET)
Volume 8, Issue 1, January 2017, pp. 307–311, Article ID: IJCIET_08_01_034
Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
© IAEME Publication
EFFICIENT COST MANAGEMENT OF MATERIALS IN
CONVENTIONAL AND PRECAST CONSTRUCTION
Suma.Yarlagadda
M. Tech Student, Department of Civil Engineering,
K L University, Vaddeswaram-522502, Andhra Pradesh, India
SS.Asadi
Associate Dean-Academics, Department of Civil Engineering,
K L University, Vaddeswaram-522502, Andhra Pradesh, India
S.S. Bhanu Prakash
Asst. Professor, Department of Civil Engineering,
K L University, Vaddeswaram-522502, Andhra Pradesh, India
ABSTRACT
Objective:To find out cost variations of materials used for the conventional building and
precast building, wastage percentage in construction of a commercial building using conventional
and precast technology. And to find out the time and cost variations in construction of commercial
building using conventional and precast technology.
Methods/Analysis: Outwardly the technique of using precast members in construction has
played one of the key roles in the industry. This technique has been measured and speckled in terms
of cost inference. A Model was carried out on a Residential building project and the data was
collected for study and concluded that the use of precast members is a better tradable factor to that
of conventional system.
Findings: Precast construction saves time and cost when compared to conventional type of
construction.
Novelty/Improvement: The transformation and revolution in the technology was grown out of
the demand of the clients/customers of both residential and commercial purposes. Outwardly the
technique of using precast members in construction has played one of the key roles in the industry.
Key words: Construction Cost Comparison, Conventional Type, Precast Construction.
Cite this Article: Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash, Efficient Cost
Management of Materials In Conventional and Precast Construction. International Journal of Civil
Engineering and Technology, 8(1), 2017, pp. 307–311.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash
http://www.iaeme.com/IJCIET/index.asp 308 editor@iaeme.com
1. INTRODUCTION
Material management is the system of planning and controlling all the resources to ensure quality of
project. In a project materials can contribute 50 to 60% of total cost1
. When materials are not managed
properly the problems like shortages, surpluses and cost overflow exists2
. The material management
system helps to provide the benefits in terms of labour productivity, reduced bulk materials surplus,
reduced materials management manpower, and cash flow savings3
. Construction site was portioned into
3zones such as semi-permanent (exterior) storage, staging areas, and workface (interior) storage. Each has
its own function related to site management of materials4
. Contrary conditions which were caused by the
lack of an effective material management were identified, and the days on which the conditions occurred
are noted. For these identified days, the actual daily productivity is compared with the expected
productivity to regulate the number of work‐hours lost5
.The application of an inclusive materials
management system contributes to predictable project outcomes, cost reduction, improved productivity and
quality6
.With the initiation of the new government, India is being developed in terms of all the aspects of
development and industrialization to achieve remarkable hikes in the industry sector, of which construction
industry in the first one to focus. The industry seemingly showed its raise from 19s and now as a mark of
use of new technology. The new government of India is greatly involved in emphasizing the necessity of
industrialization in India for a rapid economic growth. The inspiring demands by the government to gain
their financial resources through the sector pointedly guaranteed and raised the demand of the construction
workers. The use of precast members has been implied to have numerous compensations over the
conventional methods. A few patterns of such kind could be reduction in resource deployment, material
wastage, less volume of materials to be used, which intern creates the environmental and site cleanliness
over the safety, time of completion of the project, which are the core management observations. All these
factors discussed indicate and denote that the use of precast is much more economical, safe compared to
that of conventional system; nevertheless the construction cost involves all the costs right from its
construction, maintenance and its life. And the effort of this study is to throw light and focus on the
comparison of construction cost in using conventional methods to that of precast techniques. And further to
provide information as a parameter for the construction cost comparison for both systems and there will be
a chance for the future generations to use the materials which we have conserved by reduction of wastage
of materials in conventional building.
2. GENERAL ANALYSIS
2.1. Data Collection
The data required was estimated on the commercial buildings that are constructed using conventional and
precast techniques. Comparison of a building constructed using two techniques gives the variations in
usage of materials and cost variations due to material consumption. Comparison of the process in two
methods gives the statistical data which can be useful to find out the cost of whole structure for both
techniques. The estimated statistical data will also provide the variations in time and amount of wastage in
construction using above techniques. This chapter gives the special importance to the methods of research
on comparison of precast construction and conventional method. A multi-storied building is compared for
comparing the preparation of plan, statistics framing from precast industry, project duration and cost.
2.2. Plan Preparation
A plan of structure G+5, Commercial building is prepared to study the estimation of quantities of the
materials used for both conventional and precast members. It is shown in Figure 1.
Efficient Cost Management of Materials In Conventional and Precast Construction
http://www.iaeme.com/IJCIET/index.asp 309 editor@iaeme.com
Figure 1 Floor Plan of G+5 building
Window (W) = 2*1.2
Column (CL) = 0.6*0.6
Long Beam (B) = 0.23*0.45
Short beam (B1) = 0.23*0.45
Height of the floor = 4
All dimensions are in meters
2.3. Estimation of Quantities
Estimation of quantities is done for estimating the requirement of materials for both conventional and
precast types of construction for a particular structure considered. The detailed estimation is as given in the
Annexure.
2.4. Project Duration
A time line is set to predict the time required for the project by using simple techniques. The variations are
shown in Table 1 and Fig 2.
Table 1 Variations in Total Duration of the Project
S.No Type of construction Duration
1 Conventional construction 548 days
2 Pre cast construction 105days
Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash
http://www.iaeme.com/IJCIET/index.
Figure 2
3. COST ANALYSIS
Cost analysis is one the important factor for comparing both the techni
materials and missionary are considered for the study.
Table 2
S. No
1
2
Figure 3 Cost comparison between pre cast and conventional type of
4. CONCLUSION
The main objective of the study is to elevate the recent advancements and developments in both
technology and usage of prefabrication in construction of commercial building of large plinth areas and
spans. Understanding the study and various pros and cons of prefabrication in construction industry, it is
clear that all the factors are dependently relative to each other. If the technology is to be used, there will be
large amount of money spent on the installment and materials. If
used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is
the main management constraints for any project. Depending on the requirements like size, type of the
structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for
installation, and it opts for large span structures and multiple stories, which is economical and standardized
for that type. Where in convention
0
200
400
600
0
20
40
60
80
100
120
Material
Cost
Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash
IJCIET/index.asp 310
Figure 2 Variations in Total Duration of the Project
Cost analysis is one the important factor for comparing both the techniques. For better understanding labo
materials and missionary are considered for the study. The cost variations are shown i
Table 2 Variations in Total cost of the Project
Type of construction
Conventional construction 2.12 crore
Pre cast construction 1.40 crore
Cost comparison between pre cast and conventional type of
The main objective of the study is to elevate the recent advancements and developments in both
technology and usage of prefabrication in construction of commercial building of large plinth areas and
y and various pros and cons of prefabrication in construction industry, it is
clear that all the factors are dependently relative to each other. If the technology is to be used, there will be
large amount of money spent on the installment and materials. If the conventional type of construction is
used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is
the main management constraints for any project. Depending on the requirements like size, type of the
structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for
installation, and it opts for large span structures and multiple stories, which is economical and standardized
Where in conventional type is suitable only for simple and individual structures.
pre cast conventional
Duration
Material Construction Labour
pre cast construction
conventional
editor@iaeme.com
Variations in Total Duration of the Project
ques. For better understanding labor,
The cost variations are shown in Table 2 and Fig 3.
Cost
2.12 crore
1.40 crore
Cost comparison between pre cast and conventional type of constructions
The main objective of the study is to elevate the recent advancements and developments in both
technology and usage of prefabrication in construction of commercial building of large plinth areas and
y and various pros and cons of prefabrication in construction industry, it is
clear that all the factors are dependently relative to each other. If the technology is to be used, there will be
the conventional type of construction is
used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is
the main management constraints for any project. Depending on the requirements like size, type of the
structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for
installation, and it opts for large span structures and multiple stories, which is economical and standardized
al type is suitable only for simple and individual structures.
Duration
pre cast construction
conventional…
Efficient Cost Management of Materials In Conventional and Precast Construction
http://www.iaeme.com/IJCIET/index.asp 311 editor@iaeme.com
REFERENCES
[1] P.Lenin, L.Krishnaraj, D.Narendra Prasad, V.R.Prasath Kumar, Analysis of Improper Material
Management Affecting Cost in Construction Projects, International Journal for Research In Applied
Science and Engineering Technology,May 2014,2 (5), 2321-9653.
[2] Lansford C. Bell1 and George Stukhart, Attributes of Materials Management Systems, Journal of
Construction Engineering and Management, 112(1), 14-21.
[3] Lansford C. Bell and George Stukhart, Costs and Benefits of Materials Management Systems, Journal
of Construction Engineering and Management, 1987, 113(2), 222-234.
[4] 4.H. Randolph Thomas, David R. Riley, John IMessner, Fundamental Principles of Site Material
Management,Journal of Construction Engineering and Management,2005,131(7), 808-815.
[5] 5.H. Randolph Thomas, Victor E. Sanvido, Steve R. Sanders, Impact of Material Management on
Productivity - A Case Study,Journal of Construction Engineering and Management,1989, 115(3), 370-
384.
[6] Aditya Varma K.V, Manideep T and SS. Asadi. A Critical Comparison of Quantity Estimation for Gated
Community Construction Project Using Traditional Method Vs Plan Swift Software: A Case Study.
International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 707–713.
[7] Varun Teja T and SS Asadi, An Integrated Approach for Evaluation of Environmental Impact
Assessment-A Model Study. International Journal of Civil Engineering and Technology, 7(6), 2016, pp.
650–659.
[8] G.S. Sarma, SS. Asadi and S. Lakshmi Narayana, Creation of Web Based Decision Support Information
System for Evaluation of Topographic Characteristics Using Remote Sensing & GIS and Visual Basic
Programe. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 621–634.
[9] D. Satish Chandra, SS. Asadi and M.V.S. Raju, Design of Web Based Decision Support System - Model
Study of Vijayawada, A.P. International Journal of Civil Engineering and Technology, 7(6), 2016,
pp.514–522.
[10] 6.Carlos H. Caldas, Cindy L. Menches, Pedro M. Reyes, Laure Navarro, Daniel M. Vargas, Materials
Management Practices in the Construction Industry, Practice periodical on structural design and
construction, 2015, 20(3), 1943-5576.
[11] Lilly Grace Murali P, Padmapriya R. Reaction of Non–Combustible Materials with Fire to Safe Guard
Lives and Property in Building Environment. Indian Journal of Science and Technology.2015 Dec,
8(35), pp.1-5.
[12] Rajashekhar V S, Pravin T, Thirupathi K, Raghuraman S.Modeling and Simulation of Gravity based
Zig-zag Material Handling System for Transferring Materials in Multi Floor Industries. Indian Journal
of Science and Technology.2015 Sep, 8(22), pp.1-6.

More Related Content

PDF
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
PDF
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
PDF
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
PDF
Green Building Effect in Commercial Building
PDF
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
PDF
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
PDF
A review of soft computing techniques in materials engineering
PDF
Ijmet 10 01_190
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
Green Building Effect in Commercial Building
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
A review of soft computing techniques in materials engineering
Ijmet 10 01_190

What's hot (20)

PDF
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
PDF
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
PDF
Assesing the various problems facing in arranging appropirate labour and qual...
PDF
Success factors enhancing business performance of engineering procurement
PDF
Success factors enhancing business performance of engineering procurement c...
PDF
Guidelines industrial engineering
PDF
Fu3610581067
PDF
Improvement of construction labor productivity in chambal region
PDF
There is Always A Better Way: The Argument for Industrial Engineering
PDF
TOTAL EFFECTIVE ENERGY MANAGEMENT: THE MUST NEED FOR INDIAN INDUSTRY
DOCX
Definition of Industrial Engineering
PDF
B1303020508
PDF
Cv of Dr. Osman Taylan
PDF
Development of a web based decision support system for materials selection in...
PDF
Analytical Study between Construction Material Wastage and Time Overrun
PPTX
Industrial Engineering At A glance.
PDF
IRJET- Daily Updates on Construction Sites Progress
DOCX
Industrial Engineering
PPTX
6 things you should know about industrial engineering
PPS
Engineering As Carrier Option
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
Assesing the various problems facing in arranging appropirate labour and qual...
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement c...
Guidelines industrial engineering
Fu3610581067
Improvement of construction labor productivity in chambal region
There is Always A Better Way: The Argument for Industrial Engineering
TOTAL EFFECTIVE ENERGY MANAGEMENT: THE MUST NEED FOR INDIAN INDUSTRY
Definition of Industrial Engineering
B1303020508
Cv of Dr. Osman Taylan
Development of a web based decision support system for materials selection in...
Analytical Study between Construction Material Wastage and Time Overrun
Industrial Engineering At A glance.
IRJET- Daily Updates on Construction Sites Progress
Industrial Engineering
6 things you should know about industrial engineering
Engineering As Carrier Option
Ad

Viewers also liked (20)

PDF
Precast concrete construction
PPT
PreCast Construction
PPTX
Gliding & Skylight Windows
PDF
COMPARISON OF VERTICAL SETTLEMENT IN A MULTI-STOREYED BUILDING IN DIFFERENT F...
PPT
11. environmentally sensitive maintenance and road closure small
PPTX
Flyash Bricks
PDF
Architecture of Peter Zumthor
PPTX
Soil erosion2
PPTX
IMPACT OF IT IN CIVIL ENGINEERING
PPTX
Flyash bricks
PPT
Fly ash presentation
PPTX
Fly ash concrete ppt
PPTX
Presentation on indian railway
PPTX
Rail gauges & rail sections Railway Engineering
PPTX
railway presentation Ppt
PPTX
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
PPTX
Fly Ash as a construction material
PPTX
Civil engineering powerpoint
PPTX
Civil engineering
Precast concrete construction
PreCast Construction
Gliding & Skylight Windows
COMPARISON OF VERTICAL SETTLEMENT IN A MULTI-STOREYED BUILDING IN DIFFERENT F...
11. environmentally sensitive maintenance and road closure small
Flyash Bricks
Architecture of Peter Zumthor
Soil erosion2
IMPACT OF IT IN CIVIL ENGINEERING
Flyash bricks
Fly ash presentation
Fly ash concrete ppt
Presentation on indian railway
Rail gauges & rail sections Railway Engineering
railway presentation Ppt
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Fly Ash as a construction material
Civil engineering powerpoint
Civil engineering
Ad

Similar to EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION (20)

PDF
IRJET- Study on Economic Sustainability of Industrial Buildings
PDF
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
PDF
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
PDF
IRJET- Efficient Techniques of Construction Material Management in Constr...
DOC
Mechanized Construction- Relevance and Importance in India
PDF
ENERGY ANALYSIS OF SMITHA MEMORIAL CANCER, THODUPUZHA CENTER USING BIM TECHNO...
PDF
IRJET- Passive Design Strategies in Energy Efficient Building
PDF
Redefining Construction in India: Advancements in Prefabrication and Their Im...
PDF
Ijciet 10 01_075
PDF
The Study of Measurement of Over-Engineering in Construction Project
PDF
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
PDF
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
PDF
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
PDF
Effective techniques in cost optimization of construction project an review
PDF
IRJET-A Review on Precast Concrete
PDF
IRJET- Cost Comparison on Industrialized Building System (IBS) and Convention...
PDF
Analytical Comparison between Conventional Construction Technique and Precast...
PDF
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PDF
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
PDF
ESTABLISHING PROCESS FOR DESIGNING OF ENERGY EFFICIENT BUILDINGS
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- Efficient Techniques of Construction Material Management in Constr...
Mechanized Construction- Relevance and Importance in India
ENERGY ANALYSIS OF SMITHA MEMORIAL CANCER, THODUPUZHA CENTER USING BIM TECHNO...
IRJET- Passive Design Strategies in Energy Efficient Building
Redefining Construction in India: Advancements in Prefabrication and Their Im...
Ijciet 10 01_075
The Study of Measurement of Over-Engineering in Construction Project
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
Effective techniques in cost optimization of construction project an review
IRJET-A Review on Precast Concrete
IRJET- Cost Comparison on Industrialized Building System (IBS) and Convention...
Analytical Comparison between Conventional Construction Technique and Precast...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
ESTABLISHING PROCESS FOR DESIGNING OF ENERGY EFFICIENT BUILDINGS

More from IAEME Publication (20)

PDF
IAEME_Publication_Call_for_Paper_September_2022.pdf
PDF
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
PDF
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
PDF
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
PDF
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
PDF
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
PDF
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
PDF
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
PDF
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
PDF
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
PDF
GANDHI ON NON-VIOLENT POLICE
PDF
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
PDF
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
PDF
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
PDF
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
PDF
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
PDF
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
PDF
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
PDF
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
PDF
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
IAEME_Publication_Call_for_Paper_September_2022.pdf
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
GANDHI ON NON-VIOLENT POLICE
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT

Recently uploaded (20)

PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
introduction to high performance computing
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPTX
communication and presentation skills 01
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PPTX
Software Engineering and software moduleing
PDF
737-MAX_SRG.pdf student reference guides
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
CyberSecurity Mobile and Wireless Devices
introduction to high performance computing
Fundamentals of Mechanical Engineering.pptx
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
communication and presentation skills 01
Management Information system : MIS-e-Business Systems.pptx
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Categorization of Factors Affecting Classification Algorithms Selection
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Module 8- Technological and Communication Skills.pptx
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
Software Engineering and software moduleing
737-MAX_SRG.pdf student reference guides

EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION

  • 1. http://www.iaeme.com/IJCIET/index.asp 307 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 1, January 2017, pp. 307–311, Article ID: IJCIET_08_01_034 Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION Suma.Yarlagadda M. Tech Student, Department of Civil Engineering, K L University, Vaddeswaram-522502, Andhra Pradesh, India SS.Asadi Associate Dean-Academics, Department of Civil Engineering, K L University, Vaddeswaram-522502, Andhra Pradesh, India S.S. Bhanu Prakash Asst. Professor, Department of Civil Engineering, K L University, Vaddeswaram-522502, Andhra Pradesh, India ABSTRACT Objective:To find out cost variations of materials used for the conventional building and precast building, wastage percentage in construction of a commercial building using conventional and precast technology. And to find out the time and cost variations in construction of commercial building using conventional and precast technology. Methods/Analysis: Outwardly the technique of using precast members in construction has played one of the key roles in the industry. This technique has been measured and speckled in terms of cost inference. A Model was carried out on a Residential building project and the data was collected for study and concluded that the use of precast members is a better tradable factor to that of conventional system. Findings: Precast construction saves time and cost when compared to conventional type of construction. Novelty/Improvement: The transformation and revolution in the technology was grown out of the demand of the clients/customers of both residential and commercial purposes. Outwardly the technique of using precast members in construction has played one of the key roles in the industry. Key words: Construction Cost Comparison, Conventional Type, Precast Construction. Cite this Article: Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash, Efficient Cost Management of Materials In Conventional and Precast Construction. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 307–311. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
  • 2. Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash http://www.iaeme.com/IJCIET/index.asp 308 editor@iaeme.com 1. INTRODUCTION Material management is the system of planning and controlling all the resources to ensure quality of project. In a project materials can contribute 50 to 60% of total cost1 . When materials are not managed properly the problems like shortages, surpluses and cost overflow exists2 . The material management system helps to provide the benefits in terms of labour productivity, reduced bulk materials surplus, reduced materials management manpower, and cash flow savings3 . Construction site was portioned into 3zones such as semi-permanent (exterior) storage, staging areas, and workface (interior) storage. Each has its own function related to site management of materials4 . Contrary conditions which were caused by the lack of an effective material management were identified, and the days on which the conditions occurred are noted. For these identified days, the actual daily productivity is compared with the expected productivity to regulate the number of work‐hours lost5 .The application of an inclusive materials management system contributes to predictable project outcomes, cost reduction, improved productivity and quality6 .With the initiation of the new government, India is being developed in terms of all the aspects of development and industrialization to achieve remarkable hikes in the industry sector, of which construction industry in the first one to focus. The industry seemingly showed its raise from 19s and now as a mark of use of new technology. The new government of India is greatly involved in emphasizing the necessity of industrialization in India for a rapid economic growth. The inspiring demands by the government to gain their financial resources through the sector pointedly guaranteed and raised the demand of the construction workers. The use of precast members has been implied to have numerous compensations over the conventional methods. A few patterns of such kind could be reduction in resource deployment, material wastage, less volume of materials to be used, which intern creates the environmental and site cleanliness over the safety, time of completion of the project, which are the core management observations. All these factors discussed indicate and denote that the use of precast is much more economical, safe compared to that of conventional system; nevertheless the construction cost involves all the costs right from its construction, maintenance and its life. And the effort of this study is to throw light and focus on the comparison of construction cost in using conventional methods to that of precast techniques. And further to provide information as a parameter for the construction cost comparison for both systems and there will be a chance for the future generations to use the materials which we have conserved by reduction of wastage of materials in conventional building. 2. GENERAL ANALYSIS 2.1. Data Collection The data required was estimated on the commercial buildings that are constructed using conventional and precast techniques. Comparison of a building constructed using two techniques gives the variations in usage of materials and cost variations due to material consumption. Comparison of the process in two methods gives the statistical data which can be useful to find out the cost of whole structure for both techniques. The estimated statistical data will also provide the variations in time and amount of wastage in construction using above techniques. This chapter gives the special importance to the methods of research on comparison of precast construction and conventional method. A multi-storied building is compared for comparing the preparation of plan, statistics framing from precast industry, project duration and cost. 2.2. Plan Preparation A plan of structure G+5, Commercial building is prepared to study the estimation of quantities of the materials used for both conventional and precast members. It is shown in Figure 1.
  • 3. Efficient Cost Management of Materials In Conventional and Precast Construction http://www.iaeme.com/IJCIET/index.asp 309 editor@iaeme.com Figure 1 Floor Plan of G+5 building Window (W) = 2*1.2 Column (CL) = 0.6*0.6 Long Beam (B) = 0.23*0.45 Short beam (B1) = 0.23*0.45 Height of the floor = 4 All dimensions are in meters 2.3. Estimation of Quantities Estimation of quantities is done for estimating the requirement of materials for both conventional and precast types of construction for a particular structure considered. The detailed estimation is as given in the Annexure. 2.4. Project Duration A time line is set to predict the time required for the project by using simple techniques. The variations are shown in Table 1 and Fig 2. Table 1 Variations in Total Duration of the Project S.No Type of construction Duration 1 Conventional construction 548 days 2 Pre cast construction 105days
  • 4. Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash http://www.iaeme.com/IJCIET/index. Figure 2 3. COST ANALYSIS Cost analysis is one the important factor for comparing both the techni materials and missionary are considered for the study. Table 2 S. No 1 2 Figure 3 Cost comparison between pre cast and conventional type of 4. CONCLUSION The main objective of the study is to elevate the recent advancements and developments in both technology and usage of prefabrication in construction of commercial building of large plinth areas and spans. Understanding the study and various pros and cons of prefabrication in construction industry, it is clear that all the factors are dependently relative to each other. If the technology is to be used, there will be large amount of money spent on the installment and materials. If used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is the main management constraints for any project. Depending on the requirements like size, type of the structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for installation, and it opts for large span structures and multiple stories, which is economical and standardized for that type. Where in convention 0 200 400 600 0 20 40 60 80 100 120 Material Cost Suma.Yarlagadda, SS.Asadi and S.S. Bhanu Prakash IJCIET/index.asp 310 Figure 2 Variations in Total Duration of the Project Cost analysis is one the important factor for comparing both the techniques. For better understanding labo materials and missionary are considered for the study. The cost variations are shown i Table 2 Variations in Total cost of the Project Type of construction Conventional construction 2.12 crore Pre cast construction 1.40 crore Cost comparison between pre cast and conventional type of The main objective of the study is to elevate the recent advancements and developments in both technology and usage of prefabrication in construction of commercial building of large plinth areas and y and various pros and cons of prefabrication in construction industry, it is clear that all the factors are dependently relative to each other. If the technology is to be used, there will be large amount of money spent on the installment and materials. If the conventional type of construction is used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is the main management constraints for any project. Depending on the requirements like size, type of the structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for installation, and it opts for large span structures and multiple stories, which is economical and standardized Where in conventional type is suitable only for simple and individual structures. pre cast conventional Duration Material Construction Labour pre cast construction conventional editor@iaeme.com Variations in Total Duration of the Project ques. For better understanding labor, The cost variations are shown in Table 2 and Fig 3. Cost 2.12 crore 1.40 crore Cost comparison between pre cast and conventional type of constructions The main objective of the study is to elevate the recent advancements and developments in both technology and usage of prefabrication in construction of commercial building of large plinth areas and y and various pros and cons of prefabrication in construction industry, it is clear that all the factors are dependently relative to each other. If the technology is to be used, there will be the conventional type of construction is used, it leads to large amount of time. So, the two main constraints of the project is time and cost, which is the main management constraints for any project. Depending on the requirements like size, type of the structure the type of construction is to be decided. Prefabrication type of construction incurs more costs for installation, and it opts for large span structures and multiple stories, which is economical and standardized al type is suitable only for simple and individual structures. Duration pre cast construction conventional…
  • 5. Efficient Cost Management of Materials In Conventional and Precast Construction http://www.iaeme.com/IJCIET/index.asp 311 editor@iaeme.com REFERENCES [1] P.Lenin, L.Krishnaraj, D.Narendra Prasad, V.R.Prasath Kumar, Analysis of Improper Material Management Affecting Cost in Construction Projects, International Journal for Research In Applied Science and Engineering Technology,May 2014,2 (5), 2321-9653. [2] Lansford C. Bell1 and George Stukhart, Attributes of Materials Management Systems, Journal of Construction Engineering and Management, 112(1), 14-21. [3] Lansford C. Bell and George Stukhart, Costs and Benefits of Materials Management Systems, Journal of Construction Engineering and Management, 1987, 113(2), 222-234. [4] 4.H. Randolph Thomas, David R. Riley, John IMessner, Fundamental Principles of Site Material Management,Journal of Construction Engineering and Management,2005,131(7), 808-815. [5] 5.H. Randolph Thomas, Victor E. Sanvido, Steve R. Sanders, Impact of Material Management on Productivity - A Case Study,Journal of Construction Engineering and Management,1989, 115(3), 370- 384. [6] Aditya Varma K.V, Manideep T and SS. Asadi. A Critical Comparison of Quantity Estimation for Gated Community Construction Project Using Traditional Method Vs Plan Swift Software: A Case Study. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 707–713. [7] Varun Teja T and SS Asadi, An Integrated Approach for Evaluation of Environmental Impact Assessment-A Model Study. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 650–659. [8] G.S. Sarma, SS. Asadi and S. Lakshmi Narayana, Creation of Web Based Decision Support Information System for Evaluation of Topographic Characteristics Using Remote Sensing & GIS and Visual Basic Programe. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 621–634. [9] D. Satish Chandra, SS. Asadi and M.V.S. Raju, Design of Web Based Decision Support System - Model Study of Vijayawada, A.P. International Journal of Civil Engineering and Technology, 7(6), 2016, pp.514–522. [10] 6.Carlos H. Caldas, Cindy L. Menches, Pedro M. Reyes, Laure Navarro, Daniel M. Vargas, Materials Management Practices in the Construction Industry, Practice periodical on structural design and construction, 2015, 20(3), 1943-5576. [11] Lilly Grace Murali P, Padmapriya R. Reaction of Non–Combustible Materials with Fire to Safe Guard Lives and Property in Building Environment. Indian Journal of Science and Technology.2015 Dec, 8(35), pp.1-5. [12] Rajashekhar V S, Pravin T, Thirupathi K, Raghuraman S.Modeling and Simulation of Gravity based Zig-zag Material Handling System for Transferring Materials in Multi Floor Industries. Indian Journal of Science and Technology.2015 Sep, 8(22), pp.1-6.