© 2013 City and Guilds of London Institute. All rights reserved. 1 of 15
City & Guilds Construction
PowerPointpresentation
Presentation 4: Flat roofs
Unit 101: Principles of building construction,
information and communication
© 2013 City and Guilds of London Institute. All rights reserved. 2 of 15
City & Guilds Construction
Aim
Introduce learners to flat roofs.
Objectives
• Identify at least two components of a flat roof.
• List the two methods of obtaining fall on a flat roof.
• State the level of degree that determines a flat roof.
• State two of the materials used in covering on a flat roof.
© 2013 City and Guilds of London Institute. All rights reserved. 3 of 15
City & Guilds Construction
What is a flat roof?
A flat roof is one of the three types of roof structure. It is generally used
on garages or small extensions, rather than a main house roof.
A flat roof has on average a life span of approximately 15 years.
The definition of a flat roof is any roof which has a slope of less than 10
degrees or a fall ratio of 1:6.
© 2013 City and Guilds of London Institute. All rights reserved. 4 of 15
City & Guilds Construction
Components of a flat roof
© 2013 City and Guilds of London Institute. All rights reserved. 5 of 15
City & Guilds Construction
Task
Sketch and label a flat roof.
© 2013 City and Guilds of London Institute. All rights reserved. 6 of 15
City & Guilds Construction
Fall on a flat roof
The direction of the slope of the roof is called the fall.
The fall of the roof will depend upon the:
• type of roof construction and its covering
• location of the building
• position of any surface water drain.
© 2013 City and Guilds of London Institute. All rights reserved. 7 of 15
City & Guilds Construction
Fall on a flat roof continued
The amount of fall should be enough to clear away any water and direct
it to the guttering.
If the fall is not enough, the water may form pools on top of the roof.
Water pools on the roof will increase the weight of the roof and can
lead to water penetration.
There are three basic methods of obtaining the fall of a flat roof. The
chosen method will depend upon the type and use of the building and
the internal ceiling finish required.
© 2013 City and Guilds of London Institute. All rights reserved. 8 of 15
City & Guilds Construction
Sloping roof joists
In this type of construction, the slope or fall is obtained by sloping the
roof joists. This type of construction is used where there is no level
ceiling required.
© 2013 City and Guilds of London Institute. All rights reserved. 9 of 15
City & Guilds Construction
Tapered firring pieces
In this type of construction, the slope or fall is obtained by attaching
tapered pieces of timber to the roof joists. This type of construction will
produce a level ceiling.
© 2013 City and Guilds of London Institute. All rights reserved. 10 of 15
City & Guilds Construction
Deepened joists (parallel fittings)
This type of construction involves parallel firring pieces. The firrings are
diminished section and are nailed at right angles to the fall of the roof.
© 2013 City and Guilds of London Institute. All rights reserved. 11 of 15
City & Guilds Construction
Roof joists
All the roof joists used in the construction of flat roofs must comply with
the requirements of current building regulations.
These regulations govern:
• the sectional sizes and grades of timber
• dead loads imposed upon sectional areas of roof
• maximum clear span for imposed loadings
• spacing of joists in relation to covering and imposed loads.
© 2013 City and Guilds of London Institute. All rights reserved. 12 of 15
City & Guilds Construction
Flat roof covering
When covering a flat roof, a sequence of events must take place:
• When the joists and firrings are installed, the chipboard sheets can be
cut and secured to the joists using annular ring nails.
• Once the boards are laid, the roof must be inspected for any sharp
edges/parts and swept.
• Hot bitumen is then poured onto
the roof and the underfelt is laid
in the same direction as the fall
of the roof.
Image courtesy of www.shutterstock.com. Reproduced with permission.
© 2013 City and Guilds of London Institute. All rights reserved. 13 of 15
City & Guilds Construction
Using underfelt
Once the fist layer of underfelt has cooled, the next layer of underfelt
can be laid using the same process as the first layer, but in the
opposite direction to the fall of the roof.
This ensures crossed joints and more strength.
Image courtesy of www.constructionphotography.com. Reproduced with permission.
Flashing providing waterproofing
© 2013 City and Guilds of London Institute. All rights reserved. 14 of 15
City & Guilds Construction
Using underfelt continued
When two layers of underfelt are
laid, the top layer, which is green
mineral felt can be laid, using the
same processes again but in the
same direction to the fall on the
roof.
The eaves of the felt are tucked
and doubled to create a drip which
directs water into the gutter. The
other edges are raised preventing
water from leaving the roof.
Flashing around a chimney
Image courtesy of www.shutterstock.com. Reproduced with permission.
© 2013 City and Guilds of London Institute. All rights reserved. 15 of 15
City & Guilds Construction
Any questions?

More Related Content

PPTX
CARA BELAJAR EFEKTIF.pptx
PDF
Avery Dennison battery pack construction April 2022.pdf
PPTX
unit 207 carry out first fix flooring and roofing
PPTX
Unit 101, ppt 3, Principles of building, construction, information and commu...
PPTX
unit 101 ppt_3
PPTX
101 Level 1 Principles of building construction, information and communication
PPTX
Construction u101 ppt_3
PPTX
Working Materials
CARA BELAJAR EFEKTIF.pptx
Avery Dennison battery pack construction April 2022.pdf
unit 207 carry out first fix flooring and roofing
Unit 101, ppt 3, Principles of building, construction, information and commu...
unit 101 ppt_3
101 Level 1 Principles of building construction, information and communication
Construction u101 ppt_3
Working Materials

Similar to unit 101 ppt_4 (20)

PPTX
Foundations 3
PPT
Set Out and Build Masonry Structures
PPTX
Working Relationship between Bricks and Block Sand
PPTX
Floor boarding and calculations 4
PPTX
unit 207 carry out first fix flooring and roofing
PDF
Basement construction report
PPTX
Materials
PPTX
Bricklaying: Step by Step
PPTX
Roof Treatment
PPTX
Practical Equipment for Blocklaying
PPTX
Blockwork Tools
PPTX
Session 3
PPTX
Sustainable insulation materials 1
PPTX
Unit 301: Principles of organising, planning and pricing construction work
PPTX
Component of building
PPTX
Power point 3
PPTX
Power point 3
ODP
Sin título 1 (copia)
ODP
Sin título 1 (copia)
ODP
Sin título 1 (copia)
Foundations 3
Set Out and Build Masonry Structures
Working Relationship between Bricks and Block Sand
Floor boarding and calculations 4
unit 207 carry out first fix flooring and roofing
Basement construction report
Materials
Bricklaying: Step by Step
Roof Treatment
Practical Equipment for Blocklaying
Blockwork Tools
Session 3
Sustainable insulation materials 1
Unit 301: Principles of organising, planning and pricing construction work
Component of building
Power point 3
Power point 3
Sin título 1 (copia)
Sin título 1 (copia)
Sin título 1 (copia)
Ad

More from kevin porter (20)

PPTX
unit 213 ppt 1
PPTX
unit 213 ppt5
PPTX
unit 213 ppt 4
PPTX
unit 213 ppt 3
PPTX
unit 213 ppt 2
PPTX
202 principles of construction
PPTX
unit 101 ppt_5
PPTX
unit 101 ppt_2
PPTX
unit 101 ppt_1
PPTX
unit 211 PPT 5
PPTX
unit 211 PPT 4
PPTX
unit 211 PPT 3
PPTX
unit 211 PPT 2
PPTX
unit 211 PPT 1
PPTX
unit 210 - capentry maintenance ppt 5
PPTX
unit 210 - capentry maintenance ppt 4
PPTX
unit 210 - capentry maintenance ppt 3
PPTX
unit 210 - capentry maintenance ppt 2
PPTX
unit 210 - capentry maintenance ppt 1
PPTX
Construction u101 ppt_5
unit 213 ppt 1
unit 213 ppt5
unit 213 ppt 4
unit 213 ppt 3
unit 213 ppt 2
202 principles of construction
unit 101 ppt_5
unit 101 ppt_2
unit 101 ppt_1
unit 211 PPT 5
unit 211 PPT 4
unit 211 PPT 3
unit 211 PPT 2
unit 211 PPT 1
unit 210 - capentry maintenance ppt 5
unit 210 - capentry maintenance ppt 4
unit 210 - capentry maintenance ppt 3
unit 210 - capentry maintenance ppt 2
unit 210 - capentry maintenance ppt 1
Construction u101 ppt_5
Ad

Recently uploaded (20)

PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
HVAC Specification 2024 according to central public works department
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
Hazard Identification & Risk Assessment .pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Unit 4 Computer Architecture Multicore Processor.pptx
HVAC Specification 2024 according to central public works department
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
History, Philosophy and sociology of education (1).pptx
B.Sc. DS Unit 2 Software Engineering.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Practical Manual AGRO-233 Principles and Practices of Natural Farming
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Hazard Identification & Risk Assessment .pdf
What if we spent less time fighting change, and more time building what’s rig...
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)

unit 101 ppt_4

  • 1. © 2013 City and Guilds of London Institute. All rights reserved. 1 of 15 City & Guilds Construction PowerPointpresentation Presentation 4: Flat roofs Unit 101: Principles of building construction, information and communication
  • 2. © 2013 City and Guilds of London Institute. All rights reserved. 2 of 15 City & Guilds Construction Aim Introduce learners to flat roofs. Objectives • Identify at least two components of a flat roof. • List the two methods of obtaining fall on a flat roof. • State the level of degree that determines a flat roof. • State two of the materials used in covering on a flat roof.
  • 3. © 2013 City and Guilds of London Institute. All rights reserved. 3 of 15 City & Guilds Construction What is a flat roof? A flat roof is one of the three types of roof structure. It is generally used on garages or small extensions, rather than a main house roof. A flat roof has on average a life span of approximately 15 years. The definition of a flat roof is any roof which has a slope of less than 10 degrees or a fall ratio of 1:6.
  • 4. © 2013 City and Guilds of London Institute. All rights reserved. 4 of 15 City & Guilds Construction Components of a flat roof
  • 5. © 2013 City and Guilds of London Institute. All rights reserved. 5 of 15 City & Guilds Construction Task Sketch and label a flat roof.
  • 6. © 2013 City and Guilds of London Institute. All rights reserved. 6 of 15 City & Guilds Construction Fall on a flat roof The direction of the slope of the roof is called the fall. The fall of the roof will depend upon the: • type of roof construction and its covering • location of the building • position of any surface water drain.
  • 7. © 2013 City and Guilds of London Institute. All rights reserved. 7 of 15 City & Guilds Construction Fall on a flat roof continued The amount of fall should be enough to clear away any water and direct it to the guttering. If the fall is not enough, the water may form pools on top of the roof. Water pools on the roof will increase the weight of the roof and can lead to water penetration. There are three basic methods of obtaining the fall of a flat roof. The chosen method will depend upon the type and use of the building and the internal ceiling finish required.
  • 8. © 2013 City and Guilds of London Institute. All rights reserved. 8 of 15 City & Guilds Construction Sloping roof joists In this type of construction, the slope or fall is obtained by sloping the roof joists. This type of construction is used where there is no level ceiling required.
  • 9. © 2013 City and Guilds of London Institute. All rights reserved. 9 of 15 City & Guilds Construction Tapered firring pieces In this type of construction, the slope or fall is obtained by attaching tapered pieces of timber to the roof joists. This type of construction will produce a level ceiling.
  • 10. © 2013 City and Guilds of London Institute. All rights reserved. 10 of 15 City & Guilds Construction Deepened joists (parallel fittings) This type of construction involves parallel firring pieces. The firrings are diminished section and are nailed at right angles to the fall of the roof.
  • 11. © 2013 City and Guilds of London Institute. All rights reserved. 11 of 15 City & Guilds Construction Roof joists All the roof joists used in the construction of flat roofs must comply with the requirements of current building regulations. These regulations govern: • the sectional sizes and grades of timber • dead loads imposed upon sectional areas of roof • maximum clear span for imposed loadings • spacing of joists in relation to covering and imposed loads.
  • 12. © 2013 City and Guilds of London Institute. All rights reserved. 12 of 15 City & Guilds Construction Flat roof covering When covering a flat roof, a sequence of events must take place: • When the joists and firrings are installed, the chipboard sheets can be cut and secured to the joists using annular ring nails. • Once the boards are laid, the roof must be inspected for any sharp edges/parts and swept. • Hot bitumen is then poured onto the roof and the underfelt is laid in the same direction as the fall of the roof. Image courtesy of www.shutterstock.com. Reproduced with permission.
  • 13. © 2013 City and Guilds of London Institute. All rights reserved. 13 of 15 City & Guilds Construction Using underfelt Once the fist layer of underfelt has cooled, the next layer of underfelt can be laid using the same process as the first layer, but in the opposite direction to the fall of the roof. This ensures crossed joints and more strength. Image courtesy of www.constructionphotography.com. Reproduced with permission. Flashing providing waterproofing
  • 14. © 2013 City and Guilds of London Institute. All rights reserved. 14 of 15 City & Guilds Construction Using underfelt continued When two layers of underfelt are laid, the top layer, which is green mineral felt can be laid, using the same processes again but in the same direction to the fall on the roof. The eaves of the felt are tucked and doubled to create a drip which directs water into the gutter. The other edges are raised preventing water from leaving the roof. Flashing around a chimney Image courtesy of www.shutterstock.com. Reproduced with permission.
  • 15. © 2013 City and Guilds of London Institute. All rights reserved. 15 of 15 City & Guilds Construction Any questions?