X472 HVAC System Design Considerations
Class 8 – Codes, Construction
Documentation and Coordination
Todd Gottshall, PE
Western Allied
Redwood City, CA
Reinhard Seidl, PE
Taylor Engineering
Alameda, CA
Fall 2015
Mark Hydeman, PE
Continual Energy, Inc.
mark.hydeman@continual.net
415-602-9982
www.continual.net
2
General
 Contact Information
Reinhard: rseidl@taylor-engineering.com
Mark: mark.hydeman@continual.net
Todd: tgottshall@westernallied.com
 Text
• None
 Slides
• download from web before class
• Log in to Box at https://app.box.com/login
• Username: x472student@gmail.com
• Password: x472_student (case sensitive)
3
Course Outline
Date Class Topic Teacher
9/02/2015 1. Introduction / Systems Overview / walkthrough RS
9/09/2015 2. Generation Systems TG
9/16/2015 3. Distribution Systems RS
9/23/2015 4. Central Plants TG
9/30/2015 5. System Selection 1 - class exercises RS
10/07/2015 6. Specialty Building types (High rise, Lab, Hospital,
Data center)
TG
10/14/2015 7. System Selection 2 - class exercises RS
10/21/2015 8. Construction codes and Project delivery methods TG
10/28/2015 9. 2013 T24 and LEED v4 MH
11/04/2015 10. Life-Cycle Cost Analysis and exam hand-out TG
There are three instructors for this class. Todd Gottshall (TG), Reinhard Seidl (RS)
and Mark Hydeman (MH). The schedule below shows what topics will be covered by
who, and in what order.
4
Outline
 LCCA – Overview and Terminology
 System Selection LCCA Example
 Answers to Final
LCCA Overview and
Terminology
6
Life-Cycle Cost Analysis
 Evaluate economic performance over
entire life of a building.
• “Whole Cost Accounting”
• “Total Cost of Ownership”
 Uses the “time value of money” to fairly
compare future costs with present costs.
7
Life-Cycle Cost Analysis
 Cannot compare Hp, Btu/h, tons, kW
directly, since it’s apples and oranges. But
can convert them all to the same units and
then compare
 Same with money: as its value changes
over time, we cannot compare the actual
face values. But we can convert to present
value (PV) for a common denominator.
8
Why LCCA Matters
 Campus
Classroom /
Office
Building
Gates Computer Science Building
30 Year Life-Cycle Cost
Utilities,
$18,300,000, 28%
Maintenance,
$3,900,000, 6%
Service,
$2,400,000, 4%
System
Replacements,
$2,900,000, 4%
Initial Project Cost,
$37,700,000, 58%
9
LCCA Possibilities
 HEATING/COOLING SYSTEMS
• Central-plant connected vs. stand-alone systems
• Utility connection options if connected to the central plant
• Equipment options for stand-alone systems (e.g., chilled water vs. direct-expansion
(DX) units)
 HVAC DISTRIBUTION SYSTEMS
• Air distribution systems (e.g., variable volume vs. constant volume, overhead vs.
underfloor)
• Water distribution systems (e.g., primary-only vs. primary-secondary)
 BUILDING ENVELOPE
• Roofing systems (various materials and insulation methods)
• Glazing, daylighting, and shading options
 SITING/MASSING
• Orientation, floor to floor height, and overall building height
• Landscape, irrigation, and hardscape options
10
LCCA Possibilities
 Generally for mechanical systems
• High first cost vs low energy/maintenance cost
• Low first cost vs higher energy or maintenance cost
• Balancing which of the two is better for overall customer needs is goal of LCC
0
2
4
6
8
10
12
14
Solution A Solution B
Which is better?
First Cost Energy Cost - 20 yrs
Solution ASolution B
FirstCost 5 8
Energy Cost- 20yrs 12 7.2
11
 Generally for mechanical systems
• High first cost vs low energy/maintenance cost
• Low first cost vs higher energy or maintenance cost
• Balancing which of the two is better for overall customer needs is goal of LCC
• Present potentially complex data sets in a simple comparison
LCCA Possibilities
Solution ASolution B
FirstCost 5 8
Energy Cost- 20yrs 12 7.2
0
2
4
6
8
10
12
14
16
18
Solution A Solution B
Which is better?
First Cost Energy Cost - 20 yrs
12
When to do LCCA and how much
effort?
 Complex analysis and significant effort when
• Potential first cost impact is high and potential operating
cost impact is high
• New or untested measures
• To prioritize competing or mutually exclusive energy
conservation efforts
 Simple or no analysis when
• Payback is obvious based on past experience
• First cost impact is low
• Cost of complex analysis is a large % of cost of
measure
13
LCCA Process
1. Establish Objectives
2. Determine LCCA Metrics and Criteria
3. Identify and Develop Alternatives
4. Gather Cost Information
5. Perform LCCA Calculations
14
LCCA Costs
 One-Time (First) Costs
• Design
• Construction
• Commissioning
 Recurring Costs
• Utilities
• Maintenance
• Replacements
15
Example System Lifetimes
(ASHRAE Handbook – 2003 Applications)
16
Time value of Money
 Time-dependent value of money is much like
temperature-dependent air volume:
 Which air handler supplies more air?
• 10,000 cfm
• 11,213 cfm
17
Time value of Money
 Time-dependent value of money is much like
temperature-dependent air volume:
 Which air handler supplies more air?
• 10,000 cfm = 714 lbs/min @ 35°F, 80% RH (intake)
• 11,213 cfm = 714 lbs/min @ 95°F, 9.8% RH (supply)
• Same AHU, heating mode
18
Time value of Money
 Time-dependent value of money is much like
temperature-dependent relative humidity:
 Which air handler supplies more humid air?
• 80%RH
• 9.8%RH
19
Time value of Money
 Time-dependent value of money is much like
temperature-dependent relative humidity:
 Which air handler supplies more humid air?
• 80%RH = 29.8°F dewpoint at 35°F
• 9.8%RH = 29.8°F dewpoint at 95°F
 Same AHU, heating mode
20
Time value of Money
 Asking “How much air” is like asking “How much
money”
• It depends on the psychrometric state of air
• It depends on the age of money
 But we can make a common denominator
• Using mass to compare airflows
• Using present value (PV) or future value (FV), and compare
investments made at different times by comparing them “at
the same common time” by accounting for their ages
21
Present Value
 Accounts the “time value” of money.
 Basic Discount Equation:
 Where:
• PV is the present value (in Year 0 dollars)
• FY is the value in the future (in Year Y dollars)
• DISC is the discount rate
• Y is the number of years in the future
Y
Y
DISC
F
PV
)1( 

22
Escalation
 Most items increase in price but do not track
overall inflation rate exactly.
 Basic Escalation Equation:
 Where:
• COSTYEAR-Y is the cost at Y years into the future
• COSTYEAR-0 is today’s cost (at Year 0)
• ESC is the escalation rate
• Y is the number of years into the future
Y
YEARYYEAR ESCCOSTCOST )1(0  
23
Study Life
 Term of study over which costs will be
accumulated
 Could be
• Life of equipment/system being analyzed
• Life of building
• As far into the future as you think you can
speculate
 Typically, because of discount rate, does
not matter much to go beyond ~15 years
24
LCCA Calculation Method
 The formula for the basic LCC equation:
 Where:
• LCC is the life cycle cost
• C is the Year 0 construction cost (hard and soft costs)
• PVRECURRING is the present value of all recurring costs
(utilities, maintenance, replacements, service, etc)
• PVRESIDUAL-VALUE is the present value of the residual
value at the end of the study life
VALUERESIDUALRECURRING PVPVCLCC 
25
LCC Discounted Payback Calculation
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
0 1 2 3 4 5 6 7 8 9 10
30 Year Study
CumulativeCost[PresentValue$]
300 6 12 18 24
payback in roughly 6 years
payback in roughly 9 years
EnergyAnalysisandLCCA
26
CSU LCCA Spreadsheet
 http://www.calstate.edu/cpdc/AE/
LCCA
System Design
Example
28
Case Study:
UC Merced Classroom Building
 90,000 sq. ft., 3 stories
 Classrooms, Offices
 Minimize energy use (20% below T-24)
– Heating and cooling
– Reheat
 Maximize thermal comfort
 Provide individual control
– Operable windows
– Integration with HVAC systems
 LEED Rating
29
UCM: System Selection
30
What is Building Simulation?
 Allows prediction of energy use, dynamic
response, control optimization
 Options
• Custom spreadsheets
• Third party software
• Custom Visual Basic models
 3rd Party Software
• EnergyPro (DOE-2.1)
• eQUEST (DOE-2.2, www.doe2.com)
• EnergyPlus
• TRACE
EnergyAnalysisandLCCA
31
DOE-2 Inputs
Detailed Input Required!
 Hourly Weather Data
 Building Geometry
 Glazing and Material
Properties
 Internal Loads
 HVAC Systems and
Equipment Efficiencies
 Utility Rates and
Structures
EnergyAnalysisandLCCA
32
DOE2 Outputs
 500 pages text, 8 point font, minimum –
more depending on complexity and
reports
 Hourly values for any variable of any
object
 Predicts energy use
 Predicts energy cost
EnergyAnalysisandLCCA
33
eQUEST Interface
34
Simulation Results
UC Merced Classroom/Office Building
System Selection Analysis
Predicted Energy Use Summary
VAVR DFDD Change
[Mbtu] [Mbtu] [%]
Lights 768.8 768.8 0%
Equipment 612.0 612.0 0%
Heating 256.0 104.6 -59%
Cooling 880.1 862.5 -2.0%
Pumps 11.3 13.6 20%
Fans 172.8 172.0 -0.5%
Total 2,701.0 2,533.5 -6%
35
Energy Efficiency Component Analysis
 “Run-Around” Heat-Recovery Coils
 “Run-Around” Heat-Recovery Coils with
Direct-Evaporative Assist
 Heat-Pipe Heat-Recovery Coils
 Heat-Pipe Heat-Recovery Coils with Direct-
Evaporative Assist
 Air-to-Air Heat Recovery
 Indirect Evaporative Pre-Cooling
WHAT’S YOUR GUESS?
36
Base Case
37
Maintenance Materials First Cost
Component Number Visits/Year Time Extension Item Extension Item Extension
[-] [min] [min] [-] [$] [$] [$]
Fans
CF 2 4 10 80 35,000$ 70,000$
HF 1 4 10 40 78,000$ 78,000$
EAF 2 4 10 80 6,000$ 12,000$
Coils
CC 4 4 10 160 7,500$ 30,000$
HC 4 4 5 80 incl above with HF
PHC 4 4 5 80 2,500$ 10,000$
Dampers
Each 6 4 5 120 5,000$ 30,000$
Filters
Cooling 70 1 5 350 75 5,250$ 150$ 10,500$
Heating 20 1 5 100 75 1,500$ incl above with HF
Penthouse
Each 2100 sq.ft 30$ 63,000$
Labor Time Total [hours] 18.2
Cost Subtotal 908$ 6,750$
($50/hr loaded rate)
Yearly Maintenance Total 7,658$
First Cost Total 303,500$
Base Case
38
Run-Around Coils
39
Run-Around Coils
Maintenance Materials First Cost
Component Number Visits/Year Time Extension Item Extension Item Extension
[-] [min] [min] [-] [$] [$] [$]
Fans
CF 2 4 10 80 35,000$ 70,000$
HF 1 4 10 40 78,000$ 78,000$
EAF 2 4 10 80 6,000$ 12,000$
OAF 2 4 10 80 6,000$ 12,000$
Coils
CC 4 4 10 160 7,500$ 30,000$
HC 4 4 5 80 inclulded above with HF
OAC 4 4 5 80 2,500$ 10,000$
EAC 4 4 5 80 5,000$ 20,000$
Wet-Side Run Around Coil Equipent
Pump 1 4 15 60 6,000$ 6,000$
Piping, etc. 100 linear feet 60$ 6,000$
Dampers
Each 7 4 5 140 2,500$ 17,500$
Filters
Cooling 70 1 5 350 75 5,250$ 150$ 10,500$
Heating 20 1 5 100 75 1,500$ inclulded above with HF
Pre-Heat 45 1 5 225 40 1,800$ 125$ 5,625$
Penthouse
Each 2880 sq.ft 30$ 86,400$
Labor Time Total [hours] 26
Cost Subtotal 1,296$ 8,550$
($50/hr loaded rate)
Yearly Maintenance Total 9,846$
First Cost Total 364,025$
40
Run-Around with Evap
41
Run-Around with Evap Cooling
Maintenance Materials First Cost
Component Number Visits/Year Time Extension Item Extension Item Extension
[-] [min] [min] [-] [$] [$] [$]
Fans
CF 2 4 10 80 35,000$ 70,000$
HF 1 4 10 40 78,000$ 78,000$
EAF 2 4 10 80 6,000$ 12,000$
OAF 2 4 10 80 6,000$ 12,000$
Coils
CC 4 4 10 160 7,500$ 30,000$
HC 4 4 5 80 included with HF above
OAC 4 4 5 80 2,500$ 10,000$
EAC 4 4 5 80 5,000$ 20,000$
Wet-Side Run Around Coil Equipent
Pump 1 4 15 60 6,000$ 6,000$
Piping, etc. 100 linear feet 60$ 6,000$
Muenters every 2 years
Equip 1 4 240 960 2,940$ 1,470$ 14,700$ 14,700$
Dampers
Each 7 4 5 140 2,500$ 17,500$
Filters
Cooling 70 1 5 350 75$ 5,250$ 150$ 10,500$
Heating 20 1 5 100 75$ 1,500$ included with HF above
Pre-Heat 45 1 5 225 40$ 1,800$ 125$ 5,625$
Penthouse
Each 2880 sq.ft 30$ 86,400$
Labor Time Total [hours] 42
Cost Subtotal 2,096$ 10,020$
($50/hr loaded rate)
Yearly Maintenance Total 12,116$
First Cost Total 378,725$
42
Heat-Pipe
43
Heat-Pipe with Evap
44
Air-to-Air Heat Recovery
45
Indirect Evap Pre-Cooling
46
Life-Cycle Cost Analysis Parameters
General Analysis Parameters
Study Life 30 years
Escalation Period 1 Ends in Year 5
General Inflation Rate 2.8%
Campus (Nominal) Discount Rate 6.5%
Real Discount Rate 3.6%
Annual Escalation Rates
Period 1: Years 1 to 5 Period 2: Years 6 to 30
Nominal Real Nominal Real
Maintenance 3% 0.22% 3.50% 0.71%
Materials 3% 0.22% 3.50% 0.71%
Natural Gas 5% 2.16% 4% 1.19%
Electricity 5% 2.16% 4% 1.19%
Electricity Rates
Summer Winter
(5/1 to 10/31) (11/1 to 4/30)
Demand Energy Demand Energy
[/kW] [/kWh] [/kW] [/kWh]
On-Peak* $16.00 $0.055 $10.75 $0.051
Off-Peak** $0 $0.037 $0 $0.033
* weekdays: 12:00 noon to 5:59 pm
** weekdays: 12:00 midnight to 11:59 am and 6:00 pm to 11:59 pm
** weekends: all day
Natural Gas Rates
Summer Winter
(5/1 to 10/31) (11/1 to 4/30)
[/therm] [/therm]
$0.590 $0.760
Chilled Water Rate
$5.06 /million Btu
Steam Rate
$7.20 /million Btu
Hot Water Rate
$3.60 /million Btu
Benefits to Campus Infrastructure
Peak Period
Utility Months Days Hours
CHW $1,000 /ton June-Sept M to F 3PM-6PM
CHW $100 /gpm June-Sept M to F 3PM-6PM
Steam $23 /pph Nov-Feb M to F 5AM-8AM
Electricity $300 /kW June-Sept M to F Noon-6PM
Hot Water $13 /MBH Nov-Feb M to F 5AM-8AM
Hot Water $100 /gpm Nov-Feb M to F 5AM-8AM
Discounted
Savings
47
First Costs
Unmodified Modified
Maintenance First Cost Electricity First Cost
Run Description Cost Cost Peak Dist'n Peak Dist'n Peak Cost
[$] [$] [$] [$] [$] [$] [$] [$]
0 Base Case $7,658 $303,500 $303,500
1 Run Around Coil - w/o Evap $9,846 $364,025 -$46,000 -$4,416 -$1,406 -$244 $7,860 $319,819
2 Run Around Coil - w/ Evap $12,116 $378,725 -$58,083 -$5,576 -$1,406 -$244 $7,500 $320,916
3 Heat Pipe - w/o Evap $9,796 $378,025 -$55,750 -$5,352 -$1,610 -$280 $5,370 $320,403
4 Heat Pipe - w/ Evap $12,066 $392,725 -$70,699 -$6,787 -$1,610 -$280 $5,250 $318,599
5 Air-Air Plate HX - w/o Evap $9,796 $349,525 -$66,048 -$6,341 -$1,692 -$294 $3,300 $278,450
6 Indirect Evap Pre-Cooling $10,225 $351,500 -$63,429 -$6,089 -$1,166 -$203 $4,830 $285,443
Infrastructure Benefits
Chilled Water Hot Water
48
Energy Use and Cost
Electricity Chilled Water Hot Water
Run Description Annual Peak Cost Annual Peak Cost Annual Peak Cost
[kWh] [kW] [$] [Mbtu] [Btu/hr] [$] [Mbtu] [Btu/hr] [$]
0 Base Case 465,036 201.9 $48,592 1,822 2,346,000 $9,219 309 656,000 $1,112
1 Run Around Coil - w/o Evap 500,503 228.1 $53,795 1,751 1,794,000 $8,860 141 546,000 $507
2 Run Around Coil - w/ Evap 508,456 226.9 $54,139 1,702 1,649,000 $8,612 141 546,000 $507
3 Heat Pipe - w/o Evap 491,904 219.8 $52,293 1,703 1,677,000 $8,617 119 530,000 $429
4 Heat Pipe - w/ Evap 492,461 219.4 $52,304 1,701 1,497,617 $8,607 119 530,000 $429
5 Air-Air Plate HX - w/o Evap 483,239 212.9 $50,916 1,693 1,553,428 $8,567 113 523,566 $405
6 Indirect Evap Pre-Cooling 502,848 218.0 $52,733 841 1,584,852 $4,255 153 564,759 $549
49
LCC Results
UC Merced Classrooom / Office Building Life Cycle Analysis
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
0 5 10 15 20 25 30
Study Year
CumulativeCost[PresentValue$]
Run 0 - Base Case
Run 1 - Run-Around Coil w/o Evap
Run 2 - Run-Around Coil w/ Evap
Run 3 - Heat Pipe w/o Evap
Run 4 - Heat Pipe w/ Evap
Run 5 - Air to Air Plate HX w/o Evap
Run 6 - Indirect Evap Pre-Cooling
Life Cycle
Run Description Cost
[present dollars]
0 Base Case $2,112,503
1 Run Around Coil - w/o Evap $2,481,282
2 Run Around Coil - w/ Evap $2,307,405
3 Heat Pipe - w/o Evap $2,433,117
4 Heat Pipe - w/ Evap $2,223,283
5 Air-Air Plate HX - w/o Evap $2,223,283
6 Indirect Evap Pre-Cooling $2,204,087
50
Another Tool – Weighted Comparison
Table
51
Class Example
 System 1: CRAC units
• First cost: $672,000
• Annual energy cost: $223,000
 System 2: Central CHW plant and CRAHs
• First cost: $2,664,000
• Annual energy cost: $75,600
 Energy cost escalation 4%
 Depreciation 8%
 Inflation 2%
 No major replacement for either system
 At what year does the central plant break even?

More Related Content

PDF
2015 x472 class 07 - system selection ii - pre-class
PDF
2015 x472 class 03 - distribution systems
PDF
2015 x472 class 01 - intro and system overview
PDF
X472 class 09 2 of 2 title 24 and leed
PDF
2015 x472 class 05 - system selection
PDF
2015 x472 class 02 - generation systems
PDF
2015 x472 class 04 - central and specialty
PDF
2015 x472 class 06- special building types
2015 x472 class 07 - system selection ii - pre-class
2015 x472 class 03 - distribution systems
2015 x472 class 01 - intro and system overview
X472 class 09 2 of 2 title 24 and leed
2015 x472 class 05 - system selection
2015 x472 class 02 - generation systems
2015 x472 class 04 - central and specialty
2015 x472 class 06- special building types

What's hot (20)

PDF
2015 x472 class 02 - generation systems
PDF
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
PDF
Whole Building Modeling Using OpenStudio
PPTX
DEAP Heat Pump Webinar 2
PPTX
SEAI - Non Domestic Webinar #1 Domestic Hot Water Systems in NEAP
PDF
2015 x472 class 8 - codes, construction documentation and coordination
PPTX
BER non-domestic lighting webinar
PDF
X472 class 09 1 of 2 title 24 and leed
PDF
Integrating Cost & Engineering Considerations in HVAC Design
PDF
SEAI BER Heat Pump Webinar #3
PPTX
Warmer Homes Scheme - TGD L Major Renovation Requirements
PPTX
BER Non-Domestic Webinar #2 -Checking your work
PDF
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
PDF
Cowhorn Vineyard + Garden Tasting Room
PDF
Chilled water plants
PPTX
BER - National Home Retrofit Programme
PDF
Ab bp warehouse hvac calculation
PDF
Optimizing Existing Rooftop Unit Energy Efficiency
PDF
Envelope Design Training
PPT
ECBC CODE 2017
2015 x472 class 02 - generation systems
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
Whole Building Modeling Using OpenStudio
DEAP Heat Pump Webinar 2
SEAI - Non Domestic Webinar #1 Domestic Hot Water Systems in NEAP
2015 x472 class 8 - codes, construction documentation and coordination
BER non-domestic lighting webinar
X472 class 09 1 of 2 title 24 and leed
Integrating Cost & Engineering Considerations in HVAC Design
SEAI BER Heat Pump Webinar #3
Warmer Homes Scheme - TGD L Major Renovation Requirements
BER Non-Domestic Webinar #2 -Checking your work
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Cowhorn Vineyard + Garden Tasting Room
Chilled water plants
BER - National Home Retrofit Programme
Ab bp warehouse hvac calculation
Optimizing Existing Rooftop Unit Energy Efficiency
Envelope Design Training
ECBC CODE 2017
Ad

Viewers also liked (14)

PDF
Code questions
PDF
Service cabinetandtransformerbreakersizing1082004
PDF
Pullbox sizing
PDF
Electrical Lessons learned
PDF
Ge generator and ups problems
PDF
Substation design guideliness
PPT
Introduction to hvac systems
PDF
Power system slide notes
PDF
Understanding overcurrent protection
PDF
Nec emergency requirements
PDF
Grounding and bonding testing
PDF
2006 01-16 evap techniques r seidl
PDF
Nfpa 110 review
PDF
Application Considerations for Power System Grounding
Code questions
Service cabinetandtransformerbreakersizing1082004
Pullbox sizing
Electrical Lessons learned
Ge generator and ups problems
Substation design guideliness
Introduction to hvac systems
Power system slide notes
Understanding overcurrent protection
Nec emergency requirements
Grounding and bonding testing
2006 01-16 evap techniques r seidl
Nfpa 110 review
Application Considerations for Power System Grounding
Ad

Similar to 2015 x472 class 10 - lcca (20)

DOC
PDF
PPTX
Ufad thesis presentation ln
PDF
Retrocommissioning of Existing Buildings
PPT
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
PDF
Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis
PDF
Existing Buildings: Energy Efficiency
PPTX
COST EFFECIENT CHAP 2 ppt.pptx
PPTX
IES Faculty - IESVE as a Design Application & Part L Clinic
PPTX
Net Zero heating system. 3700 sq ft two story with full basement
DOCX
report.docx
PDF
PDF
HVAC Cent vs decent ac systems
PPTX
Life Cycle Costing for BREEAM 2011 requirements
PDF
Ethan Handelman, Recap Real Estate Advisors
PDF
6: Energy Management in Water Supply Systems - Life-Cycle Cost Analysis
PDF
ComEd Retro-Commissioning Program
PPT
Cost/Benefit Analysis of LEED-NC & LEED-EB
PDF
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
Ufad thesis presentation ln
Retrocommissioning of Existing Buildings
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis
Existing Buildings: Energy Efficiency
COST EFFECIENT CHAP 2 ppt.pptx
IES Faculty - IESVE as a Design Application & Part L Clinic
Net Zero heating system. 3700 sq ft two story with full basement
report.docx
HVAC Cent vs decent ac systems
Life Cycle Costing for BREEAM 2011 requirements
Ethan Handelman, Recap Real Estate Advisors
6: Energy Management in Water Supply Systems - Life-Cycle Cost Analysis
ComEd Retro-Commissioning Program
Cost/Benefit Analysis of LEED-NC & LEED-EB
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...

More from michaeljmack (20)

PDF
Auburn, NY - 200 Years of History 1793-1993
PDF
Auburn High School, Auburn, NY, 1982 Yearbook
PDF
Auburn High School, Auburn, NY, 1980 Yearbook
PDF
Surge Protection
PDF
Diesel Particulate Filters Control Systems
PDF
Understanding Arc Flash
PDF
Siemens MV GIS Switchgear
PDF
Fundamentals of transformer inrush
PDF
Building information modeling
PDF
15 years of experience stator ground fault protection
PPT
Emergency, Legally Required and Optional Standby Systems
PDF
Lighting Control Solutions for Daylit Spaces
PDF
COPS: An Arresting Look at NEC Article 708
PDF
Seismic Compliance of Electrical Distribution
PDF
Generator Set Transient Performance
PDF
Modeling of a digital protective relay in a RT Digital Simulator
PDF
Facts on Grid Friendly Wind Plants
PDF
Power Plant Horror Stories
PDF
Blackout Avoidance & Undervoltage Load Shedding
PDF
Transformer Fundamentals
Auburn, NY - 200 Years of History 1793-1993
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbook
Surge Protection
Diesel Particulate Filters Control Systems
Understanding Arc Flash
Siemens MV GIS Switchgear
Fundamentals of transformer inrush
Building information modeling
15 years of experience stator ground fault protection
Emergency, Legally Required and Optional Standby Systems
Lighting Control Solutions for Daylit Spaces
COPS: An Arresting Look at NEC Article 708
Seismic Compliance of Electrical Distribution
Generator Set Transient Performance
Modeling of a digital protective relay in a RT Digital Simulator
Facts on Grid Friendly Wind Plants
Power Plant Horror Stories
Blackout Avoidance & Undervoltage Load Shedding
Transformer Fundamentals

Recently uploaded (20)

PDF
Empowerment Technology for Senior High School Guide
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
IGGE1 Understanding the Self1234567891011
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Introduction to Building Materials
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
advance database management system book.pdf
Empowerment Technology for Senior High School Guide
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
IGGE1 Understanding the Self1234567891011
202450812 BayCHI UCSC-SV 20250812 v17.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
Hazard Identification & Risk Assessment .pdf
Introduction to Building Materials
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
History, Philosophy and sociology of education (1).pptx
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Indian roads congress 037 - 2012 Flexible pavement
Weekly quiz Compilation Jan -July 25.pdf
advance database management system book.pdf

2015 x472 class 10 - lcca

  • 1. X472 HVAC System Design Considerations Class 8 – Codes, Construction Documentation and Coordination Todd Gottshall, PE Western Allied Redwood City, CA Reinhard Seidl, PE Taylor Engineering Alameda, CA Fall 2015 Mark Hydeman, PE Continual Energy, Inc. mark.hydeman@continual.net 415-602-9982 www.continual.net
  • 2. 2 General  Contact Information Reinhard: rseidl@taylor-engineering.com Mark: mark.hydeman@continual.net Todd: tgottshall@westernallied.com  Text • None  Slides • download from web before class • Log in to Box at https://app.box.com/login • Username: x472student@gmail.com • Password: x472_student (case sensitive)
  • 3. 3 Course Outline Date Class Topic Teacher 9/02/2015 1. Introduction / Systems Overview / walkthrough RS 9/09/2015 2. Generation Systems TG 9/16/2015 3. Distribution Systems RS 9/23/2015 4. Central Plants TG 9/30/2015 5. System Selection 1 - class exercises RS 10/07/2015 6. Specialty Building types (High rise, Lab, Hospital, Data center) TG 10/14/2015 7. System Selection 2 - class exercises RS 10/21/2015 8. Construction codes and Project delivery methods TG 10/28/2015 9. 2013 T24 and LEED v4 MH 11/04/2015 10. Life-Cycle Cost Analysis and exam hand-out TG There are three instructors for this class. Todd Gottshall (TG), Reinhard Seidl (RS) and Mark Hydeman (MH). The schedule below shows what topics will be covered by who, and in what order.
  • 4. 4 Outline  LCCA – Overview and Terminology  System Selection LCCA Example  Answers to Final
  • 6. 6 Life-Cycle Cost Analysis  Evaluate economic performance over entire life of a building. • “Whole Cost Accounting” • “Total Cost of Ownership”  Uses the “time value of money” to fairly compare future costs with present costs.
  • 7. 7 Life-Cycle Cost Analysis  Cannot compare Hp, Btu/h, tons, kW directly, since it’s apples and oranges. But can convert them all to the same units and then compare  Same with money: as its value changes over time, we cannot compare the actual face values. But we can convert to present value (PV) for a common denominator.
  • 8. 8 Why LCCA Matters  Campus Classroom / Office Building Gates Computer Science Building 30 Year Life-Cycle Cost Utilities, $18,300,000, 28% Maintenance, $3,900,000, 6% Service, $2,400,000, 4% System Replacements, $2,900,000, 4% Initial Project Cost, $37,700,000, 58%
  • 9. 9 LCCA Possibilities  HEATING/COOLING SYSTEMS • Central-plant connected vs. stand-alone systems • Utility connection options if connected to the central plant • Equipment options for stand-alone systems (e.g., chilled water vs. direct-expansion (DX) units)  HVAC DISTRIBUTION SYSTEMS • Air distribution systems (e.g., variable volume vs. constant volume, overhead vs. underfloor) • Water distribution systems (e.g., primary-only vs. primary-secondary)  BUILDING ENVELOPE • Roofing systems (various materials and insulation methods) • Glazing, daylighting, and shading options  SITING/MASSING • Orientation, floor to floor height, and overall building height • Landscape, irrigation, and hardscape options
  • 10. 10 LCCA Possibilities  Generally for mechanical systems • High first cost vs low energy/maintenance cost • Low first cost vs higher energy or maintenance cost • Balancing which of the two is better for overall customer needs is goal of LCC 0 2 4 6 8 10 12 14 Solution A Solution B Which is better? First Cost Energy Cost - 20 yrs Solution ASolution B FirstCost 5 8 Energy Cost- 20yrs 12 7.2
  • 11. 11  Generally for mechanical systems • High first cost vs low energy/maintenance cost • Low first cost vs higher energy or maintenance cost • Balancing which of the two is better for overall customer needs is goal of LCC • Present potentially complex data sets in a simple comparison LCCA Possibilities Solution ASolution B FirstCost 5 8 Energy Cost- 20yrs 12 7.2 0 2 4 6 8 10 12 14 16 18 Solution A Solution B Which is better? First Cost Energy Cost - 20 yrs
  • 12. 12 When to do LCCA and how much effort?  Complex analysis and significant effort when • Potential first cost impact is high and potential operating cost impact is high • New or untested measures • To prioritize competing or mutually exclusive energy conservation efforts  Simple or no analysis when • Payback is obvious based on past experience • First cost impact is low • Cost of complex analysis is a large % of cost of measure
  • 13. 13 LCCA Process 1. Establish Objectives 2. Determine LCCA Metrics and Criteria 3. Identify and Develop Alternatives 4. Gather Cost Information 5. Perform LCCA Calculations
  • 14. 14 LCCA Costs  One-Time (First) Costs • Design • Construction • Commissioning  Recurring Costs • Utilities • Maintenance • Replacements
  • 15. 15 Example System Lifetimes (ASHRAE Handbook – 2003 Applications)
  • 16. 16 Time value of Money  Time-dependent value of money is much like temperature-dependent air volume:  Which air handler supplies more air? • 10,000 cfm • 11,213 cfm
  • 17. 17 Time value of Money  Time-dependent value of money is much like temperature-dependent air volume:  Which air handler supplies more air? • 10,000 cfm = 714 lbs/min @ 35°F, 80% RH (intake) • 11,213 cfm = 714 lbs/min @ 95°F, 9.8% RH (supply) • Same AHU, heating mode
  • 18. 18 Time value of Money  Time-dependent value of money is much like temperature-dependent relative humidity:  Which air handler supplies more humid air? • 80%RH • 9.8%RH
  • 19. 19 Time value of Money  Time-dependent value of money is much like temperature-dependent relative humidity:  Which air handler supplies more humid air? • 80%RH = 29.8°F dewpoint at 35°F • 9.8%RH = 29.8°F dewpoint at 95°F  Same AHU, heating mode
  • 20. 20 Time value of Money  Asking “How much air” is like asking “How much money” • It depends on the psychrometric state of air • It depends on the age of money  But we can make a common denominator • Using mass to compare airflows • Using present value (PV) or future value (FV), and compare investments made at different times by comparing them “at the same common time” by accounting for their ages
  • 21. 21 Present Value  Accounts the “time value” of money.  Basic Discount Equation:  Where: • PV is the present value (in Year 0 dollars) • FY is the value in the future (in Year Y dollars) • DISC is the discount rate • Y is the number of years in the future Y Y DISC F PV )1(  
  • 22. 22 Escalation  Most items increase in price but do not track overall inflation rate exactly.  Basic Escalation Equation:  Where: • COSTYEAR-Y is the cost at Y years into the future • COSTYEAR-0 is today’s cost (at Year 0) • ESC is the escalation rate • Y is the number of years into the future Y YEARYYEAR ESCCOSTCOST )1(0  
  • 23. 23 Study Life  Term of study over which costs will be accumulated  Could be • Life of equipment/system being analyzed • Life of building • As far into the future as you think you can speculate  Typically, because of discount rate, does not matter much to go beyond ~15 years
  • 24. 24 LCCA Calculation Method  The formula for the basic LCC equation:  Where: • LCC is the life cycle cost • C is the Year 0 construction cost (hard and soft costs) • PVRECURRING is the present value of all recurring costs (utilities, maintenance, replacements, service, etc) • PVRESIDUAL-VALUE is the present value of the residual value at the end of the study life VALUERESIDUALRECURRING PVPVCLCC 
  • 25. 25 LCC Discounted Payback Calculation $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 0 1 2 3 4 5 6 7 8 9 10 30 Year Study CumulativeCost[PresentValue$] 300 6 12 18 24 payback in roughly 6 years payback in roughly 9 years EnergyAnalysisandLCCA
  • 26. 26 CSU LCCA Spreadsheet  http://www.calstate.edu/cpdc/AE/
  • 28. 28 Case Study: UC Merced Classroom Building  90,000 sq. ft., 3 stories  Classrooms, Offices  Minimize energy use (20% below T-24) – Heating and cooling – Reheat  Maximize thermal comfort  Provide individual control – Operable windows – Integration with HVAC systems  LEED Rating
  • 30. 30 What is Building Simulation?  Allows prediction of energy use, dynamic response, control optimization  Options • Custom spreadsheets • Third party software • Custom Visual Basic models  3rd Party Software • EnergyPro (DOE-2.1) • eQUEST (DOE-2.2, www.doe2.com) • EnergyPlus • TRACE EnergyAnalysisandLCCA
  • 31. 31 DOE-2 Inputs Detailed Input Required!  Hourly Weather Data  Building Geometry  Glazing and Material Properties  Internal Loads  HVAC Systems and Equipment Efficiencies  Utility Rates and Structures EnergyAnalysisandLCCA
  • 32. 32 DOE2 Outputs  500 pages text, 8 point font, minimum – more depending on complexity and reports  Hourly values for any variable of any object  Predicts energy use  Predicts energy cost EnergyAnalysisandLCCA
  • 34. 34 Simulation Results UC Merced Classroom/Office Building System Selection Analysis Predicted Energy Use Summary VAVR DFDD Change [Mbtu] [Mbtu] [%] Lights 768.8 768.8 0% Equipment 612.0 612.0 0% Heating 256.0 104.6 -59% Cooling 880.1 862.5 -2.0% Pumps 11.3 13.6 20% Fans 172.8 172.0 -0.5% Total 2,701.0 2,533.5 -6%
  • 35. 35 Energy Efficiency Component Analysis  “Run-Around” Heat-Recovery Coils  “Run-Around” Heat-Recovery Coils with Direct-Evaporative Assist  Heat-Pipe Heat-Recovery Coils  Heat-Pipe Heat-Recovery Coils with Direct- Evaporative Assist  Air-to-Air Heat Recovery  Indirect Evaporative Pre-Cooling WHAT’S YOUR GUESS?
  • 37. 37 Maintenance Materials First Cost Component Number Visits/Year Time Extension Item Extension Item Extension [-] [min] [min] [-] [$] [$] [$] Fans CF 2 4 10 80 35,000$ 70,000$ HF 1 4 10 40 78,000$ 78,000$ EAF 2 4 10 80 6,000$ 12,000$ Coils CC 4 4 10 160 7,500$ 30,000$ HC 4 4 5 80 incl above with HF PHC 4 4 5 80 2,500$ 10,000$ Dampers Each 6 4 5 120 5,000$ 30,000$ Filters Cooling 70 1 5 350 75 5,250$ 150$ 10,500$ Heating 20 1 5 100 75 1,500$ incl above with HF Penthouse Each 2100 sq.ft 30$ 63,000$ Labor Time Total [hours] 18.2 Cost Subtotal 908$ 6,750$ ($50/hr loaded rate) Yearly Maintenance Total 7,658$ First Cost Total 303,500$ Base Case
  • 39. 39 Run-Around Coils Maintenance Materials First Cost Component Number Visits/Year Time Extension Item Extension Item Extension [-] [min] [min] [-] [$] [$] [$] Fans CF 2 4 10 80 35,000$ 70,000$ HF 1 4 10 40 78,000$ 78,000$ EAF 2 4 10 80 6,000$ 12,000$ OAF 2 4 10 80 6,000$ 12,000$ Coils CC 4 4 10 160 7,500$ 30,000$ HC 4 4 5 80 inclulded above with HF OAC 4 4 5 80 2,500$ 10,000$ EAC 4 4 5 80 5,000$ 20,000$ Wet-Side Run Around Coil Equipent Pump 1 4 15 60 6,000$ 6,000$ Piping, etc. 100 linear feet 60$ 6,000$ Dampers Each 7 4 5 140 2,500$ 17,500$ Filters Cooling 70 1 5 350 75 5,250$ 150$ 10,500$ Heating 20 1 5 100 75 1,500$ inclulded above with HF Pre-Heat 45 1 5 225 40 1,800$ 125$ 5,625$ Penthouse Each 2880 sq.ft 30$ 86,400$ Labor Time Total [hours] 26 Cost Subtotal 1,296$ 8,550$ ($50/hr loaded rate) Yearly Maintenance Total 9,846$ First Cost Total 364,025$
  • 41. 41 Run-Around with Evap Cooling Maintenance Materials First Cost Component Number Visits/Year Time Extension Item Extension Item Extension [-] [min] [min] [-] [$] [$] [$] Fans CF 2 4 10 80 35,000$ 70,000$ HF 1 4 10 40 78,000$ 78,000$ EAF 2 4 10 80 6,000$ 12,000$ OAF 2 4 10 80 6,000$ 12,000$ Coils CC 4 4 10 160 7,500$ 30,000$ HC 4 4 5 80 included with HF above OAC 4 4 5 80 2,500$ 10,000$ EAC 4 4 5 80 5,000$ 20,000$ Wet-Side Run Around Coil Equipent Pump 1 4 15 60 6,000$ 6,000$ Piping, etc. 100 linear feet 60$ 6,000$ Muenters every 2 years Equip 1 4 240 960 2,940$ 1,470$ 14,700$ 14,700$ Dampers Each 7 4 5 140 2,500$ 17,500$ Filters Cooling 70 1 5 350 75$ 5,250$ 150$ 10,500$ Heating 20 1 5 100 75$ 1,500$ included with HF above Pre-Heat 45 1 5 225 40$ 1,800$ 125$ 5,625$ Penthouse Each 2880 sq.ft 30$ 86,400$ Labor Time Total [hours] 42 Cost Subtotal 2,096$ 10,020$ ($50/hr loaded rate) Yearly Maintenance Total 12,116$ First Cost Total 378,725$
  • 46. 46 Life-Cycle Cost Analysis Parameters General Analysis Parameters Study Life 30 years Escalation Period 1 Ends in Year 5 General Inflation Rate 2.8% Campus (Nominal) Discount Rate 6.5% Real Discount Rate 3.6% Annual Escalation Rates Period 1: Years 1 to 5 Period 2: Years 6 to 30 Nominal Real Nominal Real Maintenance 3% 0.22% 3.50% 0.71% Materials 3% 0.22% 3.50% 0.71% Natural Gas 5% 2.16% 4% 1.19% Electricity 5% 2.16% 4% 1.19% Electricity Rates Summer Winter (5/1 to 10/31) (11/1 to 4/30) Demand Energy Demand Energy [/kW] [/kWh] [/kW] [/kWh] On-Peak* $16.00 $0.055 $10.75 $0.051 Off-Peak** $0 $0.037 $0 $0.033 * weekdays: 12:00 noon to 5:59 pm ** weekdays: 12:00 midnight to 11:59 am and 6:00 pm to 11:59 pm ** weekends: all day Natural Gas Rates Summer Winter (5/1 to 10/31) (11/1 to 4/30) [/therm] [/therm] $0.590 $0.760 Chilled Water Rate $5.06 /million Btu Steam Rate $7.20 /million Btu Hot Water Rate $3.60 /million Btu Benefits to Campus Infrastructure Peak Period Utility Months Days Hours CHW $1,000 /ton June-Sept M to F 3PM-6PM CHW $100 /gpm June-Sept M to F 3PM-6PM Steam $23 /pph Nov-Feb M to F 5AM-8AM Electricity $300 /kW June-Sept M to F Noon-6PM Hot Water $13 /MBH Nov-Feb M to F 5AM-8AM Hot Water $100 /gpm Nov-Feb M to F 5AM-8AM Discounted Savings
  • 47. 47 First Costs Unmodified Modified Maintenance First Cost Electricity First Cost Run Description Cost Cost Peak Dist'n Peak Dist'n Peak Cost [$] [$] [$] [$] [$] [$] [$] [$] 0 Base Case $7,658 $303,500 $303,500 1 Run Around Coil - w/o Evap $9,846 $364,025 -$46,000 -$4,416 -$1,406 -$244 $7,860 $319,819 2 Run Around Coil - w/ Evap $12,116 $378,725 -$58,083 -$5,576 -$1,406 -$244 $7,500 $320,916 3 Heat Pipe - w/o Evap $9,796 $378,025 -$55,750 -$5,352 -$1,610 -$280 $5,370 $320,403 4 Heat Pipe - w/ Evap $12,066 $392,725 -$70,699 -$6,787 -$1,610 -$280 $5,250 $318,599 5 Air-Air Plate HX - w/o Evap $9,796 $349,525 -$66,048 -$6,341 -$1,692 -$294 $3,300 $278,450 6 Indirect Evap Pre-Cooling $10,225 $351,500 -$63,429 -$6,089 -$1,166 -$203 $4,830 $285,443 Infrastructure Benefits Chilled Water Hot Water
  • 48. 48 Energy Use and Cost Electricity Chilled Water Hot Water Run Description Annual Peak Cost Annual Peak Cost Annual Peak Cost [kWh] [kW] [$] [Mbtu] [Btu/hr] [$] [Mbtu] [Btu/hr] [$] 0 Base Case 465,036 201.9 $48,592 1,822 2,346,000 $9,219 309 656,000 $1,112 1 Run Around Coil - w/o Evap 500,503 228.1 $53,795 1,751 1,794,000 $8,860 141 546,000 $507 2 Run Around Coil - w/ Evap 508,456 226.9 $54,139 1,702 1,649,000 $8,612 141 546,000 $507 3 Heat Pipe - w/o Evap 491,904 219.8 $52,293 1,703 1,677,000 $8,617 119 530,000 $429 4 Heat Pipe - w/ Evap 492,461 219.4 $52,304 1,701 1,497,617 $8,607 119 530,000 $429 5 Air-Air Plate HX - w/o Evap 483,239 212.9 $50,916 1,693 1,553,428 $8,567 113 523,566 $405 6 Indirect Evap Pre-Cooling 502,848 218.0 $52,733 841 1,584,852 $4,255 153 564,759 $549
  • 49. 49 LCC Results UC Merced Classrooom / Office Building Life Cycle Analysis $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 0 5 10 15 20 25 30 Study Year CumulativeCost[PresentValue$] Run 0 - Base Case Run 1 - Run-Around Coil w/o Evap Run 2 - Run-Around Coil w/ Evap Run 3 - Heat Pipe w/o Evap Run 4 - Heat Pipe w/ Evap Run 5 - Air to Air Plate HX w/o Evap Run 6 - Indirect Evap Pre-Cooling Life Cycle Run Description Cost [present dollars] 0 Base Case $2,112,503 1 Run Around Coil - w/o Evap $2,481,282 2 Run Around Coil - w/ Evap $2,307,405 3 Heat Pipe - w/o Evap $2,433,117 4 Heat Pipe - w/ Evap $2,223,283 5 Air-Air Plate HX - w/o Evap $2,223,283 6 Indirect Evap Pre-Cooling $2,204,087
  • 50. 50 Another Tool – Weighted Comparison Table
  • 51. 51 Class Example  System 1: CRAC units • First cost: $672,000 • Annual energy cost: $223,000  System 2: Central CHW plant and CRAHs • First cost: $2,664,000 • Annual energy cost: $75,600  Energy cost escalation 4%  Depreciation 8%  Inflation 2%  No major replacement for either system  At what year does the central plant break even?