4.1.1 Example Single
4.1.1 Example Single
4.1.1 Example Single
4.1.1 Example Single
21 x lighting points
12 x double 10 A socket-outlets
1 x 15 A socket-outlet
1 x 230 V, 6.0 kW oven
1 x 230 V, 2.4 kW instantaneous water heater
4.1.1 Example Single
4.1.1 Example Single
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
4.1.1 Example Single

More Related Content

DOC
Voltage sags evaluation studies
PDF
AP PGECET Instrumentation 2016 question paper
PDF
Ondasujetadora4
PDF
ATPG of reversible circuits
PDF
5.3.6 Worked Example 1
PDF
E426content
PPTX
Lighting nilanka
PPT
8.1.3formula
Voltage sags evaluation studies
AP PGECET Instrumentation 2016 question paper
Ondasujetadora4
ATPG of reversible circuits
5.3.6 Worked Example 1
E426content
Lighting nilanka
8.1.3formula

Viewers also liked (10)

PPTX
Lighting
PPSX
Illumination - Method of calculation
DOCX
Cellphone detector report
PPTX
Estimation of a residential building
PPTX
Building Services Engg. (Electrical installations)
PPTX
Building Services Electrical (MEP)
PPT
Electrical Wiring Practices and Diagrams
PPSX
Building services
DOC
ELECTRICAL WIRING
PPTX
Electrical Systems in a Building
Lighting
Illumination - Method of calculation
Cellphone detector report
Estimation of a residential building
Building Services Engg. (Electrical installations)
Building Services Electrical (MEP)
Electrical Wiring Practices and Diagrams
Building services
ELECTRICAL WIRING
Electrical Systems in a Building
Ad

Similar to 4.1.1 Example Single (7)

PDF
4.1.4 Step 2
PDF
4.1.3 Example Solution Three
PDF
4.1.11 Light Demand 2 Table
PDF
4.1.12 Light Demand 2 Table Part2
PPT
Chapter 2 ( A) - Polyphase Circuits .ppt
PDF
Gate ee 2008 with solutions
DOC
Unit4questions
4.1.4 Step 2
4.1.3 Example Solution Three
4.1.11 Light Demand 2 Table
4.1.12 Light Demand 2 Table Part2
Chapter 2 ( A) - Polyphase Circuits .ppt
Gate ee 2008 with solutions
Unit4questions
Ad

More from Talia Carbis (20)

PDF
7.4.6 slip
PDF
4.2.1 Better Load
PDF
4.1.13 Light Demand 3
PDF
4.1.10 Light Demand 2
PDF
4.1.9 Light Demand 1
PDF
4.1.8 Light Demand
PDF
4.1.7 Example Domestic 3
PDF
4.1.6 Example Domestic 2
PDF
4.1.5 Example Domestic 1
PDF
4.1.2 Example Three
PDF
5.4.4 LR Circuits
PDF
14.5.4 Example 1 Part 1
PDF
14.5.3 Improve
PDF
14.1.2 TRA Power
PDF
14.5.8 Example 1 Part 5
PDF
14.5.7 Example 1 Part 4
PDF
14.5.6 Example 1 Part 3
PDF
14.5.5 Example 1 Part 2
PDF
14.5.2 Correction
PDF
14.5.1 Improvement
7.4.6 slip
4.2.1 Better Load
4.1.13 Light Demand 3
4.1.10 Light Demand 2
4.1.9 Light Demand 1
4.1.8 Light Demand
4.1.7 Example Domestic 3
4.1.6 Example Domestic 2
4.1.5 Example Domestic 1
4.1.2 Example Three
5.4.4 LR Circuits
14.5.4 Example 1 Part 1
14.5.3 Improve
14.1.2 TRA Power
14.5.8 Example 1 Part 5
14.5.7 Example 1 Part 4
14.5.6 Example 1 Part 3
14.5.5 Example 1 Part 2
14.5.2 Correction
14.5.1 Improvement

Recently uploaded (20)

PPTX
8 - Airport Statistical Forms icon related
PPTX
Package Module | Dynamic Packaging Software
PPTX
Quiz- Thursday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
PDF
Introduction of Secrets of Mount Kailash.pdf
PDF
How to Choose the Best Tour Operators in Rajasthan – A Complete Guide.pdf
PPTX
How Indian Culture Is Perceived Around the World,Infouncle.pptx
PDF
Discover The Charm of Dublin with isango !.pdf
PPTX
Unlocking Travel Insights with Cruise Critic Dataset for Analysis.pptx
PDF
Understanding Travel Insurance: Your Safety Net While Exploring the World
PDF
Discovering the Best Tour Itinerary for the Indian Buddhist Circuit.
PPTX
Minimalist Business Slides XL by Slidesgo.pptx
PPTX
Luxury in the Skies: Business Class Flights to Tokyo with FlightsLux
PDF
Memorable Outdoor Adventures with Premium River Rafting & Guided Tours
PPTX
Enjoy Peaceful Travel Even in Busy Places.pptx
PDF
Chardham Yatra Packing List 2026 – Essentials to Carry
PDF
International Kailash Mansarovar Yatra, Visa, Permits, and Package.pdf
PPTX
Presentation medhansh.pptx dmadlkamdolak,daopdp
PDF
Golden Triangle Tour A Complete Travel Guide.pdf
PPTX
Airline API Integration | Flight API Supplier
PDF
Two Journeys, One Destination: Kalka-Shimla Toy Train to Jakhu Ropeway
8 - Airport Statistical Forms icon related
Package Module | Dynamic Packaging Software
Quiz- Thursday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Introduction of Secrets of Mount Kailash.pdf
How to Choose the Best Tour Operators in Rajasthan – A Complete Guide.pdf
How Indian Culture Is Perceived Around the World,Infouncle.pptx
Discover The Charm of Dublin with isango !.pdf
Unlocking Travel Insights with Cruise Critic Dataset for Analysis.pptx
Understanding Travel Insurance: Your Safety Net While Exploring the World
Discovering the Best Tour Itinerary for the Indian Buddhist Circuit.
Minimalist Business Slides XL by Slidesgo.pptx
Luxury in the Skies: Business Class Flights to Tokyo with FlightsLux
Memorable Outdoor Adventures with Premium River Rafting & Guided Tours
Enjoy Peaceful Travel Even in Busy Places.pptx
Chardham Yatra Packing List 2026 – Essentials to Carry
International Kailash Mansarovar Yatra, Visa, Permits, and Package.pdf
Presentation medhansh.pptx dmadlkamdolak,daopdp
Golden Triangle Tour A Complete Travel Guide.pdf
Airline API Integration | Flight API Supplier
Two Journeys, One Destination: Kalka-Shimla Toy Train to Jakhu Ropeway

4.1.1 Example Single

  • 5. 21 x lighting points 12 x double 10 A socket-outlets 1 x 15 A socket-outlet 1 x 230 V, 6.0 kW oven 1 x 230 V, 2.4 kW instantaneous water heater
  • 8. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 9. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 10. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 11. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 12. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 13. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 14. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A