Iceland Geothermal Conference
April 24-27, 2018
Anca Timofte, Team Leader Process Engineering
contact@climeworks.com
C4 - Climeworks: Capturing CO2 from air
3CONFIDENTIAL
87% of IPCC mitigation scenarios
compatible with the 2°C target –
and all those compatible with the
1.5°C target – rely on the
assumption of large-scale CO2
removal
WHY DIRECT AIR CAPTURE
4CONFIDENTIAL
• World’s first company supplying
atmospheric CO2 to customers
• Modular CO2 capture plants
• Scale-up via mass production of
CO2 collectors
• Low-temperature heat
(renewable or waste) as main
energy source
• Minimal carbon footprint:
90% net efficiency
THE CLIMEWORKS SOLUTION
5CONFIDENTIAL
HOW OUR TECHNOLOGY WORKS
6CONFIDENTIAL
ASSEMBLY AND PRODUCTION INFRASTRUCTURE
7CONFIDENTIAL
MERCHANT MARKET
RENEWABLE FUELS
CARBON DIOXIDE REMOVAL
MARKETS
• Onsite CO2 supply for bottlers, greenhouses, etc.
• 30 million tCO2 / year (source: Global CCS Institute)
• Onsite CO2 supply for renewable fuel synthesis
• 2 billion tCO2 / year (source: CO2 Sources & The Global CO2 Initiative)
• Large-scale CO2 removal from air
• 10 billion tCO2 / year (source: IPCC)
8CONFIDENTIAL
MERCHANT MARKET FLAGSHIP
World’s first commercial DAC plant
Plant type: DAC-18
CO2 capacity: 2’460 kg/day
CO2 application: Greenhouse
Heat source: Waste heat
Location: Hinwil,
Switzerland
Commissioned: 31st May 2017
9CONFIDENTIAL
MERCHANT MARKET FLAGSHIP
1 CO2 is captured directly from
air using low-grade heat.
CO2 is delivered to nearby
greenhouse via an underground pipe.
2
3
The more CO2 is
in the air, the
better vegetables
grow – up to 20%
better!
10CONFIDENTIAL
KOPERNIKUS POWER-TO-X STORE&GO CELBICON
RENEWABLE FUELS PROJECTS
• Power-to-Liquids
• Supplied Climeworks
Demonstrator
• 46 Partners, EUR 30 million
budget
• Power-to-Methane
• Supplied Climeworks Plant
DAC-3
• 27 Partners, EUR 27 million
budget
• Power-to-Chemicals
• Supplied Climeworks
Demonstrator
• 13 Partners, EUR 6 million
budget
11CONFIDENTIAL
1
23
4
CO2-NEUTRAL FUELS VIA DIRECT AIR CAPTURE
12CONFIDENTIAL
CARBON DIOXIDE REMOVAL FLAGSHIP
World’s first carbon dioxide
removal plant enabled by DAC
Plant type: DAC-1
CO2 capacity: 135 kg/day
CO2 application: Mineralization
Heat source: Geothermal
Location: Hellisheidi,
Iceland
Commissioned: 11th Oct 2017
13CONFIDENTIAL
CARBON DIOXIDE REMOVAL FLAGSHIP
1 CO2 is captured directly from air
using geothermal energy.
CO2 is mixed with water and
pumped deep underground.
2
3
CO2 reacts with underground
rock formations and is
mineralized, binding the CO2
permanently and safely.
14CONFIDENTIAL
Established strategic
partnership with car
manufacturer AUDI
2013
Finalist of the Virgin Earth
Challenge, a USD 25 million
prize by Richard Branson
2011
Won Venture Kick,
Switzerland’s leading
startup incubation
initiative
2010
Founded as an
ETH spin-off
2009
Developed modular
CO2 Collector
2014
Commissioned two
world firsts: a
commercial-scale
DAC plant and
Carbon Dioxide
Removal plant
2017
COMPANY HISTORY
CAPTURE 1% OF GLOBAL CO2 EMISSIONS BY 2025
VISION 1/25
Climeworks AG
Birchstrasse 155 • CH - 8050 Zurich
+41 (0) 44 533 29 99 • contact@climeworks.com
www.climeworks.com

More Related Content

PPTX
Global Thermostat: A Profitable Solution to Climate Change
PDF
Reaching Net Zero by 2050
PDF
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
PPT
Carbon Credit
PDF
Carbon Capture, Utilization and Storage (CCUS)
PDF
Modelling challenges for Hydrogen and Synfuel pathways in Europe
PDF
The future of H2 economy with the position of H2 in Heavy duty mobility | Spa...
PPT
Carbon Dioxide Capture and Storage (CSS)
Global Thermostat: A Profitable Solution to Climate Change
Reaching Net Zero by 2050
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
Carbon Credit
Carbon Capture, Utilization and Storage (CCUS)
Modelling challenges for Hydrogen and Synfuel pathways in Europe
The future of H2 economy with the position of H2 in Heavy duty mobility | Spa...
Carbon Dioxide Capture and Storage (CSS)

What's hot (20)

PPTX
STATUS OF THE BATTERY SUPPLY CHAIN IN EUROPE
PDF
Carbon Capture and Storage in the Cement Industry
PPTX
Hydrogen energy
PDF
Green Hydrogen Financial Model Toolkit
PDF
GHG Science based targets
PPT
Carbon credits
PPTX
Carbon Capture and Storage
PDF
Circularity 23: Digital Product Passports: Insights and Actions From the Field
PPTX
British Petroleum
PDF
Webinar : Setting up a Belgian Hydrogen Council - 10 novembre
PPTX
Carbon capture & storage
PDF
What is a Science Based Target?
PPT
Carbon Credit - Main Aspects
PDF
India's journey to Net Zero 2070
PDF
Carbon Capture and Storage breakfast seminar
PDF
Green hydrogen production and distribution
PPTX
Carbon capture and storage
PPTX
Circular economy - a new paradigm in manufacutring
PDF
BP Energy Outlook 2023
PDF
Green hydrogen Basics - Overview_Jan 2022
STATUS OF THE BATTERY SUPPLY CHAIN IN EUROPE
Carbon Capture and Storage in the Cement Industry
Hydrogen energy
Green Hydrogen Financial Model Toolkit
GHG Science based targets
Carbon credits
Carbon Capture and Storage
Circularity 23: Digital Product Passports: Insights and Actions From the Field
British Petroleum
Webinar : Setting up a Belgian Hydrogen Council - 10 novembre
Carbon capture & storage
What is a Science Based Target?
Carbon Credit - Main Aspects
India's journey to Net Zero 2070
Carbon Capture and Storage breakfast seminar
Green hydrogen production and distribution
Carbon capture and storage
Circular economy - a new paradigm in manufacutring
BP Energy Outlook 2023
Green hydrogen Basics - Overview_Jan 2022
Ad

Similar to C4 - Climeworks: Capturing CO2 from air (20)

PDF
Climeworks - Capturing CO2 from air
PDF
D2 Christoph Gebald
PDF
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
PDF
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
PPTX
CLOSING THE CARBON CYCLE - Peter Eisenberger (October 16, 2012 @ London)
PDF
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
PDF
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
PDF
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
PDF
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
PDF
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
PDF
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
PDF
Snam 2022-2026 Strategic Plan
PDF
CO2 Conversion
PDF
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
PDF
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
PDF
TECHNOLOGY TRENDS WITH PROF. ARMIN HAFNER
PPTX
Closing the Carbon Cycle for Sustainability - Peter Eisenberger (October 15, ...
PPTX
CO2 capture and utilisation for industry
PPTX
Carbondioxideremovalcdrintheatmosphere 141228031039-conversion-gate01
PPTX
Carbon Capture and storage technologies around the world
Climeworks - Capturing CO2 from air
D2 Christoph Gebald
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
CLOSING THE CARBON CYCLE - Peter Eisenberger (October 16, 2012 @ London)
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Snam 2022-2026 Strategic Plan
CO2 Conversion
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
TECHNOLOGY TRENDS WITH PROF. ARMIN HAFNER
Closing the Carbon Cycle for Sustainability - Peter Eisenberger (October 15, ...
CO2 capture and utilisation for industry
Carbondioxideremovalcdrintheatmosphere 141228031039-conversion-gate01
Carbon Capture and storage technologies around the world
Ad

More from Iceland Geothermal (20)

PDF
Geothermal Landscape study final
PDF
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
PDF
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
PDF
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
PDF
C4 - Lithium recovery from high temperature geothermal brines.
PDF
C4 - Transforming CO2 into a commercial product
PDF
C3 - Production Modelling for Sustainability
PDF
C3 - IDDP2 A better tomorrow
PDF
C3 - Production and reinjection at Hellisheiði: Holistic approach
PDF
C3 - Geothermal reservoir management and sustainable use
PDF
C2 - Optimization of existing systems: Improvement of plants in operation and...
PDF
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
PDF
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
PDF
C2 - ENGINEERING THE ENERGY TRANSITION
PDF
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
PDF
C1 - Operation: Ownership Structure and its Effects
PDF
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
PDF
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
PDF
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
PDF
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
Geothermal Landscape study final
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Lithium recovery from high temperature geothermal brines.
C4 - Transforming CO2 into a commercial product
C3 - Production Modelling for Sustainability
C3 - IDDP2 A better tomorrow
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Geothermal reservoir management and sustainable use
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - ENGINEERING THE ENERGY TRANSITION
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Operation: Ownership Structure and its Effects
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects

Recently uploaded (20)

PDF
My India Quiz Book_20210205121199924.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
Complications of Minimal Access-Surgery.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PPTX
20th Century Theater, Methods, History.pptx
PDF
advance database management system book.pdf
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
HVAC Specification 2024 according to central public works department
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
IGGE1 Understanding the Self1234567891011
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
Computer Architecture Input Output Memory.pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
My India Quiz Book_20210205121199924.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Complications of Minimal Access-Surgery.pdf
Introduction to pro and eukaryotes and differences.pptx
20th Century Theater, Methods, History.pptx
advance database management system book.pdf
Environmental Education MCQ BD2EE - Share Source.pdf
HVAC Specification 2024 according to central public works department
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
IGGE1 Understanding the Self1234567891011
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Cambridge-Practice-Tests-for-IELTS-12.docx
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Computer Architecture Input Output Memory.pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
TNA_Presentation-1-Final(SAVE)) (1).pptx
What if we spent less time fighting change, and more time building what’s rig...
Unit 4 Computer Architecture Multicore Processor.pptx
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf

C4 - Climeworks: Capturing CO2 from air

  • 1. Iceland Geothermal Conference April 24-27, 2018 Anca Timofte, Team Leader Process Engineering contact@climeworks.com
  • 3. 3CONFIDENTIAL 87% of IPCC mitigation scenarios compatible with the 2°C target – and all those compatible with the 1.5°C target – rely on the assumption of large-scale CO2 removal WHY DIRECT AIR CAPTURE
  • 4. 4CONFIDENTIAL • World’s first company supplying atmospheric CO2 to customers • Modular CO2 capture plants • Scale-up via mass production of CO2 collectors • Low-temperature heat (renewable or waste) as main energy source • Minimal carbon footprint: 90% net efficiency THE CLIMEWORKS SOLUTION
  • 7. 7CONFIDENTIAL MERCHANT MARKET RENEWABLE FUELS CARBON DIOXIDE REMOVAL MARKETS • Onsite CO2 supply for bottlers, greenhouses, etc. • 30 million tCO2 / year (source: Global CCS Institute) • Onsite CO2 supply for renewable fuel synthesis • 2 billion tCO2 / year (source: CO2 Sources & The Global CO2 Initiative) • Large-scale CO2 removal from air • 10 billion tCO2 / year (source: IPCC)
  • 8. 8CONFIDENTIAL MERCHANT MARKET FLAGSHIP World’s first commercial DAC plant Plant type: DAC-18 CO2 capacity: 2’460 kg/day CO2 application: Greenhouse Heat source: Waste heat Location: Hinwil, Switzerland Commissioned: 31st May 2017
  • 9. 9CONFIDENTIAL MERCHANT MARKET FLAGSHIP 1 CO2 is captured directly from air using low-grade heat. CO2 is delivered to nearby greenhouse via an underground pipe. 2 3 The more CO2 is in the air, the better vegetables grow – up to 20% better!
  • 10. 10CONFIDENTIAL KOPERNIKUS POWER-TO-X STORE&GO CELBICON RENEWABLE FUELS PROJECTS • Power-to-Liquids • Supplied Climeworks Demonstrator • 46 Partners, EUR 30 million budget • Power-to-Methane • Supplied Climeworks Plant DAC-3 • 27 Partners, EUR 27 million budget • Power-to-Chemicals • Supplied Climeworks Demonstrator • 13 Partners, EUR 6 million budget
  • 12. 12CONFIDENTIAL CARBON DIOXIDE REMOVAL FLAGSHIP World’s first carbon dioxide removal plant enabled by DAC Plant type: DAC-1 CO2 capacity: 135 kg/day CO2 application: Mineralization Heat source: Geothermal Location: Hellisheidi, Iceland Commissioned: 11th Oct 2017
  • 13. 13CONFIDENTIAL CARBON DIOXIDE REMOVAL FLAGSHIP 1 CO2 is captured directly from air using geothermal energy. CO2 is mixed with water and pumped deep underground. 2 3 CO2 reacts with underground rock formations and is mineralized, binding the CO2 permanently and safely.
  • 14. 14CONFIDENTIAL Established strategic partnership with car manufacturer AUDI 2013 Finalist of the Virgin Earth Challenge, a USD 25 million prize by Richard Branson 2011 Won Venture Kick, Switzerland’s leading startup incubation initiative 2010 Founded as an ETH spin-off 2009 Developed modular CO2 Collector 2014 Commissioned two world firsts: a commercial-scale DAC plant and Carbon Dioxide Removal plant 2017 COMPANY HISTORY
  • 15. CAPTURE 1% OF GLOBAL CO2 EMISSIONS BY 2025 VISION 1/25
  • 16. Climeworks AG Birchstrasse 155 • CH - 8050 Zurich +41 (0) 44 533 29 99 • contact@climeworks.com www.climeworks.com