The Rio Grande project involves a 1000 MW pumped storage hydroelectric plant located in Argentina. It provides electrical storage for the local power grid. The main underground facilities are located within high quality gneiss rock. Support requirements were assessed during excavation and minimal support was needed due to the excellent rock quality. Rockbolts and shotcrete were used as needed based on geotechnical inspection. The UNWEDGE program was utilized to analyze wedge failures and determine support requirements.