© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-1
Configuring Catalyst Switch Operations
Introducing Spanning Tree Protocol
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-2
Outline
• Overview
• Spanning Tree Protocol
• Spanning-Tree Operation
• Root Bridge Selection
• Spanning-Tree Port States
• Spanning-Tree Path Costs
• Spanning-Tree Recalculation
• Rapid Spanning Tree Protocol
• Summary
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-3
• Provides a loop-free redundant network topology by
placing certain ports in the blocking state
Spanning Tree Protocol
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-4
Spanning-Tree Operation
• One root bridge per broadcast domain
• One root port per nonroot bridge
• One designated port per segment
• Nondesignated ports are unused
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-5
• BPDU (default = sent every two seconds)
• Root bridge = bridge with the lowest bridge ID
• Bridge ID =
In this example, which switch has the lowest bridge ID?
Spanning Tree Protocol
Root Bridge Selection
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-6
• Spanning tree transits each port through several different
states:
Spanning-Tree Port States
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-7
Spanning-Tree Port States (Cont.)
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-8
Spanning-Tree Operation
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-9
Spanning-Tree Path Cost
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-10
Spanning-Tree Recalculation
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-11
Spanning-Tree Convergence
• Convergence occurs when all the switch and bridge ports
have transitioned to either the forwarding or the blocking
state.
• When the network topology changes, switches and bridges
must recompute STP, which disrupts user traffic.
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-12
Rapid Spanning-Tree Protocol
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-13
Rapid Transition to Forwarding
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-14
Summary
• STP is a bridge-to-bridge protocol used to maintain a loop-free
network.
• To maintain a loop-free network topology, STP establishes a root
bridge, a root port, and designated ports.
• With STP, the root bridge has the lowest BID, which is made up of
the bridge priority and the MAC address.
• When STP is enabled, every bridge in the network goes through the
blocking state and the transitory states of listening and learning at
power up. If properly configured, the ports then stabilize to the
forwarding or blocking state.
• If the network topology changes, STP maintains connectivity by
transitioning some blocked ports to the forwarding state.
• RSTP significantly speeds the recalculation of the spanning tree
when the network topology changes.

More Related Content

PPT
Spanning tree protocol
PPT
Wide area networks
PPTX
Лекц 9
PPTX
Лекц 8
PPT
Day 20.2 frame relay
PPT
Day 3.2 routing
PPT
9 ec606a.36(finished)
PPTX
VDC by NETWORKERS HOME
Spanning tree protocol
Wide area networks
Лекц 9
Лекц 8
Day 20.2 frame relay
Day 3.2 routing
9 ec606a.36(finished)
VDC by NETWORKERS HOME

What's hot (20)

PPTX
FEX -PPT By NETWORKERS HOME
PPTX
NETWORKERS HOME Cisco UCS PPT .
PPT
Switch configuration
PDF
I2C BUS PROTOCOL
PPT
Icnd210 s03l01
PPTX
I2c buses
PPT
Icnd210 s02l01
PPT
CCNA Icnd110 s05l03
PPT
Icnd210 s02l06
DOCX
Nexus 1000 v access guide
PPT
Icnd210 s01l02
PDF
Max232
PPT
Cap6 intervlan routing
PPT
I2C And SPI Part-23
PDF
RUGGEDCOM RS940G compact switch
PPT
I2 c
PPT
Icnd210 s08l05
PPTX
I2C Protocol
PPTX
PPTX
CCNA 2 Routing and Switching v5.0 Chapter 5
FEX -PPT By NETWORKERS HOME
NETWORKERS HOME Cisco UCS PPT .
Switch configuration
I2C BUS PROTOCOL
Icnd210 s03l01
I2c buses
Icnd210 s02l01
CCNA Icnd110 s05l03
Icnd210 s02l06
Nexus 1000 v access guide
Icnd210 s01l02
Max232
Cap6 intervlan routing
I2C And SPI Part-23
RUGGEDCOM RS940G compact switch
I2 c
Icnd210 s08l05
I2C Protocol
CCNA 2 Routing and Switching v5.0 Chapter 5
Ad

Similar to Day 15 spanning tree protocol (20)

PPT
Icnd210 s02l02
PPT
Stp premdeep gill-lu045310-14aug12
PPT
Spannig tree
PPTX
CCNA3 Verson6 Chapter3
PPTX
Stp premdeep gill-lu045310-14aug12
PPTX
CCNA (R & S) Module 04 - Scaling Networks - Chapter 3
PPTX
ENCOR_Capitulo 2.pptx
PDF
Ccnp3 lab 3_1_en (hacer)
PDF
Stp. cli command reference, quiz
PPT
Day 15.1 spanningtreeprotocol
PPT
Managing Redundant Links & Inter-VLAN Routing
PPT
02_Layer2_Network_Design.ppt
PPT
Spannig tree
PDF
Spanning tree protocol (stp)
PPTX
Spanning tree protocol
PDF
STP (spanning tree protocol)
PPTX
ENCOR_Chapter_2_Spanning_Tree presentation
PPTX
CCNA Lan Redundancy
PPT
chapter 10 - switchingccnapresentation.ppt
PPT
chapter 10 - switchingccnapresentation.ppt
Icnd210 s02l02
Stp premdeep gill-lu045310-14aug12
Spannig tree
CCNA3 Verson6 Chapter3
Stp premdeep gill-lu045310-14aug12
CCNA (R & S) Module 04 - Scaling Networks - Chapter 3
ENCOR_Capitulo 2.pptx
Ccnp3 lab 3_1_en (hacer)
Stp. cli command reference, quiz
Day 15.1 spanningtreeprotocol
Managing Redundant Links & Inter-VLAN Routing
02_Layer2_Network_Design.ppt
Spannig tree
Spanning tree protocol (stp)
Spanning tree protocol
STP (spanning tree protocol)
ENCOR_Chapter_2_Spanning_Tree presentation
CCNA Lan Redundancy
chapter 10 - switchingccnapresentation.ppt
chapter 10 - switchingccnapresentation.ppt
Ad

More from CYBERINTELLIGENTS (20)

PPT
Wide area networks
PPTX
PPTX
PPTX
Routerfundaments gurwinder
PPTX
Rip 1 rip 2
PPTX
PPT
TXT
Nat config
PPTX
PPT
Ip addressing...
PPT
Ip address
PPTX
Frame relay
PPTX
PPT
Day 25 cisco ios router configuration
PPT
Day 22 _ ppp
PPT
Day 20.i pv6 lab
PPT
Day 20.3 frame relay
PPT
Day 20.1 configuringframerelay
PPT
Day 19 wan connections
Wide area networks
Routerfundaments gurwinder
Rip 1 rip 2
Nat config
Ip addressing...
Ip address
Frame relay
Day 25 cisco ios router configuration
Day 22 _ ppp
Day 20.i pv6 lab
Day 20.3 frame relay
Day 20.1 configuringframerelay
Day 19 wan connections

Recently uploaded (20)

PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PPTX
Computer Architecture Input Output Memory.pptx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
advance database management system book.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
Education and Perspectives of Education.pptx
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
PDF
Journal of Dental Science - UDMY (2021).pdf
PDF
Empowerment Technology for Senior High School Guide
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
PDF
HVAC Specification 2024 according to central public works department
PDF
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
semiconductor packaging in vlsi design fab
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
PDF
What if we spent less time fighting change, and more time building what’s rig...
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Computer Architecture Input Output Memory.pptx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
advance database management system book.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
Education and Perspectives of Education.pptx
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
Journal of Dental Science - UDMY (2021).pdf
Empowerment Technology for Senior High School Guide
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
HVAC Specification 2024 according to central public works department
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
semiconductor packaging in vlsi design fab
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
AI-driven educational solutions for real-life interventions in the Philippine...
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence
What if we spent less time fighting change, and more time building what’s rig...

Day 15 spanning tree protocol

  • 1. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-1 Configuring Catalyst Switch Operations Introducing Spanning Tree Protocol
  • 2. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-2 Outline • Overview • Spanning Tree Protocol • Spanning-Tree Operation • Root Bridge Selection • Spanning-Tree Port States • Spanning-Tree Path Costs • Spanning-Tree Recalculation • Rapid Spanning Tree Protocol • Summary
  • 3. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-3 • Provides a loop-free redundant network topology by placing certain ports in the blocking state Spanning Tree Protocol
  • 4. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-4 Spanning-Tree Operation • One root bridge per broadcast domain • One root port per nonroot bridge • One designated port per segment • Nondesignated ports are unused
  • 5. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-5 • BPDU (default = sent every two seconds) • Root bridge = bridge with the lowest bridge ID • Bridge ID = In this example, which switch has the lowest bridge ID? Spanning Tree Protocol Root Bridge Selection
  • 6. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-6 • Spanning tree transits each port through several different states: Spanning-Tree Port States
  • 7. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-7 Spanning-Tree Port States (Cont.)
  • 8. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-8 Spanning-Tree Operation
  • 9. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-9 Spanning-Tree Path Cost
  • 10. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-10 Spanning-Tree Recalculation
  • 11. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-11 Spanning-Tree Convergence • Convergence occurs when all the switch and bridge ports have transitioned to either the forwarding or the blocking state. • When the network topology changes, switches and bridges must recompute STP, which disrupts user traffic.
  • 12. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-12 Rapid Spanning-Tree Protocol
  • 13. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-13 Rapid Transition to Forwarding
  • 14. © 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-14 Summary • STP is a bridge-to-bridge protocol used to maintain a loop-free network. • To maintain a loop-free network topology, STP establishes a root bridge, a root port, and designated ports. • With STP, the root bridge has the lowest BID, which is made up of the bridge priority and the MAC address. • When STP is enabled, every bridge in the network goes through the blocking state and the transitory states of listening and learning at power up. If properly configured, the ports then stabilize to the forwarding or blocking state. • If the network topology changes, STP maintains connectivity by transitioning some blocked ports to the forwarding state. • RSTP significantly speeds the recalculation of the spanning tree when the network topology changes.