SlideShare a Scribd company logo
MUHAMMAD ILYAS
Civil Engineer (M.Sc Civil, B.Sc Civil, BSS, NEBOSH-IGC ,PM,CM)
Cell # +92-345-8531855, 345-9803117
Email: engrilyasktk@gmail.com
I have diversified more than 14years professional experience in the Oil & Gas (E&P) industry from concept to
complete facility (FEED to Commissioning). Have managed and worked with million dollars complex projects and
have implemented them successfully with efficiency and quality. Have expertise in Project Designing, Management,
Execution, Cost estimation, Negotiations for projects of Processing Plants, Pipe Lines, Well Heads, Valve Assemblies,
Water Treatment Plants and Infrastructure Development(Roads, Buildings, water supply schemes, Basic Health Units
schools) as well as well experienced in Project/Construction Management, HSE and QA&QC.
Key positions worked:-
1- Site Manager at Pak Arab Refinery Project (1 ½ years)
2- Site incharge at Well Heads facility (5 years)
3- Lead Civil (11.3years)
Expertise:-
1- Project and Construction Management
2- Oil & Gas Plant and Pipe Line Construction
3- Estimation and Invoicing
4- FEED and Feasibility study
5- QA/QC
6- Health, Safety and Environment
7- Infrastructure and Community Development
Education and Qualification:-
1- M.Sc in Civil (Environmental)Engineering from UET Peshawar-PAKISTAN (2006 -2009) (www.nwfpuet.edu.pk)
2- B.Sc in Civil Engineering from UET Peshawar-PAKISTAN (1997-2002) (www.nwfpuet.edu.pk)
3- Bachelor in social sciences from University of Peshawar-PAKISTAN (1998-2000) (www.uopesh.edu.pk)
4- NEBOSH-IGC UK (P) www.nebosh.org.uk
MEMBERSHIP OF PROFESSIONAL SOCIETIES OF ENGINEERS AND SAFETY
1. Pakistan Engineering Council as Professional Engineer (Reg # CIVIL/23893) (www.pec.org.pk)
2. National Examination Board of Occupational Safety and Health–UK (NEBOSH IGC)
(Student number: 00170441) (www.nebosh.org.uk)
Management Courses
1- Project Management.
2- Construction Management
3- Disaster and risk Management
4- Communication and Presentation Skills.
5- 7-Habbits (Leadership Skills)
Professional Courses
1- MS Primavera
2- SAP (Structural Analysis Program)
3- AutoCAD
4- MS Office
5- NEBOSH IGS (Health, Safety and Environment)
6- Firefighting
7- Emergency First Aid
Employement History:
1 MOL PAKISTAN Oil & Gas Co B.V
Job Title: Sr.Construction Engineer (Head Civil) (December-2004-Till date)
General Responsibilities
1. Define scope of work for projects; review design proposals; conduct preconstruction meetings; meet with
engineers, other agencies and other departments to resolve problems pertaining to design.
2. Meets construction budget by exercising strict control over project cost, schedules and expenditures, checks
and authorizes all claims for payment from all sub-contractors involved in the project to assure accuracy and
that proper contractual obligations are met, verify incoming invoices for payment.
3. Accomplishes construction human resource objectives by selecting, orienting, training, assigning, scheduling,
coaching, counseling, and disciplining employees working in the construction area, communicates job
expectations to the employees; plans, monitors, appraises job contributions, recommends compensation
actions to the Project Implementation Manager.
4. Reviews critical design drawings of the project before passing them for use to the Superintendent or Site
Supervisor, directs and supervises project engineers in the performance of all aspects of their work, reviews
all Work Instructions before they are approved by the Project Manager.
5. Establishes execution standards and protocols, allocates resources, schedules and coordinates staff and sub-
contractors, evaluates milestone assumptions and conclusions.
6. Resolves design problems emerging during construction in consultation with the Design Manager, evaluates
and implements change orders after approval.
7. Monitors the construction schedule and progress on a daily, weekly and monthly basis and provides input to
the regular reports of the Project Manager, discusses and resolves daily site problems with site supervisors.
8. Participates in or (subject to the Project Manager’s delegation) leads in discussion of all contractual matters
related to sub-contractors employed in the project, monitors and controls performance (e.g.
approves/rejects work packages, submitted by project engineers) at each stage of the work to ensure proper
compliance with all technical aspects of the contract through both individual contacts and co-ordination
meetings.
9. Plan, coordinate and actively participate in the preparation of FEED study, Detail Design and “Technical
Specifications and Proposals” for EPCC Projects such as Process Plants, Valve Assemblies, Well Heads, Pipe
Line, Buildings, Storm drains and related structures; review work in progress and submit finished products to
the Head Office.
10. Planning, and executing Civil / Structural engineering as well as underground piping. This entails overseeing
the preparation of basic design, FEED and detailed design.
11. Coordinates various activities relating to site hand over and mobilization of contractors following contract
award. Includes coordinating the placement of the contractor's site office, material storage area and camp as
applicable, location of mobile equipment, arranging for access to stores and any other matters required to
assist contractor in the orderly mobilization of facilities, equipment and manpower to site
12. Planning and implementation of the Project to ensure that deliverables are issued on schedule, project
milestone dates are met, and given tasks are completed within the allowed budget; Prepare of scope of
work, man-hours distribution; Selection of resources in consultation with H.O.D to meet the specific job
requirements.
13. BOQs, Specifications and Tender documents for new projects.
14. Monitoring of job progress, identifying slippage and short comings and setting solutions and remedies in
consultation with Project Managers (and H.O.D, if required).
15. Identifying codes and standards, providing technical expertise to the task force and enforcing quality
assurance requirements of company.
16. Ensuring that the design is carried out as per the industry standard practices and in conformance with the
quality management system.
17. Assisting in the preparation of project proposals and tenders in what relates to Civil Engineering design;
proposals and preliminary design during tenders for MTO purposes.
18. Identification of issues that impede project progress and reporting to Project Managers / Discipline Heads.
19. Resolve disputes; handle claims by/against with the Contractor in liaison with Company Site Representative
and Contractor Representative.
20. Prepare and send Daily Progress Report and Next Day Planning of all ongoing projects to all heads and key
personnel.
HSE Responsibilities (NEBOSH IGC -UK Qualified)
1. MOL Group HSE management system compliance.
2. Ensure day-to-day work is performed effectively, efficiently, and safely in order to increase plant profit, enhance
plant reliability/integrity, and promote safety & compliance to environmental standards.
3. Supervise the development, implementation, coordination and monitoring of scheduled turnaround plans to
ensure engineering requirements and operational objectives are being met while utilizing all resources in the
most timely and cost effective manner possible.
4. Lead the execution of planned and unplanned unit shutdowns including job plans and critical path schedule
development, and tracking and closeout activities.
5. Supervise all aspects of turnarounds and major shutdowns, and ensure compliance to quality, environment and
all health and safety aspects.
6. Coordinate with maintenance and operations division for the development of work priorities, identification of
required resources, assigning roles and responsibilities, agreeing on schedules and development of estimated
budgets and expected outcomes.
7. Participate and review of Task Risk Assessment (TRA), Job Safety Analysis (JSA) prior to start of each jobs.
8. Educate and guide work force regarding Work Permit, Working at Height, Defensive Driving, Emergency Drill,
Hazard Identification and Control, Confine Space and Working at night.
9. Notify incident and participate in investigation. Participate and conduct contractor inspection and audits.
10. Contributing towards, maintaining and implementing both company and International HSE Management System
objectives and procedures.
11. Guide and educate the contractor staff about the basic HSE requirements corresponding to the work they are
performing.
12. Guide, educate and implement the MOL Group PTW system at all locations.
QA&QC Responsibilities
1. Prepare Quality Inspection Plans (QIPs) and Method Statement (MS) for all civil works. Perform civil quality
inspection activities in accordance with the Project Quality plan and ISO, ASTM, AASHTO, ACI, IBC and other
BS Standards.
2. Preparing and attending all preparatory and follow-up meetings, coordination meetings, conducting
third party inspections. To prepare the ITP for the projects according the project scope.
3. Establishing site laboratory, concrete batching plant, performing calibration of the equipments and
scale, and managing operations of site laboratory and the batching plant in accordance with the quality
requirements.
4. Conducting material tests, concrete cube testing etc at site laboratory in witness with the independent
laboratory.
5. Implementing Quality management system on the projects as per the project specifications and the
requirements, through RFI, IR, MR, SO, NCR etc.
6. Assisting in developing Quality control plans and obtaining approvals from client representative
7. Conducting all QC site inspections through RFI and closing the RFI and maintaining the log and issuing
the records
8. Assisting in preparing and implementing Inspection Test plans and test procedures on projects as per the
project specifications and requirements
9. Holding meetings with the subcontractors / suppliers related to the quality issues and its compliance in
accordance with the project requirements and the QA/QC Plan.
10. Conducting internal audits and third party inspections as per the requirements and Issuing corrective
plans and preventive plans to comply the non conformances on the project.
11. Ensure document control system is maintained on the projects as per the quality system and the project
requirements, such as document numbering and archiving
12. Administering team of QC engineers and inspectors and monitor the QC implantation on site in
accordance to the project specifications and procedures.
13. Administering the Site laboratory and conducting the QA/QC procedures in coordinating / witness with
independent agencies / third party.
14. Maintaining all the QA/QC documents flow in an organized effective manner and close all the open
listing of documents immediately.
15. Organizing and establishing pre-inspection meetings and coordination of source inspections.
16. Review manufacture / Vendor quality plan and conducting vendor / factory inspections and Factory
acceptance tests (FAC)
2- MARATHON Construction Co. (Oil and Gas Development Project)
Job Title Site Engineer (Feb-2004-November-2004)
Job Duties Working as a site civil engineer in the leading organization of OGDCL in the Construction of big LPG
plant Processing Facility at Chanda Oil Field.
1. Review the contract documents (drawings and specification related to his discipline) and advises the
Construction Manager of any deficiency.
2. Review Contractor's submittals, related to his discipline, and ensure its compliance with concept design,
contract requirements and properly coordinated with other disciplines.
3. Review shop drawings, related to his discipline, and ensure its compliance with design requirements,
contract requirements, properly coordinated with other disciplines and submitted as per the approved
schedules.
4. Regular visits to Project site to ensure quality of work is in compliance with contract requirements, good
construction practice, only approved materials are used, compliance with shop drawings, and report any
deviations to Construction Manager.
5. Make sure that CONTRACTOR has submitted the Method Statement (MS), Quality Control Procedure (QCP)
and Inspection & Test Plan (ITP) prior to starting the relevant activity. Inspection & Test Plans and other
Quality Verification Forms address all necessary information outlined in the project specification or in the
Manufacturer recommendations.
6. Review and approval of Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan
(ITP) as submitted by Contractor and ensure its compliance with all contract requirements.
3-M/S SARFARAZ Hussain & Co
Job Title Civil engineer (Jun-2003-Jan -2004)
Job Duties Worked as a Civil Engineer in the local construction company.
1. Check and balance site progress, quality of work and site expenses.
2. Coordination with client engineer.
3. Prepare DPR and next day activities report .
4. Verification of invoices of subcontractor, checking and evaluation of new coming sites survey, soil
investigation and structure stability reports.
5. Checking and controlling basic structure for documents required for final acceptance including
Personal Profile:
F/Name: - Abdul Hakim
Date of Birth: - 12-03-1979
Domicile:- Karak-KPK
Nationality: - Pakistani
CNIC # :- 14202-1644433-3
Passport No: - BN 17443
LANGUAGES: English, Urdu, Pashto and Arabic

More Related Content

DOC
Gerry_Garciano_resume
DOC
Sachin parab
DOCX
Vince Winkler CV (Mar 16)
DOCX
Final Resume
DOC
Resume_SBA_180515
DOCX
Resume Gp
DOC
Resume
PDF
Moh CV Updated
Gerry_Garciano_resume
Sachin parab
Vince Winkler CV (Mar 16)
Final Resume
Resume_SBA_180515
Resume Gp
Resume
Moh CV Updated

What's hot (19)

PDF
Resume Gp
DOCX
Abi Ninan Joseph cv 10-01-2016
PDF
Resume Gp
DOCX
CV of KP Tomy
PDF
Tarek Gamil El Fergani_CV
PDF
Cv copy. khedr-c
DOCX
Vimal, Civil Engr CV
DOC
Santhan CV-2016
DOCX
DHAKSHINA MURTHY RESUME normal
DOCX
Updated CV of MUSA ELSHEIKH
PDF
CV for civil engineer (Updated)--- Alpesh Parmar
DOC
Asim_Siraj__Mechanical_updated
DOC
Mahmood Ibrahim Mansoor - Resume - Final 2
DOC
Peter L. Cabbab.
PDF
Updated CV
DOCX
CV- Abdullah Reddy Baddam
PDF
Raguram palnichamy jun 2019
PDF
Ranjith_Kumar R - CV
DOCX
CV AMINUL 19-05-2015
Resume Gp
Abi Ninan Joseph cv 10-01-2016
Resume Gp
CV of KP Tomy
Tarek Gamil El Fergani_CV
Cv copy. khedr-c
Vimal, Civil Engr CV
Santhan CV-2016
DHAKSHINA MURTHY RESUME normal
Updated CV of MUSA ELSHEIKH
CV for civil engineer (Updated)--- Alpesh Parmar
Asim_Siraj__Mechanical_updated
Mahmood Ibrahim Mansoor - Resume - Final 2
Peter L. Cabbab.
Updated CV
CV- Abdullah Reddy Baddam
Raguram palnichamy jun 2019
Ranjith_Kumar R - CV
CV AMINUL 19-05-2015
Ad

Viewers also liked (17)

DOCX
Online Assignment
PDF
Tradeshow Workbook
PDF
P3 Heuristics Act It Out
PDF
6A Slide Design Project
PPTX
гигиена зрения
PPT
San Francisco 4ever
PPTX
Dominos (Lesser known facts) freekaamaal
PPT
Campagne buzz & community marketing signée Modedemploi pour Floricienta - Car...
PPTX
Состав и действия объектов. Решение логических задач
PPTX
Единая информационно-образовательная среда как условие повышения качества о...
PDF
2016 olimpiad udirdamj
PPT
Презентация Международная Маркетинговая Группа
PDF
P4 Multiplication & Division Problem Sums
PPTX
Primary Sector: Forestry and Fishing
PDF
【Interop Tokyo 2016】 30年の実績と経験!シスコ スイッチ最新機能と伝統機能をご紹介
PDF
Presidential Precinct Brochure Pages Email
Online Assignment
Tradeshow Workbook
P3 Heuristics Act It Out
6A Slide Design Project
гигиена зрения
San Francisco 4ever
Dominos (Lesser known facts) freekaamaal
Campagne buzz & community marketing signée Modedemploi pour Floricienta - Car...
Состав и действия объектов. Решение логических задач
Единая информационно-образовательная среда как условие повышения качества о...
2016 olimpiad udirdamj
Презентация Международная Маркетинговая Группа
P4 Multiplication & Division Problem Sums
Primary Sector: Forestry and Fishing
【Interop Tokyo 2016】 30年の実績と経験!シスコ スイッチ最新機能と伝統機能をご紹介
Presidential Precinct Brochure Pages Email
Ad

Similar to Engr ilyas cv new (20)

DOC
Resume sba 180515
DOCX
CV Abdul Gaffer.docx revised (3)
DOCX
CV Abdul Gaffer.docx revised (3)
DOC
QA QC CIVIL
DOCX
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
DOCX
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
DOC
Ghullam murtaza cv (1)
DOC
CV Pholapatra Latest Rev 05
DOC
DOCX
jovy's RESUME
DOC
Ajay Resume
DOC
Arfat Resume 15-03-2016
PDF
Civil Engineer Hassan Shafeeq CV
DOCX
Amir QC
PDF
C.V. of Mohamed Sherif Hegazi
DOCX
Responsibilities as vice president projects at jacobs 1.9.16
PDF
c.v M_Helal 8-2016
DOC
my_cv_WP
DOCX
Mohamed El Hadi ADJABI 2016
Resume sba 180515
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
QA QC CIVIL
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Ghullam murtaza cv (1)
CV Pholapatra Latest Rev 05
jovy's RESUME
Ajay Resume
Arfat Resume 15-03-2016
Civil Engineer Hassan Shafeeq CV
Amir QC
C.V. of Mohamed Sherif Hegazi
Responsibilities as vice president projects at jacobs 1.9.16
c.v M_Helal 8-2016
my_cv_WP
Mohamed El Hadi ADJABI 2016

Recently uploaded (20)

PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Software Engineering and software moduleing
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
Current and future trends in Computer Vision.pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
737-MAX_SRG.pdf student reference guides
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Fundamentals of Mechanical Engineering.pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Software Engineering and software moduleing
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Current and future trends in Computer Vision.pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
737-MAX_SRG.pdf student reference guides
Exploratory_Data_Analysis_Fundamentals.pdf
Categorization of Factors Affecting Classification Algorithms Selection
Soil Improvement Techniques Note - Rabbi
Information Storage and Retrieval Techniques Unit III
R24 SURVEYING LAB MANUAL for civil enggi
distributed database system" (DDBS) is often used to refer to both the distri...
CURRICULAM DESIGN engineering FOR CSE 2025.pptx

Engr ilyas cv new

  • 1. MUHAMMAD ILYAS Civil Engineer (M.Sc Civil, B.Sc Civil, BSS, NEBOSH-IGC ,PM,CM) Cell # +92-345-8531855, 345-9803117 Email: engrilyasktk@gmail.com I have diversified more than 14years professional experience in the Oil & Gas (E&P) industry from concept to complete facility (FEED to Commissioning). Have managed and worked with million dollars complex projects and have implemented them successfully with efficiency and quality. Have expertise in Project Designing, Management, Execution, Cost estimation, Negotiations for projects of Processing Plants, Pipe Lines, Well Heads, Valve Assemblies, Water Treatment Plants and Infrastructure Development(Roads, Buildings, water supply schemes, Basic Health Units schools) as well as well experienced in Project/Construction Management, HSE and QA&QC. Key positions worked:- 1- Site Manager at Pak Arab Refinery Project (1 ½ years) 2- Site incharge at Well Heads facility (5 years) 3- Lead Civil (11.3years) Expertise:- 1- Project and Construction Management 2- Oil & Gas Plant and Pipe Line Construction 3- Estimation and Invoicing 4- FEED and Feasibility study 5- QA/QC 6- Health, Safety and Environment 7- Infrastructure and Community Development Education and Qualification:- 1- M.Sc in Civil (Environmental)Engineering from UET Peshawar-PAKISTAN (2006 -2009) (www.nwfpuet.edu.pk) 2- B.Sc in Civil Engineering from UET Peshawar-PAKISTAN (1997-2002) (www.nwfpuet.edu.pk) 3- Bachelor in social sciences from University of Peshawar-PAKISTAN (1998-2000) (www.uopesh.edu.pk) 4- NEBOSH-IGC UK (P) www.nebosh.org.uk MEMBERSHIP OF PROFESSIONAL SOCIETIES OF ENGINEERS AND SAFETY 1. Pakistan Engineering Council as Professional Engineer (Reg # CIVIL/23893) (www.pec.org.pk) 2. National Examination Board of Occupational Safety and Health–UK (NEBOSH IGC) (Student number: 00170441) (www.nebosh.org.uk) Management Courses 1- Project Management. 2- Construction Management 3- Disaster and risk Management 4- Communication and Presentation Skills. 5- 7-Habbits (Leadership Skills) Professional Courses 1- MS Primavera 2- SAP (Structural Analysis Program) 3- AutoCAD 4- MS Office 5- NEBOSH IGS (Health, Safety and Environment) 6- Firefighting 7- Emergency First Aid
  • 2. Employement History: 1 MOL PAKISTAN Oil & Gas Co B.V Job Title: Sr.Construction Engineer (Head Civil) (December-2004-Till date) General Responsibilities 1. Define scope of work for projects; review design proposals; conduct preconstruction meetings; meet with engineers, other agencies and other departments to resolve problems pertaining to design. 2. Meets construction budget by exercising strict control over project cost, schedules and expenditures, checks and authorizes all claims for payment from all sub-contractors involved in the project to assure accuracy and that proper contractual obligations are met, verify incoming invoices for payment. 3. Accomplishes construction human resource objectives by selecting, orienting, training, assigning, scheduling, coaching, counseling, and disciplining employees working in the construction area, communicates job expectations to the employees; plans, monitors, appraises job contributions, recommends compensation actions to the Project Implementation Manager. 4. Reviews critical design drawings of the project before passing them for use to the Superintendent or Site Supervisor, directs and supervises project engineers in the performance of all aspects of their work, reviews all Work Instructions before they are approved by the Project Manager. 5. Establishes execution standards and protocols, allocates resources, schedules and coordinates staff and sub- contractors, evaluates milestone assumptions and conclusions. 6. Resolves design problems emerging during construction in consultation with the Design Manager, evaluates and implements change orders after approval. 7. Monitors the construction schedule and progress on a daily, weekly and monthly basis and provides input to the regular reports of the Project Manager, discusses and resolves daily site problems with site supervisors. 8. Participates in or (subject to the Project Manager’s delegation) leads in discussion of all contractual matters related to sub-contractors employed in the project, monitors and controls performance (e.g. approves/rejects work packages, submitted by project engineers) at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings. 9. Plan, coordinate and actively participate in the preparation of FEED study, Detail Design and “Technical Specifications and Proposals” for EPCC Projects such as Process Plants, Valve Assemblies, Well Heads, Pipe Line, Buildings, Storm drains and related structures; review work in progress and submit finished products to the Head Office. 10. Planning, and executing Civil / Structural engineering as well as underground piping. This entails overseeing the preparation of basic design, FEED and detailed design. 11. Coordinates various activities relating to site hand over and mobilization of contractors following contract award. Includes coordinating the placement of the contractor's site office, material storage area and camp as applicable, location of mobile equipment, arranging for access to stores and any other matters required to assist contractor in the orderly mobilization of facilities, equipment and manpower to site 12. Planning and implementation of the Project to ensure that deliverables are issued on schedule, project milestone dates are met, and given tasks are completed within the allowed budget; Prepare of scope of work, man-hours distribution; Selection of resources in consultation with H.O.D to meet the specific job requirements. 13. BOQs, Specifications and Tender documents for new projects. 14. Monitoring of job progress, identifying slippage and short comings and setting solutions and remedies in consultation with Project Managers (and H.O.D, if required). 15. Identifying codes and standards, providing technical expertise to the task force and enforcing quality assurance requirements of company. 16. Ensuring that the design is carried out as per the industry standard practices and in conformance with the quality management system. 17. Assisting in the preparation of project proposals and tenders in what relates to Civil Engineering design; proposals and preliminary design during tenders for MTO purposes. 18. Identification of issues that impede project progress and reporting to Project Managers / Discipline Heads.
  • 3. 19. Resolve disputes; handle claims by/against with the Contractor in liaison with Company Site Representative and Contractor Representative. 20. Prepare and send Daily Progress Report and Next Day Planning of all ongoing projects to all heads and key personnel. HSE Responsibilities (NEBOSH IGC -UK Qualified) 1. MOL Group HSE management system compliance. 2. Ensure day-to-day work is performed effectively, efficiently, and safely in order to increase plant profit, enhance plant reliability/integrity, and promote safety & compliance to environmental standards. 3. Supervise the development, implementation, coordination and monitoring of scheduled turnaround plans to ensure engineering requirements and operational objectives are being met while utilizing all resources in the most timely and cost effective manner possible. 4. Lead the execution of planned and unplanned unit shutdowns including job plans and critical path schedule development, and tracking and closeout activities. 5. Supervise all aspects of turnarounds and major shutdowns, and ensure compliance to quality, environment and all health and safety aspects. 6. Coordinate with maintenance and operations division for the development of work priorities, identification of required resources, assigning roles and responsibilities, agreeing on schedules and development of estimated budgets and expected outcomes. 7. Participate and review of Task Risk Assessment (TRA), Job Safety Analysis (JSA) prior to start of each jobs. 8. Educate and guide work force regarding Work Permit, Working at Height, Defensive Driving, Emergency Drill, Hazard Identification and Control, Confine Space and Working at night. 9. Notify incident and participate in investigation. Participate and conduct contractor inspection and audits. 10. Contributing towards, maintaining and implementing both company and International HSE Management System objectives and procedures. 11. Guide and educate the contractor staff about the basic HSE requirements corresponding to the work they are performing. 12. Guide, educate and implement the MOL Group PTW system at all locations. QA&QC Responsibilities 1. Prepare Quality Inspection Plans (QIPs) and Method Statement (MS) for all civil works. Perform civil quality inspection activities in accordance with the Project Quality plan and ISO, ASTM, AASHTO, ACI, IBC and other BS Standards. 2. Preparing and attending all preparatory and follow-up meetings, coordination meetings, conducting third party inspections. To prepare the ITP for the projects according the project scope. 3. Establishing site laboratory, concrete batching plant, performing calibration of the equipments and scale, and managing operations of site laboratory and the batching plant in accordance with the quality requirements. 4. Conducting material tests, concrete cube testing etc at site laboratory in witness with the independent laboratory. 5. Implementing Quality management system on the projects as per the project specifications and the requirements, through RFI, IR, MR, SO, NCR etc. 6. Assisting in developing Quality control plans and obtaining approvals from client representative 7. Conducting all QC site inspections through RFI and closing the RFI and maintaining the log and issuing the records 8. Assisting in preparing and implementing Inspection Test plans and test procedures on projects as per the project specifications and requirements 9. Holding meetings with the subcontractors / suppliers related to the quality issues and its compliance in accordance with the project requirements and the QA/QC Plan. 10. Conducting internal audits and third party inspections as per the requirements and Issuing corrective plans and preventive plans to comply the non conformances on the project. 11. Ensure document control system is maintained on the projects as per the quality system and the project requirements, such as document numbering and archiving 12. Administering team of QC engineers and inspectors and monitor the QC implantation on site in accordance to the project specifications and procedures. 13. Administering the Site laboratory and conducting the QA/QC procedures in coordinating / witness with independent agencies / third party.
  • 4. 14. Maintaining all the QA/QC documents flow in an organized effective manner and close all the open listing of documents immediately. 15. Organizing and establishing pre-inspection meetings and coordination of source inspections. 16. Review manufacture / Vendor quality plan and conducting vendor / factory inspections and Factory acceptance tests (FAC) 2- MARATHON Construction Co. (Oil and Gas Development Project) Job Title Site Engineer (Feb-2004-November-2004) Job Duties Working as a site civil engineer in the leading organization of OGDCL in the Construction of big LPG plant Processing Facility at Chanda Oil Field. 1. Review the contract documents (drawings and specification related to his discipline) and advises the Construction Manager of any deficiency. 2. Review Contractor's submittals, related to his discipline, and ensure its compliance with concept design, contract requirements and properly coordinated with other disciplines. 3. Review shop drawings, related to his discipline, and ensure its compliance with design requirements, contract requirements, properly coordinated with other disciplines and submitted as per the approved schedules. 4. Regular visits to Project site to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report any deviations to Construction Manager. 5. Make sure that CONTRACTOR has submitted the Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP) prior to starting the relevant activity. Inspection & Test Plans and other Quality Verification Forms address all necessary information outlined in the project specification or in the Manufacturer recommendations. 6. Review and approval of Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP) as submitted by Contractor and ensure its compliance with all contract requirements. 3-M/S SARFARAZ Hussain & Co Job Title Civil engineer (Jun-2003-Jan -2004) Job Duties Worked as a Civil Engineer in the local construction company. 1. Check and balance site progress, quality of work and site expenses. 2. Coordination with client engineer. 3. Prepare DPR and next day activities report . 4. Verification of invoices of subcontractor, checking and evaluation of new coming sites survey, soil investigation and structure stability reports. 5. Checking and controlling basic structure for documents required for final acceptance including Personal Profile: F/Name: - Abdul Hakim Date of Birth: - 12-03-1979 Domicile:- Karak-KPK Nationality: - Pakistani CNIC # :- 14202-1644433-3 Passport No: - BN 17443 LANGUAGES: English, Urdu, Pashto and Arabic