1. The document discusses issues with using 2D drawings and conventional planning methods for construction scheduling, as they lack visualization capabilities and do not fully capture the relationships between activities.
2. It introduces BIM-based 4D modeling as an alternative that develops a 4D model combining a 3D model with time information. 4D modeling improves perception of schedules and facilitates planning by automatically detecting clashes and identifying parallel activities.
3. The research was conducted through a questionnaire survey of construction companies in Singapore to examine the benefits of using BIM-based applications for construction planning and scheduling.