SlideShare a Scribd company logo
Extension of Time (EOT) and Related Costs
in Construction
© www.asia-masters.com
•Time is of Essence
•Delays are inevitable on construction projects
•The only project to have completed on time is a Mosque. Divine
intervention (or God’s help) was understood to be the force behind the
timely completion of this Mosque.
•Time and Money go hand-in-hand. When projects get late, additional
costs are incurred.
•This makes it imperative to take control of project delays; timely and
effectively.
© www.asia-masters.com
•Majority of construction projects worldwide are administered by the
FIDIC forms of contract.
•FIDIC recognises delay and related costs and has provisions related
thereto. For example;
 Sub-Clauses 8.4 & 20.1 (FIDIC 1999 Edition)
 Clauses 44 & 53 (FIDIC 1987 Edition)
FIDIC
FIDIC
FIDIC
FIDIC
FIDIC
© www.asia-masters.com
The FIDIC Provisions define the conditions where delay may be
claimed as the basis for an Extension of Time (EOT). Some examples are;
 Late provision of design or drawings
 Unforeseeable Physical Conditions encountered on Site
 Inclement Weather
 Variations instructed by the Engineer (Additional Works etc.)
© www.asia-masters.com
Meanwhile the principles of how delay and related
costs should be calculated are not defined by FIDIC.
This leads to issues; issues which are usually
contentious due to various 'schools of thoughts' and
varied interpretations existing worldwide.
Disputes are the usual outcome.
© www.asia-masters.com
Contentious Issues in Delay Analysis
resulting in Disputes
– Critical Path
– Who owns the Float?
– Concurrent (or Contractor) Delays and how these effect
Entitlement
– EOT and its relation with Compensation for Delay
– Which is the best Method of Delay Analysis?
» As-Planned Vs. As-Built Comparison
» Impacted As-Planned
» Collapsed As-Built / But-For
» Time Slice / Sub-Networks / Time-Impact
» Etc.
© www.asia-masters.com
In order to eliminate disputes or facilitate settlement of
disputes, there are now certain standards used worldwide.
The leading standards are;
 Society of Construction Law’s
Delay and Disruption Protocol (SCL Protocol)
 AACE 29R-03 (Forensic Schedule Analysis)
© www.asia-masters.com
The SCL Protocol was
finalized in October 2002 after
several years of deliberations
and considerable debate and
agreement between experts
from different backgrounds
© www.asia-masters.com
The objective of the SCL Protocol
was to bring reasonableness and
fairness into the delay assessment
process and to eliminate
widespread manipulation of
complex delay issues
© www.asia-masters.com
The SCL Protocol tried to standardize
the issues such that disputes would be
reduced or eliminated
© www.asia-masters.com
It is recommended that;
should be adopted as a Standard
and should be, where possible,
incorporated in the Construction
Contracts
© www.asia-masters.com
The SCL Protocol can be downloaded from:
www.eotprotocol.com
© www.asia-masters.com
The remaining slides of this lecture will
review and discuss the basic Principles
suggested and recommended by the
SCL Protocol
© www.asia-masters.com
Basic Principles
suggested and recommended by
the SCL Protocol
© www.asia-masters.com
The Principles suggested by the
SCL Protocol are simple.
Some of the key principles suggested
by the Protocol are;
© www.asia-masters.com
RULE NO. 1
If there is an Employer’s delay, which is beyond the Contractor’s
control, and if this delay impacts the Completion Date of the Works,
the Contractor should be entitled to receive an
Extension of Time (EOT).
[This will effectively result in an extended Time for Completion and will
relieve the Contractor from having to pay penalties for delay (or
Delay Damages under FIDIC)]
© www.asia-masters.com
RULE NO. 2
For the case of recovery of delay (or prolongation) costs incurred due to
the Employer delays, the Contractor must be able to prove that there has
been no other delay, which is in his own control, and which is equally
(or partly) contributing for delaying the Time for Completion.
This category of delay is called a ‘Concurrent’
(or Contractor’s) Delay
[In order to win a Delay Costs Claim, the Contractor must be able to
prove that he has not been responsible for Concurrent Delays to
the Time for Completion]
© www.asia-masters.com
RULE NO. 3
Where Contractor’s Delay to Completion
occurs concurrently with Employer’s Delay
to Completion, the Contractor’s concurrent
delay should NOT reduce any
Extension of Time (EOT), which is due.
[Result of Rule No. 1 will not change and is irrespective of the result
of Rule No. 2]
© www.asia-masters.com
The foregoing Rules proposed by the SCL Protocol are
meant to bring fairness and reasonableness into the
delay assessment process.
[The emphasis of the SCL Protocol is that no one Party
should benefit from default of the other Party]
© www.asia-masters.com
The Illustrations demonstrating the principles of the SCL
Protocol are contained in the following Figures A to G
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Path 1 Float = 3.5 Weeks
Path 2 Float = 5.5 Weeks
Path 2
Figure A - Accepted Contract Programme
Weeks
Path 1
Contract Start
Date
Contract
Completion Date
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
Path 1 Float = 3.0 Weeks
Path 2 Float = 5.5 Weeks
AFTER EXCUSABLE DELAY
Excusable Delay
Path 1 Float = 1.0 Week
Path 2 Float = 5.5 Weeks
(a) 2.0 Weeks (a) 5.5 Weeks
(b) 1.0 Weeks (b) 0 Weeks
(c) 0 Weeks (c) 1.0 Weeks
(d) 5.5 Weeks (d) 2.0 Weeks
(a) 2.0 Weeks (a) 0.1% of Contract Price
(b) 1.0 Weeks (b) Direct Costs of Excusable Delay
(c) 0 Weeks (c) NIL
(d) 5.5 Weeks (d) (a) plus (b)
<=Date of Excusable Delay
Figure B - Delay Impact 1
Weeks
Path 1
Contract Start
Date
Contract
Completion Date
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
Contract
Completion Date
Impact on Path 1
= 2.0 Weeks
Path 2
Path 1
Principles & Provisions of the SCL Protocol
relevant to Figure B
Core Principle No. 7 - Float as it relates to time
Unless there is express provision to the contrary in the contract, where there is remaining
float in the programme at the time of an Employer Risk Event, an EOT should only be
granted to the extent that the Employer Delay is predicted to reduce to below zero the total
float on the activity paths affected by the Employer Delay.
Guidance Section 1.12.1
If as a result of an Employer Delay, the Contractor is prevented from completing the works
by the Contractor’s planned completion date (being a date earlier than the contract
completion date), the Contractor should in principle be entitled to be paid the costs
directly caused by the Employer Delay, notwithstanding that there is no delay to the
contract completion date (and therefore no entitlement to an EOT), provided also that at
the time they enter into the contract, the Employer is aware of the Contractor’s intention to
complete the works prior to the contract completion date, and that intention is realistic and
achievable.
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
Path 1 Float = 3.0 Weeks
Path 2 Float = 5.5 Weeks
AFTER EXCUSABLE DELAY
Excusable Delay
Float = -0.5 Week
(a) 0.5 Weeks (a) 5.5 Weeks
(b) 3.5 Weeks (b) 0.5 Weeks
(c) 0 Weeks (c) 3.5 Weeks
(d) 5.5 Weeks (d) 0 Weeks
(a) 3.5 Weeks (a) 0.15% of Contract Price
(b) 0.5 Weeks (b) Direct Costs of Excusable Delay
(c) 0 Weeks (c) (a) plus (b)
(d) 3.0 Weeks (d) NIL
Contract
Completion Date
Impact on Path 1
= 3.5 Weeks
Path 2
Path 1
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
<=Date of Excusable Delay
Figure C - Delay Impact 2
Weeks
Path 1
Contract Start
Date
Contract
Completion Date
Core Principle No. 4 - Procedure for granting extension of time
The EOT should be granted to the extent that the Employer Risk Event is
reasonably predicted to prevent the works being completed by the then
prevailing contract completion date…..The goal of the EOT procedure is
the ascertainment of the appropriate contractual entitlement to an EOT; the
procedure is not to be based on whether or not the Contractor needs an
EOT in order not to be liable for liquidated damages.
Core Principle No. 5 – Effect of delay
For an EOT to be granted, it is not necessary for the Employer Risk Event
already to have begun to affect the Contractor’s progress with the works,
or for the effect of the Employer Risk Event to have ended.
Principles & Provisions of the SCL Protocol
relevant to Figure C
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
Path 1 Float = 3.0 Weeks
Path 2 Float = 5.5 Weeks
AFTER EXCUSABLE DELAY
Float = -0.5 Week
Excusable Delay
Impact on Path 2 = 6.0 Weeks
(a) 0 Weeks (a) 5.5 Weeks
(b) 6.0 Weeks (b) 0 Weeks
(c) 0.5 Weeks (c) 6.0 Weeks
(d) 5.5 Weeks (d) 0.5 Weeks
(a) 3.5 Weeks (a) (d) minus (c)
(b) 0.5 Weeks (b) Direct Costs of Excusable DelayNIL
(c) 6.0 Weeks (c) Direct Costs of Excusable Delay
(d) 3.0 Weeks (d) 0.2% of Contract Price
<=Date of Excusable Delay
Figure D - Delay Impact 3
Weeks
Path 1
Contract Start
Date
Contract
Completion Date
Path 2
Path 1
Contract
Completion Date
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
Core Principle No. 4 - Procedure for granting extension of time
The EOT should be granted to the extent that the Employer Risk Event is
reasonably predicted to prevent the works being completed by the then
prevailing contract completion date…..The goal of the EOT procedure is
the ascertainment of the appropriate contractual entitlement to an EOT; the
procedure is not to be based on whether or not the Contractor needs an
EOT in order not to be liable for liquidated damages.
Core Principle No. 5 – Effect of delay
For an EOT to be granted, it is not necessary for the Employer Risk Event
already to have begun to affect the Contractor’s progress with the works,
or for the effect of the Employer Risk Event to have ended.
Principles & Provisions of the SCL Protocol
relevant to Figure D
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
Contract Completion Date
Float = -1.5 Weeks
AFTER EXCUSABLE DELAY
Contract Completion Date
Excusable Delay
Impact on Path 1 = 2.0 Weeks
Float = -3.5 Weeks
(a) 3.5 Weeks (a) 2.0 Weeks
(b) 2.0 Weeks (b) 0 Weeks
(c) 1.5 Weeks (c) 3.5 Weeks
(d) 0 Weeks (d) 1.5 Weeks
(a) 3.5 Weeks (a) (c) plus (d)
(b) 2.0 Weeks (b) Direct Costs of Excusable DelayNIL
(c) 3.0 Weeks (c) Direct Costs of Excusable Delay
(d) 0 Weeks (d) 0.1% of Contract Price
Figure E - Delay Impact 4
Weeks
Path 1
Contract Start
Date
<=Date of Excusable Delay
Path 2
Path 1
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
Guidance Section 1.2.11
…an EOT should be granted to the extent that the Employer Risk Event is
predicted to prevent the works being completed by the then prevailing
contract completion date. This process requires consideration of the
available float…
Guidance Section 1.4.12
…Where there has been Employer Delay, this may prevent the Employer
charging the Contractor with LDs for failure to achieve a contract
completion date…
Principles & Provisions of the SCL Protocol
relevant to Figure E
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
<=Date of Excusable Delay
Contract Completion Date
Float = -1.5 Weeks
AFTER EXCUSABLE DELAY
Contract Completion Date
Impact on Path 1 = 2.0 Weeks
Excusable Delay
Float = -3.5 Weeks
(a) 2.0 Weeks (a) 0 Weeks
(b) 3.5 Weeks (b) 2.0 Weeks
(c) 1.5 Weeks (c) 3.5 Weeks
(d) 0 Weeks (d) 1.5 Weeks
(a) 3.5 Weeks (a) (c) plus (d)
(b) 2.0 Weeks (b) Direct Costs of Excusable DelayNIL
(c) 3.0 Weeks (c) Direct Costs of Excusable Delay
(d) 0 Weeks (d) 0.1% of Contract Price
Figure F - Delay Impact 5
Weeks
Path 1
Contract Start
Date
Path 2
Path 1
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
Guidance Section 1.4.8
Where an Employer Risk Event occurs after the contract completion date, in a
situation where failure to complete by the contract completion date has been caused
by Contractor Delays, the principle set out in Section 1.4.7 above should apply,
except where the Employer Risk Event is a non-compensable Employer Risk Event.
In such an event, no EOT (or compensation) should be due. Where an EOT is due
after the contract completion date, the Employer Risk Event does not exonerate the
Contractor for all its delays prior to the Employer Risk Event occurring. The effect
of the Employer Risk Event should be assessed as described above and any EOT
found due should simply be added to the contract completion date.
Principles & Provisions of the SCL Protocol
relevant to Figure F
© www.asia-masters.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS)
<=Date of Excusable Delay
Contract Completion Date
Float = -1.5 Weeks
Path 2 Float = 2.5 Weeks
AFTER EXCUSABLE DELAY
Contract Completion Date
Float = -1.5 Weeks
Excusable Delay = 3.5 Weeks
(a) 2.5 Weeks (a) 0 Weeks
(b) 3.5 Weeks (b) 2.5 Weeks
(c) 1.0 Weeks (c) 3.5 Weeks
(d) 1.5 Weeks (d) 1.5 Weeks
(a) 0 Weeks (a) (b) plus (d)
(b) 2.0 Weeks (b) Direct Costs of Excusable Delay
(c) 3.0 Weeks (c) NIL
(d) 3.5 Weeks (d) 0.2% of Contract Price
Path 1
Path 2
(3) Compensation for Delay to
Progress
(1) EOT Entitlement (2) Period of Prolongation Costs
(4) Other Compensation
Figure G - Delay Impact 6
Weeks
Path 1
Contract Start
Date
Path 2
Guidance Section 1.4.1
Where Contractor Delay to Completion occurs concurrently with Employer Delay to
Completion, the Contractor’s concurrent delay should not reduce any EOT due.
Guidance Section 1.4.7
Where Employer Risk Events and Contractor Risk Events occur sequentially but
have concurrent effects, here again any Contractor Delay should not reduce the
amount of EOT due to the Contractor as a result of the Employer Delay.
Concurrency (Appendix A – Definations and Glossary)
True concurrent delay is the occurrence of two or more delay events at the same
time, one an Employer Risk Event, the other a Contractor Risk Event and the effects
of which are felt at the same time. The term ‘concurrent delay’ is often used to
describe the situation where two or more delay events arise at different times, but
the effects of them are felt (in whole or in part) at the same time. To avoid
confusion, this is more correctly termed the ‘concurrent effect’ of sequential delay
events.
Principles & Provisions of the SCL Protocol
relevant to Figure G – Slide 1/2
© www.asia-masters.com
Core Principle No. 9 - Concurrent delay – its effect on entitlement to extension of time
Where Contractor Delay to Completion occurs or has effect concurrently with Employer
Delay to Completion, the Contractor’s concurrent delay should not reduce any EOT
due.
Core Principle No. 14 - Link between extension of time and compensation
Entitlement to an EOT does not automatically lead to entitlement to compensation (and
vice versa).
Core Principle No. 10 - Concurrent delay – its effect on entitlement to compensation for
prolongation
If the Contractor incurs additional costs that are caused both by Employer Delay and
concurrent Contractor Delay, then the Contractor should only recover compensation to
the extent it is able to separately identify the additional costs caused by the Employer
Delay from those caused by the Contractor Delay. If it would have incurred the
additional costs in any event as a result of Contractor Delays, the Contractor will not be
entitled to recover those additional costs.
Principles & Provisions of the SCL Protocol
relevant to Figure G – Slide 2/2
© www.asia-masters.com
Guidance Section 3.2.13
Although the programme should be the primary tool for guiding the
CA in his determination of EOT, it should be used in conjunction
with the contemporary evidence to ensure that the resulting EOT is
fair and reasonable. It will also be necessary for the parties to apply
common sense and experience to the process to ensure that all
relevant factors are taken into account, and that any anomalous
results generated by the programme analysis are managed properly.
Key Guideline, Suggestion and Advice of the
SCL Protocol
© www.asia-masters.com
Figure No. Question 1 Question 2 Question 3 Question 4
B (c) (b) (a) (b)
C (a) (b) (d) (b)
D (c) (d) (d) (c)
E (b) (a) (d) (c)
F (a) (b) (d) (c)
G (c) (a) (a) (b)
Correct Responses for Figures B to G
© www.asia-masters.com
Congratulations we
have come to the end of
the Lecture.
You are now a
Qualified and Certified
Delay Claims Analyst
and Expert.
© www.asia-masters.com
FIDIC and Construction Solutions
thank you for your attendance and contribution.
We wish you all Good Luck.
© www.asia-masters.com
THANK YOU!
© www.asia-masters.com

More Related Content

PPTX
Extension of time (E.O.T) By Ahmed Ibarhim
PDF
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
PPTX
Eot claims hr__may2012
PDF
Time Impact Analysis
PDF
Claims
PPTX
Extension of time Analysis
PDF
EOT Related Cost Compensation Determination
PDF
Delay analysis ... wise after the event.
Extension of time (E.O.T) By Ahmed Ibarhim
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Eot claims hr__may2012
Time Impact Analysis
Claims
Extension of time Analysis
EOT Related Cost Compensation Determination
Delay analysis ... wise after the event.

What's hot (20)

PPTX
VERTEX Construction Delays and Forensic Schedule Analyses
PDF
Delay Analysis and Concurrent Delay
PDF
Essentials of EOT Claims
PDF
Extension of Time (EoT) in Construction Project presentation
PDF
Prolongation and HOOH Costs
PPTX
Construction Delay Analysis, Simplified
PDF
Epc project interdepency and Work Flow- promo
PDF
Training fidic moustafa ismail 2017 _ lec 4
PDF
Claims 20.1 (Flow chart)
PDF
Project Scheduling & Controls
PPT
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
PPTX
Quantify Construction Damages related to Delay, disruption, and inefficiencies
PPTX
Time management in fidic red book 2017(prmg080 project)
PDF
Favorite Delay Analysis Methodologies Town Hall SEI
PPTX
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
PPTX
Ppt on fidic claims
PPTX
Construction Claims Explained
PDF
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
PPTX
Extension of time in construction contracts
VERTEX Construction Delays and Forensic Schedule Analyses
Delay Analysis and Concurrent Delay
Essentials of EOT Claims
Extension of Time (EoT) in Construction Project presentation
Prolongation and HOOH Costs
Construction Delay Analysis, Simplified
Epc project interdepency and Work Flow- promo
Training fidic moustafa ismail 2017 _ lec 4
Claims 20.1 (Flow chart)
Project Scheduling & Controls
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Time management in fidic red book 2017(prmg080 project)
Favorite Delay Analysis Methodologies Town Hall SEI
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
Ppt on fidic claims
Construction Claims Explained
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Extension of time in construction contracts
Ad

Similar to Extension of Time (EOT) & Related Costs in Construction - Presentation Slides (20)

PPTX
FIDIC Lecture - EOT & Related Costs in Construction.pptx
PDF
Concurrent Delay in Construction
PPTX
Professional practice 2
PPTX
Professional Practice II - Presentation - Construction Delays & EOT
PDF
Concurrent Delay in Construction - NCMA 2024
PPTX
Literature review on_ extension of time
PDF
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
PDF
Scl delay protocol_2nd_edition_final
PDF
Scl delay protocol_2nd_edition_final
PDF
Managing the Risks of Delay in Construction Projects
PDF
The saga of concurrent delay vol. iv issue no. 4
PDF
Project Controls Expo 2012 - Litigation & Claims Facts & Figures By Paul Loma...
PPT
Claims in Contract - For FIDIC 1999 .ppt
PDF
PP2 - Seminar Presentation
PDF
Concurrent_Delay_Analysis_Best_Practice_1631211329.pdf
PDF
Why does an eot not automatically entitle a contractor to prolongation costs ...
DOCX
Cl compilation
PDF
Claims Management, Extension of Time (EOT) and Delays Analysis
PPTX
FIDIC-Relevant to Time Management
PDF
IRJET- Delay in Construction its Causes and Mitigation: A Review
FIDIC Lecture - EOT & Related Costs in Construction.pptx
Concurrent Delay in Construction
Professional practice 2
Professional Practice II - Presentation - Construction Delays & EOT
Concurrent Delay in Construction - NCMA 2024
Literature review on_ extension of time
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
Scl delay protocol_2nd_edition_final
Scl delay protocol_2nd_edition_final
Managing the Risks of Delay in Construction Projects
The saga of concurrent delay vol. iv issue no. 4
Project Controls Expo 2012 - Litigation & Claims Facts & Figures By Paul Loma...
Claims in Contract - For FIDIC 1999 .ppt
PP2 - Seminar Presentation
Concurrent_Delay_Analysis_Best_Practice_1631211329.pdf
Why does an eot not automatically entitle a contractor to prolongation costs ...
Cl compilation
Claims Management, Extension of Time (EOT) and Delays Analysis
FIDIC-Relevant to Time Management
IRJET- Delay in Construction its Causes and Mitigation: A Review
Ad

More from Asia Master Training آسيا ماسترز للتدريب والتطوير (20)

PPT
Human Resource Management : The Importance of Effective Strategy and Planning
PPT
Purpose of Contract CloseOuts - Overview Landscape
PPT
Public Meeting - Contract Close-Out - Ground Rules
PPT
NATIONAL AUDIT – FIDIC CONTRACTS: BASIS OF FAIR CONTRACT
PPTX
OPTICAL INDUSTRY - Design Engineering Fabrication Testing
PPTX
Microsoft Word 2010 - Technical Skills Training
PPTX
Microsoft® Office Word 2007 Skills & Compentencies Training
PPTX
PPT
Competency Approach to Human Resource Management
PPT
Developing a University-Wide Integrated Employee Core Competency Framework
PPT
Competency-based Management for the DoD-wide Contracting Community
PPT
COMPETENCY-BASED CURRICULUM DEVELOPMENT - Method & Teaching
PPT
The Counseling Interview - Principles & Practices
PPT
Behavioral Interview - Selecting Quality Employees for a Quality Organization
PPT
Effective Hiring Practices - Recruiting the Best Person
PPT
Industrial & Organisational Psychology Selecting Employees
Human Resource Management : The Importance of Effective Strategy and Planning
Purpose of Contract CloseOuts - Overview Landscape
Public Meeting - Contract Close-Out - Ground Rules
NATIONAL AUDIT – FIDIC CONTRACTS: BASIS OF FAIR CONTRACT
OPTICAL INDUSTRY - Design Engineering Fabrication Testing
Microsoft Word 2010 - Technical Skills Training
Microsoft® Office Word 2007 Skills & Compentencies Training
Competency Approach to Human Resource Management
Developing a University-Wide Integrated Employee Core Competency Framework
Competency-based Management for the DoD-wide Contracting Community
COMPETENCY-BASED CURRICULUM DEVELOPMENT - Method & Teaching
The Counseling Interview - Principles & Practices
Behavioral Interview - Selecting Quality Employees for a Quality Organization
Effective Hiring Practices - Recruiting the Best Person
Industrial & Organisational Psychology Selecting Employees

Recently uploaded (20)

PPT
Teaching material agriculture food technology
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Machine learning based COVID-19 study performance prediction
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
Electronic commerce courselecture one. Pdf
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Review of recent advances in non-invasive hemoglobin estimation
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Encapsulation theory and applications.pdf
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
NewMind AI Monthly Chronicles - July 2025
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
Teaching material agriculture food technology
The Rise and Fall of 3GPP – Time for a Sabbatical?
Machine learning based COVID-19 study performance prediction
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
Electronic commerce courselecture one. Pdf
Advanced methodologies resolving dimensionality complications for autism neur...
Chapter 3 Spatial Domain Image Processing.pdf
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Diabetes mellitus diagnosis method based random forest with bat algorithm
Review of recent advances in non-invasive hemoglobin estimation
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Encapsulation theory and applications.pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
NewMind AI Monthly Chronicles - July 2025
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Per capita expenditure prediction using model stacking based on satellite ima...
Dropbox Q2 2025 Financial Results & Investor Presentation
Spectral efficient network and resource selection model in 5G networks
Mobile App Security Testing_ A Comprehensive Guide.pdf

Extension of Time (EOT) & Related Costs in Construction - Presentation Slides

  • 1. Extension of Time (EOT) and Related Costs in Construction © www.asia-masters.com
  • 2. •Time is of Essence •Delays are inevitable on construction projects •The only project to have completed on time is a Mosque. Divine intervention (or God’s help) was understood to be the force behind the timely completion of this Mosque. •Time and Money go hand-in-hand. When projects get late, additional costs are incurred. •This makes it imperative to take control of project delays; timely and effectively. © www.asia-masters.com
  • 3. •Majority of construction projects worldwide are administered by the FIDIC forms of contract. •FIDIC recognises delay and related costs and has provisions related thereto. For example;  Sub-Clauses 8.4 & 20.1 (FIDIC 1999 Edition)  Clauses 44 & 53 (FIDIC 1987 Edition) FIDIC FIDIC FIDIC FIDIC FIDIC © www.asia-masters.com
  • 4. The FIDIC Provisions define the conditions where delay may be claimed as the basis for an Extension of Time (EOT). Some examples are;  Late provision of design or drawings  Unforeseeable Physical Conditions encountered on Site  Inclement Weather  Variations instructed by the Engineer (Additional Works etc.) © www.asia-masters.com
  • 5. Meanwhile the principles of how delay and related costs should be calculated are not defined by FIDIC. This leads to issues; issues which are usually contentious due to various 'schools of thoughts' and varied interpretations existing worldwide. Disputes are the usual outcome. © www.asia-masters.com
  • 6. Contentious Issues in Delay Analysis resulting in Disputes – Critical Path – Who owns the Float? – Concurrent (or Contractor) Delays and how these effect Entitlement – EOT and its relation with Compensation for Delay – Which is the best Method of Delay Analysis? » As-Planned Vs. As-Built Comparison » Impacted As-Planned » Collapsed As-Built / But-For » Time Slice / Sub-Networks / Time-Impact » Etc. © www.asia-masters.com
  • 7. In order to eliminate disputes or facilitate settlement of disputes, there are now certain standards used worldwide. The leading standards are;  Society of Construction Law’s Delay and Disruption Protocol (SCL Protocol)  AACE 29R-03 (Forensic Schedule Analysis) © www.asia-masters.com
  • 8. The SCL Protocol was finalized in October 2002 after several years of deliberations and considerable debate and agreement between experts from different backgrounds © www.asia-masters.com
  • 9. The objective of the SCL Protocol was to bring reasonableness and fairness into the delay assessment process and to eliminate widespread manipulation of complex delay issues © www.asia-masters.com
  • 10. The SCL Protocol tried to standardize the issues such that disputes would be reduced or eliminated © www.asia-masters.com
  • 11. It is recommended that; should be adopted as a Standard and should be, where possible, incorporated in the Construction Contracts © www.asia-masters.com
  • 12. The SCL Protocol can be downloaded from: www.eotprotocol.com © www.asia-masters.com
  • 13. The remaining slides of this lecture will review and discuss the basic Principles suggested and recommended by the SCL Protocol © www.asia-masters.com
  • 14. Basic Principles suggested and recommended by the SCL Protocol © www.asia-masters.com
  • 15. The Principles suggested by the SCL Protocol are simple. Some of the key principles suggested by the Protocol are; © www.asia-masters.com
  • 16. RULE NO. 1 If there is an Employer’s delay, which is beyond the Contractor’s control, and if this delay impacts the Completion Date of the Works, the Contractor should be entitled to receive an Extension of Time (EOT). [This will effectively result in an extended Time for Completion and will relieve the Contractor from having to pay penalties for delay (or Delay Damages under FIDIC)] © www.asia-masters.com
  • 17. RULE NO. 2 For the case of recovery of delay (or prolongation) costs incurred due to the Employer delays, the Contractor must be able to prove that there has been no other delay, which is in his own control, and which is equally (or partly) contributing for delaying the Time for Completion. This category of delay is called a ‘Concurrent’ (or Contractor’s) Delay [In order to win a Delay Costs Claim, the Contractor must be able to prove that he has not been responsible for Concurrent Delays to the Time for Completion] © www.asia-masters.com
  • 18. RULE NO. 3 Where Contractor’s Delay to Completion occurs concurrently with Employer’s Delay to Completion, the Contractor’s concurrent delay should NOT reduce any Extension of Time (EOT), which is due. [Result of Rule No. 1 will not change and is irrespective of the result of Rule No. 2] © www.asia-masters.com
  • 19. The foregoing Rules proposed by the SCL Protocol are meant to bring fairness and reasonableness into the delay assessment process. [The emphasis of the SCL Protocol is that no one Party should benefit from default of the other Party] © www.asia-masters.com
  • 20. The Illustrations demonstrating the principles of the SCL Protocol are contained in the following Figures A to G © www.asia-masters.com
  • 21. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Path 1 Float = 3.5 Weeks Path 2 Float = 5.5 Weeks Path 2 Figure A - Accepted Contract Programme Weeks Path 1 Contract Start Date Contract Completion Date © www.asia-masters.com
  • 22. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) Path 1 Float = 3.0 Weeks Path 2 Float = 5.5 Weeks AFTER EXCUSABLE DELAY Excusable Delay Path 1 Float = 1.0 Week Path 2 Float = 5.5 Weeks (a) 2.0 Weeks (a) 5.5 Weeks (b) 1.0 Weeks (b) 0 Weeks (c) 0 Weeks (c) 1.0 Weeks (d) 5.5 Weeks (d) 2.0 Weeks (a) 2.0 Weeks (a) 0.1% of Contract Price (b) 1.0 Weeks (b) Direct Costs of Excusable Delay (c) 0 Weeks (c) NIL (d) 5.5 Weeks (d) (a) plus (b) <=Date of Excusable Delay Figure B - Delay Impact 1 Weeks Path 1 Contract Start Date Contract Completion Date Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation Contract Completion Date Impact on Path 1 = 2.0 Weeks Path 2 Path 1
  • 23. Principles & Provisions of the SCL Protocol relevant to Figure B Core Principle No. 7 - Float as it relates to time Unless there is express provision to the contrary in the contract, where there is remaining float in the programme at the time of an Employer Risk Event, an EOT should only be granted to the extent that the Employer Delay is predicted to reduce to below zero the total float on the activity paths affected by the Employer Delay. Guidance Section 1.12.1 If as a result of an Employer Delay, the Contractor is prevented from completing the works by the Contractor’s planned completion date (being a date earlier than the contract completion date), the Contractor should in principle be entitled to be paid the costs directly caused by the Employer Delay, notwithstanding that there is no delay to the contract completion date (and therefore no entitlement to an EOT), provided also that at the time they enter into the contract, the Employer is aware of the Contractor’s intention to complete the works prior to the contract completion date, and that intention is realistic and achievable. © www.asia-masters.com
  • 24. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) Path 1 Float = 3.0 Weeks Path 2 Float = 5.5 Weeks AFTER EXCUSABLE DELAY Excusable Delay Float = -0.5 Week (a) 0.5 Weeks (a) 5.5 Weeks (b) 3.5 Weeks (b) 0.5 Weeks (c) 0 Weeks (c) 3.5 Weeks (d) 5.5 Weeks (d) 0 Weeks (a) 3.5 Weeks (a) 0.15% of Contract Price (b) 0.5 Weeks (b) Direct Costs of Excusable Delay (c) 0 Weeks (c) (a) plus (b) (d) 3.0 Weeks (d) NIL Contract Completion Date Impact on Path 1 = 3.5 Weeks Path 2 Path 1 Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation <=Date of Excusable Delay Figure C - Delay Impact 2 Weeks Path 1 Contract Start Date Contract Completion Date
  • 25. Core Principle No. 4 - Procedure for granting extension of time The EOT should be granted to the extent that the Employer Risk Event is reasonably predicted to prevent the works being completed by the then prevailing contract completion date…..The goal of the EOT procedure is the ascertainment of the appropriate contractual entitlement to an EOT; the procedure is not to be based on whether or not the Contractor needs an EOT in order not to be liable for liquidated damages. Core Principle No. 5 – Effect of delay For an EOT to be granted, it is not necessary for the Employer Risk Event already to have begun to affect the Contractor’s progress with the works, or for the effect of the Employer Risk Event to have ended. Principles & Provisions of the SCL Protocol relevant to Figure C © www.asia-masters.com
  • 26. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) Path 1 Float = 3.0 Weeks Path 2 Float = 5.5 Weeks AFTER EXCUSABLE DELAY Float = -0.5 Week Excusable Delay Impact on Path 2 = 6.0 Weeks (a) 0 Weeks (a) 5.5 Weeks (b) 6.0 Weeks (b) 0 Weeks (c) 0.5 Weeks (c) 6.0 Weeks (d) 5.5 Weeks (d) 0.5 Weeks (a) 3.5 Weeks (a) (d) minus (c) (b) 0.5 Weeks (b) Direct Costs of Excusable DelayNIL (c) 6.0 Weeks (c) Direct Costs of Excusable Delay (d) 3.0 Weeks (d) 0.2% of Contract Price <=Date of Excusable Delay Figure D - Delay Impact 3 Weeks Path 1 Contract Start Date Contract Completion Date Path 2 Path 1 Contract Completion Date Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation
  • 27. Core Principle No. 4 - Procedure for granting extension of time The EOT should be granted to the extent that the Employer Risk Event is reasonably predicted to prevent the works being completed by the then prevailing contract completion date…..The goal of the EOT procedure is the ascertainment of the appropriate contractual entitlement to an EOT; the procedure is not to be based on whether or not the Contractor needs an EOT in order not to be liable for liquidated damages. Core Principle No. 5 – Effect of delay For an EOT to be granted, it is not necessary for the Employer Risk Event already to have begun to affect the Contractor’s progress with the works, or for the effect of the Employer Risk Event to have ended. Principles & Provisions of the SCL Protocol relevant to Figure D © www.asia-masters.com
  • 28. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) Contract Completion Date Float = -1.5 Weeks AFTER EXCUSABLE DELAY Contract Completion Date Excusable Delay Impact on Path 1 = 2.0 Weeks Float = -3.5 Weeks (a) 3.5 Weeks (a) 2.0 Weeks (b) 2.0 Weeks (b) 0 Weeks (c) 1.5 Weeks (c) 3.5 Weeks (d) 0 Weeks (d) 1.5 Weeks (a) 3.5 Weeks (a) (c) plus (d) (b) 2.0 Weeks (b) Direct Costs of Excusable DelayNIL (c) 3.0 Weeks (c) Direct Costs of Excusable Delay (d) 0 Weeks (d) 0.1% of Contract Price Figure E - Delay Impact 4 Weeks Path 1 Contract Start Date <=Date of Excusable Delay Path 2 Path 1 Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation
  • 29. Guidance Section 1.2.11 …an EOT should be granted to the extent that the Employer Risk Event is predicted to prevent the works being completed by the then prevailing contract completion date. This process requires consideration of the available float… Guidance Section 1.4.12 …Where there has been Employer Delay, this may prevent the Employer charging the Contractor with LDs for failure to achieve a contract completion date… Principles & Provisions of the SCL Protocol relevant to Figure E © www.asia-masters.com
  • 30. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) <=Date of Excusable Delay Contract Completion Date Float = -1.5 Weeks AFTER EXCUSABLE DELAY Contract Completion Date Impact on Path 1 = 2.0 Weeks Excusable Delay Float = -3.5 Weeks (a) 2.0 Weeks (a) 0 Weeks (b) 3.5 Weeks (b) 2.0 Weeks (c) 1.5 Weeks (c) 3.5 Weeks (d) 0 Weeks (d) 1.5 Weeks (a) 3.5 Weeks (a) (c) plus (d) (b) 2.0 Weeks (b) Direct Costs of Excusable DelayNIL (c) 3.0 Weeks (c) Direct Costs of Excusable Delay (d) 0 Weeks (d) 0.1% of Contract Price Figure F - Delay Impact 5 Weeks Path 1 Contract Start Date Path 2 Path 1 Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation
  • 31. Guidance Section 1.4.8 Where an Employer Risk Event occurs after the contract completion date, in a situation where failure to complete by the contract completion date has been caused by Contractor Delays, the principle set out in Section 1.4.7 above should apply, except where the Employer Risk Event is a non-compensable Employer Risk Event. In such an event, no EOT (or compensation) should be due. Where an EOT is due after the contract completion date, the Employer Risk Event does not exonerate the Contractor for all its delays prior to the Employer Risk Event occurring. The effect of the Employer Risk Event should be assessed as described above and any EOT found due should simply be added to the contract completion date. Principles & Provisions of the SCL Protocol relevant to Figure F © www.asia-masters.com
  • 32. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRIOR TO EXCUSABLE DELAY (UPDATE WITH ACTUAL PROGRESS) <=Date of Excusable Delay Contract Completion Date Float = -1.5 Weeks Path 2 Float = 2.5 Weeks AFTER EXCUSABLE DELAY Contract Completion Date Float = -1.5 Weeks Excusable Delay = 3.5 Weeks (a) 2.5 Weeks (a) 0 Weeks (b) 3.5 Weeks (b) 2.5 Weeks (c) 1.0 Weeks (c) 3.5 Weeks (d) 1.5 Weeks (d) 1.5 Weeks (a) 0 Weeks (a) (b) plus (d) (b) 2.0 Weeks (b) Direct Costs of Excusable Delay (c) 3.0 Weeks (c) NIL (d) 3.5 Weeks (d) 0.2% of Contract Price Path 1 Path 2 (3) Compensation for Delay to Progress (1) EOT Entitlement (2) Period of Prolongation Costs (4) Other Compensation Figure G - Delay Impact 6 Weeks Path 1 Contract Start Date Path 2
  • 33. Guidance Section 1.4.1 Where Contractor Delay to Completion occurs concurrently with Employer Delay to Completion, the Contractor’s concurrent delay should not reduce any EOT due. Guidance Section 1.4.7 Where Employer Risk Events and Contractor Risk Events occur sequentially but have concurrent effects, here again any Contractor Delay should not reduce the amount of EOT due to the Contractor as a result of the Employer Delay. Concurrency (Appendix A – Definations and Glossary) True concurrent delay is the occurrence of two or more delay events at the same time, one an Employer Risk Event, the other a Contractor Risk Event and the effects of which are felt at the same time. The term ‘concurrent delay’ is often used to describe the situation where two or more delay events arise at different times, but the effects of them are felt (in whole or in part) at the same time. To avoid confusion, this is more correctly termed the ‘concurrent effect’ of sequential delay events. Principles & Provisions of the SCL Protocol relevant to Figure G – Slide 1/2 © www.asia-masters.com
  • 34. Core Principle No. 9 - Concurrent delay – its effect on entitlement to extension of time Where Contractor Delay to Completion occurs or has effect concurrently with Employer Delay to Completion, the Contractor’s concurrent delay should not reduce any EOT due. Core Principle No. 14 - Link between extension of time and compensation Entitlement to an EOT does not automatically lead to entitlement to compensation (and vice versa). Core Principle No. 10 - Concurrent delay – its effect on entitlement to compensation for prolongation If the Contractor incurs additional costs that are caused both by Employer Delay and concurrent Contractor Delay, then the Contractor should only recover compensation to the extent it is able to separately identify the additional costs caused by the Employer Delay from those caused by the Contractor Delay. If it would have incurred the additional costs in any event as a result of Contractor Delays, the Contractor will not be entitled to recover those additional costs. Principles & Provisions of the SCL Protocol relevant to Figure G – Slide 2/2 © www.asia-masters.com
  • 35. Guidance Section 3.2.13 Although the programme should be the primary tool for guiding the CA in his determination of EOT, it should be used in conjunction with the contemporary evidence to ensure that the resulting EOT is fair and reasonable. It will also be necessary for the parties to apply common sense and experience to the process to ensure that all relevant factors are taken into account, and that any anomalous results generated by the programme analysis are managed properly. Key Guideline, Suggestion and Advice of the SCL Protocol © www.asia-masters.com
  • 36. Figure No. Question 1 Question 2 Question 3 Question 4 B (c) (b) (a) (b) C (a) (b) (d) (b) D (c) (d) (d) (c) E (b) (a) (d) (c) F (a) (b) (d) (c) G (c) (a) (a) (b) Correct Responses for Figures B to G © www.asia-masters.com
  • 37. Congratulations we have come to the end of the Lecture. You are now a Qualified and Certified Delay Claims Analyst and Expert. © www.asia-masters.com
  • 38. FIDIC and Construction Solutions thank you for your attendance and contribution. We wish you all Good Luck. © www.asia-masters.com