Secondary Selective Substation
Transfer Scheme
April 2013
Industrial Power System Design
Presentation Outline
• Definition – Secondary Selective Substation
• Equipment Arrangement
• Discussion Topics – How do you design a
transfer scheme?
• Existing System Description
 Normal System Loading
 Abnormal System Loading
• Final System Configuration
• Transfer Scheme Definitions
• Implementation
Definition
Secondary Selective Substation
• Substations having two busses, each supplied by a
normally-closed incoming line circuit breaker and
connected together by a normally-open bus tie
circuit breaker.
Single Tie Arrangement
Double Tie Arrangement
Discussion Topics
How do you design a transfer scheme?
• What conditions are required for transfer?
 Breaker positions?
 Breaker status?
 Voltage conditions?
 Make before break or break before make?
 Do we need to know about one side or both sides of
switchgear to initiate transfer?
 Flow Chart, Logic Chart or if then statements?
• What is the equipment arrangement?
 Where are current transformers going to be placed? Why?
 Where are potential transformers going to be placed? Why?
Discussion Topics
How do you design a transfer scheme?
• Safety concerns?
 Electrical protection requirements?
 Re-energizing bus with fault present?
 What do I do with downstream power sources (i.e.
generators or synchronous motors)?
 Sources synchronized? How do you know?
• Motor spin down complete
• How will the system be implemented?
 Mechanical relays/hardwired
 Electronic relays/hardwired
 Electronic relays/communication
Discussion Topics
How do you design a transfer scheme?
• How do you recover from automatic transfer?
 Automatic or Manual?
• If electronic relays, which ones?
 Pros and Cons for each
 Do you want to program the scheme or do you want to
work within an existing framework?
 Typical: SEL or MULTILIN
 Does one give you an advantage in terms of end of
project paperwork?
 Will final implementation be “black box” approach or will
there be certain outputs that can be checked to tell you
where you are in the transfer initiation by technician?
Discussion Topics
How do you design a transfer scheme?
• Communication between team members?
 No two engineers will design the system the same way.
 What are common assumptions?
• Single mode of failure or multiple?
• Will additional failure modes be handled with internal
programming or procedural changes to the operation
of the equipment.
• What ranges or setpoints will be utilized? Why?
• What requires an alarm to be sent?
• What requires the automatic system to be disabled?
Discussion Topics
How do you design a transfer scheme?
• How do you test the system?
 What equipment is needed?
 If doors are stand alone
• Where do you test the system?
 Factory
 Office/Lab
 In the field
• Who should be involved in final testing?
• Who decides on final testing methodology?
Discussion Topics
How do you design a transfer scheme?
• How do you know if your system is working properly?
• Maintenance
 What needs to be done on a periodic basis?
• Software updates, how do they effect the current system?
• Who maintains programming files?
• Standard breaker maintenance and time testing?
• Relay testing to validate accuracy?
• Training
 Who gets trained?
 What material is provided to make that individual
successful?
52-A 52-B
52-T
50P/N,
51P/N,
25, 27
51P/N,
25, 27
PT-1
PT-2 PT-4
PT-3
50P/N,
51P/N,
25, 27
Single Tie Arrangement
52-A 52-B
52-T
50P/N,
51P/N,
25, 27
PT-1 PT-350P/N,
51P/N,
25, 27
Single Tie Arrangement
Flow Chart
Flow Chart
Flow Chart
One-Line
Depiction
• 27I-1, 27I-2 Instantantaneous under voltage relay
• 27R-1, 27R-2 Residual voltage relay, 3 phase
• 50/51-1, 2 Instantaneous and time overcrurrent relay
• 50N/51N-1, 2 Residually connected instantaneous and time overcurrent relay
• 51G-1, 2 Transformer X0 connection overcurrent relay
One-Line
Depiction
• 63 - Transformer fault pressure relay, rate-of-rise type or Buchholz relay
• 63X - Auxiliary seal in relay
• 86T- Hand reset transformer lockout relay
• 25- Synchronism check relay
One-Line
Depiction
• 27I Relays 27I prevent an automatic transfer from occurring upon simultaneous
loss of both sources, or loss of one source and low voltage on the other.
Relays 27I operate through auxiliary relay 96. Because relays 96 are time
delay type, an automatic transfer is also prevented upon simultaneous
restoration of both sources after a double outage. Relays 27I also seal in
relays 97 to prevent transfer if the supply breaker should trip first on
overcurrent faults in the secondary selective substation.
Main Breaker Schematic
27I Relays 27I prevent an automatic transfer from occurring upon simultaneous
loss of both sources, or loss of one source and low voltage on the other.
Relays 27I operate through auxiliary relay 96. Because relays 96 are time
delay type, an automatic transfer is also prevented upon simultaneous
restoration of both sources after a double outage. Relays 27I also seal in
relays 97 to prevent transfer if the supply breaker should trip first on
overcurrent faults in the secondary selective substation.
Main Breaker Schematic
50/50N Relays 50 and 50N operate through the 97 relay, and are used to
block transfer during overcurrent faults until the fault is cleared by
the feeder breaker or incoming line breaker. When the settings are
properly set they permit relay 27 to time out faster under fault
conditions. The backup to this scheme includes time
current/voltage coordination between the 51 overcurrent relay and
the 27 undervoltage relay. The 51 relay should trip before the 27
sends the tripping signal.
Main Breaker Schematic
•83- Auxiliary relay used in the transfer initiation from the main breaker to
the tie breaker via the following functions:
Trips the main breaker
Closes the tie once the main breaker opens, and the bus voltage is
25% of it nominal value to prevent out of phase re-closer
Main Breaker Schematic
• Auxiliary relay, instantaneous pickup, adjustable time delay drop out
TDDO- time delay dropout,
TDC- time delay closing,
TDO-time delay opening
Main Breaker Schematic
• 52LS-1 contact closes when incomer No. 1 is in the racked in position.
• 52LS-2 contact closes when incomer No. 2 is in the racked in position.
• 24LS contact closes when the tie breaker is in the racked in position.
• 52-2/a contact closes when incomer No. 2 breaker is closed.
• 10 trip selector switch used in manual transfers.
Main Breaker Schematic
• 24/a contact closes when the tie breaker is closed.
• 52-1/a contact closes when incomer No. 1 breaker is closed.
• 96-1/TDC blocks the automatic transfer if the incomer No. 2 bus voltage is not
healthy.
• 97-1/TDC blocks the automatic transfer if the 50 instantaneous current relay
detects flow of fault current. The block doesn't clear until the 50 relay
clears and there is no longer a depressed undervoltage condition
caused by the fault condition.
Main Breaker Schematic
• 24/b breaks the transfer system seal in rung when the tie breaker closes.
• 83-1 auxiliary relay that initiates the automatic transfer.
Tie Breaker Schematic
24LS
D-C BUS NO.3
(+)
8-T
27R-1 27R-2
24CS
C 83-1 83-2
52-1
b
52-2
b
24
b
(1)
52LS-1 (4)
52LS-2 (4)
10
T
52-1
a
52-2
a
(4)
(4)
24CS
TRLGL
(8)
(8)
(8) 24
a
24
TC
(1)
24
CC
(-)
8-T D-C BUS NO.3
25Y (2)
27R Relays protect the motors which carry through automatic transfer, against
overvoltage and instantaneous tripping of their circuit breakers due to
closing in out of phase with residual voltage. Protection is achieved by
delaying transfer until residual voltage drops to a safe level. Motors will
generate a decaying residual voltage if source power is interrupted under
load with no fault to dissipate magnetic energy stored in the motors.
Tie Breaker Schematic
24LS
D-C BUS NO.3
(+)
8-T
27R-1 27R-2
24CS
C 83-1 83-2
52-1
b
52-2
b
24
b
(1)
52LS-1 (4)
52LS-2 (4)
10
T
52-1
a
52-2
a
(4)
(4)
24CS
TRLGL
(8)
(8)
(8) 24
a
24
TC
(1)
24
CC
(-)
8-T D-C BUS NO.3
25Y (2)
27R-1 contact closes when the residual bus voltage decays to 25% of
the rated bus voltage in order to prevent an out of phase
reclosure between the motor back emf and the new source
voltage when the tie breaker is closed.
Normal Operating Condition
SCE Owned/
Operated
XOM Owned/
Operated
Cable Capacity
Transformer Capacity
Switchgear Capacity
18
Air Cooled
Fan Cooled
15
22.4
Power
MVA
21.6
Normal Load 12.5 MVA Normal Load 15.5 MVA
Cable Capacity
Transformer Capacity
Air Cooled
Fan Cooled
Switchgear Capacity
18
Power
MVA
15
22.4
21.6
Normal
Flow
Normal
Flow
12.5 MVA 15.5 MVA
Percent Capacity
Utilized
86
103
69
72
Total Load 28 MVA
Breaker Open
Breaker Closed Breaker Closed
69
83
56
58
Percent Capacity
Utilized
Bus 1 Bus 2
Abnormal Operating Condition
SCE Owned/
Operated
XOM Owned/
Operated
Cable Capacity
Transformer Capacity
Switchgear Capacity
18
Air Cooled
Fan Cooled
15
22.4
Power
MVA
21.6
Normal Load 12.5 MVA Normal Load 15.5 MVA
Cable Out of Service
Transformer Out of Service
Switchgear Breaker Out of Service
Abnormal
Flow
Abnormal
Flow
0 MVA 28 MVA
Percent Capacity
Utilized
156
187
123
130
Total Load 28 MVA
Breaker Closed
Breaker Closed
Breaker Open
Bus 1 Bus 2
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final System Logic Diagrams
Final Discussion
End Transfer Schemes

More Related Content

PPT
Power System Protection course - Part I
PDF
Short Circuit, Protective Device Coordination
PDF
PDF
An si completa
PDF
Protection of transmission lines (distance)
PPT
transmission-line-protection.ppt
PDF
ETAP - Coordination and protecion 2
PDF
IEEE substation design
Power System Protection course - Part I
Short Circuit, Protective Device Coordination
An si completa
Protection of transmission lines (distance)
transmission-line-protection.ppt
ETAP - Coordination and protecion 2
IEEE substation design

What's hot (20)

PPTX
Methods of Voltage Control
PPTX
auto-reclosure
PPTX
MTDC Systems: Control & Protection of MTDC Systems
PDF
ETAP - Transformer sizing using etap
PDF
Power system protection topic 1
PDF
Overcurrent protection
PPT
Basic protection and relaying
PDF
Switchgear presentation
PPT
protection of transmission lines[distance relay protection scheme]
PPTX
Protection & switchgear
DOC
DISTANCE PROTECTION RELAY
PPTX
Introduction to Smart Grid.pptx
PPTX
Switchgear - complete guide
PPT
Eds coordination system protectives device ppt
PPTX
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
PDF
Surge Protection
PPTX
Extra high voltage long ac transmission lines
PPTX
Power quality
PPT
Hvdc transmission & its applications
PDF
Er rahul sharma feeder protection
Methods of Voltage Control
auto-reclosure
MTDC Systems: Control & Protection of MTDC Systems
ETAP - Transformer sizing using etap
Power system protection topic 1
Overcurrent protection
Basic protection and relaying
Switchgear presentation
protection of transmission lines[distance relay protection scheme]
Protection & switchgear
DISTANCE PROTECTION RELAY
Introduction to Smart Grid.pptx
Switchgear - complete guide
Eds coordination system protectives device ppt
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
Surge Protection
Extra high voltage long ac transmission lines
Power quality
Hvdc transmission & its applications
Er rahul sharma feeder protection
Ad

Viewers also liked (20)

PDF
Motor bus transfer
PPT
Tracking firm presentation (vincent wedelich) mmm
PPT
FUTURES TRADING
PDF
Understanding power concepts rev 0
PPT
MANAGEMENT ACCOUNTING STUDY PPT
PPT
PERCEPTIONS OF GENDER EQUALITY IN CORPORATE AMERICA
PPT
American barrick vww
PDF
Area classification
PPTX
2012 ieee pes lunch ethics 020112
PDF
Electrical Condition monitoring part 1
PDF
Ieee power quality distribution systems
PDF
Zero Policy = maximize profits; Clients (Refineries and petrochemical Facilit...
PPT
Good to great ppt (vww)
PPT
Area classification
PPT
MANAGEMENT ACCOUNTING STUDY PPT
PDF
Electrical master plan for chemical engineers and managers
PDF
Affordable automobile for low income families
PDF
IEEE Motor Presentation
PPT
Executive compensation main ppt
Motor bus transfer
Tracking firm presentation (vincent wedelich) mmm
FUTURES TRADING
Understanding power concepts rev 0
MANAGEMENT ACCOUNTING STUDY PPT
PERCEPTIONS OF GENDER EQUALITY IN CORPORATE AMERICA
American barrick vww
Area classification
2012 ieee pes lunch ethics 020112
Electrical Condition monitoring part 1
Ieee power quality distribution systems
Zero Policy = maximize profits; Clients (Refineries and petrochemical Facilit...
Good to great ppt (vww)
Area classification
MANAGEMENT ACCOUNTING STUDY PPT
Electrical master plan for chemical engineers and managers
Affordable automobile for low income families
IEEE Motor Presentation
Executive compensation main ppt
Ad

Similar to Ieee transfer schemes for M-T-M distribution systems (20)

PPTX
SOC Interconnect modified version 2019 course
PDF
Sliding Mode Control for DC DC Converters
PPTX
Stability of power
PPTX
presentation on substation layout and BUS bar arrangement.
PPTX
TSE SCADA Design presentation new
PDF
Fundamentals of Microprocessor-based Relaying
PDF
Fundamentals of Microprocessor Based Relays
PPTX
EIT_Presentation
PDF
Selective Coordination "The Rest of the Story"
PPTX
DISTRIBUTION SYSTEM OPERATION AND CONTROL
PPTX
Electrical Engineering Protective Relays.pptx
PDF
IIA module 6
PDF
Abb b.g. controlled switching ed4
PPTX
EIT_Presentation
PPTX
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
PDF
Carrier_Protn_08_01_16 - Copy.pdf
PDF
Carrier_Protn_08_01_16.pdf
PDF
SWITCHGEAR AND PROTECTION DEVICES REPORT.pdf
PPTX
Substation monitoring system for maintaining a data log.ppt
PPTX
vacuum circuit breakers in flexible ac transmission system
SOC Interconnect modified version 2019 course
Sliding Mode Control for DC DC Converters
Stability of power
presentation on substation layout and BUS bar arrangement.
TSE SCADA Design presentation new
Fundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor Based Relays
EIT_Presentation
Selective Coordination "The Rest of the Story"
DISTRIBUTION SYSTEM OPERATION AND CONTROL
Electrical Engineering Protective Relays.pptx
IIA module 6
Abb b.g. controlled switching ed4
EIT_Presentation
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
Carrier_Protn_08_01_16 - Copy.pdf
Carrier_Protn_08_01_16.pdf
SWITCHGEAR AND PROTECTION DEVICES REPORT.pdf
Substation monitoring system for maintaining a data log.ppt
vacuum circuit breakers in flexible ac transmission system

More from Vincent Wedelich, PE MBA (13)

PDF
Part 3 motor application considerations understanding power concepts rev 5 vi...
PPT
Amerada hess final presentation
PPT
Balanced scorecard presentation rev 0
PPT
THE PROFIT CHAIN
PPT
Frontier corporation
PPT
Financial Derivatives and Options
PPT
Iceland krona vincent wedelich
PPT
Tracking firm presentation (vincent wedelich) mmm 3M
PDF
Electrical condition monitoring part 2
PDF
Overcurrent coordination
PDF
Improving substation reliability & availability
PPT
Lightning protection
Part 3 motor application considerations understanding power concepts rev 5 vi...
Amerada hess final presentation
Balanced scorecard presentation rev 0
THE PROFIT CHAIN
Frontier corporation
Financial Derivatives and Options
Iceland krona vincent wedelich
Tracking firm presentation (vincent wedelich) mmm 3M
Electrical condition monitoring part 2
Overcurrent coordination
Improving substation reliability & availability
Lightning protection

Recently uploaded (20)

PPTX
Geodesy 1.pptx...............................................
PPTX
web development for engineering and engineering
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
additive manufacturing of ss316l using mig welding
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
Lecture Notes Electrical Wiring System Components
PDF
Digital Logic Computer Design lecture notes
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Well-logging-methods_new................
PPTX
Construction Project Organization Group 2.pptx
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
PPT on Performance Review to get promotions
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Geodesy 1.pptx...............................................
web development for engineering and engineering
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
additive manufacturing of ss316l using mig welding
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Lecture Notes Electrical Wiring System Components
Digital Logic Computer Design lecture notes
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Well-logging-methods_new................
Construction Project Organization Group 2.pptx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Safety Seminar civil to be ensured for safe working.
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
bas. eng. economics group 4 presentation 1.pptx
PPT on Performance Review to get promotions
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf

Ieee transfer schemes for M-T-M distribution systems

  • 1. Secondary Selective Substation Transfer Scheme April 2013 Industrial Power System Design
  • 2. Presentation Outline • Definition – Secondary Selective Substation • Equipment Arrangement • Discussion Topics – How do you design a transfer scheme? • Existing System Description  Normal System Loading  Abnormal System Loading • Final System Configuration • Transfer Scheme Definitions • Implementation
  • 3. Definition Secondary Selective Substation • Substations having two busses, each supplied by a normally-closed incoming line circuit breaker and connected together by a normally-open bus tie circuit breaker.
  • 6. Discussion Topics How do you design a transfer scheme? • What conditions are required for transfer?  Breaker positions?  Breaker status?  Voltage conditions?  Make before break or break before make?  Do we need to know about one side or both sides of switchgear to initiate transfer?  Flow Chart, Logic Chart or if then statements? • What is the equipment arrangement?  Where are current transformers going to be placed? Why?  Where are potential transformers going to be placed? Why?
  • 7. Discussion Topics How do you design a transfer scheme? • Safety concerns?  Electrical protection requirements?  Re-energizing bus with fault present?  What do I do with downstream power sources (i.e. generators or synchronous motors)?  Sources synchronized? How do you know? • Motor spin down complete • How will the system be implemented?  Mechanical relays/hardwired  Electronic relays/hardwired  Electronic relays/communication
  • 8. Discussion Topics How do you design a transfer scheme? • How do you recover from automatic transfer?  Automatic or Manual? • If electronic relays, which ones?  Pros and Cons for each  Do you want to program the scheme or do you want to work within an existing framework?  Typical: SEL or MULTILIN  Does one give you an advantage in terms of end of project paperwork?  Will final implementation be “black box” approach or will there be certain outputs that can be checked to tell you where you are in the transfer initiation by technician?
  • 9. Discussion Topics How do you design a transfer scheme? • Communication between team members?  No two engineers will design the system the same way.  What are common assumptions? • Single mode of failure or multiple? • Will additional failure modes be handled with internal programming or procedural changes to the operation of the equipment. • What ranges or setpoints will be utilized? Why? • What requires an alarm to be sent? • What requires the automatic system to be disabled?
  • 10. Discussion Topics How do you design a transfer scheme? • How do you test the system?  What equipment is needed?  If doors are stand alone • Where do you test the system?  Factory  Office/Lab  In the field • Who should be involved in final testing? • Who decides on final testing methodology?
  • 11. Discussion Topics How do you design a transfer scheme? • How do you know if your system is working properly? • Maintenance  What needs to be done on a periodic basis? • Software updates, how do they effect the current system? • Who maintains programming files? • Standard breaker maintenance and time testing? • Relay testing to validate accuracy? • Training  Who gets trained?  What material is provided to make that individual successful?
  • 12. 52-A 52-B 52-T 50P/N, 51P/N, 25, 27 51P/N, 25, 27 PT-1 PT-2 PT-4 PT-3 50P/N, 51P/N, 25, 27 Single Tie Arrangement
  • 13. 52-A 52-B 52-T 50P/N, 51P/N, 25, 27 PT-1 PT-350P/N, 51P/N, 25, 27 Single Tie Arrangement
  • 17. One-Line Depiction • 27I-1, 27I-2 Instantantaneous under voltage relay • 27R-1, 27R-2 Residual voltage relay, 3 phase • 50/51-1, 2 Instantaneous and time overcrurrent relay • 50N/51N-1, 2 Residually connected instantaneous and time overcurrent relay • 51G-1, 2 Transformer X0 connection overcurrent relay
  • 18. One-Line Depiction • 63 - Transformer fault pressure relay, rate-of-rise type or Buchholz relay • 63X - Auxiliary seal in relay • 86T- Hand reset transformer lockout relay • 25- Synchronism check relay
  • 19. One-Line Depiction • 27I Relays 27I prevent an automatic transfer from occurring upon simultaneous loss of both sources, or loss of one source and low voltage on the other. Relays 27I operate through auxiliary relay 96. Because relays 96 are time delay type, an automatic transfer is also prevented upon simultaneous restoration of both sources after a double outage. Relays 27I also seal in relays 97 to prevent transfer if the supply breaker should trip first on overcurrent faults in the secondary selective substation.
  • 20. Main Breaker Schematic 27I Relays 27I prevent an automatic transfer from occurring upon simultaneous loss of both sources, or loss of one source and low voltage on the other. Relays 27I operate through auxiliary relay 96. Because relays 96 are time delay type, an automatic transfer is also prevented upon simultaneous restoration of both sources after a double outage. Relays 27I also seal in relays 97 to prevent transfer if the supply breaker should trip first on overcurrent faults in the secondary selective substation.
  • 21. Main Breaker Schematic 50/50N Relays 50 and 50N operate through the 97 relay, and are used to block transfer during overcurrent faults until the fault is cleared by the feeder breaker or incoming line breaker. When the settings are properly set they permit relay 27 to time out faster under fault conditions. The backup to this scheme includes time current/voltage coordination between the 51 overcurrent relay and the 27 undervoltage relay. The 51 relay should trip before the 27 sends the tripping signal.
  • 22. Main Breaker Schematic •83- Auxiliary relay used in the transfer initiation from the main breaker to the tie breaker via the following functions: Trips the main breaker Closes the tie once the main breaker opens, and the bus voltage is 25% of it nominal value to prevent out of phase re-closer
  • 23. Main Breaker Schematic • Auxiliary relay, instantaneous pickup, adjustable time delay drop out TDDO- time delay dropout, TDC- time delay closing, TDO-time delay opening
  • 24. Main Breaker Schematic • 52LS-1 contact closes when incomer No. 1 is in the racked in position. • 52LS-2 contact closes when incomer No. 2 is in the racked in position. • 24LS contact closes when the tie breaker is in the racked in position. • 52-2/a contact closes when incomer No. 2 breaker is closed. • 10 trip selector switch used in manual transfers.
  • 25. Main Breaker Schematic • 24/a contact closes when the tie breaker is closed. • 52-1/a contact closes when incomer No. 1 breaker is closed. • 96-1/TDC blocks the automatic transfer if the incomer No. 2 bus voltage is not healthy. • 97-1/TDC blocks the automatic transfer if the 50 instantaneous current relay detects flow of fault current. The block doesn't clear until the 50 relay clears and there is no longer a depressed undervoltage condition caused by the fault condition.
  • 26. Main Breaker Schematic • 24/b breaks the transfer system seal in rung when the tie breaker closes. • 83-1 auxiliary relay that initiates the automatic transfer.
  • 27. Tie Breaker Schematic 24LS D-C BUS NO.3 (+) 8-T 27R-1 27R-2 24CS C 83-1 83-2 52-1 b 52-2 b 24 b (1) 52LS-1 (4) 52LS-2 (4) 10 T 52-1 a 52-2 a (4) (4) 24CS TRLGL (8) (8) (8) 24 a 24 TC (1) 24 CC (-) 8-T D-C BUS NO.3 25Y (2) 27R Relays protect the motors which carry through automatic transfer, against overvoltage and instantaneous tripping of their circuit breakers due to closing in out of phase with residual voltage. Protection is achieved by delaying transfer until residual voltage drops to a safe level. Motors will generate a decaying residual voltage if source power is interrupted under load with no fault to dissipate magnetic energy stored in the motors.
  • 28. Tie Breaker Schematic 24LS D-C BUS NO.3 (+) 8-T 27R-1 27R-2 24CS C 83-1 83-2 52-1 b 52-2 b 24 b (1) 52LS-1 (4) 52LS-2 (4) 10 T 52-1 a 52-2 a (4) (4) 24CS TRLGL (8) (8) (8) 24 a 24 TC (1) 24 CC (-) 8-T D-C BUS NO.3 25Y (2) 27R-1 contact closes when the residual bus voltage decays to 25% of the rated bus voltage in order to prevent an out of phase reclosure between the motor back emf and the new source voltage when the tie breaker is closed.
  • 29. Normal Operating Condition SCE Owned/ Operated XOM Owned/ Operated Cable Capacity Transformer Capacity Switchgear Capacity 18 Air Cooled Fan Cooled 15 22.4 Power MVA 21.6 Normal Load 12.5 MVA Normal Load 15.5 MVA Cable Capacity Transformer Capacity Air Cooled Fan Cooled Switchgear Capacity 18 Power MVA 15 22.4 21.6 Normal Flow Normal Flow 12.5 MVA 15.5 MVA Percent Capacity Utilized 86 103 69 72 Total Load 28 MVA Breaker Open Breaker Closed Breaker Closed 69 83 56 58 Percent Capacity Utilized Bus 1 Bus 2
  • 30. Abnormal Operating Condition SCE Owned/ Operated XOM Owned/ Operated Cable Capacity Transformer Capacity Switchgear Capacity 18 Air Cooled Fan Cooled 15 22.4 Power MVA 21.6 Normal Load 12.5 MVA Normal Load 15.5 MVA Cable Out of Service Transformer Out of Service Switchgear Breaker Out of Service Abnormal Flow Abnormal Flow 0 MVA 28 MVA Percent Capacity Utilized 156 187 123 130 Total Load 28 MVA Breaker Closed Breaker Closed Breaker Open Bus 1 Bus 2
  • 38. Final System Logic Diagrams
  • 39. Final System Logic Diagrams
  • 40. Final System Logic Diagrams
  • 41. Final System Logic Diagrams
  • 42. Final System Logic Diagrams
  • 43. Final System Logic Diagrams
  • 44. Final System Logic Diagrams
  • 45. Final System Logic Diagrams
  • 46. Final System Logic Diagrams
  • 47. Final System Logic Diagrams
  • 48. Final System Logic Diagrams
  • 49. Final System Logic Diagrams
  • 50. Final System Logic Diagrams
  • 51. Final System Logic Diagrams

Editor's Notes

  • #13: Permissives: MOC (Both Mains Closed and Tie Open/Dummy Tie Closed) TOC (Both Mains and Tie/Dummy Tie Racked In) No 86 Lockouts (M, L, T, or B) Good Voltage on alternate incomer for a minimum of X seconds. On fault block transfer and allow for downstream coordinated fault clearing