SlideShare a Scribd company logo
2
Most read
3
Most read
12
Most read
BASIC KAIZEN
TOOLS
BASIC KAIZEN
TOOLS
1. TARGET PROGRESS REPORT
2. STANDARDIZED WORK SHEET
3. TIME OBSERVATION SHEET
4. CYCLE TIME / TAKT TIME BAR CHART
5. YAMAZUMI (STACK) CHART
6. STANDARDIZED WORK COMBINATION SHEET
7. CAPACITY SHEET
8. KAIZEN PROPOSAL SHEET
9. KAIZEN NEWSPAPER
1. TARGET PROGRESS REPORT
2. STANDARDIZED WORK SHEET
3. TIME OBSERVATION SHEET
4. CYCLE TIME / TAKT TIME BAR CHART
5. YAMAZUMI (STACK) CHART
6. STANDARDIZED WORK COMBINATION SHEET
7. CAPACITY SHEET
8. KAIZEN PROPOSAL SHEET
9. KAIZEN NEWSPAPER
Using the Basic
Kaizen Tools
Using the Basic
Kaizen Tools
If equipment seems to lack
in capacity, use Capacity
Sheet to define problems.
Fill out Standardized Work
Combination Sheet with best
times.
If equipment seems to lack
in capacity, use Capacity
Sheet to define problems.
Fill out Standardized Work
Combination Sheet with best
times.
Note long times on Combination
Sheet, there are opportunities for
Kaizen.
Continue to observe site, note
problems on Kaizen Newspaper
Note long times on Combination
Sheet, there are opportunities for
Kaizen.
Continue to observe site, note
problems on Kaizen Newspaper
Try out ideas for kaizen
immediately, verify results.
Prepare Kaizen Proposal
Sheets for effective kaizen
ideas.
Try out ideas for kaizen
immediately, verify results.
Prepare Kaizen Proposal
Sheets for effective kaizen
ideas.
Update Kaizen newspaper.
Update Target Progress
Report.
Update Kaizen newspaper.
Update Target Progress
Report.
Calculate Takt Time.
Identify problems.
Set targets and enter on
Target Progress Report
Plan & initiate Kaizen
Workshop.
Calculate Takt Time.
Identify problems.
Set targets and enter on
Target Progress Report
Plan & initiate Kaizen
Workshop.
Kaizen EVERY
DAY!!.
Kaizen EVERY
DAY!!.
Observe site.
Identify Process.
Prepare Standardized
Work Sheet
Observe site.
Identify Process.
Prepare Standardized
Work Sheet
Pair up 2 for each process.
One times w/ stopwatch, other
jots down times.
Find best times.
Verify if Cycle Time meets Takt
Time.
Pair up 2 for each process.
One times w/ stopwatch, other
jots down times.
Find best times.
Verify if Cycle Time meets Takt
Time.
11
11
22
22 33
33
44
44
55
55
66
66
77
77
∞∞
∞∞
TARGET PROGRESS REPORT
Department / Section / Site
Date: ___/____/____/____/__________
Takt Time: _______________________
CATEGORY
SPACE (sq. ft.)
INVENTORY
WALKING DISTANCE
MATERIAL TRAVEL DISTANCE
LEAD TIME (sec.)
CYCLE TIME (sec.)
OUTPUT (units / day)
CREW SIZE
PRODUCTIVITY
CHANGEOVER TIME (sec.)
REMARKS:
CURRENT TARGET DAY 1 DAY 2 DAY 3 DAY 4 FINAL RESULT % CHANGE
Process: __________________________
Part # ____________________________
Part Name: ________________________
Scope of
Operation
FROM:
TO:
DATE: _____/____/____
Takt
Time
sec.
Cycle
Time
Operators
this op/line total
1 /
Total Pcs of Std
Work in Process
Standard Work
In Process
Safety
Precaution
Quality
Check
Approvals:
SYMBOLS BASIC
DATA
NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on
Combination Sheet), and numbers of Standard Work in Process must be
known to define Standardized Work. Identify all safety concerns, points where
quality must be verified (go/no-go) and numbers of pieces of standard work in
process using the symbols to the right.
STANDARDIZED WORK SHEET
TIME OBSERVATION SHEET
Line / Process: __________________________________________________
Date / Time: ___/____/____/_________________:________
Observed by: _____________________________________
Page _____ of _____
# Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Best Time Observations (changeover time)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Complete Cycle Time
0
Cycle Time / Takt Time Bar Chart (Blank Chart)
Cycle Time / Takt Time Bar Chart
CycleTime
Process
1 2 3 4 5 6 7
8 9
Cycle Time / Takt Time
Bar Chart (with Graphing
Feature)
Cycle Time / Takt Time Bar Chart
0
0.2
0.4
0.6
0.8
1
1.2
Process
CycleTime
Before
After
1 2 3 4 5 6 7
T/T
Yamazumi (Stack) Chart (Blank Chart)
Yamazumi (Stack) Chart
CycleTime
Process
1 2 3 4 5 6 7
8 9
Yamazumi (Stack) Chart
0
0.2
0.4
0.6
0.8
1
1 2 3 4 5 6 7
Process
CycleTime
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6
Yamazumi (Stack) Chart
(with Graphing Feature)
T/T
Line: ____________________________
Process: _________________________
Date: ______/______/_______
Section: __________________
Quota / Shift: ____________
Takt Time: ______________ sec.
Operator _____ of _____
MANUAL:
AUTO:
WALKING:
Step Description
Time
Man Auto Walk
TIME (unit: 1 sec.)
Waiting
Totals
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
1
STANDARDIZED WORK
COMBINATION SHEET
Part Name
Part No.
Max Output
per Day
Line
pieces
Workers
Needed
Current Output
Per Day
pieces
Page ____ of ____
Step Description
Machine
ID
Tools
Capacity
Base Times
Walking Time Manual Time Auto Run Time Completion Time Pieces/Run Change Time Time/Piece
Remarks
Times: Manual
Automatic
Walking
1
Subtotal
Total
NOTE
Update times when improvements are achieved through kaizen, and detail reasons for improvement in “Remarks” column.
   New / Revised as of (date): ___/___/___
Authorizations:
CAPACITY SHEET
Before After
Location Objective Date Operator
Problem Effects (cycle time / inventory / changeover time reduction,poka yoke etc.)
KAIZEN PROPOSAL SHEET
KAIZEN NEWSPAPER
TEAM: __________________________________ DATE: _______/_______/_______/___________
No. PROBLEM WHO BY WHEN CHECK
In recognition of your earnest efforts to learn and
practice kaizen during the [XXX] Kaizen
Workshop held at [XXX] factory during the week
of [Date], you have been granted this license to
practice kaizen daily in accordance with the
principles of Just in Time, Quality in Station,
Production leveling, and Production Preparation.
[Name of Recipient]
Expiration Date: [1 year from date of issuance]
改
善
Kaizen License

More Related Content

PPT
Overview of 3 day Lean & Kaizen Course Content
PPTX
Toyota Production System and Lean Tools
PPTX
Standard work training
PPT
PDF
Manufacturing Excellence - Visual Factory
PDF
Value Stream Mapping in the Office
PPT
Lean manufacturing
PPT
Mistake proofing smpl_1
Overview of 3 day Lean & Kaizen Course Content
Toyota Production System and Lean Tools
Standard work training
Manufacturing Excellence - Visual Factory
Value Stream Mapping in the Office
Lean manufacturing
Mistake proofing smpl_1

What's hot (20)

PDF
Lean Standard or Standardized Work Training Module
PDF
OPL - One Point Lesson
PDF
A Kaizen - Continues Improvement
PPTX
TPM Overview and AM Workshop
PDF
5s Audit Checklist
PPTX
Lean Fundamentals Overview Webinar
PDF
5S AWARNESS TRAINING PROGRAM
PPT
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
PPTX
PPTX
Kaizen
PDF
Presentation - introduction to 5S
PPT
Kaizen Innovation in Manufacturing
PPTX
Kaizen
PPTX
5 Why Training Slides Oct 14, 2009
PPTX
Total productive maintenance(TPM)
PPT
16 major losses tng
PDF
Kaizen training
PDF
6 s visual management
PPT
5S basic training ppt
PPTX
Lean manufacturing ppt
Lean Standard or Standardized Work Training Module
OPL - One Point Lesson
A Kaizen - Continues Improvement
TPM Overview and AM Workshop
5s Audit Checklist
Lean Fundamentals Overview Webinar
5S AWARNESS TRAINING PROGRAM
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Kaizen
Presentation - introduction to 5S
Kaizen Innovation in Manufacturing
Kaizen
5 Why Training Slides Oct 14, 2009
Total productive maintenance(TPM)
16 major losses tng
Kaizen training
6 s visual management
5S basic training ppt
Lean manufacturing ppt
Ad

Viewers also liked (20)

PDF
Kaizen Event Guide
PDF
Kaizen Ppt
PPT
Kaizen
PPTX
Kaizen Seminar Presentation
PPTX
QCFI PRODUCTIVITY
PPT
Conducting Kaizen Events
PPT
Kaizen Ppt
PDF
Engaging Your Team in Continuous Improvement by Mark Graban
PDF
Factory performance optimization
PDF
TPS, Lean, and Scrum - How They Are Developed and Influenced One Another
PDF
Cursos Agile Think - Kanban - 3/4
PDF
ぐるぐるDDDは何を目指しているのか
PDF
3 Faces of Kaizen
PDF
Stacey Seronick: Kaizen You! Continuous Improvement for You and Your Team
PDF
Kaizen in Action
PDF
スクラム再入門(仮) Developer Summit 関西 2013
PDF
TPS Lean and Agile - Brief History and Future
PDF
Lean funnel infograph - how to apply lean thinking in sales
PPTX
From Good-enough to Great (LKFR16)
PDF
ぐるぐるDDD/Scrum - モデリングと実装のうずまきをまわそう
Kaizen Event Guide
Kaizen Ppt
Kaizen
Kaizen Seminar Presentation
QCFI PRODUCTIVITY
Conducting Kaizen Events
Kaizen Ppt
Engaging Your Team in Continuous Improvement by Mark Graban
Factory performance optimization
TPS, Lean, and Scrum - How They Are Developed and Influenced One Another
Cursos Agile Think - Kanban - 3/4
ぐるぐるDDDは何を目指しているのか
3 Faces of Kaizen
Stacey Seronick: Kaizen You! Continuous Improvement for You and Your Team
Kaizen in Action
スクラム再入門(仮) Developer Summit 関西 2013
TPS Lean and Agile - Brief History and Future
Lean funnel infograph - how to apply lean thinking in sales
From Good-enough to Great (LKFR16)
ぐるぐるDDD/Scrum - モデリングと実装のうずまきをまわそう
Ad

Similar to Kaizen forms xls (20)

PPT
Basic kaizen tools
PPT
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
PPT
LEAN - Kaizen Meaning and introduced con
PPT
Kaizen.ppt
PPTX
Kaizen
PPTX
The KAIZEN method.pptx
PPT
F hcom kaizenforms
PPTX
Kaizen in manufacturing industry
PPTX
Lean Smpl 1
PPTX
Au production kaizen event - Anthony Guillen
PDF
683185833-GBE-KPO-2-007-00-Kaizen-Guide.pdf
PPTX
Certified kaizen practitioner v1.0
PPTX
Operation standard .pptx
PPT
5 Steps Kaizen
DOCX
Kaizen folder
DOCX
Assignment kaizen
PPTX
Kaizen
PDF
LEAN STANDARDIZED WORK TOOL
PDF
Kaizen and Continuous Improvement...pdf
PPTX
KAIZEN TRAINING FOR SHOP FLOOR TEAM.pptx
Basic kaizen tools
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - Kaizen Meaning and introduced con
Kaizen.ppt
Kaizen
The KAIZEN method.pptx
F hcom kaizenforms
Kaizen in manufacturing industry
Lean Smpl 1
Au production kaizen event - Anthony Guillen
683185833-GBE-KPO-2-007-00-Kaizen-Guide.pdf
Certified kaizen practitioner v1.0
Operation standard .pptx
5 Steps Kaizen
Kaizen folder
Assignment kaizen
Kaizen
LEAN STANDARDIZED WORK TOOL
Kaizen and Continuous Improvement...pdf
KAIZEN TRAINING FOR SHOP FLOOR TEAM.pptx

Recently uploaded (20)

PDF
120725175041.pdfhjjjjjjjjjjjjjjjjjjjjjjh
PDF
Volvo EC290C NL EC290CNL engine Manual.pdf
PPTX
capstoneoooooooooooooooooooooooooooooooooo
PDF
higher edu open stores 12.5.24 (1).pdf forreal
PDF
How much horsepower does a Volvo EC210Cl have.pdf
PDF
Todays Technician Automotive Heating & Air Conditioning Classroom Manual and ...
PPT
Kaizen for Beginners and how to implement Kaizen
PDF
Volvo ecr58 problems Repair Manual Pdf Download
PPTX
vsdfhlahsadfjkhasihdflakjsdfhlajdhlfkjahfdljkash
PDF
3-REasdfghjkl;[poiunvnvncncn-Process.pdf
PDF
Volvo ecr58 plus Service Manual Download
PPTX
TOEFL ITP Grammar_ Clausessssssssssssssssss.pptx
PDF
Caterpillar Cat 315C Excavator (Prefix CJC) Service Repair Manual Instant Dow...
PDF
Caterpillar Cat 329D LN Excavator (Prefix EBM) Service Repair Manual Instant ...
PDF
Volvo EC290C NL EC290CNL excavator weight.pdf
PPTX
Chapter-1.pptxhhhhhhhhhhhhhhhhhhhhhhhhhh
PDF
EC300D LR EC300DLR - Volvo Service Repair Manual.pdf
PDF
Diagnose and Repair Transmission Sound Issues in Volkswagen Vehicles
PDF
Volvo ecr88 excavator specs Manual Download
PDF
Volvo ecr88 battery location Service Repair Manual.pdf
120725175041.pdfhjjjjjjjjjjjjjjjjjjjjjjh
Volvo EC290C NL EC290CNL engine Manual.pdf
capstoneoooooooooooooooooooooooooooooooooo
higher edu open stores 12.5.24 (1).pdf forreal
How much horsepower does a Volvo EC210Cl have.pdf
Todays Technician Automotive Heating & Air Conditioning Classroom Manual and ...
Kaizen for Beginners and how to implement Kaizen
Volvo ecr58 problems Repair Manual Pdf Download
vsdfhlahsadfjkhasihdflakjsdfhlajdhlfkjahfdljkash
3-REasdfghjkl;[poiunvnvncncn-Process.pdf
Volvo ecr58 plus Service Manual Download
TOEFL ITP Grammar_ Clausessssssssssssssssss.pptx
Caterpillar Cat 315C Excavator (Prefix CJC) Service Repair Manual Instant Dow...
Caterpillar Cat 329D LN Excavator (Prefix EBM) Service Repair Manual Instant ...
Volvo EC290C NL EC290CNL excavator weight.pdf
Chapter-1.pptxhhhhhhhhhhhhhhhhhhhhhhhhhh
EC300D LR EC300DLR - Volvo Service Repair Manual.pdf
Diagnose and Repair Transmission Sound Issues in Volkswagen Vehicles
Volvo ecr88 excavator specs Manual Download
Volvo ecr88 battery location Service Repair Manual.pdf

Kaizen forms xls

  • 1. BASIC KAIZEN TOOLS BASIC KAIZEN TOOLS 1. TARGET PROGRESS REPORT 2. STANDARDIZED WORK SHEET 3. TIME OBSERVATION SHEET 4. CYCLE TIME / TAKT TIME BAR CHART 5. YAMAZUMI (STACK) CHART 6. STANDARDIZED WORK COMBINATION SHEET 7. CAPACITY SHEET 8. KAIZEN PROPOSAL SHEET 9. KAIZEN NEWSPAPER 1. TARGET PROGRESS REPORT 2. STANDARDIZED WORK SHEET 3. TIME OBSERVATION SHEET 4. CYCLE TIME / TAKT TIME BAR CHART 5. YAMAZUMI (STACK) CHART 6. STANDARDIZED WORK COMBINATION SHEET 7. CAPACITY SHEET 8. KAIZEN PROPOSAL SHEET 9. KAIZEN NEWSPAPER
  • 2. Using the Basic Kaizen Tools Using the Basic Kaizen Tools If equipment seems to lack in capacity, use Capacity Sheet to define problems. Fill out Standardized Work Combination Sheet with best times. If equipment seems to lack in capacity, use Capacity Sheet to define problems. Fill out Standardized Work Combination Sheet with best times. Note long times on Combination Sheet, there are opportunities for Kaizen. Continue to observe site, note problems on Kaizen Newspaper Note long times on Combination Sheet, there are opportunities for Kaizen. Continue to observe site, note problems on Kaizen Newspaper Try out ideas for kaizen immediately, verify results. Prepare Kaizen Proposal Sheets for effective kaizen ideas. Try out ideas for kaizen immediately, verify results. Prepare Kaizen Proposal Sheets for effective kaizen ideas. Update Kaizen newspaper. Update Target Progress Report. Update Kaizen newspaper. Update Target Progress Report. Calculate Takt Time. Identify problems. Set targets and enter on Target Progress Report Plan & initiate Kaizen Workshop. Calculate Takt Time. Identify problems. Set targets and enter on Target Progress Report Plan & initiate Kaizen Workshop. Kaizen EVERY DAY!!. Kaizen EVERY DAY!!. Observe site. Identify Process. Prepare Standardized Work Sheet Observe site. Identify Process. Prepare Standardized Work Sheet Pair up 2 for each process. One times w/ stopwatch, other jots down times. Find best times. Verify if Cycle Time meets Takt Time. Pair up 2 for each process. One times w/ stopwatch, other jots down times. Find best times. Verify if Cycle Time meets Takt Time. 11 11 22 22 33 33 44 44 55 55 66 66 77 77 ∞∞ ∞∞
  • 3. TARGET PROGRESS REPORT Department / Section / Site Date: ___/____/____/____/__________ Takt Time: _______________________ CATEGORY SPACE (sq. ft.) INVENTORY WALKING DISTANCE MATERIAL TRAVEL DISTANCE LEAD TIME (sec.) CYCLE TIME (sec.) OUTPUT (units / day) CREW SIZE PRODUCTIVITY CHANGEOVER TIME (sec.) REMARKS: CURRENT TARGET DAY 1 DAY 2 DAY 3 DAY 4 FINAL RESULT % CHANGE
  • 4. Process: __________________________ Part # ____________________________ Part Name: ________________________ Scope of Operation FROM: TO: DATE: _____/____/____ Takt Time sec. Cycle Time Operators this op/line total 1 / Total Pcs of Std Work in Process Standard Work In Process Safety Precaution Quality Check Approvals: SYMBOLS BASIC DATA NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on Combination Sheet), and numbers of Standard Work in Process must be known to define Standardized Work. Identify all safety concerns, points where quality must be verified (go/no-go) and numbers of pieces of standard work in process using the symbols to the right. STANDARDIZED WORK SHEET
  • 5. TIME OBSERVATION SHEET Line / Process: __________________________________________________ Date / Time: ___/____/____/_________________:________ Observed by: _____________________________________ Page _____ of _____ # Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Best Time Observations (changeover time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Complete Cycle Time 0
  • 6. Cycle Time / Takt Time Bar Chart (Blank Chart) Cycle Time / Takt Time Bar Chart CycleTime Process 1 2 3 4 5 6 7 8 9
  • 7. Cycle Time / Takt Time Bar Chart (with Graphing Feature) Cycle Time / Takt Time Bar Chart 0 0.2 0.4 0.6 0.8 1 1.2 Process CycleTime Before After 1 2 3 4 5 6 7 T/T
  • 8. Yamazumi (Stack) Chart (Blank Chart) Yamazumi (Stack) Chart CycleTime Process 1 2 3 4 5 6 7 8 9
  • 9. Yamazumi (Stack) Chart 0 0.2 0.4 0.6 0.8 1 1 2 3 4 5 6 7 Process CycleTime Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Yamazumi (Stack) Chart (with Graphing Feature) T/T
  • 10. Line: ____________________________ Process: _________________________ Date: ______/______/_______ Section: __________________ Quota / Shift: ____________ Takt Time: ______________ sec. Operator _____ of _____ MANUAL: AUTO: WALKING: Step Description Time Man Auto Walk TIME (unit: 1 sec.) Waiting Totals 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 1 STANDARDIZED WORK COMBINATION SHEET
  • 11. Part Name Part No. Max Output per Day Line pieces Workers Needed Current Output Per Day pieces Page ____ of ____ Step Description Machine ID Tools Capacity Base Times Walking Time Manual Time Auto Run Time Completion Time Pieces/Run Change Time Time/Piece Remarks Times: Manual Automatic Walking 1 Subtotal Total NOTE Update times when improvements are achieved through kaizen, and detail reasons for improvement in “Remarks” column.    New / Revised as of (date): ___/___/___ Authorizations: CAPACITY SHEET
  • 12. Before After Location Objective Date Operator Problem Effects (cycle time / inventory / changeover time reduction,poka yoke etc.) KAIZEN PROPOSAL SHEET
  • 13. KAIZEN NEWSPAPER TEAM: __________________________________ DATE: _______/_______/_______/___________ No. PROBLEM WHO BY WHEN CHECK
  • 14. In recognition of your earnest efforts to learn and practice kaizen during the [XXX] Kaizen Workshop held at [XXX] factory during the week of [Date], you have been granted this license to practice kaizen daily in accordance with the principles of Just in Time, Quality in Station, Production leveling, and Production Preparation. [Name of Recipient] Expiration Date: [1 year from date of issuance] 改 善 Kaizen License

Editor's Notes

  • #2: With the Basic Kaizen Tools and a stopwatch, anyone can improve any process.
  • #3: There is no set order to using the basic kaizen tools, but there is a normal pattern.
  • #4: Quantify current state and target state. Add relevant categories when necessary. Write improvements (lowered inventory, shorter walking distance, etc.) in RED INK. Use the target progress report to report on status of activities at the end of each day and at the presentation at the end of the week-long workshop.
  • #5: Use grid to express site to scale accurately and remember to include “real world” aspects such as posts, trash cans, tool boxes, break areas -- whatever is truly in the area. Do not forget to fill out the “BASIC DATA,” without it Standardized Work cannot be defined. Try to break up the process into the shortest steps possible. Each step of the operation sequence must be shown where it is done and given a sequence number. These numbers are identical to those entered in the Standardized Work Combination Sheet in the “Step” column. Connect the sequence numbers with solid lines that truly express the route traveled by the operator. Do not use arrows. The sequence numbers express the direction of movement. Do not forget to express the path the operator takes to return to the first step with a dotted line.
  • #6: Time many cycles to increase accuracy. “Step” column entries are identical to sequence numbers on Standardized Work Sheet and Standardized Work Combination Sheet. Partner with another person - one runs stopwatch and calls times for each step while observing the process, the other writes down times on sheet. Keep stopwatch running, write times called for steps above dotted line. After observation has been completed, subtract to calculate splits for each step and write below dotted line. Calculate complete times for each cycle observed and enter at bottom of column. Find best time for each step and enter in “Best Time” column. Total best times and enter in bottom row (“Complete Cycle Time”). ALWAYS USE THE BEST TIMES FOR CALCULATING CYCLE TIME. DO NOT AVERAGE TIMES.
  • #7: Print out a hard copy for use in your workshop. Denote takt time with a horizontal red line across the length of the chart. Denote the length of the cycle time for each process with a vertical bar over the corresponding process number. Cycle times that are longer than takt time are candidates for kaizen or re-balancing of tasks.
  • #8: Double-click on the graph and use the graph editor to enter the cycle times for each process in the spreadsheet provided. Quit the graph editor and the bar chart will be generated automatically. Place the red line at the appropriate height in on the chart to denote takt time. Click after the red “T/T” to enter the takt time value. Cycle times that are longer than takt time are candidates for kaizen or re-balancing of tasks. While it is better to hand write the Kaizen tools during activities (for speed and flexibility) this slide is handy for presentations and recording final results.
  • #9: Print out a hard copy for use in your workshop. Denote takt time with a horizontal red line across the length of the chart. Denote the length of the cycle time for each element of each process with a vertical stack chart over the corresponding process number. The Yamazumi chart aids in targeting tasks for kaizen in a process that does not meet takt time, and as a last resort for re-balancing (re-assigning) tasks to meet takt time.
  • #10: Double-click on the graph and use the graph editor to enter the cycle times for each task of process in the spreadsheet provided. Add more tasks as needed. The graph editor will automatically chose colors and calculate. Quit the graph editor and the bar chart will be generated automatically. Place the red line at the appropriate height in on the chart to denote takt time. Click after the red “T/T” to enter the takt time value. The Yamazumi chart aids in targeting tasks for kaizen in a process that does not meet takt time, and as a last resort for re-balancing (re-assigning) tasks to meet takt time. While it is better to hand write the Kaizen tools during activities (for speed and flexibility) this slide is handy for presentations and recording final results.
  • #11: BE CERTAIN TO SHOW TAKT TIME by drawing a straight, vertical line in RED INK at the appropriate point along the time line. Try to break up the process into the shortest steps possible. End each line with a short vertical line. Don’t forget to connect the end of one step with a the next step using the wavy line when there is walking between steps. Don’t forget to connect the end of the final step with the beginning of the next cycle, this time going up to the first row, when there is walking to return to begin the cycle again. If automatic run times (dotted line) run past takt time, finish them by drawing the remainder of the line from the 0 line. Any long lines are likely to be opportunities for kaizen.
  • #13: Use pictures (sketches, photos, cartoons, etc.) in “Before and “After” boxes. Express proposal visually as much as possible and avoid verbal descriptions. Quantify “Problem” and “Effects” whenever possible. Examples: “Cycle time is 4 seconds over takt time.” “Standard Work in Process: 3 pcs., should be 1 pc.” “Searching for adhesive: 5 secs.” “5 instances of wrong bolt/hr. observed.”
  • #14: Use pictures (sketches, photos, cartoons, etc.) -- express visually and avoid verbal descriptions. Post in the area and check for completion deadlines at meeting at beginning of every shift. Add kaizen proposals as they are offered. The Kaizen Newspaper should change every day.
  • #15: The Kaizen License is granted to those who have learned and applied kaizen – customarily after participation in a kaizen workshop.Note that it has an expiration date. It is not a certification or qualification, it merely acknowledges that the recipient has made an effort to learn and practice. It is customarily signed by the factory manager, the kaizen promotion leader, and the consultant who guided the workshop.