Saigon M&C Tower Project
       Method Statement For Fire Stopping




               Installation Mechanical Piping:

                          A. PPR Pipes & Fittings Installation.

                          B. uPVC Pipes & Fittings Installation.

                          C. Cast Iron Pipes & Fittings Installation.

                          D. Ductile Iron Pipes & Fittings Installation.

                          E. Steel Pipes & Fittings Installation.

                           F. Copper Pipes Installation.




-   12-03-09       FIRST ISSUE                                             C.T.P   -.-.-   L.Q.K   J.R.P




                                                           Page 2
Saigon M&C Tower Project
Method Statement For Fire Stopping



         General:
                 Items: - The Method Statement For Mechanical Piping System Installation
         Work.

         Aim:
              The objectives is to describe Plumping works associated with installation of
              internal pipes in compliance with the contract specification, approved shop
              drawings, combine and coordinated all services and structural penetration shop
              drawings.

        Scope of Works:
              This method statement covers work related to all Mechanical works of the
              SAIGON M&C TOWER Project.

        Installation:




                                                Page 3
Saigon M&C Tower Project
Method Statement For Fire Stopping



        A. PPR Pipes & Fittings Installation:
        1. Adhesive Bonding Joint For PP-R Pipes and Fititng

              a. Cutting of the pipe
              -      Mark pipe according to the necessary length.
              -      Cutting the pipe follow the marking. Cut the pipe at right angles to the pipe
                     axis.




                                                   Cutting of the pipe


              b. Heating of pipe and fitting
              -      Push the end of the pipe up to the welding depth into the welding tool.
              -      After the stipulated heating times quickly remove pipe and fitting from the
                     welding tool (See table 1).
              -      Join them immediately until the marked welding depth is covered by the PP-R
                     bead from the fitting.




                                         Heating-up of the pipe and fitting




                                                         Page 4
Saigon M&C Tower Project
Method Statement For Fire Stopping




                                                     Joining and fixing




                                                Pipe and fitting are aligning
              Table1: The fusion data.
   Pipe external - d                 Welding depth    Heating time        Welding time   Cooling time
              (mm)                       (mm)              (sec)             (sec)          (min)
                16                        13                  8                 4             2
                20                        14                  8                 4             2
                25                        15                 11                 4             2
                32                       16.5                12                 6             4
                40                        18                 18                 6             4
                50                        20                 27                 6             4
                63                        24                 36                 8             6
                75                        26                 45                 8             8
                90                        29                 60                 8             8
               110                       32.5                75                 10            8
               125                        40                 90                 10            8




                                                         Page 5
Saigon M&C Tower Project
Method Statement For Fire Stopping



              c. Weld in saddles
              -      Weld in saddles are available for pipe outer diameter of 40, 50, 63, 75, 90,
                     110, 125, 160, 200 and 250 mm. The maximum sensor well diameter is
                     specified in the following table 2.
              -      Weld in saddles are used for:
                    •      Branch connections in existing installations.
                    •      The substitution of a tee.
                    •      Branch connections in risers.
                    •      Sensor wells, etc.




                                                  Weld-in saddle detail.


              -      Drill through the pipe wall at the intended outlet point by using the drill.
              -      Insert the heating tool on the concave side of the weld-in saddle tool into the
                     hole drilled in the pipe wall until the tool is completely in contact with the outer
                     wall of the pipe
              -      Fusing the weld-in saddle with the pipe the outer surface and the pipe inner
                     wall the connection reaches highest stability.




                                                Drilling through the pipe wall




                                                        Page 6
Saigon M&C Tower Project
Method Statement For Fire Stopping



                      Table2: The saddles data.




                                                  Page 7
Saigon M&C Tower Project
Method Statement For Fire Stopping




       The welding tool is inserted into the pipe wall …                   … heating-up of the elements




                                      Joining                               Weld-in saddle finished


            d. Butt welding
                     Pipes and fittings are fused, as explained below by butt welding ( pipe
               dimension 160, 200, and 250mm).
              -      Cut pipe into required length
              -      Plastic pipes are aligned and fixed by means of the clamping elements
              -      Push The pipes onto the heating place with a defined adjusting pressure.
              -      When heating time has expired, divide the machine slide, remove heating
                     element quickly and join the pipes (by putting both parts of the slide together).
              -      The welded connection can be unclamped the welding process is finished.




                                     The parts to be welded are fixed and aligned respectively

                                                             Page 8
Saigon M&C Tower Project
Method Statement For Fire Stopping




                                              Positioning of heating element




                                     Divide the machine slide, remove heating element.




                                         Join the pipe, cool down under pressure.




                                                         Page 9
Saigon M&C Tower Project
Method Statement For Fire Stopping



              e. Repair
              -      Damaged pipes may be repaired by mean of fusion.
              -      In addition to this the offers the possibility of the pipe repair stick.
              -      The installation: same step for weld-in saddle.




                                       Heat-up                        Install repair stick and cutting


        2. Pipe installation

               a. Exposed pipes
                                                                                  Concrete Slab



                                                                                  Anchor

                                                                                  Hanger rod




                                                                                  PP-R Pipe
                                                                                  Pipe clamp

                                                                                  Sleeve

                                                                                  Wall




                                     Detail of exposed horizontal PP-R pipe installation




                                                            Page 10
Saigon M&C Tower Project
Method Statement For Fire Stopping




                   Concrete
                   Slab

                                                                                      Anchor
                                                                                      Hanger rod

                   Sleeve                                                             Pipe clamp
                                                                                      PP-R Pipe

                   Support                                                            Sleeve



                   PP-R Pipe
                   Concrete                                                           Wall
                   Slab




                                     Detail of exposed vertical PP-R pipe installation




                                     Picture for illustrating of PP-R Pipes installation




                                                            Page 11
Saigon M&C Tower Project
Method Statement For Fire Stopping



            b. Concealed pipes
         - Mark location of pipes and outlet on walls according to approved shop drawings.
         - After layout has been established, marking the pipes route on the brick wall with
              two marked lines according to installed pipes size (Follow table 3).

                          Table 3: Wall Opening Size for PP-R Pipes
                                       Pipe size        Opening              Depth
                            Item
                                        (d) mm           (b) mm              (t) mm
                              1           20                60                  35
                              2           25                60                  35
                              3           32               100                  45
                              4           40               100                  50
                              5           50               150                  65
                              6           60               150                  80




               PP-R Pipe                                                              Cutting line
               inlet

                                                                                      PP-R Pipe
                                                                                      Inlet
                PP-R Pipe

                                                                                      PP-R Pipe
               Cutting line



               Backfill
               (by other)

                                                                                      End cap
               PP-R Pipe                                                              (cover)
               outlet




                                     Detail of concealed PP-R pipe installation.


                                                        Page 12
Saigon M&C Tower Project
Method Statement For Fire Stopping




                     PP-R Pipe

                                                                                           Cutting line




                                                                                        Mortar hole pipe

                    Outlet and
                    End cap


                             Picture for illustrating of concealed PP-R pipe installation.


        B. uPVC Pipes & Fittings Installation:

            1. Adhesive Bonding Joint For uPVC Pipes and Fititng


                                                                                Zero point
                                     Stopper




                                     PVC socket                                 PVC pipe



                                     Swell layer by Adhesive
                                     (0.1-0.2 mm)




                                     PVC socket                                  PVC pipe


                                               Detail of Installation uPVC fitting




                                                               Page 13
Saigon M&C Tower Project
Method Statement For Fire Stopping



            2. Pipe installation
               a. Exposed pipes:
                                                                              Concrete Slab

                                                                              Anchor


                                                                              Hanger rod



                                                                              uPVC Pipe



                   Fitting

                   U-bolt                                                     Pipe clamp
                   uPVC Pipe                                                  Sleeve
                   Sleeve
                                                                              Wall




                                      Detail of exposed uPVC pipe installation


                   uPVC Pipe




                   Fitting



                   Pipe clamp



                   uPVC pipe

                  Support




                  Rubber rope
                  Pipe strap

                          Picture for illustrating of exposed uPVC pipes installation

                                                     Page 14
Saigon M&C Tower Project
Method Statement For Fire Stopping



              b. Concealed pipes:
                                     Table 4: Wall Opening Following Pipe Size
                                     Item Pipe size (d) Opening (b) mm Depth (t) mm
                                       1       32A           100              45
                                       2       40A           100              50
                                       3       50A           150              65
                                       4       80A           200             100
                                       5      100A           200             120




            Concrete slab                                                              Concrete slab


                                                                                       Cutting line
             Cutting line
                                                                                       uPVC Pipe

                                                           Wall
            uPVC Pipe
            & Fitting
                                                                                        End cap
                                                                                        (cover)
            Backfill                                                                   Wall
            (by other)



                                              Drain                          Drain

                                           Detail for Concealed of uPVC pipes


                                                                                     End cap



                   uPVC pipe




                   Mortar
                   Hold pipe




                                                  Picture for illustrating
                                                           Page 15
Saigon M&C Tower Project
Method Statement For Fire Stopping



            C. Cast Iron Pipes and Fittings Installation
               1. Cutting of Pipe
       - All cutting must be done in warehouse or in designated areas at each floor. All
          cutting must not be done at work area.
       - Cutting angle must be right angle.
       - Pipe shall be cut by power hacksaw, circular cutting machine with abrasive wheel,
          hand hacksaw or square end sawing vice only.
       - Inside edges shall be reamed smooth by reamer or sand paper.




                                                Example for Cutting pipes

               2. Coupling Joint
                 a. Pipe with Pipe




                                1. Push the supplied complete connector on to the pipe
                                     end right up to the middle spacing ring of the seal.




                                2. Turn over the open half of the sealing collar.

                                                             Page 16
Saigon M&C Tower Project
Method Statement For Fire Stopping




                                3. Install the next pipe or formed part flush with the spacing
                                     ring and fold back the turned over half of the collar.




                                4. Place the clamping sleeve around the collar.




                                5. Alternatively tighten the two clamping screw uniformly
                                     and hard tight. The guiding and threaded plates of the
                                     clamp must come together parallet to avoid any
                                     deformations.




                                                             Page 17
Saigon M&C Tower Project
Method Statement For Fire Stopping



                 b. Pipe with Fitting




                                1. Push the supplied complete connector on to the pipe
                                     end right up to the middle spacing ring of the seal.




                                2. Push the pipe end from the other end into the connector.




                                3. Firmly tighten the hexagon socket screw with a socket
                                     spanner, hard ratchet or impact screwdriver, if possible to the
                                     point where the two clamping jaws come together.




                                            Picture for illustrating install complete
                                                             Page 18
Saigon M&C Tower Project
Method Statement For Fire Stopping



            D. Ductile Iron Pipes and Fittings Installation

                                        Bolt and Nut                    Flange
                                                                        D.I Pipe



                                        D.I Pipe

                                       Detail Flange joint of D.I Pipe with Pipe




                                       Bolt and Nut

                                       D.I Pipe                      Flange

                                                                     Rubber rope

                                                                     D.I Fittng

                                      Detail Flange joint of D.I Pipe with Fitting

                         D.I Pipe
                                                                                   Concrete Slab

                                                                                   Anchor
                         Sleeve                                                    Hanger rod

                                                                                   U-bolt
                         Flange

                         D.I Fittng
                                                                                   D.I Pipe
                         Angle Steel
                                            Detail for Installation D.I pipe




                                                                                                   .

                                             Some picture for illstrating

                                                          Page 19
Saigon M&C Tower Project
Method Statement For Fire Stopping



            E. Steel Pipes and Fittings Installation
                 1. Screw Joint: For pipes size less than 65A




                                                 Useful thread
                                                 (see note 1)




                                     Washout    Useful thread
                                     Threads    A (see table 5)

                                                                             End face of internally
                                                                             thread parts




                                                  Useful thread
                                                   (see note 1)

                                                A (see table 5)

  Note 1: The useful thread of the internally threaded part is to be not less than 80% of the length.
                                                  Detail of Screw

 Table 5: Size of Screw (BS 21:1985)
                               Minimum lengths A in turns of thread (see note) for:
 Thread size    Internal thread with                                  Internal thread with extreme
 designation extreme plus tolerance Internal thread of basic size           minus tolerance
                                           (gauge diameter)
               (maximum diameter)                                         (minimum diameter)
                        mm                         mm                              mm
    1/16                 8⅛                        6⅞                              5⅝
                       (7.4)                      (6.2)                           (5.1)
     1/8                 8⅛                        6⅞                              5⅝
                       (7.4)                      (6.2)                           (5.1)
        1/4                             8¼                            7                                5¾
                                       (11.0)                       (9.3)                             (7.7)
        3/8                             8½                           7¼                                 6
                                       (11.4)                       (9.7)                             (8.0)
        1/2                             8¼                            7                                5¾
                                       (15.0)                       (12.7)                            (10.4)
        3/4                              9                           7¾                                6½
                                       (16.3)                       (14.1)                            (11.7)
          1                             8¼                            7                                5¾
                                       (19.0)                       (16.2)                            (13.3)
        1¼                              9¼                            8                                6¾
                                       (21.4)                       (18.5)                            (15.6)
        1½                              9¼                            8                                6¾
                                       (21.4)                       (18.5)                            (15.6)
          2                             11⅛                          9⅞                                8⅝
                                       (25.7)                       (22.8)                            (19.9)
                                                          Page 20
Saigon M&C Tower Project
Method Statement For Fire Stopping




                                                                                Concrete Slab


                                                                                Anchor

                                                                                Hanger rod

                                                                                Pipe clamp

                                                                                Steel pipe



                                                                                Steel fitting
                                     Detail installation for thread steel pipe and fitting

                 2. Welding Joint: For pipes size 65A and over

                                                                         Bevel angle

                                                                       Pipe thickness




                                                             Distance between Pipes

                                             Detail for Chamfer of groove weld

                            Weld point




                           Pipe thickness
                                               Details Finish of welding seam

                                 More than t
                                                                          Flange
                                 X: (mm)


                                 Pipe thickness
                                                                          Weld point
                                 t (mm)


                                 Steel Pipe
                                                                          1mm shorter than X




                                            Details of welding Joint for Flange

                                                             Page 21
Saigon M&C Tower Project
Method Statement For Fire Stopping



                         Steel Pipe
                                                                                     Concrete Slab

                                                                                     Anchor
                         Sleeve                                                      Hanger rod

                        Welding                                                      U-bolt
                        point
                        Steel Fittng
                                                                                     Steel Pipe
                        Angle Steel
                                          Detail Installation welding pipes

            3. Welding joint for branch pipes: For pipe size less than 65A.

       Table 6. Saddle fitting connection combination

             Branch pipe diameter             Main pipe diameter Ø (mm)
                   Ø (mm)         40 50 65 80 100 125 150 Hole size Ø (mm)
                      15                                                    27
                      20                                                    33
                      25                                                    40
                      32                                                    48
                      40                                                    54
                      50                   o                                66
                                     o: to limit used            : to allow used


                                             Hole on pipe                                     Spot weld
                                             (see table 6)                                    Saddle fitting

                    Main pipe                                            Main pipe



                1. Making and Cut hole                              2. Insert saddle and Spot weld

                                             Branch pipe


                                             Saddle fitting
                                                                                          Branch pipe
                                             Seam weld

                     Main pipe                                          Main pipe



                    3. Welding for certain                       4. Insert branch pipe by screw

                                       Detail of welding joint for branch pipe.

                                                              Page 22
Saigon M&C Tower Project
Method Statement For Fire Stopping



            F. Copper Pipes and Fittings Installation
                 1. Application of Flux and Insert

                                                   No applicaion area of Flux
                                                   D = 8 - 15 mm:        about 3 mm
                                                   D = 5/8B, 20 - 32 mm: about 5 mm




         Copper pipe                                   Copper pipe


                                                   Flux must apply only joint area
                                                   Too much Flux cause pipes to corrosion

                                            Detail for Application of Flux

                 2. Application of Solder

       Table 7. Necessary Length of Solder

             Pipe Size                             8     10         15   5/8B   20      25   32
             Necessary Length (mm)                 6     8          13   22     30      60   90
             Maximum Length (mm)                   8     12         19   32     42      82   123


           * Diameter of solder is 2mm. If other diameter is used, Change the length in
             accordance with this table.




                                                                          Flame




                                     Copper pipe                          Copper pipe

                                                                           Solder

                                     Solder must be melted by the heat of surface.
                                     Apply solder to opposite side of heated position.

                                           Detail for Application of Solder



                                                          Page 23

More Related Content

DOCX
23 casting of concrete slabs risk assessment templates
PDF
Risk Assessment (Master).pdf
DOCX
Planning Engineer CV
DOCX
15 formwork (temporary works) risk assessment templates
DOCX
Method statement piping works
PDF
Piping Installation and Erection Procedure.pdf
PPTX
Building Services
PPTX
High rise building construction
23 casting of concrete slabs risk assessment templates
Risk Assessment (Master).pdf
Planning Engineer CV
15 formwork (temporary works) risk assessment templates
Method statement piping works
Piping Installation and Erection Procedure.pdf
Building Services
High rise building construction

What's hot (20)

PPTX
Basic load out methodologies introduction
PDF
Method statement of temporary office and fa
DOCX
Method of statement piping works
PDF
Method statement for civil works
PDF
Wrapping coating
DOC
Ms 12.doc 7.6.13.
DOC
Concreting of super structure
PDF
ERECTION METHOD STATEMENT
PDF
Methodstatement welding
DOC
Resume - Zubair Khan - Civil QC Inspector
PDF
Quality Assurance in PEB - Pre Engineered steel buildings
PDF
Saudi Aramco Inspection Checklist (SAIC)
DOCX
Method statement tank base concrete pouring
DOC
Concrete method rev02
PDF
Material approval procedure
DOCX
QAQC MEP HVAC INSPECTOR
DOCX
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
PDF
Lifting steam drum 72 ton by winch
DOC
Itp civil
DOCX
8 lifting operations with mobile crane risk assessment templates
Basic load out methodologies introduction
Method statement of temporary office and fa
Method of statement piping works
Method statement for civil works
Wrapping coating
Ms 12.doc 7.6.13.
Concreting of super structure
ERECTION METHOD STATEMENT
Methodstatement welding
Resume - Zubair Khan - Civil QC Inspector
Quality Assurance in PEB - Pre Engineered steel buildings
Saudi Aramco Inspection Checklist (SAIC)
Method statement tank base concrete pouring
Concrete method rev02
Material approval procedure
QAQC MEP HVAC INSPECTOR
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Lifting steam drum 72 ton by winch
Itp civil
8 lifting operations with mobile crane risk assessment templates
Ad

Viewers also liked (15)

PDF
Pipe and-fittings
DOCX
Method statement painting
DOC
Building work method statement cm - ms- bw - 001
PPT
072 Method Statement
DOC
Method statement for repair of concrete surface
DOC
Method statement for structural concrete repair rev.0
DOC
Piling work method statement cm- ms- bw - 002
PDF
15.2.2 bored pile wall - method statement
PDF
574An Integrated Framework for IT Infrastructure Management by Work Flow Mana...
PDF
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
PPT
Construction Photo Essay Project
PDF
J press Stainless Steel piping
PDF
World of bathrooms 2010 - Villeroy & Boch | Hùng Hiền Luxury Co., Ltd
PPTX
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
PDF
ASPE CEU Pipe Hangers and Supports
Pipe and-fittings
Method statement painting
Building work method statement cm - ms- bw - 001
072 Method Statement
Method statement for repair of concrete surface
Method statement for structural concrete repair rev.0
Piling work method statement cm- ms- bw - 002
15.2.2 bored pile wall - method statement
574An Integrated Framework for IT Infrastructure Management by Work Flow Mana...
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
Construction Photo Essay Project
J press Stainless Steel piping
World of bathrooms 2010 - Villeroy & Boch | Hùng Hiền Luxury Co., Ltd
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
ASPE CEU Pipe Hangers and Supports
Ad

Similar to Ms for-mechanical-piping-system-installation-work (20)

PDF
Various approaches to Eliminate MIG Welding and Defects occurring in DT cap F...
PDF
Inspection manual for piping
PDF
Est group harbin urea conference 2014 pap paper v1 english
PDF
As-Welded Tube Securing DOM-Like Dimensional Accuracy
PPT
Engineering and Design Webinar - September
PPT
Transmission Line Towers and details
PDF
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
PPT
Engineering & Design - April
PDF
WP_May_2015
PDF
BHEL Trainning Report
DOCX
Stainless Steel Threaded&Welding Joint.docx
PDF
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
PDF
Cswip welding inspection notes and questions
PDF
Twi cswip welding inspection notes and questions
PPT
Engineering & Design - January
PPTX
Summer Internship Presentation
PDF
Design and Stress Analysis of High Pressure Accumulator
PPTX
Development of Special Purpose of profile Machine, PVC Fittings and PVC Pipe ...
Various approaches to Eliminate MIG Welding and Defects occurring in DT cap F...
Inspection manual for piping
Est group harbin urea conference 2014 pap paper v1 english
As-Welded Tube Securing DOM-Like Dimensional Accuracy
Engineering and Design Webinar - September
Transmission Line Towers and details
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
Engineering & Design - April
WP_May_2015
BHEL Trainning Report
Stainless Steel Threaded&Welding Joint.docx
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
Cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
Engineering & Design - January
Summer Internship Presentation
Design and Stress Analysis of High Pressure Accumulator
Development of Special Purpose of profile Machine, PVC Fittings and PVC Pipe ...

Recently uploaded (20)

PDF
Roadmap Map-digital Banking feature MB,IB,AB
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Training And Development of Employee .pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PPT
Chapter four Project-Preparation material
PDF
How to Get Business Funding for Small Business Fast
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
Amazon (Business Studies) management studies
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Roadmap Map-digital Banking feature MB,IB,AB
Euro SEO Services 1st 3 General Updates.docx
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
unit 1 COST ACCOUNTING AND COST SHEET
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Unit 1 Cost Accounting - Cost sheet
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Training And Development of Employee .pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Chapter four Project-Preparation material
How to Get Business Funding for Small Business Fast
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Lecture (1)-Introduction.pptx business communication
COST SHEET- Tender and Quotation unit 2.pdf
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Amazon (Business Studies) management studies
Power and position in leadershipDOC-20250808-WA0011..pdf
Probability Distribution, binomial distribution, poisson distribution
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...

Ms for-mechanical-piping-system-installation-work

  • 1. Saigon M&C Tower Project Method Statement For Fire Stopping Installation Mechanical Piping: A. PPR Pipes & Fittings Installation. B. uPVC Pipes & Fittings Installation. C. Cast Iron Pipes & Fittings Installation. D. Ductile Iron Pipes & Fittings Installation. E. Steel Pipes & Fittings Installation. F. Copper Pipes Installation. - 12-03-09 FIRST ISSUE C.T.P -.-.- L.Q.K J.R.P Page 2
  • 2. Saigon M&C Tower Project Method Statement For Fire Stopping General: Items: - The Method Statement For Mechanical Piping System Installation Work. Aim: The objectives is to describe Plumping works associated with installation of internal pipes in compliance with the contract specification, approved shop drawings, combine and coordinated all services and structural penetration shop drawings. Scope of Works: This method statement covers work related to all Mechanical works of the SAIGON M&C TOWER Project. Installation: Page 3
  • 3. Saigon M&C Tower Project Method Statement For Fire Stopping A. PPR Pipes & Fittings Installation: 1. Adhesive Bonding Joint For PP-R Pipes and Fititng a. Cutting of the pipe - Mark pipe according to the necessary length. - Cutting the pipe follow the marking. Cut the pipe at right angles to the pipe axis. Cutting of the pipe b. Heating of pipe and fitting - Push the end of the pipe up to the welding depth into the welding tool. - After the stipulated heating times quickly remove pipe and fitting from the welding tool (See table 1). - Join them immediately until the marked welding depth is covered by the PP-R bead from the fitting. Heating-up of the pipe and fitting Page 4
  • 4. Saigon M&C Tower Project Method Statement For Fire Stopping Joining and fixing Pipe and fitting are aligning Table1: The fusion data. Pipe external - d Welding depth Heating time Welding time Cooling time (mm) (mm) (sec) (sec) (min) 16 13 8 4 2 20 14 8 4 2 25 15 11 4 2 32 16.5 12 6 4 40 18 18 6 4 50 20 27 6 4 63 24 36 8 6 75 26 45 8 8 90 29 60 8 8 110 32.5 75 10 8 125 40 90 10 8 Page 5
  • 5. Saigon M&C Tower Project Method Statement For Fire Stopping c. Weld in saddles - Weld in saddles are available for pipe outer diameter of 40, 50, 63, 75, 90, 110, 125, 160, 200 and 250 mm. The maximum sensor well diameter is specified in the following table 2. - Weld in saddles are used for: • Branch connections in existing installations. • The substitution of a tee. • Branch connections in risers. • Sensor wells, etc. Weld-in saddle detail. - Drill through the pipe wall at the intended outlet point by using the drill. - Insert the heating tool on the concave side of the weld-in saddle tool into the hole drilled in the pipe wall until the tool is completely in contact with the outer wall of the pipe - Fusing the weld-in saddle with the pipe the outer surface and the pipe inner wall the connection reaches highest stability. Drilling through the pipe wall Page 6
  • 6. Saigon M&C Tower Project Method Statement For Fire Stopping Table2: The saddles data. Page 7
  • 7. Saigon M&C Tower Project Method Statement For Fire Stopping The welding tool is inserted into the pipe wall … … heating-up of the elements Joining Weld-in saddle finished d. Butt welding Pipes and fittings are fused, as explained below by butt welding ( pipe dimension 160, 200, and 250mm). - Cut pipe into required length - Plastic pipes are aligned and fixed by means of the clamping elements - Push The pipes onto the heating place with a defined adjusting pressure. - When heating time has expired, divide the machine slide, remove heating element quickly and join the pipes (by putting both parts of the slide together). - The welded connection can be unclamped the welding process is finished. The parts to be welded are fixed and aligned respectively Page 8
  • 8. Saigon M&C Tower Project Method Statement For Fire Stopping Positioning of heating element Divide the machine slide, remove heating element. Join the pipe, cool down under pressure. Page 9
  • 9. Saigon M&C Tower Project Method Statement For Fire Stopping e. Repair - Damaged pipes may be repaired by mean of fusion. - In addition to this the offers the possibility of the pipe repair stick. - The installation: same step for weld-in saddle. Heat-up Install repair stick and cutting 2. Pipe installation a. Exposed pipes Concrete Slab Anchor Hanger rod PP-R Pipe Pipe clamp Sleeve Wall Detail of exposed horizontal PP-R pipe installation Page 10
  • 10. Saigon M&C Tower Project Method Statement For Fire Stopping Concrete Slab Anchor Hanger rod Sleeve Pipe clamp PP-R Pipe Support Sleeve PP-R Pipe Concrete Wall Slab Detail of exposed vertical PP-R pipe installation Picture for illustrating of PP-R Pipes installation Page 11
  • 11. Saigon M&C Tower Project Method Statement For Fire Stopping b. Concealed pipes - Mark location of pipes and outlet on walls according to approved shop drawings. - After layout has been established, marking the pipes route on the brick wall with two marked lines according to installed pipes size (Follow table 3). Table 3: Wall Opening Size for PP-R Pipes Pipe size Opening Depth Item (d) mm (b) mm (t) mm 1 20 60 35 2 25 60 35 3 32 100 45 4 40 100 50 5 50 150 65 6 60 150 80 PP-R Pipe Cutting line inlet PP-R Pipe Inlet PP-R Pipe PP-R Pipe Cutting line Backfill (by other) End cap PP-R Pipe (cover) outlet Detail of concealed PP-R pipe installation. Page 12
  • 12. Saigon M&C Tower Project Method Statement For Fire Stopping PP-R Pipe Cutting line Mortar hole pipe Outlet and End cap Picture for illustrating of concealed PP-R pipe installation. B. uPVC Pipes & Fittings Installation: 1. Adhesive Bonding Joint For uPVC Pipes and Fititng Zero point Stopper PVC socket PVC pipe Swell layer by Adhesive (0.1-0.2 mm) PVC socket PVC pipe Detail of Installation uPVC fitting Page 13
  • 13. Saigon M&C Tower Project Method Statement For Fire Stopping 2. Pipe installation a. Exposed pipes: Concrete Slab Anchor Hanger rod uPVC Pipe Fitting U-bolt Pipe clamp uPVC Pipe Sleeve Sleeve Wall Detail of exposed uPVC pipe installation uPVC Pipe Fitting Pipe clamp uPVC pipe Support Rubber rope Pipe strap Picture for illustrating of exposed uPVC pipes installation Page 14
  • 14. Saigon M&C Tower Project Method Statement For Fire Stopping b. Concealed pipes: Table 4: Wall Opening Following Pipe Size Item Pipe size (d) Opening (b) mm Depth (t) mm 1 32A 100 45 2 40A 100 50 3 50A 150 65 4 80A 200 100 5 100A 200 120 Concrete slab Concrete slab Cutting line Cutting line uPVC Pipe Wall uPVC Pipe & Fitting End cap (cover) Backfill Wall (by other) Drain Drain Detail for Concealed of uPVC pipes End cap uPVC pipe Mortar Hold pipe Picture for illustrating Page 15
  • 15. Saigon M&C Tower Project Method Statement For Fire Stopping C. Cast Iron Pipes and Fittings Installation 1. Cutting of Pipe - All cutting must be done in warehouse or in designated areas at each floor. All cutting must not be done at work area. - Cutting angle must be right angle. - Pipe shall be cut by power hacksaw, circular cutting machine with abrasive wheel, hand hacksaw or square end sawing vice only. - Inside edges shall be reamed smooth by reamer or sand paper. Example for Cutting pipes 2. Coupling Joint a. Pipe with Pipe 1. Push the supplied complete connector on to the pipe end right up to the middle spacing ring of the seal. 2. Turn over the open half of the sealing collar. Page 16
  • 16. Saigon M&C Tower Project Method Statement For Fire Stopping 3. Install the next pipe or formed part flush with the spacing ring and fold back the turned over half of the collar. 4. Place the clamping sleeve around the collar. 5. Alternatively tighten the two clamping screw uniformly and hard tight. The guiding and threaded plates of the clamp must come together parallet to avoid any deformations. Page 17
  • 17. Saigon M&C Tower Project Method Statement For Fire Stopping b. Pipe with Fitting 1. Push the supplied complete connector on to the pipe end right up to the middle spacing ring of the seal. 2. Push the pipe end from the other end into the connector. 3. Firmly tighten the hexagon socket screw with a socket spanner, hard ratchet or impact screwdriver, if possible to the point where the two clamping jaws come together. Picture for illustrating install complete Page 18
  • 18. Saigon M&C Tower Project Method Statement For Fire Stopping D. Ductile Iron Pipes and Fittings Installation Bolt and Nut Flange D.I Pipe D.I Pipe Detail Flange joint of D.I Pipe with Pipe Bolt and Nut D.I Pipe Flange Rubber rope D.I Fittng Detail Flange joint of D.I Pipe with Fitting D.I Pipe Concrete Slab Anchor Sleeve Hanger rod U-bolt Flange D.I Fittng D.I Pipe Angle Steel Detail for Installation D.I pipe . Some picture for illstrating Page 19
  • 19. Saigon M&C Tower Project Method Statement For Fire Stopping E. Steel Pipes and Fittings Installation 1. Screw Joint: For pipes size less than 65A Useful thread (see note 1) Washout Useful thread Threads A (see table 5) End face of internally thread parts Useful thread (see note 1) A (see table 5) Note 1: The useful thread of the internally threaded part is to be not less than 80% of the length. Detail of Screw Table 5: Size of Screw (BS 21:1985) Minimum lengths A in turns of thread (see note) for: Thread size Internal thread with Internal thread with extreme designation extreme plus tolerance Internal thread of basic size minus tolerance (gauge diameter) (maximum diameter) (minimum diameter) mm mm mm 1/16 8⅛ 6⅞ 5⅝ (7.4) (6.2) (5.1) 1/8 8⅛ 6⅞ 5⅝ (7.4) (6.2) (5.1) 1/4 8¼ 7 5¾ (11.0) (9.3) (7.7) 3/8 8½ 7¼ 6 (11.4) (9.7) (8.0) 1/2 8¼ 7 5¾ (15.0) (12.7) (10.4) 3/4 9 7¾ 6½ (16.3) (14.1) (11.7) 1 8¼ 7 5¾ (19.0) (16.2) (13.3) 1¼ 9¼ 8 6¾ (21.4) (18.5) (15.6) 1½ 9¼ 8 6¾ (21.4) (18.5) (15.6) 2 11⅛ 9⅞ 8⅝ (25.7) (22.8) (19.9) Page 20
  • 20. Saigon M&C Tower Project Method Statement For Fire Stopping Concrete Slab Anchor Hanger rod Pipe clamp Steel pipe Steel fitting Detail installation for thread steel pipe and fitting 2. Welding Joint: For pipes size 65A and over Bevel angle Pipe thickness Distance between Pipes Detail for Chamfer of groove weld Weld point Pipe thickness Details Finish of welding seam More than t Flange X: (mm) Pipe thickness Weld point t (mm) Steel Pipe 1mm shorter than X Details of welding Joint for Flange Page 21
  • 21. Saigon M&C Tower Project Method Statement For Fire Stopping Steel Pipe Concrete Slab Anchor Sleeve Hanger rod Welding U-bolt point Steel Fittng Steel Pipe Angle Steel Detail Installation welding pipes 3. Welding joint for branch pipes: For pipe size less than 65A. Table 6. Saddle fitting connection combination Branch pipe diameter Main pipe diameter Ø (mm) Ø (mm) 40 50 65 80 100 125 150 Hole size Ø (mm) 15 27 20 33 25 40 32 48 40 54 50 o 66 o: to limit used : to allow used Hole on pipe Spot weld (see table 6) Saddle fitting Main pipe Main pipe 1. Making and Cut hole 2. Insert saddle and Spot weld Branch pipe Saddle fitting Branch pipe Seam weld Main pipe Main pipe 3. Welding for certain 4. Insert branch pipe by screw Detail of welding joint for branch pipe. Page 22
  • 22. Saigon M&C Tower Project Method Statement For Fire Stopping F. Copper Pipes and Fittings Installation 1. Application of Flux and Insert No applicaion area of Flux D = 8 - 15 mm: about 3 mm D = 5/8B, 20 - 32 mm: about 5 mm Copper pipe Copper pipe Flux must apply only joint area Too much Flux cause pipes to corrosion Detail for Application of Flux 2. Application of Solder Table 7. Necessary Length of Solder Pipe Size 8 10 15 5/8B 20 25 32 Necessary Length (mm) 6 8 13 22 30 60 90 Maximum Length (mm) 8 12 19 32 42 82 123 * Diameter of solder is 2mm. If other diameter is used, Change the length in accordance with this table. Flame Copper pipe Copper pipe Solder Solder must be melted by the heat of surface. Apply solder to opposite side of heated position. Detail for Application of Solder Page 23