This document provides a method statement for installing mechanical piping at the Saigon M&C Tower Project. It describes the installation of various pipe materials, including PPR, uPVC, cast iron, ductile iron, and steel pipes. For PPR pipe installation specifically, it details the adhesive bonding joint process of cutting, heating, joining, and welding pipes and fittings. It also provides guidance on installing exposed and concealed PPR pipes.