This document provides a risk assessment and method statement for installing a steel boardwalk along the Liffey River in Dublin. It identifies major risks such as falling, drowning, equipment hazards, and outlines control measures. The workforce of 6 includes a foreman, welder, operatives, and crane operator. Installation will involve demolishing an existing wall, lifting steel sections, and working at the river's edge where harnesses and life jackets are required.