SlideShare a Scribd company logo
2
Most read
3
Most read
Dear students get fully solved assignments 
Send your semester & Specialization name to our mail id : 
“ help.mbaassignments@gmail.com ” 
or 
Call us at : 08263069601 
(Prefer mailing. Call in emergency ) 
ASSIGNMENT 
DRIVE WINETR SUMMER 2014 
PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4) 
PGDPMN (SEM 2) 
SUBJECT CODE & NAME PM0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT 
SEMESTER 4 
BK ID B1344 
CREDITS 4 
MARKS 60 
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately 
of 400 words. Each question is followed by evaluation scheme. 
Q.1. Write short notes on: 
 Scoring Method for project selection 
 Rules for network construction 
 Project crashing using network analysis
 Graphical Evaluation & Review Technique 
Answer: - 
 Scoring Method for project selection: - The weighted scoring method, also known as 'weighting 
and scoring', is a form of multi-attribute or multi-criterion analysis. It involves identification of 
all the non-monetary factors (or "attributes") that are relevant to the project; the allocation of 
weights to each of them to reflect their relative importance; and the allocation of scores to 
each option to reflect how it performs in relation to each attribute. The result is a single 
weighted score for each option, 
Rules for network construction:-The following are the primary rules for constructing AOA diagram. 
1. The starting event and ending event of an activity are called tail event and head event, respectively. 
2. The network should have a unique completion node (head event).4. No activity should be represented 
by more than one arc in the network.5 
Project crashing using network analysis: - One important extension to the basic network analysis 
technique relates to project cost/ project time tradeoff. 
 In this extension to the basic method we assume that, for each activity, the completion time 
can be reduced (within limits) by spending more money on the activity. Essentially each activity 
now has more than one possible completion 
Graphical Evaluation & Review Technique:- Graphical Evaluation and Review Technique, commonly 
known as GERT, is a network analysis technique used in project management that allows probabilistic 
treatment of both network logic and estimation of activity duration. The technique was first described in 
1966 by Dr. Alan B. Pritsker of Purdue 
Q.2. Describe the importance of Business Forecasting. 
Answer: - Business Forecasting:- Forecasting is the process of making statements about events whose 
actual outcomes (typically) have not yet been observed. A commonplace example might be estimation 
of some variable of interest at some specified future date. Prediction is a similar, but more general term. 
Both might refer to formal statistical methods employing time series, cross-sectional or longitudinal 
data, or alternatively to less formal judgmental methods. Usage can differ between areas of application: 
for example, in hydrology, the terms "forecast" and "forecasting" are sometimes reserved for estimates 
of values at certain specific future times, while the term "prediction" is used for more general estimates, 
such as the number of times floods will occur over a long
Q.3. Describe the different stages in Project management. 
Answer: - Different stages in Project management: - Project Life Cycle Overview:- The project 
management life cycle consists of five process groups (often referred to as phases): Initiation, Planning, 
Execution, Control, and Closure. It is important not to skip any of these stages if you want to keep your 
project from failing. For example, if you skip from initiation to execution without effectively planning the 
project, mistakes can be made, the project will be too disorganized, and it will fall apart. 
Life Cycle Phase I: Initiation of the Project 
Before you can get to plan a project, the project has to be initiated. Project initiation consists of the 
following steps: 
Q.4. Write short notes on: 
 Time-series forecasting of Seasonal Data 
 Setting resource calendar in MS Project 
 Network diagram chart 
 Cost Performance Index 
Answer: - Time-series forecasting of Seasonal Data: - Many time series are collected quarterly or 
monthly, and others are collected weekly, daily, and even hourly. When a time series is collected 
quarterly or monthly, you must consider the impact of seasonal effects. In this section, regression 
model building is used to forecast monthly or quarterly data. 
One of the companies of interest in the Using Statistics scenario is Wal-Mart Stores, Inc. In 2010, 
Wal-Mart Stores, Inc., operated more than 8, 
Setting resource calendar in MS Project :- First I will crate a brand new Project Calendar: 
Network diagram chart: - A network diagram may refer to: 
 Computer network diagram, a depiction of nodes and connections in a computer or 
telecommunications network 
 Graph drawing, methods 
Cost Performance Index: - A measure of the efficiency of expenses spent on a project. The formula that 
a business normally uses to assess the cost performance index (CPI) is the ratio of earned value (EV) over 
actual costs (AC); therefore, CPI is equal to 
Q.5. How to create a report on the project activities in the MS Project. 
Answer: - Set up of Reports:-
 To set report margins 
 In Report Builder design mode, click Page Setup on the File menu. 
 The Page Setup dialog box opens. 
 In the Margins area, specify the margin settings. 
 Click OK. 
 
 
Q.6. Discuss the algorithm for solving the shortest-route problem. 
Answer: - Description of shortest-route problems:- The shortest path problem is the problem of finding 
a path between two vertices (or nodes) in a graph such that the sum of the weights of its constituent 
edges is minimized. 
This is analogous to the problem of finding the shortest path between two intersections on a road map: 
the graph's vertices correspond to intersections and the edges correspond to road segments, each 
weighted by the length of its road segment. 
Everyone's favorite way to explain dynamic programming seems to be by example. One of the favorite 
examples is a simple shortest path problem. We 
Dear students get fully solved assignments 
Send your semester & Specialization name to our mail id : 
“ help.mbaassignments@gmail.com ” 
or 
Call us at : 08263069601 
(Prefer mailing. Call in emergency )

More Related Content

DOCX
Pm0011 project planning and scheduling (1)
PPTX
Classical estimating methods
PPTX
Chapt 12
DOCX
Pm0015 quantitative methods in project management
DOCX
Sub project management
PPT
Estimation maturity model using function points
DOCX
Software Cost and Effort Esitmation
Pm0011 project planning and scheduling (1)
Classical estimating methods
Chapt 12
Pm0015 quantitative methods in project management
Sub project management
Estimation maturity model using function points
Software Cost and Effort Esitmation

What's hot (20)

DOCX
Cost estimation method
PPT
Project management overview
PPTX
A3 using data modelling to consider alternatives updated
PDF
CSC-1986.original
PPTX
The Vertex Companies, Inc. - Time Impact Analysis
PPTX
Project control. Management
PPTX
Cost estimation techniques
PPT
PM Estimation techniques
PPSX
3 pm3 t_2%20-%20activity%20duration%20estimating
PPTX
Project planning and scheduling techniques
PDF
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
PDF
DCMA 14-Point Schedule Quality Check
PPTX
Project Scheduling
PDF
Introduction to Project Management
PPT
Sharp Printing,AG
PPTX
New Quality Tools
PPTX
LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...
PPT
new quality tools
PPT
NCV 3 Project Management Hands-On Support Slide Show - Module 4
PDF
P&msp2010 10 project-control
Cost estimation method
Project management overview
A3 using data modelling to consider alternatives updated
CSC-1986.original
The Vertex Companies, Inc. - Time Impact Analysis
Project control. Management
Cost estimation techniques
PM Estimation techniques
3 pm3 t_2%20-%20activity%20duration%20estimating
Project planning and scheduling techniques
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
DCMA 14-Point Schedule Quality Check
Project Scheduling
Introduction to Project Management
Sharp Printing,AG
New Quality Tools
LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...
new quality tools
NCV 3 Project Management Hands-On Support Slide Show - Module 4
P&msp2010 10 project-control
Ad

Viewers also liked (20)

DOCX
Pm0016 project risk management
DOCX
Pm0018 contracts management in projects
PPTX
Diapos quechua julia qquenaya apaza
PPT
Jammu & kashmir
PDF
Presentation: Manufacturing medical devices
PPTX
Adoption of analytics in retail | Retail Analytics
PPT
Pela Internet
DOCX
Mca4020 probability and statistics
DOCX
Bt0081, software engineering
PPTX
resalveo tradicional
PPS
Un Paseo Por Ronda
PDF
Acordo Bio Vale Pref Itabira
PPS
Higiene pessoal na_idade_media
DOCX
2013 2014 eğitim ve öğretim yılı ingilizce dersi 6. sınıf 1.dönem 1.yazılı sı...
PPTX
Averting Social Customer Service Disaster
DOCX
Mit103 object oriented programming
PDF
Resultado da enchente em Ponte Nova
PPTX
Proyecto de vida
DOCX
Bca3020 database management system
PPTX
SOLD Little Hayden Circle Hagerstown Md 21742
Pm0016 project risk management
Pm0018 contracts management in projects
Diapos quechua julia qquenaya apaza
Jammu & kashmir
Presentation: Manufacturing medical devices
Adoption of analytics in retail | Retail Analytics
Pela Internet
Mca4020 probability and statistics
Bt0081, software engineering
resalveo tradicional
Un Paseo Por Ronda
Acordo Bio Vale Pref Itabira
Higiene pessoal na_idade_media
2013 2014 eğitim ve öğretim yılı ingilizce dersi 6. sınıf 1.dönem 1.yazılı sı...
Averting Social Customer Service Disaster
Mit103 object oriented programming
Resultado da enchente em Ponte Nova
Proyecto de vida
Bca3020 database management system
SOLD Little Hayden Circle Hagerstown Md 21742
Ad

Similar to Pm0015 quantitative methods in project management (20)

DOCX
Pm0015 – quantitative methods in project management
DOCX
Pm0015 – quantitative methods in project management
PPT
Project Planning
PPT
Planning.ppt
PPT
5-ProjPlanning.ppt
PPT
dcvdhusdbsduvb0sdyvbsdyvbsdvysdvysdbvsydvdbvbyubdvbdvhvhvhvh
DOCX
Mb0049 project management
PPT
5-ProjPlanning.ppthhjjjjhhhjjjjhgyhhjhggg
PPTX
PERT Ghant chart and bench marking with application to nursing
PPT
8 project planning
DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 – project planning
DOCX
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
PPT
Project-Planning
PDF
Student guide for unit 9
PDF
4. project cost management
DOCX
Running head critical path method1 critical path method7critic
PDF
Budgeting in SCRUM
PDF
Budgeting in SCRUM
DOCX
Pm0015 – quantitative methods in project
Pm0015 – quantitative methods in project management
Pm0015 – quantitative methods in project management
Project Planning
Planning.ppt
5-ProjPlanning.ppt
dcvdhusdbsduvb0sdyvbsdyvbsdvysdvysdbvsydvdbvbyubdvbdvhvhvhvh
Mb0049 project management
5-ProjPlanning.ppthhjjjjhhhjjjjhgyhhjhggg
PERT Ghant chart and bench marking with application to nursing
8 project planning
Pm0011 project planning and scheduling
Pm0011 – project planning
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
Project-Planning
Student guide for unit 9
4. project cost management
Running head critical path method1 critical path method7critic
Budgeting in SCRUM
Budgeting in SCRUM
Pm0015 – quantitative methods in project

Pm0015 quantitative methods in project management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency ) ASSIGNMENT DRIVE WINETR SUMMER 2014 PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4) PGDPMN (SEM 2) SUBJECT CODE & NAME PM0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT SEMESTER 4 BK ID B1344 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q.1. Write short notes on:  Scoring Method for project selection  Rules for network construction  Project crashing using network analysis
  • 2.  Graphical Evaluation & Review Technique Answer: -  Scoring Method for project selection: - The weighted scoring method, also known as 'weighting and scoring', is a form of multi-attribute or multi-criterion analysis. It involves identification of all the non-monetary factors (or "attributes") that are relevant to the project; the allocation of weights to each of them to reflect their relative importance; and the allocation of scores to each option to reflect how it performs in relation to each attribute. The result is a single weighted score for each option, Rules for network construction:-The following are the primary rules for constructing AOA diagram. 1. The starting event and ending event of an activity are called tail event and head event, respectively. 2. The network should have a unique completion node (head event).4. No activity should be represented by more than one arc in the network.5 Project crashing using network analysis: - One important extension to the basic network analysis technique relates to project cost/ project time tradeoff.  In this extension to the basic method we assume that, for each activity, the completion time can be reduced (within limits) by spending more money on the activity. Essentially each activity now has more than one possible completion Graphical Evaluation & Review Technique:- Graphical Evaluation and Review Technique, commonly known as GERT, is a network analysis technique used in project management that allows probabilistic treatment of both network logic and estimation of activity duration. The technique was first described in 1966 by Dr. Alan B. Pritsker of Purdue Q.2. Describe the importance of Business Forecasting. Answer: - Business Forecasting:- Forecasting is the process of making statements about events whose actual outcomes (typically) have not yet been observed. A commonplace example might be estimation of some variable of interest at some specified future date. Prediction is a similar, but more general term. Both might refer to formal statistical methods employing time series, cross-sectional or longitudinal data, or alternatively to less formal judgmental methods. Usage can differ between areas of application: for example, in hydrology, the terms "forecast" and "forecasting" are sometimes reserved for estimates of values at certain specific future times, while the term "prediction" is used for more general estimates, such as the number of times floods will occur over a long
  • 3. Q.3. Describe the different stages in Project management. Answer: - Different stages in Project management: - Project Life Cycle Overview:- The project management life cycle consists of five process groups (often referred to as phases): Initiation, Planning, Execution, Control, and Closure. It is important not to skip any of these stages if you want to keep your project from failing. For example, if you skip from initiation to execution without effectively planning the project, mistakes can be made, the project will be too disorganized, and it will fall apart. Life Cycle Phase I: Initiation of the Project Before you can get to plan a project, the project has to be initiated. Project initiation consists of the following steps: Q.4. Write short notes on:  Time-series forecasting of Seasonal Data  Setting resource calendar in MS Project  Network diagram chart  Cost Performance Index Answer: - Time-series forecasting of Seasonal Data: - Many time series are collected quarterly or monthly, and others are collected weekly, daily, and even hourly. When a time series is collected quarterly or monthly, you must consider the impact of seasonal effects. In this section, regression model building is used to forecast monthly or quarterly data. One of the companies of interest in the Using Statistics scenario is Wal-Mart Stores, Inc. In 2010, Wal-Mart Stores, Inc., operated more than 8, Setting resource calendar in MS Project :- First I will crate a brand new Project Calendar: Network diagram chart: - A network diagram may refer to:  Computer network diagram, a depiction of nodes and connections in a computer or telecommunications network  Graph drawing, methods Cost Performance Index: - A measure of the efficiency of expenses spent on a project. The formula that a business normally uses to assess the cost performance index (CPI) is the ratio of earned value (EV) over actual costs (AC); therefore, CPI is equal to Q.5. How to create a report on the project activities in the MS Project. Answer: - Set up of Reports:-
  • 4.  To set report margins  In Report Builder design mode, click Page Setup on the File menu.  The Page Setup dialog box opens.  In the Margins area, specify the margin settings.  Click OK.   Q.6. Discuss the algorithm for solving the shortest-route problem. Answer: - Description of shortest-route problems:- The shortest path problem is the problem of finding a path between two vertices (or nodes) in a graph such that the sum of the weights of its constituent edges is minimized. This is analogous to the problem of finding the shortest path between two intersections on a road map: the graph's vertices correspond to intersections and the edges correspond to road segments, each weighted by the length of its road segment. Everyone's favorite way to explain dynamic programming seems to be by example. One of the favorite examples is a simple shortest path problem. We Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency )