The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
1
WENTLOOGE
This Theme area contains the Policy Units WEN 1 and WEN 2.
It starts at Lamby Way Landfill Site drain/outfall on the west shoreline of the Severn Estuary,
and ends on the River Ebbw (west bank) at the Maesglas railway bridge.
The Key Policy Drivers in this area are:
• International nature conservation sites – Severn Estuary SAC, SPA and Ramsar;
• Critical infrastructure – railway line, electricity substations;
• Residential developments.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
2
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
3
Policy Unit: WEN 1 - Lamby Way landfill site drain to Sluice House
Farm (Tarwick Rhyne)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
4
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The Short Term policy for this unit is Hold The Line
The existing defences will remain in place with some maintenance, managing
the risk of flooding and erosion impacts to a large, mainly agricultural area.
Rumney Great Wharf is likely to to erode as sea levels rise. Actions should
take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3,
and WEN 2). Investigations of future potential for MR should start in this
epoch. All stakeholders should be involved. Future MR will help manage
impacts from sea level rise and create new habitat.
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
20 to 50
years
(2055)
HTL
The Medium Term policy for this unit is Hold The Line
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. Opportunities to create
habitat and help manage the impacts of sea level rise through MR should be
investigated when the position of any new defences is chosen. The position of
new defences and the impacts of erosion at Rumney Great Wharf need to be
investigated in more detail. Long term erosion rates are unclear and should be
monitored. Saltmarsh in front of any new defences will continue to erode -
other, similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites. Actions
should take account of potential impacts in linked Policy Units (CAR 1, CAR 2,
CAR 3, and WEN 2).
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
50 to 100
years
(2105)
HTL
The Long Term policy for this unit is Hold The Line
Defences are likely to have been reconstructed in the previous epoch and
should be maintained. Long term erosion rates are unclear and should be
monitored. Actions may be needed to ensure new defences are not
undermined. Saltmarsh in front of new defences will continue to erode - other,
similar habitat should be created elsewhere. The potential for MR should be
investigated to create a long term sustainable defence.
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
5
Economics
Policy
Unit
Existing
SMP1 Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present
Value Damages
Preferred Plan Present
Value Defence Costs
WEN 1
HTL (or
Realignment)
HTL HTL HTL
£568m
(CAR1-3, WEN1-2 total)
£24m
(CAR1-3, WEN1-2 total)
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and
WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
6
Predicted Implication of the Preferred Plan for the WEN 1 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth Heritage,
Geology and Biodiversity
Landscape Character
and Visual Amenity
Historic
Environment
Amenity and
Recreational Use
0 – 20
years
The current defences will
remain in place.
Maintenance will help to
prolong the residual life of
the defences.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
A HTL policy will not impact
the nature conservation
sites during this time period.
Works should take account
of possible environmental
impacts and the need for an
EIA.
A HTL policy will not
impact on landscape
character and visual
amenity during this epoch
as existing defences are
expected to remain in
place
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage
the risk of flooding on
amenity or recreational
value of the land.
20 – 50
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epoch and should be
replaced. There are
some privately owned
defences in this policy
unit that could offer a
second line of defence.
How these are utilised
should be investigated
when new defences are
considered.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
Coastal squeeze will occur
which will result in loss of
intertidal habitats of Severn
N2K sites. The Gwent
Levels, Rumney and
Peterstone SSSI terrestrial
habitats will be protected.
Works should take account
of possible environmental
impacts and the need for an
EIA.
Defences are likely to need
reconstruction during this
(or the next) epoch. Any
increase in the height of
the new defences will
affect local landscape -
increasing presence in the
landscape. Landscape will
also alter as saltmarsh in
front of new defences
erodes. Higher defences
will also create a visual
impact with defences
disrupting views.
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases. Private
defences should be
maintained if they are part
of the flood management
strategy. Public funding
for this is not guaranteed.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
Coastal squeeze will occur
which will result in loss of
intertidal habitats of the
Severn N2K sites. The
Gwent Levels, Rumney and
Peterstone SSSI terrestrial
habitats will be protected.
Works should take account
of possible environmental
impacts and the need for an
EIA.
Any increase in the height
of defences will affect local
landscape - increasing
presence in the landscape.
Landscape will also alter
as saltmarsh in front of
new defences erodes.
Higher defences will also
create a visual impact with
defences disrupting views.
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
7
Policy Unit: WEN 2 - Sluice House Farm (Tarwick Rhyne) to the River
Ebbw (west bank) at Maesglas Railway Bridge
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
8
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
9
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line
The existing defences will remain in place in the short term with some
maintenance, managing the risk of flooding and erosion impacts to a large
area of mainly agricultural Land and important infrastructure (road, rail,
electricity). Erosion of Peterstone Great Wharf will increase as sea levels rise
Actions should take account of potential impacts in linked Policy Units (CAR
1, CAR 2, CAR 3, and WEN 1). Investigations of future potential for MR
should start in this epoch. All stakeholders should be involved. Future MR
will help manage impacts from sea level rise and create new habitat.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. The position of new
defences and the impact on erosion rates should be considered in more
detail. Opportunities to create habitat and help manage the impacts of sea
level rise through MR should be investigated when the position of any new
defences is chosen. Erosion of Peterstone Great Wharf will increase as sea
levels rise. Actions should take account of potential impacts in linked Policy
Units (CAR 1, CAR 2, CAR 3, and WEN 1).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line
Defences are likely to have been reconstructed in the previous epoch and
should be maintained. Erosion of Peterstone Great Wharf will increase as
sea levels rise. Actions may be needed to ensure new defences are not
undermined. Intertidal habitat in front of any new defences will continue to
erode – other, similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites. The
potential for MR should be investigated to create a long term sustainable
defence. Actions should take account of potential impacts in linked Policy
Units (CAR 1, CAR 2, CAR 3, and WEN 1).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
10
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
WEN 2 HTL HTL HTL HTL
£568m (CAR1-3, WEN1-2
total)
£24m (CAR1-3, WEN1-2 total)
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1,
and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
11
Predicted Implication of the Preferred Plan for the WEN 2 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character and
Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The current defences will
remain in place.
Maintenance will help to
prolong the residual life of
the defences. Studies to
help inform the potential
for MR should be
undertaken.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk under a HTL policy will
not impact on existing
landscape and visual
amenity
Defences will manage
the risk of flooding to
the historic
environment, including
Gwent Levels Historic
Landscape Area.
Defences will manage the
risk of flooding to amenity
or recreational value of
the land.
20 – 50
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epochand should be
replaced. The position of
new defences should be
investigated, including
opportunity for MR.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
Realignment of defences
could lead to a loss of
property / land but reduce
the risk of impacts from
flooding to areas behind
the new defences.
Losses will depend on the
location of new defences.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
within Severn N2K sites.
The Gwent Levels St
Brides SSSI terrestrial
habitats will be
protected. Realignment
of defences could lead to
a loss of terrestrial
habitat. Works should
take account of possible
environmental impacts
and the need for an EIA.
Defences are likely to need
reconstruction during this
epoch. Any increase in the
height of the new defences
will affect local landscape -
increasing presence in the
landscape. Landscape will
also alter as Peterstone
Great Wharf erodes. Higher
defences will also create a
visual impact with defences
disrupting views.
Realignment of defences will
alter the landscape, but may
be less visually intrusive
than higher defences in their
current location.
Defences will manage
the risk of flooding to
the historic environment
including Gwent Levels
Historic Landscape
Area. Realignment of
defences could lead to
the loss of historic
environment features
and alter the historic
landscape.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
Realignment of defences
could lead to the loss of
recreational assets.
PRoW / coastal path may
need to be re-routed.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
12
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character and
Visual Amenity
Historic Environment
Amenity and
Recreational Use
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases. The potential
for MR should be
investigated.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
Realignment of defences
could lead to a loss of
property / land but reduce
the risk of impacts from
flooding to areas behind
the new defences.
Losses will depend on the
location of new defences
Coastal squeeze will
occur which will result in
loss of intertidal habitats
within Severn N2K sites.
The Gwent Levels St
Brides SSSI terrestrial
habitats will be
protected. Realignment
of defences could lead to
a loss of terrestrial
habitat. Works should
take account of possible
environmental impacts
and the need for an EIA.
Any increase in the height of
the new defences will affect
local landscape - increasing
presence in the landscape.
Landscape will also alter as
Peterstone Great Wharf
erodes. Higher defences will
also create a visual impact
with defences disrupting
views. Realignment of
defences will alter the
landscape, but may be less
visually intrusive than higher
defences in their current
location.
Defences will manage
the risk of flooding to
the historic environment
including Gwent Levels
Historic Landscape
Area. Realignment of
defences could lead to
the loss of historic
environment features
and alter the historic
landscape.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
Realignment of defences
could lead to the loss of
recreational assets.
PRoW / coastal path may
need to be re-routed.

More Related Content

PDF
Smp2 part b policy statements tidenham only_final
PDF
Smp2 part b policy statements portishead only_final
PDF
Smp2 part b policy statements glos-haw bridge only_final
PDF
Smp2 part b policy statements newport-usk only_final
PDF
Smp2 part b policy statements lydney-glos only_final
PDF
Smp2 part b policy statements caldicot only_final
PDF
Smp2 part b policy statements glos-sharpness only_final
PDF
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements tidenham only_final
Smp2 part b policy statements portishead only_final
Smp2 part b policy statements glos-haw bridge only_final
Smp2 part b policy statements newport-usk only_final
Smp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements caldicot only_final
Smp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements chepstow-wye only_final

What's hot (19)

PDF
Smp2 part b policy statements bristol only_final
PDF
Smp2 part b policy statements cardiff only_final
PDF
Appendix f policy development and appraisal final_dec2010
PDF
Smp2 part b policy statements kingston seymour only_final
PPT
Multi-Hazard Mitigation Presentation
PDF
Smp2 part b policy statements holms only_final
PDF
NAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
PDF
Alaska
PDF
Flood erosioncontrolfs4
PDF
Nelsonquarrylanteigne 121011161032-phpapp01
PPT
Nelson quarry lanteigne
PDF
backgrounder_lmfls
PDF
ICM Act of South Africa most recent - as amended wef May 2015
PDF
RIVER BASIN MANAGEMENT 1997
PDF
Sn woodfibre update-01
PDF
PDF
Eacc bangladesh
PDF
7ErosSediCntrlMthds
PDF
Eacc ghana
Smp2 part b policy statements bristol only_final
Smp2 part b policy statements cardiff only_final
Appendix f policy development and appraisal final_dec2010
Smp2 part b policy statements kingston seymour only_final
Multi-Hazard Mitigation Presentation
Smp2 part b policy statements holms only_final
NAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
Alaska
Flood erosioncontrolfs4
Nelsonquarrylanteigne 121011161032-phpapp01
Nelson quarry lanteigne
backgrounder_lmfls
ICM Act of South Africa most recent - as amended wef May 2015
RIVER BASIN MANAGEMENT 1997
Sn woodfibre update-01
Eacc bangladesh
7ErosSediCntrlMthds
Eacc ghana
Ad

Viewers also liked (7)

PDF
Appendix e issues and features final_dec2010
PPTX
Perceptum Education Workshop Istanbul
PPTX
Mi universidad
PPTX
Evaluation question 1
PPTX
El deporte
PPTX
clase 15.03.16
PPTX
Factibilidades
Appendix e issues and features final_dec2010
Perceptum Education Workshop Istanbul
Mi universidad
Evaluation question 1
El deporte
clase 15.03.16
Factibilidades
Ad

Similar to Smp2 part b policy statements wentlooge only_final (20)

PDF
Smp2 part b policy statements sharpness-sev cross only_final
PDF
Smp2 part a main report final
PDF
Smp2 part b policy statements intro sections_final
PDF
Appendix d theme review final_dec2010a
PDF
Appendix g preferred management approach testing final_dec2010
PDF
Appendix a development of the smp2 final_dec2010
PDF
Appendix h economics final dec2010
PDF
Appendix c baseline understanding final_dec2010
PDF
Appendix k metadata and bibliographic database final_dec2010
PDF
Appendix j wfd assessment final_dec2010
PDF
Smp2 part c action plan final
PDF
Appendix i part b _hra_final_dec2010
PDF
2011 05 Severn Estuary Flood Risk Management Strategy and Shoreline Managemen...
PDF
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
PDF
Appendix i part a sea_final_dec2010
PDF
Appendix b stakeholder engagement and consultation final_dec2010
PPTX
Sustainability East - East of England Climate Change Adaptation
PDF
Appendix i part a sea annexes_final_dec2010
PPT
2008 01 Welcome Address Natasha Barker, WWF
PPTX
Dissertation Poster
Smp2 part b policy statements sharpness-sev cross only_final
Smp2 part a main report final
Smp2 part b policy statements intro sections_final
Appendix d theme review final_dec2010a
Appendix g preferred management approach testing final_dec2010
Appendix a development of the smp2 final_dec2010
Appendix h economics final dec2010
Appendix c baseline understanding final_dec2010
Appendix k metadata and bibliographic database final_dec2010
Appendix j wfd assessment final_dec2010
Smp2 part c action plan final
Appendix i part b _hra_final_dec2010
2011 05 Severn Estuary Flood Risk Management Strategy and Shoreline Managemen...
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
Appendix i part a sea_final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
Sustainability East - East of England Climate Change Adaptation
Appendix i part a sea annexes_final_dec2010
2008 01 Welcome Address Natasha Barker, WWF
Dissertation Poster

Recently uploaded (20)

PPTX
FIRE SAFETY SEMINAR SAMPLE FOR EVERYONE.pptx
PPTX
Concept of Safe and Wholesome Water.pptx
PPTX
NSTP1 NSTP1NSTP1NSTP1NSTP1NSTP1NSTP1NSTP
PDF
Global Natural Disasters in H1 2025 by Beinsure
PPTX
Disposal Of Wastes.pptx according to community medicine
PDF
Effective factors on adoption of intercropping and it’s role on development o...
PPTX
Corporate Social Responsibility & Governance
PPTX
ser tico.pptxXYDTRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRY
PPTX
Green Modern Sustainable Living Nature Presentation_20250226_230231_0000.pptx
PPTX
"One Earth Celebrating World Environment Day"
PDF
Earthquake, learn from the past and do it now.pdf
PPTX
Green and Cream Aesthetic Group Project Presentation.pptx
PDF
Tree Biomechanics, a concise presentation
PPTX
Office Hours on Drivers of Tree Cover Loss
PPTX
Delivery census may 2025.pptxMNNN HJTDV U
PPTX
Conformity-and-Deviance module 7 ucsp grade 12
PPTX
Arugula. Crop used for medical plant in kurdistant
DOCX
Epoxy Coated Steel Bolted Tanks for Fish Farm Water Provides Reliable Water f...
PDF
The Role of Non-Legal Advocates in Fighting Social Injustice.pdf
PPTX
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire
FIRE SAFETY SEMINAR SAMPLE FOR EVERYONE.pptx
Concept of Safe and Wholesome Water.pptx
NSTP1 NSTP1NSTP1NSTP1NSTP1NSTP1NSTP1NSTP
Global Natural Disasters in H1 2025 by Beinsure
Disposal Of Wastes.pptx according to community medicine
Effective factors on adoption of intercropping and it’s role on development o...
Corporate Social Responsibility & Governance
ser tico.pptxXYDTRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRY
Green Modern Sustainable Living Nature Presentation_20250226_230231_0000.pptx
"One Earth Celebrating World Environment Day"
Earthquake, learn from the past and do it now.pdf
Green and Cream Aesthetic Group Project Presentation.pptx
Tree Biomechanics, a concise presentation
Office Hours on Drivers of Tree Cover Loss
Delivery census may 2025.pptxMNNN HJTDV U
Conformity-and-Deviance module 7 ucsp grade 12
Arugula. Crop used for medical plant in kurdistant
Epoxy Coated Steel Bolted Tanks for Fish Farm Water Provides Reliable Water f...
The Role of Non-Legal Advocates in Fighting Social Injustice.pdf
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire

Smp2 part b policy statements wentlooge only_final

  • 1. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 1 WENTLOOGE This Theme area contains the Policy Units WEN 1 and WEN 2. It starts at Lamby Way Landfill Site drain/outfall on the west shoreline of the Severn Estuary, and ends on the River Ebbw (west bank) at the Maesglas railway bridge. The Key Policy Drivers in this area are: • International nature conservation sites – Severn Estuary SAC, SPA and Ramsar; • Critical infrastructure – railway line, electricity substations; • Residential developments.
  • 2. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 2
  • 3. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 3 Policy Unit: WEN 1 - Lamby Way landfill site drain to Sluice House Farm (Tarwick Rhyne)
  • 4. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 4 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The Short Term policy for this unit is Hold The Line The existing defences will remain in place with some maintenance, managing the risk of flooding and erosion impacts to a large, mainly agricultural area. Rumney Great Wharf is likely to to erode as sea levels rise. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 2). Investigations of future potential for MR should start in this epoch. All stakeholders should be involved. Future MR will help manage impacts from sea level rise and create new habitat. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The Medium Term policy for this unit is Hold The Line The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. Opportunities to create habitat and help manage the impacts of sea level rise through MR should be investigated when the position of any new defences is chosen. The position of new defences and the impacts of erosion at Rumney Great Wharf need to be investigated in more detail. Long term erosion rates are unclear and should be monitored. Saltmarsh in front of any new defences will continue to erode - other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 2). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The Long Term policy for this unit is Hold The Line Defences are likely to have been reconstructed in the previous epoch and should be maintained. Long term erosion rates are unclear and should be monitored. Actions may be needed to ensure new defences are not undermined. Saltmarsh in front of new defences will continue to erode - other, similar habitat should be created elsewhere. The potential for MR should be investigated to create a long term sustainable defence. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 5. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 5 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs WEN 1 HTL (or Realignment) HTL HTL HTL £568m (CAR1-3, WEN1-2 total) £24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 6. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 6 Predicted Implication of the Preferred Plan for the WEN 1 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current defences will remain in place. Maintenance will help to prolong the residual life of the defences. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. A HTL policy will not impact on landscape character and visual amenity during this epoch as existing defences are expected to remain in place Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land. 20 – 50 years The current earth embankment defences are expected to come to the end of their serviceable life in this epoch and should be replaced. There are some privately owned defences in this policy unit that could offer a second line of defence. How these are utilised should be investigated when new defences are considered. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats of Severn N2K sites. The Gwent Levels, Rumney and Peterstone SSSI terrestrial habitats will be protected. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to need reconstruction during this (or the next) epoch. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as saltmarsh in front of new defences erodes. Higher defences will also create a visual impact with defences disrupting views. Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land. 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. Private defences should be maintained if they are part of the flood management strategy. Public funding for this is not guaranteed. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats of the Severn N2K sites. The Gwent Levels, Rumney and Peterstone SSSI terrestrial habitats will be protected. Works should take account of possible environmental impacts and the need for an EIA. Any increase in the height of defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as saltmarsh in front of new defences erodes. Higher defences will also create a visual impact with defences disrupting views. Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land.
  • 7. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 7 Policy Unit: WEN 2 - Sluice House Farm (Tarwick Rhyne) to the River Ebbw (west bank) at Maesglas Railway Bridge
  • 8. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 8
  • 9. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 9 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line The existing defences will remain in place in the short term with some maintenance, managing the risk of flooding and erosion impacts to a large area of mainly agricultural Land and important infrastructure (road, rail, electricity). Erosion of Peterstone Great Wharf will increase as sea levels rise Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). Investigations of future potential for MR should start in this epoch. All stakeholders should be involved. Future MR will help manage impacts from sea level rise and create new habitat. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. The position of new defences and the impact on erosion rates should be considered in more detail. Opportunities to create habitat and help manage the impacts of sea level rise through MR should be investigated when the position of any new defences is chosen. Erosion of Peterstone Great Wharf will increase as sea levels rise. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line Defences are likely to have been reconstructed in the previous epoch and should be maintained. Erosion of Peterstone Great Wharf will increase as sea levels rise. Actions may be needed to ensure new defences are not undermined. Intertidal habitat in front of any new defences will continue to erode – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. The potential for MR should be investigated to create a long term sustainable defence. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 10. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 10 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs WEN 2 HTL HTL HTL HTL £568m (CAR1-3, WEN1-2 total) £24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1, and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 11. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 11 Predicted Implication of the Preferred Plan for the WEN 2 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current defences will remain in place. Maintenance will help to prolong the residual life of the defences. Studies to help inform the potential for MR should be undertaken. Defences reduce the risk of impacts from flooding to existing property, land use or human health. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding to amenity or recreational value of the land. 20 – 50 years The current earth embankment defences are expected to come to the end of their serviceable life in this epochand should be replaced. The position of new defences should be investigated, including opportunity for MR. Defences reduce the risk of impacts from flooding to existing property, land use or human health. Realignment of defences could lead to a loss of property / land but reduce the risk of impacts from flooding to areas behind the new defences. Losses will depend on the location of new defences. Coastal squeeze will occur which will result in loss of intertidal habitats within Severn N2K sites. The Gwent Levels St Brides SSSI terrestrial habitats will be protected. Realignment of defences could lead to a loss of terrestrial habitat. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to need reconstruction during this epoch. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as Peterstone Great Wharf erodes. Higher defences will also create a visual impact with defences disrupting views. Realignment of defences will alter the landscape, but may be less visually intrusive than higher defences in their current location. Defences will manage the risk of flooding to the historic environment including Gwent Levels Historic Landscape Area. Realignment of defences could lead to the loss of historic environment features and alter the historic landscape. Defences will manage the risk of flooding on amenity or recreational value of the land. Realignment of defences could lead to the loss of recreational assets. PRoW / coastal path may need to be re-routed.
  • 12. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 12 Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. The potential for MR should be investigated. Defences reduce the risk of impacts from flooding to existing property, land use or human health. Realignment of defences could lead to a loss of property / land but reduce the risk of impacts from flooding to areas behind the new defences. Losses will depend on the location of new defences Coastal squeeze will occur which will result in loss of intertidal habitats within Severn N2K sites. The Gwent Levels St Brides SSSI terrestrial habitats will be protected. Realignment of defences could lead to a loss of terrestrial habitat. Works should take account of possible environmental impacts and the need for an EIA. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as Peterstone Great Wharf erodes. Higher defences will also create a visual impact with defences disrupting views. Realignment of defences will alter the landscape, but may be less visually intrusive than higher defences in their current location. Defences will manage the risk of flooding to the historic environment including Gwent Levels Historic Landscape Area. Realignment of defences could lead to the loss of historic environment features and alter the historic landscape. Defences will manage the risk of flooding on amenity or recreational value of the land. Realignment of defences could lead to the loss of recreational assets. PRoW / coastal path may need to be re-routed.