SlideShare a Scribd company logo
Slide 1
Today’s session will begin shortly
@tescometering
@TESCO_Metering
TESCO -The Eastern Specialty Company
TESCO -The Eastern Specialty Company
TESCO
Tuesdays
Slide 2
10/02/2012 Slide 2
Meter Testing in the Field
Prepared by John H Carroll, BSEE TESCO
Western Regional Sales Manager. The Eastern Specialty Company
Tuesday, February 23, 2021
Slide 3
Topics we will be covering
• Test Switches and CT’s
• Meter Accuracy Testing Using
MTS 3050 True 3 Phase
• Customer Load Test-Video
• Customer CT Ratio Test-Video
• Phantom Load Test-Video
• Q&A Discussions
Slide 4
Transformer Rated Metering
• Meter measures scaled down
representation of the load.
• Scaling is accomplished by the use
of external current transformers
(CTs) and sometimes voltage
transformers or PTs).
• The meter is NOT part of the circuit
• When the meter is removed from
the socket, power to the customer
is not effected.
Slide 5
9S Meter Installation with 400:5 CT’s
400A
400A
400A
LOAD
5A 5A 5A
SOURCE
PHASE A
PHASE B
PHASE C
The Basic Components
Slide 6
TESCO/Georgia Power 2017 Caribbean Meter School
Fundamentals of Polyphase Field Meter Testing and Site Verification
 Full Load
 Light Load
 Power Factor
Meter Accuracy Testing
Meter Accuracy Testing
Customer Load
 Customer Load
 Customer Billing
 Customer Conditions
Meter Accuracy Testing
Phantom Load
Slide 7
The Importance of CT Testing in the Field
• One transformer in three wired
backwards will give the customer a
bill of 1/3rd the actual bill.
• One broken wire to a single
transformer will give the customer a
bill of 2/3rd the actual bill
• One dual ratio transformer
inappropriately marked in the billing
system as 400:5 instead of 800:5
provides a bill that is ½ of the actual
bill. And the inverse will give a bill
double of what should have been
sent. Both are lose-lose situations
for the utility.
Slide 8
The Importance of CT Testing in the Field
(continued)
• Cross Phasing (wiring errors)
• Loose or Corroded Connections
• CT Mounted Backwards
• CT’s with Shorted Turns
• Wrong Selection of Dual Ratio CT
• Detect Magnetized CT’s
• Burden Failure in Secondary Circuit
• Open or Shorted Secondary
• Mislabeled CT’s
• Ensures all Shorting Blocks have been Removed
Slide 9
Meter Accuracy Testing
 Meter Accuracy Test using IR
Pulse Detection
 Make connections from Field
Tester to Meter Form
 Connect IR Pulse Detector to
meter output
 Check pulse indictor
 Pulse Align if necessary
Courtesy of APS
Slide 10
Meter Accuracy Testing
 Meter Accuracy Test
using IR Pulse
Detection
 Make connections from
Field Tester to Meter
Form
 Connect IR Pulse
Detector to meter
output
 Check pulse indictor
 Pulse Align if
necessary
Slide 11
Customer Load Test -Video
 Meter Accuracy Test
using IR Pulse
Detection
 Make connections from
Field Tester to Meter
Form
 Connect IR Pulse
Detector to meter
output
 Check pulse indictor
 Pulse Align if
necessary
https://youtu.be/Miq3trNaPPc
Slide 12
Customer CT Ratio Test
 Make Connections from
Field Tester to Primary
current phases
 Make connections from
Field Tester to
Secondary test switch
 Connect IR Pulse
Detector to meter output
Courtesy of APS
Slide 13
Ratio of Primary Current to Secondary Current
PHASE A
SOURCE LOAD
400A
400A
400A
5A
5A
Calculate Ratio
Customer CT Ratio Test
80:1
Slide 14
Customer CT Ratio Test -Video
Make Connections from
Field Tester to Primary
current phases
Make connections from
Field Tester to Secondary
test switch
Connect IR Pulse
Detector to meter output
https://youtu.be/JlHM-4mzuTs
Slide 15
Fundamentals of Polyphase Field Meter
Testing and Site Verification
Functionality with Burden Present on the Secondary Loop
Example Burden Spec:
0.3% @ B0.1, B0.2, B0.5
or
There should be less than the 0.3%
change in secondary current from initial
(“0” burden) reading, when up to 0.5 Ohms
of burden is applied
Customer CT Ratio Test with Burden
Slide 16
Customer CT Ratio Test with Burden
Functionality with Burden Present on the Secondary Loop
PHASE A
• Some burden will
always be present –
junctions, meter
coils, test switches,
cables, etc.
• CT’s must be able to
maintain an accurate
ratio with burden on
the secondary.
Slide 17
Customer CT Test with Burden
Functionality with Burden Present on the Secondary Loop
0.3% @ B0.1, B0.2, B0.5
0.0000
1.0000
2.0000
3.0000
4.0000
5.0000
6.0000
0 2 4 6 8
Initial Reading = 5Amps
0.3% x 5A = 0.015A
5A – 0.015 = 4.985A
Burden Reading
0 5.0000
0.1 4.9999
0.2 4.9950
0.5 4.9900
1 4.9800
2 4.9500
4 4.0000
8 0.8000
Slide 18
CT Ratio Testing with Burden Added
 Meter Accuracy
Test using IR
Pulse Detection
 Make
connections
from Field
Tester to Meter
Form
 Connect IR
Pulse Detector
to meter output
 Check pulse
indictor
 Pulse Align if
necessary
Slide 19
Customer CT Test with Burden-Video
Make Connections from
Field Tester to Primary
current phases
Make connections from
Field Tester to Secondary
test switch
Ensure additional
burden value is selected
Connect IR Pulse
Detector to meter output
https://youtu.be/d6PV3ZtWjPQ
Slide 20
Phantom Load Testing
 Determine the TA ( Test Amps)
from Meter Faceplate
 Ensure Safety shorting switch and
test jack have been disengaged
 Make connections from Field
Tester to Meter Form using jumper
EZ Clips.
 Connect IR Pulse Detector to
meter output
 Check pulse indictor
 Pulse Align if necessary
Courtesy of APS
Slide 21
Phantom Load Testing
 Determine the TA ( Test Amps)
from Meter Faceplate
 Ensure Safety shorting switch
and test jack have been
disengaged
 Make connections from Field
Tester to Meter Form using
jumper EZ Clips.
 Connect IR Pulse Detector to
meter output
 Check pulse indictor
 Pulse Align if necessary
Slide 22
Phantom Load Testing
Determine the TA ( Test
Amps) from Meter
Faceplate
Ensure Safety shorting
switch and test jack have
been disengaged
Make connections from
Field Tester to Meter Form
using jumper EZ Clips.
Connect IR Pulse
Detector to meter output
Check pulse indictor
Pulse Align if necessary
Slide 23
Phantom Load Testing
Slide 24
Phantom Load Testing-Video
Ensure Test Switch
CT’s are shunted
Make connections from
Field Tester to Secondary
test switch
Connect EZ Clips to
test switch
Connect IR Pulse
Detector to meter output
https://youtu.be/Hdyn-KWOXaA
Slide 25
Harmonics Testing
 Harmonics are integer
frequencies often found
with non linear loads.
THD=Total Harmonic
Distortion
Vthd <5%
Slide 26
Harmonics Testing-Waveforms
 Harmonics are
generated as a
voltage or current at
an integer frequency
of the system,
produced by the
action of non-linear
loads such as
rectifiers, discharge
lighting, or switch
mode power
supplies.
 Harmonic
frequencies in the
power grid are a
frequent cause of
power quality
problems.
Slide 27
Harmonics Testing-Waveforms
What is the problem with Harmonics?
HEAT.
 Can cause significant damage
 Safety Hazard
 Poor Power Factor
 AMI Mesh Interference
 Transformer Overheating
 Loss of service
Image courtesy of irinfo.org
Slide 28
Harmonics Testing-Waveforms
Can we reduce or eliminate Harmonics?
 Perhaps not eliminate. But we can reduce their impact.
 We live in non linear world of power where harmonics are generated.
 PWM conversion and AC Frequency Drive Motors and Pumps.
 Many thousands of todays electrical products have SWPS devices.
Slide 29
Harmonics Testing-Waveforms
How can we reduce the impact of harmonics ?
 Measure and determine major harmonic condition under customer load.
 Assess most significant even & odd harmonics.
 Active Harmonic Filtering can reduce most significant index.
 Power Factor Correction Capacitor.
Slide 30
Periodic Site Inspections…..
….Can Discover or Prevent:
• Billing Errors
• Bad Metering set-up
• Detect Current Diversion
• Identify Potential Safety Issues
• Metering Issues (issues not
related to meter accuracy)
• AMR/AMI Communications Issues
• The need for Unscheduled Truck Rolls
due to Undetected Field Related Issues
• Discrepancies between what is
believed to be at a given site versus the
actual setup and equipment at the site
Slide 31
Questions and Discussion
Thank you for Attending.
John H Carroll
Western Regional Manager
john.carroll@tescometering.com
TESCO – The Eastern Specialty Company
Arizona Regional Office
480-467-7998
Slide 32
Thanks for tuning in!
See you at the next session.
Upcoming Session:
Metering Configurations
February 2, 2021 | 11:00 AM Eastern
**TESCO Users Group: July 18-21, 2021**
Presentation Date
Transformer-Rated Testing Using Pickups and Probes 3/2
Traditional Ratio, Burden, Admittance and Demag Testing – Part 1 3/9
Traditional Ratio, Burden, Admittance and Demag Testing – Part 2 3/16
Realizing Your Investment in Technology Through Analytics 3/23
Shop Testing 3/30
Preparing for AMI Deployment 4/6
Communication Equipment 4/13
Sign up: tescometering.com/tesco-tuesdays

More Related Content

PDF
TESCO Tuesday: Metering Configurations
PPTX
TESCO Tuesday: Communication Equipment
PPTX
PPTX
PPTX
Single Phase Meter Testing Overview
PPTX
Certifying DC Electric Vehicle Chargers and AC Level Two Chargers
PPTX
Communicating to Your Meters
PPTX
Site Verification for Newer Employees
TESCO Tuesday: Metering Configurations
TESCO Tuesday: Communication Equipment
Single Phase Meter Testing Overview
Certifying DC Electric Vehicle Chargers and AC Level Two Chargers
Communicating to Your Meters
Site Verification for Newer Employees

What's hot (20)

PPTX
Meter Forms: Wiring and Uses
PPTX
21st Century Power Measurements
PPTX
PDF
TESCO Tuesday: Metering Testing by Form
PPTX
CT Testing: Theory and Practice
PPTX
Introduction to Transformer Rated Metering
PDF
Simulating Real World Metering Conditions
PPTX
Learning the Language (Meter Testing 101)
PPTX
Ratio, Burden, and Admittance Testing
PPTX
Introduction to CTs and PTs
PPT
Site Verification for Self-Contained Hot Socket Detection
PPTX
Site Verification for Self-Contained Hot Socket Detection
PPT
PPTX
AMI Technology Overview
PPTX
Field Verification: Test Equipment and Best Practices
PPTX
Introduction to CTs and PTs
PDF
The art of meter testing on site 2019
PPTX
Calmet testing energy-measurement-equipment
Meter Forms: Wiring and Uses
21st Century Power Measurements
TESCO Tuesday: Metering Testing by Form
CT Testing: Theory and Practice
Introduction to Transformer Rated Metering
Simulating Real World Metering Conditions
Learning the Language (Meter Testing 101)
Ratio, Burden, and Admittance Testing
Introduction to CTs and PTs
Site Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket Detection
AMI Technology Overview
Field Verification: Test Equipment and Best Practices
Introduction to CTs and PTs
The art of meter testing on site 2019
Calmet testing energy-measurement-equipment
Ad

Similar to TESCO Tuesday: Meter Testing in the Field (20)

PPT
Burden Testing, Theory, and Practice
PPT
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
PPT
Transformer Rated Metering Site Verification
PPT
Transformer Rated Metering
PPT
Introduction to Transformer Rated Metering
PPT
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
PPTX
Introduction to Transformer Rated Metering
PPT
Transformer Rated Metering Site Verification
PPTX
Hands-On Transformer Rated Polyphase Meter Testing
PPT
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
PPT
Transformer Rated Metering 09.27.17
PPT
Instrument Transformer Testing
PPTX
Ratio Burden Admittance Testing
PPT
Instrument Transformer Testing in the Shop and Field
PPT
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
PPTX
Ratio, Burden, Admittance Testing
PPT
Electric Meter and Transformer Testing in an AMI World - AclaraConnect 2018
PPTX
CT Testing - Theory and Practice.pptx
PPTX
Field Test Kits and Hot Socket Repair Kits
PDF
REPORT -VALLUR THERMAL POWER PLANT
Burden Testing, Theory, and Practice
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Transformer Rated Metering Site Verification
Transformer Rated Metering
Introduction to Transformer Rated Metering
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
Introduction to Transformer Rated Metering
Transformer Rated Metering Site Verification
Hands-On Transformer Rated Polyphase Meter Testing
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Transformer Rated Metering 09.27.17
Instrument Transformer Testing
Ratio Burden Admittance Testing
Instrument Transformer Testing in the Shop and Field
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
Ratio, Burden, Admittance Testing
Electric Meter and Transformer Testing in an AMI World - AclaraConnect 2018
CT Testing - Theory and Practice.pptx
Field Test Kits and Hot Socket Repair Kits
REPORT -VALLUR THERMAL POWER PLANT
Ad

Recently uploaded (20)

PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PDF
Encapsulation theory and applications.pdf
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
A Presentation on Artificial Intelligence
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
Approach and Philosophy of On baking technology
PPTX
1. Introduction to Computer Programming.pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPTX
MYSQL Presentation for SQL database connectivity
PDF
cuic standard and advanced reporting.pdf
PDF
Empathic Computing: Creating Shared Understanding
PDF
Getting Started with Data Integration: FME Form 101
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PPTX
Big Data Technologies - Introduction.pptx
SOPHOS-XG Firewall Administrator PPT.pptx
Encapsulation theory and applications.pdf
20250228 LYD VKU AI Blended-Learning.pptx
A Presentation on Artificial Intelligence
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Assigned Numbers - 2025 - Bluetooth® Document
Approach and Philosophy of On baking technology
1. Introduction to Computer Programming.pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
MIND Revenue Release Quarter 2 2025 Press Release
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
MYSQL Presentation for SQL database connectivity
cuic standard and advanced reporting.pdf
Empathic Computing: Creating Shared Understanding
Getting Started with Data Integration: FME Form 101
“AI and Expert System Decision Support & Business Intelligence Systems”
The Rise and Fall of 3GPP – Time for a Sabbatical?
Big Data Technologies - Introduction.pptx

TESCO Tuesday: Meter Testing in the Field

  • 1. Slide 1 Today’s session will begin shortly @tescometering @TESCO_Metering TESCO -The Eastern Specialty Company TESCO -The Eastern Specialty Company TESCO Tuesdays
  • 2. Slide 2 10/02/2012 Slide 2 Meter Testing in the Field Prepared by John H Carroll, BSEE TESCO Western Regional Sales Manager. The Eastern Specialty Company Tuesday, February 23, 2021
  • 3. Slide 3 Topics we will be covering • Test Switches and CT’s • Meter Accuracy Testing Using MTS 3050 True 3 Phase • Customer Load Test-Video • Customer CT Ratio Test-Video • Phantom Load Test-Video • Q&A Discussions
  • 4. Slide 4 Transformer Rated Metering • Meter measures scaled down representation of the load. • Scaling is accomplished by the use of external current transformers (CTs) and sometimes voltage transformers or PTs). • The meter is NOT part of the circuit • When the meter is removed from the socket, power to the customer is not effected.
  • 5. Slide 5 9S Meter Installation with 400:5 CT’s 400A 400A 400A LOAD 5A 5A 5A SOURCE PHASE A PHASE B PHASE C The Basic Components
  • 6. Slide 6 TESCO/Georgia Power 2017 Caribbean Meter School Fundamentals of Polyphase Field Meter Testing and Site Verification  Full Load  Light Load  Power Factor Meter Accuracy Testing Meter Accuracy Testing Customer Load  Customer Load  Customer Billing  Customer Conditions Meter Accuracy Testing Phantom Load
  • 7. Slide 7 The Importance of CT Testing in the Field • One transformer in three wired backwards will give the customer a bill of 1/3rd the actual bill. • One broken wire to a single transformer will give the customer a bill of 2/3rd the actual bill • One dual ratio transformer inappropriately marked in the billing system as 400:5 instead of 800:5 provides a bill that is ½ of the actual bill. And the inverse will give a bill double of what should have been sent. Both are lose-lose situations for the utility.
  • 8. Slide 8 The Importance of CT Testing in the Field (continued) • Cross Phasing (wiring errors) • Loose or Corroded Connections • CT Mounted Backwards • CT’s with Shorted Turns • Wrong Selection of Dual Ratio CT • Detect Magnetized CT’s • Burden Failure in Secondary Circuit • Open or Shorted Secondary • Mislabeled CT’s • Ensures all Shorting Blocks have been Removed
  • 9. Slide 9 Meter Accuracy Testing  Meter Accuracy Test using IR Pulse Detection  Make connections from Field Tester to Meter Form  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary Courtesy of APS
  • 10. Slide 10 Meter Accuracy Testing  Meter Accuracy Test using IR Pulse Detection  Make connections from Field Tester to Meter Form  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary
  • 11. Slide 11 Customer Load Test -Video  Meter Accuracy Test using IR Pulse Detection  Make connections from Field Tester to Meter Form  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary https://youtu.be/Miq3trNaPPc
  • 12. Slide 12 Customer CT Ratio Test  Make Connections from Field Tester to Primary current phases  Make connections from Field Tester to Secondary test switch  Connect IR Pulse Detector to meter output Courtesy of APS
  • 13. Slide 13 Ratio of Primary Current to Secondary Current PHASE A SOURCE LOAD 400A 400A 400A 5A 5A Calculate Ratio Customer CT Ratio Test 80:1
  • 14. Slide 14 Customer CT Ratio Test -Video Make Connections from Field Tester to Primary current phases Make connections from Field Tester to Secondary test switch Connect IR Pulse Detector to meter output https://youtu.be/JlHM-4mzuTs
  • 15. Slide 15 Fundamentals of Polyphase Field Meter Testing and Site Verification Functionality with Burden Present on the Secondary Loop Example Burden Spec: 0.3% @ B0.1, B0.2, B0.5 or There should be less than the 0.3% change in secondary current from initial (“0” burden) reading, when up to 0.5 Ohms of burden is applied Customer CT Ratio Test with Burden
  • 16. Slide 16 Customer CT Ratio Test with Burden Functionality with Burden Present on the Secondary Loop PHASE A • Some burden will always be present – junctions, meter coils, test switches, cables, etc. • CT’s must be able to maintain an accurate ratio with burden on the secondary.
  • 17. Slide 17 Customer CT Test with Burden Functionality with Burden Present on the Secondary Loop 0.3% @ B0.1, B0.2, B0.5 0.0000 1.0000 2.0000 3.0000 4.0000 5.0000 6.0000 0 2 4 6 8 Initial Reading = 5Amps 0.3% x 5A = 0.015A 5A – 0.015 = 4.985A Burden Reading 0 5.0000 0.1 4.9999 0.2 4.9950 0.5 4.9900 1 4.9800 2 4.9500 4 4.0000 8 0.8000
  • 18. Slide 18 CT Ratio Testing with Burden Added  Meter Accuracy Test using IR Pulse Detection  Make connections from Field Tester to Meter Form  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary
  • 19. Slide 19 Customer CT Test with Burden-Video Make Connections from Field Tester to Primary current phases Make connections from Field Tester to Secondary test switch Ensure additional burden value is selected Connect IR Pulse Detector to meter output https://youtu.be/d6PV3ZtWjPQ
  • 20. Slide 20 Phantom Load Testing  Determine the TA ( Test Amps) from Meter Faceplate  Ensure Safety shorting switch and test jack have been disengaged  Make connections from Field Tester to Meter Form using jumper EZ Clips.  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary Courtesy of APS
  • 21. Slide 21 Phantom Load Testing  Determine the TA ( Test Amps) from Meter Faceplate  Ensure Safety shorting switch and test jack have been disengaged  Make connections from Field Tester to Meter Form using jumper EZ Clips.  Connect IR Pulse Detector to meter output  Check pulse indictor  Pulse Align if necessary
  • 22. Slide 22 Phantom Load Testing Determine the TA ( Test Amps) from Meter Faceplate Ensure Safety shorting switch and test jack have been disengaged Make connections from Field Tester to Meter Form using jumper EZ Clips. Connect IR Pulse Detector to meter output Check pulse indictor Pulse Align if necessary
  • 24. Slide 24 Phantom Load Testing-Video Ensure Test Switch CT’s are shunted Make connections from Field Tester to Secondary test switch Connect EZ Clips to test switch Connect IR Pulse Detector to meter output https://youtu.be/Hdyn-KWOXaA
  • 25. Slide 25 Harmonics Testing  Harmonics are integer frequencies often found with non linear loads. THD=Total Harmonic Distortion Vthd <5%
  • 26. Slide 26 Harmonics Testing-Waveforms  Harmonics are generated as a voltage or current at an integer frequency of the system, produced by the action of non-linear loads such as rectifiers, discharge lighting, or switch mode power supplies.  Harmonic frequencies in the power grid are a frequent cause of power quality problems.
  • 27. Slide 27 Harmonics Testing-Waveforms What is the problem with Harmonics? HEAT.  Can cause significant damage  Safety Hazard  Poor Power Factor  AMI Mesh Interference  Transformer Overheating  Loss of service Image courtesy of irinfo.org
  • 28. Slide 28 Harmonics Testing-Waveforms Can we reduce or eliminate Harmonics?  Perhaps not eliminate. But we can reduce their impact.  We live in non linear world of power where harmonics are generated.  PWM conversion and AC Frequency Drive Motors and Pumps.  Many thousands of todays electrical products have SWPS devices.
  • 29. Slide 29 Harmonics Testing-Waveforms How can we reduce the impact of harmonics ?  Measure and determine major harmonic condition under customer load.  Assess most significant even & odd harmonics.  Active Harmonic Filtering can reduce most significant index.  Power Factor Correction Capacitor.
  • 30. Slide 30 Periodic Site Inspections….. ….Can Discover or Prevent: • Billing Errors • Bad Metering set-up • Detect Current Diversion • Identify Potential Safety Issues • Metering Issues (issues not related to meter accuracy) • AMR/AMI Communications Issues • The need for Unscheduled Truck Rolls due to Undetected Field Related Issues • Discrepancies between what is believed to be at a given site versus the actual setup and equipment at the site
  • 31. Slide 31 Questions and Discussion Thank you for Attending. John H Carroll Western Regional Manager john.carroll@tescometering.com TESCO – The Eastern Specialty Company Arizona Regional Office 480-467-7998
  • 32. Slide 32 Thanks for tuning in! See you at the next session. Upcoming Session: Metering Configurations February 2, 2021 | 11:00 AM Eastern **TESCO Users Group: July 18-21, 2021** Presentation Date Transformer-Rated Testing Using Pickups and Probes 3/2 Traditional Ratio, Burden, Admittance and Demag Testing – Part 1 3/9 Traditional Ratio, Burden, Admittance and Demag Testing – Part 2 3/16 Realizing Your Investment in Technology Through Analytics 3/23 Shop Testing 3/30 Preparing for AMI Deployment 4/6 Communication Equipment 4/13 Sign up: tescometering.com/tesco-tuesdays