RiskyProject
Project Risk Analysis
and
Project Risk
Management Software
Suite
WHAT IS RISKYPROJECT?
2
• Project Scheduling
• Risk Register
• Quantitative risk analysis using Monte Carlo simulations
• Project performance measurement
RiskyProject is Windows-based project risk
management software.
Risky Project gives you a simple answer to a
common question: What will happen to your
project if certain risks occur?
THE PROJECT MANAGEMENT PROBLEM
3
Projects
consistently
fail to meet:
• Budget
• Schedule
• Quality
• Safety
• Technology
• Other measures
THE PROJECT MANAGEMENT PROBLEM
4
Reasons
• Human psychological limits
• Inadequate training
• Poor processes
• others
THE PROJECT MANAGEMENT PROBLEM
5
Key Project Management Issues
• How to estimate project duration or cost?
• What are the most critical risks and how to mitigate them?
• How to measure project performance?
• How to make an informed decision about future course of
the project?
THE RISKYPROJECT SOLUTION
6
Project risk management made simple
• RiskyProject is consistent with PMI PMBOK. Risky
Project supports the full project risk management
process.
• RiskyProject is very easy to use. RiskyProject is uses a
scheduling interface similar to other project popular
project management tools.
• RiskyProject has low implementation and support
costs. Compared with the comparative products,
RiskyProject provides unmatched value
THE RISKYPROJECT SOLUTION
7
Project risk management for Project
Managers
• Provide state of art quantitative project risk
management tools
• Low cost
• Ease of implementation
• Limited initial training required
• Scalable
KEY RISKYPROJECT FEATURES
8
• Full scheduling engine with costs and resources
• Full risk register that links to project schedules
• Quantitative and qualitative analysis
• Project control with risks and uncertainties
• Integration with Microsoft Project, Primavera, or other project management software
• Analysis of critical risk events, which need to be mitigated first
• Product lifecycle management
• Probabilistic and conditional branching
• Managing mitigation and response plans
• “What if “ analysis
• Advanced reporting tools
• Multiple statistical distributions and distribution fitting
• … and more
RiskyProject uses common PM
artifacts
• WBS
• Resources
• Costs
• Risk Register or Risk Lists
RISKYPROJECTWORKFLOW
RISKYPROJECTWORKFLOW
RiskyProject’s workflow is
compatible with PMI, Prince II,
and other risk management
processes
DEFINE PROJECT SCHEDULE
You may also import
project schedules
from other
scheduling tools,
such as Microsoft
Project or Oracle
Primavera.
Enter resources, cost and
income for each task
Enter complete WBS, as it is
done in other project
management software
INTEGRATION WITH SCHEDULING SOFTWARE
RiskyProject’s Add –
in installed on the
Microsoft Project
ribbon allows users
move projects
seamlessly into
RiskyProject
RiskyProject can import schedules from Oracle Primavera and other project
management software.
Microsoft Project
RiskyProject Add-in for
Microsoft Project
Defining Statistical
Distribution in Microsoft
Project
RISK REGISTER
Pre mitigation
Probability, Impact, and
Score
Post mitigation
Probability, Impact, and
Score
Separate opened and
closed risks, risk, issues,
lessons learned
Separate threats or
opportunities
Risk register view
CUSTOMIZABLE RISK FORM
Double-click on a risk to view or modify Risk Information
Risk description and status
Management Strategy and
Risk Ownership
Cost of Risk
Risk Trigger and Response
Plan
Edit Risk Form Layout: You can
define any risk properties
MITIGATIONWATERFALL CHART
Track total cost, expected reductions in probability or impact and dates for mitigation plans
Compare actual and
planned mitigation efforts
You can associate tasks on
the project schedule with
mitigation plans
Waterfall Chart: How risks
are changing over time
RISK REVIEWS AND RISK HISTORY
All risk reviews with details can be saved and tracked in system
Next review timing
Information about risk
reviews
Risk History Log: All changes to risk
properties, probabilities and
impacts
RISK DASHBOARD Select different charts, graphs and
indicators.
Draw and drop then on the dashboard
Create any number of tabs
representing different dashboards
ASSIGN RISKSTOTASKS AND RESOURCES
If project schedule is available, quantitative risk assessments is performed
Drag and drop risk on
particular task or group of
tasks
Define risk chance, outcome and result. Risks can have
mutually exclusive outcomes, different outcomes of
the same risk
Risks Tasks
STATISTICAL DISTRIBUTIONS
If you enter only the low, base and high
cost, duration, start time and income,
RiskyProject will generate statistical
distribution based on this data
In addition to risk events you may define uncertainties
as statistical distributions for:
• task cost
• task start time
• task duration
• income associated with task
MONTE CARLO SIMULATION
When your project schedule and risk breakdown
structure is ready, click here to perform Monte Carlo
simulations
RISK ADJUSTED PROJECT SCHEDULE
White bars represent original project schedule (no
risks)
Compare original project schedule and result of
analysis
Blue bars represent risk adjusted project schedule
(with risks and uncertainties)
PROJECT DASHBOARD
22
Select different charts, graphs and
indicators.
Draw and drop then on the dashboard
Create any number of tabs
representing different dashboards
RESULTS OF RISK ANALYSIS
Results of analysis for
project cost, finish time,
and duration
Double click on any chart to view detailed information
The meters show project risk score
for cost and duration
Project Summary: project duration, cost, and finish
time with and without risks
DETAILED RESULTS OF ANALYSIS
Move the slider to determine the
chance that project will be within
budget
Get detailed statistical
data
Data can be exported as an
image or text
Detailed results can be shown for each task or
project for cost, duration, start time, finish time,
and income.
COSTVS. SCHEDULE SCATTER PLOT
Move the slider to determine the
chance of meeting both schedule and
budget
Base
Estimate indicated by
yellow dot
This plot is often
referred to as
the “Bull’s eye”
or “Football”
chart
COST ANALYSIS
Project cost with risks (blue line)
Cost chart is generated based on
fixed and variables cost and
income associated with tasks and
resources
Project cost without risks (red line)
Actual cost (green line)
PROBABILISTIC CASH FLOW ANALYSIS
Cash flow with risks (blue bars)
Cash flow is generated based on fixed and
variables cost and income associated with tasks
and resources
Project cost without risks (red line)
Actual cost (green line)
SENSITIVITY ANALYSIS
Tornado chart shows risks or other parameters that have
the most affect on the project schedule
Prioritize critical task or risks
CRUCIALTASKS
Crucial tasks have the most effect
on the project schedule
Crucial tasks for project cost and duration can be
different
Crucial tasks are red
RISK CHART
Risk chart shows task duration and versus risk, associated with task
This task has low duration but
high risk
These tasks have balanced risk
versus duration ratio.
RISK MATRIX
Risk Probability, Impact and
Score for the current schedule
Probability vs. Impact Chart
Filter Risks based on Severity
PROJECTTRACKING
This task is partially completed (yellow bar)
Risky project automatically adjusts the probability
of risks for partially completed tasks
This task is 100% completed (green bar)
FORECAST PROJECT FINISHTIME
Original (baseline) project duration
Actual project performance
Low, base, and high forecast
• View results for each baseline
• Select the working schedule that you will use to manage
the project
Compare different baselines
Select the current schedule
Compare results for each
baseline
MANAGING BASELINES
BRANCHING
• Model different scenarios when project activities are uncertain
• Calculate Expected Value of project given uncertainties in project activities
Conditional and Probabilistic Branching
Run alternative project
branches probabilistically
• Model non working days due to weather
WEATHER CALENDAR
Weather Calendar
Non working days due to
weather
Weather calendar settings:
number of non-working days
due to weather each month
RiskyProject
Learn more about RiskyProject
www.intaver.com
Intaver Institute Inc.
400, 7015, Macleod Tr. S.
Calgary, AB, Canada
Tel: +1 (403) 692-2252
4280 East Tamiami Trail, 302-M,
Naples Florida, 34112, USA
Tel: +1(510) 984 3527

More Related Content

PPTX
RiskyProject Software
PPT
Quantitative Project Risk Analysis
PPTX
Quantitative Project Risk Analysis
PPT
112 risk- metrics for risk reduction
PDF
Perform quantitative risk analysis
PDF
Acumen Risk: Brochure
PPTX
RiskyProject Enterprise
RiskyProject Software
Quantitative Project Risk Analysis
Quantitative Project Risk Analysis
112 risk- metrics for risk reduction
Perform quantitative risk analysis
Acumen Risk: Brochure
RiskyProject Enterprise

Similar to RiskyProject Software Version 7.2 (20)

PPTX
Software project management- Software Engineering
PDF
Primavera Monte Carlo[1]
PPT
PPT
Ch5 - Project Management
PPT
Chapitulo 5
PPT
PDF
Project management part 3
PDF
Guide to Software Estimation
PPT
Project-Planning
PPT
Planning.ppt
PPT
5-ProjPlanning.ppt
PPT
dcvdhusdbsduvb0sdyvbsdyvbsdvysdvysdbvsydvdbvbyubdvbdvhvhvhvh
PPTX
3. Lect 29_ 30_ 32 Project Planning.pptx
PPT
Project Planning
PPTX
Project risk analysis
PPT
RiskyProject Software
PPT
college training ppt kanpur university ppt
PPT
Project Planning for undergraduate students
Software project management- Software Engineering
Primavera Monte Carlo[1]
Ch5 - Project Management
Chapitulo 5
Project management part 3
Guide to Software Estimation
Project-Planning
Planning.ppt
5-ProjPlanning.ppt
dcvdhusdbsduvb0sdyvbsdyvbsdvysdvysdbvsydvdbvbyubdvbdvhvhvhvh
3. Lect 29_ 30_ 32 Project Planning.pptx
Project Planning
Project risk analysis
RiskyProject Software
college training ppt kanpur university ppt
Project Planning for undergraduate students
Ad

More from Intaver Insititute (20)

PPTX
How Risk Events and Uncertainties can affect your project
PPTX
Project risk analysis in Construction Industry
PPT
Risk Analysis of Linear Projects
PPTX
Project Cost Risk Analysis - Reporting
PPTX
Project Cost Analysis
PPT
Project Risk Analysis and Risk Management Software RiskyProject version 7.1
PPT
Risk Analysis of Linear Projects
PPTX
Smart Monte Carlo: Tricks for schedule risk analysis.
PPT
Risk Resilient Projects and Project Portfolios
PPT
Project Risk Analysis: Creating and Managing Risk Adjusted Project Schedules
PPTX
RiskyProject 7
PPTX
Oil and Gas Risk Analysis
PPTX
Risk Event Modeling and Event Chains
PPTX
Quantiative Risk Analysis for the Aerospace Industry
PPTX
Monte Carlo and Schedule Risk Analysis
PPTX
Estimates in Project Management
PPTX
Project Management: Adaptive management
PPTX
Decision framing in Project Management
PDF
Risky projectpresentation rus
PDF
Risky project Cloud presentation rus
How Risk Events and Uncertainties can affect your project
Project risk analysis in Construction Industry
Risk Analysis of Linear Projects
Project Cost Risk Analysis - Reporting
Project Cost Analysis
Project Risk Analysis and Risk Management Software RiskyProject version 7.1
Risk Analysis of Linear Projects
Smart Monte Carlo: Tricks for schedule risk analysis.
Risk Resilient Projects and Project Portfolios
Project Risk Analysis: Creating and Managing Risk Adjusted Project Schedules
RiskyProject 7
Oil and Gas Risk Analysis
Risk Event Modeling and Event Chains
Quantiative Risk Analysis for the Aerospace Industry
Monte Carlo and Schedule Risk Analysis
Estimates in Project Management
Project Management: Adaptive management
Decision framing in Project Management
Risky projectpresentation rus
Risky project Cloud presentation rus
Ad

Recently uploaded (20)

PDF
IFRS Notes in your pocket for study all the time
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
MSPs in 10 Words - Created by US MSP Network
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Types of control:Qualitative vs Quantitative
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
Amazon (Business Studies) management studies
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
How to Get Funding for Your Trucking Business
DOCX
Business Management - unit 1 and 2
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
IFRS Notes in your pocket for study all the time
Deliverable file - Regulatory guideline analysis.pdf
Unit 1 Cost Accounting - Cost sheet
MSPs in 10 Words - Created by US MSP Network
unit 1 COST ACCOUNTING AND COST SHEET
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
New Microsoft PowerPoint Presentation - Copy.pptx
Types of control:Qualitative vs Quantitative
ICG2025_ICG 6th steering committee 30-8-24.pptx
Amazon (Business Studies) management studies
DOC-20250806-WA0002._20250806_112011_0000.pdf
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Euro SEO Services 1st 3 General Updates.docx
COST SHEET- Tender and Quotation unit 2.pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
WRN_Investor_Presentation_August 2025.pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
How to Get Funding for Your Trucking Business
Business Management - unit 1 and 2
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman

RiskyProject Software Version 7.2

  • 1. RiskyProject Project Risk Analysis and Project Risk Management Software Suite
  • 2. WHAT IS RISKYPROJECT? 2 • Project Scheduling • Risk Register • Quantitative risk analysis using Monte Carlo simulations • Project performance measurement RiskyProject is Windows-based project risk management software. Risky Project gives you a simple answer to a common question: What will happen to your project if certain risks occur?
  • 3. THE PROJECT MANAGEMENT PROBLEM 3 Projects consistently fail to meet: • Budget • Schedule • Quality • Safety • Technology • Other measures
  • 4. THE PROJECT MANAGEMENT PROBLEM 4 Reasons • Human psychological limits • Inadequate training • Poor processes • others
  • 5. THE PROJECT MANAGEMENT PROBLEM 5 Key Project Management Issues • How to estimate project duration or cost? • What are the most critical risks and how to mitigate them? • How to measure project performance? • How to make an informed decision about future course of the project?
  • 6. THE RISKYPROJECT SOLUTION 6 Project risk management made simple • RiskyProject is consistent with PMI PMBOK. Risky Project supports the full project risk management process. • RiskyProject is very easy to use. RiskyProject is uses a scheduling interface similar to other project popular project management tools. • RiskyProject has low implementation and support costs. Compared with the comparative products, RiskyProject provides unmatched value
  • 7. THE RISKYPROJECT SOLUTION 7 Project risk management for Project Managers • Provide state of art quantitative project risk management tools • Low cost • Ease of implementation • Limited initial training required • Scalable
  • 8. KEY RISKYPROJECT FEATURES 8 • Full scheduling engine with costs and resources • Full risk register that links to project schedules • Quantitative and qualitative analysis • Project control with risks and uncertainties • Integration with Microsoft Project, Primavera, or other project management software • Analysis of critical risk events, which need to be mitigated first • Product lifecycle management • Probabilistic and conditional branching • Managing mitigation and response plans • “What if “ analysis • Advanced reporting tools • Multiple statistical distributions and distribution fitting • … and more
  • 9. RiskyProject uses common PM artifacts • WBS • Resources • Costs • Risk Register or Risk Lists RISKYPROJECTWORKFLOW
  • 10. RISKYPROJECTWORKFLOW RiskyProject’s workflow is compatible with PMI, Prince II, and other risk management processes
  • 11. DEFINE PROJECT SCHEDULE You may also import project schedules from other scheduling tools, such as Microsoft Project or Oracle Primavera. Enter resources, cost and income for each task Enter complete WBS, as it is done in other project management software
  • 12. INTEGRATION WITH SCHEDULING SOFTWARE RiskyProject’s Add – in installed on the Microsoft Project ribbon allows users move projects seamlessly into RiskyProject RiskyProject can import schedules from Oracle Primavera and other project management software. Microsoft Project RiskyProject Add-in for Microsoft Project Defining Statistical Distribution in Microsoft Project
  • 13. RISK REGISTER Pre mitigation Probability, Impact, and Score Post mitigation Probability, Impact, and Score Separate opened and closed risks, risk, issues, lessons learned Separate threats or opportunities Risk register view
  • 14. CUSTOMIZABLE RISK FORM Double-click on a risk to view or modify Risk Information Risk description and status Management Strategy and Risk Ownership Cost of Risk Risk Trigger and Response Plan Edit Risk Form Layout: You can define any risk properties
  • 15. MITIGATIONWATERFALL CHART Track total cost, expected reductions in probability or impact and dates for mitigation plans Compare actual and planned mitigation efforts You can associate tasks on the project schedule with mitigation plans Waterfall Chart: How risks are changing over time
  • 16. RISK REVIEWS AND RISK HISTORY All risk reviews with details can be saved and tracked in system Next review timing Information about risk reviews Risk History Log: All changes to risk properties, probabilities and impacts
  • 17. RISK DASHBOARD Select different charts, graphs and indicators. Draw and drop then on the dashboard Create any number of tabs representing different dashboards
  • 18. ASSIGN RISKSTOTASKS AND RESOURCES If project schedule is available, quantitative risk assessments is performed Drag and drop risk on particular task or group of tasks Define risk chance, outcome and result. Risks can have mutually exclusive outcomes, different outcomes of the same risk Risks Tasks
  • 19. STATISTICAL DISTRIBUTIONS If you enter only the low, base and high cost, duration, start time and income, RiskyProject will generate statistical distribution based on this data In addition to risk events you may define uncertainties as statistical distributions for: • task cost • task start time • task duration • income associated with task
  • 20. MONTE CARLO SIMULATION When your project schedule and risk breakdown structure is ready, click here to perform Monte Carlo simulations
  • 21. RISK ADJUSTED PROJECT SCHEDULE White bars represent original project schedule (no risks) Compare original project schedule and result of analysis Blue bars represent risk adjusted project schedule (with risks and uncertainties)
  • 22. PROJECT DASHBOARD 22 Select different charts, graphs and indicators. Draw and drop then on the dashboard Create any number of tabs representing different dashboards
  • 23. RESULTS OF RISK ANALYSIS Results of analysis for project cost, finish time, and duration Double click on any chart to view detailed information The meters show project risk score for cost and duration Project Summary: project duration, cost, and finish time with and without risks
  • 24. DETAILED RESULTS OF ANALYSIS Move the slider to determine the chance that project will be within budget Get detailed statistical data Data can be exported as an image or text Detailed results can be shown for each task or project for cost, duration, start time, finish time, and income.
  • 25. COSTVS. SCHEDULE SCATTER PLOT Move the slider to determine the chance of meeting both schedule and budget Base Estimate indicated by yellow dot This plot is often referred to as the “Bull’s eye” or “Football” chart
  • 26. COST ANALYSIS Project cost with risks (blue line) Cost chart is generated based on fixed and variables cost and income associated with tasks and resources Project cost without risks (red line) Actual cost (green line)
  • 27. PROBABILISTIC CASH FLOW ANALYSIS Cash flow with risks (blue bars) Cash flow is generated based on fixed and variables cost and income associated with tasks and resources Project cost without risks (red line) Actual cost (green line)
  • 28. SENSITIVITY ANALYSIS Tornado chart shows risks or other parameters that have the most affect on the project schedule Prioritize critical task or risks
  • 29. CRUCIALTASKS Crucial tasks have the most effect on the project schedule Crucial tasks for project cost and duration can be different Crucial tasks are red
  • 30. RISK CHART Risk chart shows task duration and versus risk, associated with task This task has low duration but high risk These tasks have balanced risk versus duration ratio.
  • 31. RISK MATRIX Risk Probability, Impact and Score for the current schedule Probability vs. Impact Chart Filter Risks based on Severity
  • 32. PROJECTTRACKING This task is partially completed (yellow bar) Risky project automatically adjusts the probability of risks for partially completed tasks This task is 100% completed (green bar)
  • 33. FORECAST PROJECT FINISHTIME Original (baseline) project duration Actual project performance Low, base, and high forecast
  • 34. • View results for each baseline • Select the working schedule that you will use to manage the project Compare different baselines Select the current schedule Compare results for each baseline MANAGING BASELINES
  • 35. BRANCHING • Model different scenarios when project activities are uncertain • Calculate Expected Value of project given uncertainties in project activities Conditional and Probabilistic Branching Run alternative project branches probabilistically
  • 36. • Model non working days due to weather WEATHER CALENDAR Weather Calendar Non working days due to weather Weather calendar settings: number of non-working days due to weather each month
  • 37. RiskyProject Learn more about RiskyProject www.intaver.com Intaver Institute Inc. 400, 7015, Macleod Tr. S. Calgary, AB, Canada Tel: +1 (403) 692-2252 4280 East Tamiami Trail, 302-M, Naples Florida, 34112, USA Tel: +1(510) 984 3527