helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.ukhtt://www.construction-productivity.co.uk
CONSTRUCTIONCONSTRUCTION
PRODUCTIVITYPRODUCTIVITY
CONSTRUCTION PRODUCTIVITYCONSTRUCTION PRODUCTIVITY
• Productivity level have a direct
impact on the macro-economic
success or failure of modern
industrialised economies.
• The industry employs a large
number of skilled, semi skilled
and un-skilled workers.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• The industry deals with a wide range
of building and civil engineering
projects.
• Improving construction productivity
depends on many factors.
• its activity also provides work for the
economic sector.
022 Construction Productivity (PART 1)
PRODUCTIVITY MODELPRODUCTIVITY MODEL
• site/project manager Characteristics
• management Factors
• resource Management
• management Systems
• labour Characteristics
• waste on site
• delay and disruption
• motivating Factors
• hygiene Factors
CONSTRUCTION PRODUCTIVITYCONSTRUCTION PRODUCTIVITY
• The role of project manger:
• Mobilising resources
• Remove constraints and difficulties
from the site
To study construction productivity is
complex and difficult.
• Construction companies find it
difficult, or are unable to study the
level of productivity within their
organisation.
• Mainly, because of the limitations.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Common failures within the
construction industry are often
manifest in:
• cost and time overruns;
• poor quality workmanship;
• repetitive work;
• wastage on site and at the head
office;
• idleness within the workforce;
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• incorrect estimating;
• poor planning;
• lack of good quality product;
• safety management-site safety
and the level of accidents;
• Claims;
• Disputes;
• poor quality machinery on site.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
•Harvey and Ashworth (1998)
have investigated that,
despite Britain’s improved
productivity,
•West Germany, France and
Italy are 104%, 41% and
12% more productive than
Britain respectively.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
•In 2008 only 2% difference in
productivity amongst top 100
firms.
•Amongst average and small
UK construction firms, up to
45% more manpower is
required to complete a
project compared to other
European Countries.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• Dispute in February 2009.
• The use of foreign contractors and
skilled labour force on UK civil
engineering construction projects.
• Lord Mandelson appointed Mark
Gibson (The Whitehall and Industry
Group)
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• To review the UK construction
productivity and make
recommendations.
• Larger index numbers indicate
poorer productivity.
• For example, relative to US Gulf
Coast, UK projects have 11% worse
productivity.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• Table1.01 shows comparative labour
productivity between years 1998 to
2008.
• US Gulf Coast 1.00
• Germany 1.05
• Continental Europe 1.06
• The Netherland 1.08
• UK 1.11
• France 1.20
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• In his report Mark Gibson compared
the productivity level amongst
several European countries.
• With USA construction contractors
• His investigation showed that UK
productivity has improved compared
to earlier reports.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• Countries represented in Continental
Europe were France, Germany, The
Netherlands, Italy, Spain and
Ireland.
• However, to compare with earlier
report UK productivity has been
improving over the past 10 years.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Q 1) Today’s Productivity level in
West Germany, France and Britain
are? 1-5% difference.
• The construction industry employs
more than 7% of Europe’s
workforce and represents
approximately 12% of GDP.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• The world economic forum 2009
ranks Britain 76th out of 134
nations on productivity/
efficiency of public sector.
• UK is behind countries such as:
• Greece
• Ethiopia
• Mozambique.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Sir Michael Latham also identified:
• potential for cost reduction in his
report entitled ‘Constructing the
Team’ (HMSO July 1994).
• A potential 30% saving was also
strongly advocated.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
There are five basic resources used
to produce goods. These are:
• Capital
• Land
• Materials
• Plant/ Machinery
• Manpower
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Use of high quality
management
techniques such as;
•Planning
•Scheduling
•money invested in the
project
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
Including:
• improved Communication
• efficient use of labour
• efficient use of material and
equipment
Use other methods of construction
productivity improvement such as:
• Lean construction;
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• Last planner system;
• JIT & Quality Management Systems;
• Construction Productivity-Logistics;
• Productivity Improvement;
• ISO 9000, ISO 9001, ISO1400;
• Quality Assurance.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Sir Michael Latham set up the Working
Group II.
• To find out what steps are required to
improve Productivity.
• The board agreed that a single solution
to the problem is unlikely to be found.
• The board concluded that some
important tried and tested measures
had already been taken.
• These methods had proven to be
successful.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Their recommendation suggested
that issues such as:
• Value Engineering (VE)
• Life cycle costing
• Pre-fabrication
• Standardisation
Which will improve the level of
productivity.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Group II recommended the
promotion of other techniques
not commonly used in the UK.
This included:
• Total quality management
• Total quality control and bench-
marking
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Project mangers can also
improve construction productivity
by:
• The use of best practice productivity
data which has been collected
carefully and accurately.
These information should cover areas
such as:
• Tendering;
• planning processes;
• The use of IT – based information
management systems (MIS) for
material procurement.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Training site workers so that they
become multi – skilled craftsmen.
• The introduction of post
qualification training on new
products.
• Methods and time management
techniques.
• The promotion of pre-fabrication
and assembly.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
Some researchers give reasons
for the decline in productivity
due to:
• A big step in communication
channels;
• Often on large construction
projects where there is a lack
of a clear communication
method.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• The time that members of the
management team spend on site
obtaining data.
• Writing reports and sending to
different departments.
• All these paper work diverts
them from giving adequate
attention to managing the
project.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Over looking areas on the
construction site which need
improvement during the construction
period.
• Lack of a ‘team effort culture’, which
would bind all levels of the workforce
together.
• The lack of a speedy feedback
system.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Technological Factors-The smaller
construction firms are less
adaptable.
• They are slower to accept the arrival
of new technology.
• They delay the Policy of increased
mechanisation on site.
• In general they are less competitive.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• BSRIA in mid-90th has
identified that the UK
construction labour force lags
behind other countries in terms
of:
• Skills;
• Salaries;
• working conditions;
• Job motivation.
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
•The report also claims that
UK workers loose around
19% of their working capacity
through late starts and early
finishes.
•compared to 5% in America
•and 3% in Sweden and
Germany.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
•Q-visit BSRIA site and
investigate if the trend has
changed in 2009.
•The reasons given by BSRIA
for productivity decline in
early 2000 were:
CONSTUCTIONCONSTUCTION
PRODUCTIVITYPRODUCTIVITY
• Many UK sub-contractors do not
organise and execute their work
in a productive way.
• mechanical/electrical (M&E)
installation work that was
monitored was characterised by
numerous levels of sub-
contractors.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• There was a loss of 12% as a
result of poor management.
• storage of materials on site
very poor.
• Handling of materials were
found to cause delay on all of
the UK projects monitored.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• On the more than 90 UK sites
monitored, workers were found to
have received no post-qualification
training.
• The average level of productivity in
the UK projects monitored was
only 56%.
• Compared with the best-achieved
productivity figures (benchmark).
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• Site workers in the UK were
engaged in too much office
administration
• Above average inappropriate design
and specification.
• As a result, slowed down work.
• Resulted in poor levels of house
keeping.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• time wastage was identified at all
levels of the construction process;
• from contract strategy;
• Procurement;
• project organisation;
• services design;
• and in the whole philosophy of
construction.
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• There are other factors, which
may cause a decline in
productivity;
these factors may arise from:
• shortage of equipment
• information
• bad weather
CONSTUCTION PRODUCTIVITYCONSTUCTION PRODUCTIVITY
• management style
• wastage on site or at the head
office
• lack of training
• variations in the scope of work,
• disruption on site.
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)

More Related Content

PPT
021 Construction Productivity (PART 1)
PPT
Construction productivity
PPT
Construction Productivity
PPTX
Productivity improvement in construction
PPTX
Heavy Construction Equipment Productivity
PDF
Construction Management (1st Lecture)
PPTX
Construction Equipment Management
PPTX
lean construction and integrated project delivery
021 Construction Productivity (PART 1)
Construction productivity
Construction Productivity
Productivity improvement in construction
Heavy Construction Equipment Productivity
Construction Management (1st Lecture)
Construction Equipment Management
lean construction and integrated project delivery

What's hot (20)

PPTX
Construction Project Management
PDF
Introduction-construction management_Construction Management (2180611) (Semes...
PPT
056 Labour Productivity
PPT
Construction process
PPTX
Labour Productivity for construction projects
PPTX
Construction planning - Construction Technology and Project Management
PDF
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
PPTX
Lean Construction Management
PPTX
Construction Project Management
PPTX
1# introduction to Quantity Surveying
PDF
Construction Project Management
PPTX
A powerpoint presentation on Building maintanance
PPT
Rates Analysis For Calculating Material and Labour for building works
PPT
Ready mix concrete (2)
PPTX
PPTX
Construction management
DOCX
Analysis of rates for labour and material
PDF
Project management in construction.
PPTX
Ready mix concrete batching plant - business plan
PPTX
Quality Management In Construction
Construction Project Management
Introduction-construction management_Construction Management (2180611) (Semes...
056 Labour Productivity
Construction process
Labour Productivity for construction projects
Construction planning - Construction Technology and Project Management
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Lean Construction Management
Construction Project Management
1# introduction to Quantity Surveying
Construction Project Management
A powerpoint presentation on Building maintanance
Rates Analysis For Calculating Material and Labour for building works
Ready mix concrete (2)
Construction management
Analysis of rates for labour and material
Project management in construction.
Ready mix concrete batching plant - business plan
Quality Management In Construction
Ad

Viewers also liked (17)

DOCX
Five ways to improve productivity at the construction site
PPT
Labor productivity improvement in construction projects using wbs obs integra...
PPTX
1. productivity concept and calculation.
PPT
Productivity Improvement Study
PPTX
Productivity
PPTX
Factors affecting productivity
PPTX
Construction industry
PPTX
Lean construction
PPTX
different techniques to productivity improvement
PPTX
Productivity
DOCX
Construction equipments - Introduction and Classification
PDF
Productivity in Building Construction
DOCX
bernie final cv update
PPTX
Ee presentation
PDF
Constructing DSMLs
PDF
Harley's cv
PDF
Centralized Manufacturing Vs Decentralized Manufacturing
Five ways to improve productivity at the construction site
Labor productivity improvement in construction projects using wbs obs integra...
1. productivity concept and calculation.
Productivity Improvement Study
Productivity
Factors affecting productivity
Construction industry
Lean construction
different techniques to productivity improvement
Productivity
Construction equipments - Introduction and Classification
Productivity in Building Construction
bernie final cv update
Ee presentation
Constructing DSMLs
Harley's cv
Centralized Manufacturing Vs Decentralized Manufacturing
Ad

Similar to 022 Construction Productivity (PART 1) (20)

PPT
022 a construction productivity (2)
PPTX
Agile & Lean in Construction: a brilliantly compelling & inspiring case study
PPTX
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
PDF
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
PPTX
Transforming Infrastructure Performance #COMIT2018
PDF
Petrotech Presenttaion- Punj Lloyd
PDF
Managing turnarounds in times of crisis
DOC
R Canham CV1
PDF
Christian Koch
PPT
Chap009
PPT
Pengantar Akuntansi 2 - Ch20 Managerial Accounting
PPTX
World Class Manufacturing Final June 23.pptx
PPTX
Unlocking Engineering and Construction performance webinar apac slideshare
PDF
National BIM Conference 2015 - JHunt
PPT
BEST-Introduction to Management practicesT.ppt
PPT
BEST-Intro-MT (1).ppt
PPT
BEST-Intro-MT.ppt
PPTX
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
PDF
02 Construction Projects
PDF
IRJET- Review on Study of Quality Practices in Construction
022 a construction productivity (2)
Agile & Lean in Construction: a brilliantly compelling & inspiring case study
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Transforming Infrastructure Performance #COMIT2018
Petrotech Presenttaion- Punj Lloyd
Managing turnarounds in times of crisis
R Canham CV1
Christian Koch
Chap009
Pengantar Akuntansi 2 - Ch20 Managerial Accounting
World Class Manufacturing Final June 23.pptx
Unlocking Engineering and Construction performance webinar apac slideshare
National BIM Conference 2015 - JHunt
BEST-Introduction to Management practicesT.ppt
BEST-Intro-MT (1).ppt
BEST-Intro-MT.ppt
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
02 Construction Projects
IRJET- Review on Study of Quality Practices in Construction

More from Dr Fereidoun Dejahang (20)

DOCX
27 j20 my news punch -dr f dejahang 27-01-2020
DOCX
28 dej my news punch rev 28-12-2019
DOCX
16 fd my news punch rev 16-12-2019
PPT
029 fast-tracking projects
PPT
028 fast-tracking projects & cost overrun
PPT
027 fast-tracked projects-materials
PPT
026 fast react-productivity improvement
PPT
025 enterprise resources management
PPT
022 b construction productivity-write
PPT
021 construction productivity (1)
PPTX
019 competencies-managers
PPT
018 company productivity
PPT
017 communication
PPT
016 communication in construction sector
PPTX
015 changes-process model
PPTX
014 changes-cost overrun measurement
PPTX
013 changes in construction projects
PPT
012 bussiness planning process
PPT
011 business performance management
PPT
010 bmw tpm management training
27 j20 my news punch -dr f dejahang 27-01-2020
28 dej my news punch rev 28-12-2019
16 fd my news punch rev 16-12-2019
029 fast-tracking projects
028 fast-tracking projects & cost overrun
027 fast-tracked projects-materials
026 fast react-productivity improvement
025 enterprise resources management
022 b construction productivity-write
021 construction productivity (1)
019 competencies-managers
018 company productivity
017 communication
016 communication in construction sector
015 changes-process model
014 changes-cost overrun measurement
013 changes in construction projects
012 bussiness planning process
011 business performance management
010 bmw tpm management training

Recently uploaded (20)

PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
Feature types and data preprocessing steps
PPTX
CyberSecurity Mobile and Wireless Devices
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Exploratory_Data_Analysis_Fundamentals.pdf
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
"Array and Linked List in Data Structures with Types, Operations, Implementat...
August -2025_Top10 Read_Articles_ijait.pdf
Abrasive, erosive and cavitation wear.pdf
distributed database system" (DDBS) is often used to refer to both the distri...
Categorization of Factors Affecting Classification Algorithms Selection
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Information Storage and Retrieval Techniques Unit III
Feature types and data preprocessing steps
CyberSecurity Mobile and Wireless Devices
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...

022 Construction Productivity (PART 1)