2
Most read
3
Most read
Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com
5-S Audit check sheet
Department Name: Auditing Date:
Overall 5-S Score:
Previous 5-S auditing date: Previous 5-S Score:
Change: _ _ _ _ % improvement/ deterioration Next audit Target score:
Comments:
_ _ _ _ __ _ _ _ __ _ _ _ _
Auditor signature
_ _ _ _ __ _ _ _ __ _ _ _ _
Sectional head signature
****************************************************************
Scoring criteria:
1 2 3 4 5 6 7 8 9 10
Worse Bad Average Good Excellent
1st S Sl. Check Item Description Score
Seiri/Sort
1
Materials/
Parts
Necessary and Unnecessary materials/parts are mixed,
Unnecessary materials/parts exist in workspace
2
Machines/
Equipment
Idle/ Spoiled furniture/ machineries/ equipment/ tools exist
in workspace
3
Walls/
Boards
Unnecessary/ spoiled items on walls/ bulletin boards/
notice boards
4
Floor/
building
Aisles, stairways, corners etc. are free of items
5
Visual
Control
Idle/ Spoiled machineries/ equipment are marked
specifically
6
Preventive
action
Control on entrance of unnecessary items
Average Score on Seiri/ Sort:
Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com
2nd S Sl. Check Item Description Score
Seiton/Set-In-Order 1
Floors &
Gangways
Floor Marked per plant standard
2 Workspace
Defined place for raw materials, machineries, parts, tools,
accessories, etc.
3 Floor
Materials, equipment, accessories, etc. are randomly
pervaded in the floor
4 Storage
All material storage(Shelves and other storage) areas are
clearly designated and labeled
5
Tools &
Accessories
Tools are arranged more rationally to facilitate picking
them up and returning them
6 File cabinet
Easy to identify and pick up the required file,
Easy to trace if any file is missing
7 Workspace
First aid box, fire safety equipment etc. are effective and
easily visible, traceable and accessible to all
Average Score on Seiton/ Set-In-Order:
3rd S Sl. Check Item Description Score
Seiso/Shine
1 Floor Floor is shiny clean and free of waste, water and oil
2 Workspace
Walls, windows, doors, roof, lights, fans, posters etc. are
clean and soot free
3 Floor
Suitable doormat at the entrance of each floor to prevent
outside dust and filth
4
Machines
Machines are wiped clean regularly and kept free of dust,
chips and oil
5
Machineries/equipment inspection is combined with
equipment maintenance
6
Measuring
equipment
All measuring equipment are effective, clean and rust free
7
Cleaning
Responsibili
ty
There is a person responsible for overseeing cleaning
operations
8 Employee Nobody put dirt on the floor, but in specific bin or basket
Average Score on Seiso/ Shine:
4th S Sl. Check Item Description Score
Seiketsu/
Standardize
1 Workspace All items are marked clearly and identification is easy
2 Instructions
Necessary instructions are hanged and relevant persons
are aware about it
3
Workspace
Target, production rate, efficiency etc. are hanged and
visible by all relevant personnel easily
4
Standard sample, photos, drawings etc. are kept in proper
place/s and visible by all relevant personnel easily
5 Personnel Everyone clean his own table, computer, machines etc.
Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com
before starting job, also after finishing job and also in
regular interval through own responsibility
6
Machineries
& tools
All machineries, tools, equipment etc. are painted
properly
7
Workspace
&
machineries
Hazardous workspace, rotating machineries etc. are
fenced properly to prevent accidents and necessary
notifications are hanged properly
8
Personal
protective
equipment
All employee use Personal protective equipment (mask,
hand globes, glass, air plugs, helmet, safety guards, apron
etc.) properly
9 Environment
Sound, vibration, temperature, light etc. are suitable for
working comfortably
Average Score on Seiketsu/ Standardize:
5th S Sl. Check Item Description Score
Shitsuke/Sustain
All personnel
Top to bottom all are aware about 5-S and they are
committed & try their best to maintain 5-S from their own
position
Workspace
Necessary posters, slogans etc. relating to 5-S are hanged
in suitable locations to spread the 5-S concept to all
Time
management
All meetings, seminars etc. are hold in time without a
single minute delay
Floor head/
in-charge
A discussion on 5-S is arranged among all personnel in
regular interval
All personnel Friendly relationship among all and they work as a team
Corrective
action
If anyone do any mistake, his/her boss clarify that to
him/her without any harassment
On job
training
On job training, discussion awareness is held regularly
Top
management
A rewarding system is prevailed throughout the
organization in order to maintain 5-S
Average Score on Shitsuke/ Sustain:
Overall 5 − S score
=
Averave score on Seiri + Seiton + Seiso + Selketsu + Shitsuke
5
=
_ _ + _ _ + _ _ + _ _ + _ _
5
=

More Related Content

PDF
5s Audit Scorecard
PPTX
Application of 5S in a Warehouse by Supriya Basu
PDF
5s for a office area.pptx.pdf
PDF
5S Auditing Sheet
PPTX
5s a basic introduction
PDF
Lean 5S Visual Workplace Organization Training Module
PPT
5s training slides_432
PPTX
5s presentation
5s Audit Scorecard
Application of 5S in a Warehouse by Supriya Basu
5s for a office area.pptx.pdf
5S Auditing Sheet
5s a basic introduction
Lean 5S Visual Workplace Organization Training Module
5s training slides_432
5s presentation

What's hot (20)

PDF
5s Audit Checklist
PDF
5S AWARNESS TRAINING PROGRAM
PPTX
5S for Enhancing Productivity, Quality, and Safety at the Workplace
PPTX
AUTONOMOUS MAINTENANCE
PPTX
PDF
Presentation - introduction to 5S
PPT
Introduction to 6S
PPTX
5 s and workplace productivity cet
PPTX
5 s powerpoint presentation
PPTX
Training module 4 m change
PPT
5S Training and Effective 5S Pratices
PPTX
5S: Awareness & Implementation
PPTX
One point lessons (OPLs)
PPTX
PPT
5S Training Presentation
PDF
Kaizen | Continuous Improvement for Organization
PDF
Jishu Hozen or Autonomous Maintenance
PPT
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
PPT
5S basic training ppt
5s Audit Checklist
5S AWARNESS TRAINING PROGRAM
5S for Enhancing Productivity, Quality, and Safety at the Workplace
AUTONOMOUS MAINTENANCE
Presentation - introduction to 5S
Introduction to 6S
5 s and workplace productivity cet
5 s powerpoint presentation
Training module 4 m change
5S Training and Effective 5S Pratices
5S: Awareness & Implementation
One point lessons (OPLs)
5S Training Presentation
Kaizen | Continuous Improvement for Organization
Jishu Hozen or Autonomous Maintenance
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
5S basic training ppt
Ad

Viewers also liked (16)

PDF
5s audit template ver2
PPT
5 S Office Audit Sheet
DOC
Check list 5 s
PDF
International Environmental Health and Safety Protocol Sample
XLS
5s Score Card
PDF
5s audit template
PPTX
Copy of lla – capstone project 5s
PDF
Kaizen cho quản lý triết lý hành động - kaizen philosophies
PDF
Io ct part1-06resg-_control for renewable energy and smart grids
PDF
Visual Production Planning for Stealth
PDF
PPTX
5 s and productivity ( Values Formation )
DOC
Standart penilaian audit 5 r
DOCX
Iso 27001 2013 Standard Requirements
DOC
Check list almoxarifado
PDF
Workplace Accountability: How Effective Managers Create a Culture of Ownership
5s audit template ver2
5 S Office Audit Sheet
Check list 5 s
International Environmental Health and Safety Protocol Sample
5s Score Card
5s audit template
Copy of lla – capstone project 5s
Kaizen cho quản lý triết lý hành động - kaizen philosophies
Io ct part1-06resg-_control for renewable energy and smart grids
Visual Production Planning for Stealth
5 s and productivity ( Values Formation )
Standart penilaian audit 5 r
Iso 27001 2013 Standard Requirements
Check list almoxarifado
Workplace Accountability: How Effective Managers Create a Culture of Ownership
Ad

Similar to 5-S audit check sheet with scoring, presented at BSTQM (20)

PDF
5S Digital Audit - with toolkit
PDF
5S Audit Form from GBMP
PDF
5S Factory English
PPTX
5 s methodology
PPTX
7s ppt.pptx
PPTX
5-S Methodology - ADDVALUE - Nilesh Arora
PDF
Session 3
PPTX
KAIZEN Updated 030507
PPT
5 S – A Program To Improve Project
PPT
5-S level of excelelnce, presented at BSTQM
PPT
5 S + 1 S
PPTX
5S Training_02.05.2023.pptx5S Training_02.05.2023.pptx5S Training_02.05.2023....
PPT
5 s @ asrotex
PPT
my name is sathush i am a bsc studeS.ppt
PDF
6s overview in production floor
PPSX
Work place
PPTX
5S Digital Audit - with toolkit
5S Audit Form from GBMP
5S Factory English
5 s methodology
7s ppt.pptx
5-S Methodology - ADDVALUE - Nilesh Arora
Session 3
KAIZEN Updated 030507
5 S – A Program To Improve Project
5-S level of excelelnce, presented at BSTQM
5 S + 1 S
5S Training_02.05.2023.pptx5S Training_02.05.2023.pptx5S Training_02.05.2023....
5 s @ asrotex
my name is sathush i am a bsc studeS.ppt
6s overview in production floor
Work place

More from Engr. Abdun Noor (12)

PPTX
Occupational Health and Safety awareness for staff: Bangla
PDF
First aid: Bangla
PPTX
HRM practices in a furniture manufacturing company in Bangladesh (A Case Study)
PPT
Principle of motion economy presented at BSTQM
PPT
5-S details, presented at BSTQM
PPT
Quality Control Circle Action plan : A brief format
PPT
Problem Solving Tools
PPT
5-S Technique
PPT
KAIZEN Technique
PPT
Total Quality Management (TQM)
PPT
Life without 5 s
PPT
Something creative
Occupational Health and Safety awareness for staff: Bangla
First aid: Bangla
HRM practices in a furniture manufacturing company in Bangladesh (A Case Study)
Principle of motion economy presented at BSTQM
5-S details, presented at BSTQM
Quality Control Circle Action plan : A brief format
Problem Solving Tools
5-S Technique
KAIZEN Technique
Total Quality Management (TQM)
Life without 5 s
Something creative

Recently uploaded (20)

PPTX
Petroleum Refining & Petrochemicals.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PPTX
ai_satellite_crop_management_20250815030350.pptx
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
Java Basics-Introduction and program control
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
Feature types and data preprocessing steps
PDF
Unit1 - AIML Chapter 1 concept and ethics
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Principal presentation for NAAC (1).pptx
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Cryptography and Network Security-Module-I.pdf
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PPTX
Management Information system : MIS-e-Business Systems.pptx
Petroleum Refining & Petrochemicals.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
ai_satellite_crop_management_20250815030350.pptx
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Java Basics-Introduction and program control
20250617 - IR - Global Guide for HR - 51 pages.pdf
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
CyberSecurity Mobile and Wireless Devices
Feature types and data preprocessing steps
Unit1 - AIML Chapter 1 concept and ethics
distributed database system" (DDBS) is often used to refer to both the distri...
Principal presentation for NAAC (1).pptx
Information Storage and Retrieval Techniques Unit III
Cryptography and Network Security-Module-I.pdf
MLpara ingenieira CIVIL, meca Y AMBIENTAL
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
Management Information system : MIS-e-Business Systems.pptx

5-S audit check sheet with scoring, presented at BSTQM

  • 1. Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com 5-S Audit check sheet Department Name: Auditing Date: Overall 5-S Score: Previous 5-S auditing date: Previous 5-S Score: Change: _ _ _ _ % improvement/ deterioration Next audit Target score: Comments: _ _ _ _ __ _ _ _ __ _ _ _ _ Auditor signature _ _ _ _ __ _ _ _ __ _ _ _ _ Sectional head signature **************************************************************** Scoring criteria: 1 2 3 4 5 6 7 8 9 10 Worse Bad Average Good Excellent 1st S Sl. Check Item Description Score Seiri/Sort 1 Materials/ Parts Necessary and Unnecessary materials/parts are mixed, Unnecessary materials/parts exist in workspace 2 Machines/ Equipment Idle/ Spoiled furniture/ machineries/ equipment/ tools exist in workspace 3 Walls/ Boards Unnecessary/ spoiled items on walls/ bulletin boards/ notice boards 4 Floor/ building Aisles, stairways, corners etc. are free of items 5 Visual Control Idle/ Spoiled machineries/ equipment are marked specifically 6 Preventive action Control on entrance of unnecessary items Average Score on Seiri/ Sort:
  • 2. Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com 2nd S Sl. Check Item Description Score Seiton/Set-In-Order 1 Floors & Gangways Floor Marked per plant standard 2 Workspace Defined place for raw materials, machineries, parts, tools, accessories, etc. 3 Floor Materials, equipment, accessories, etc. are randomly pervaded in the floor 4 Storage All material storage(Shelves and other storage) areas are clearly designated and labeled 5 Tools & Accessories Tools are arranged more rationally to facilitate picking them up and returning them 6 File cabinet Easy to identify and pick up the required file, Easy to trace if any file is missing 7 Workspace First aid box, fire safety equipment etc. are effective and easily visible, traceable and accessible to all Average Score on Seiton/ Set-In-Order: 3rd S Sl. Check Item Description Score Seiso/Shine 1 Floor Floor is shiny clean and free of waste, water and oil 2 Workspace Walls, windows, doors, roof, lights, fans, posters etc. are clean and soot free 3 Floor Suitable doormat at the entrance of each floor to prevent outside dust and filth 4 Machines Machines are wiped clean regularly and kept free of dust, chips and oil 5 Machineries/equipment inspection is combined with equipment maintenance 6 Measuring equipment All measuring equipment are effective, clean and rust free 7 Cleaning Responsibili ty There is a person responsible for overseeing cleaning operations 8 Employee Nobody put dirt on the floor, but in specific bin or basket Average Score on Seiso/ Shine: 4th S Sl. Check Item Description Score Seiketsu/ Standardize 1 Workspace All items are marked clearly and identification is easy 2 Instructions Necessary instructions are hanged and relevant persons are aware about it 3 Workspace Target, production rate, efficiency etc. are hanged and visible by all relevant personnel easily 4 Standard sample, photos, drawings etc. are kept in proper place/s and visible by all relevant personnel easily 5 Personnel Everyone clean his own table, computer, machines etc.
  • 3. Engr. Abdun Noor, Centre for Management Development, bd.abdunnoor@gmail.com before starting job, also after finishing job and also in regular interval through own responsibility 6 Machineries & tools All machineries, tools, equipment etc. are painted properly 7 Workspace & machineries Hazardous workspace, rotating machineries etc. are fenced properly to prevent accidents and necessary notifications are hanged properly 8 Personal protective equipment All employee use Personal protective equipment (mask, hand globes, glass, air plugs, helmet, safety guards, apron etc.) properly 9 Environment Sound, vibration, temperature, light etc. are suitable for working comfortably Average Score on Seiketsu/ Standardize: 5th S Sl. Check Item Description Score Shitsuke/Sustain All personnel Top to bottom all are aware about 5-S and they are committed & try their best to maintain 5-S from their own position Workspace Necessary posters, slogans etc. relating to 5-S are hanged in suitable locations to spread the 5-S concept to all Time management All meetings, seminars etc. are hold in time without a single minute delay Floor head/ in-charge A discussion on 5-S is arranged among all personnel in regular interval All personnel Friendly relationship among all and they work as a team Corrective action If anyone do any mistake, his/her boss clarify that to him/her without any harassment On job training On job training, discussion awareness is held regularly Top management A rewarding system is prevailed throughout the organization in order to maintain 5-S Average Score on Shitsuke/ Sustain: Overall 5 − S score = Averave score on Seiri + Seiton + Seiso + Selketsu + Shitsuke 5 = _ _ + _ _ + _ _ + _ _ + _ _ 5 =