Civilverse Admin 17 January 2021
Basics of Contract Management
civilverse.org/contract-management-basics
Table of Content for Basics of Contract Management-
1. Introduction
2. What is Contract and Contract Management?
3. Need for Contract Management
4. Contract Management Life Cycle
5. Stages of Contract Management
1. Formulation of Contract
2. Contract Administration
3. Risk Management
4. Ending Contract
5. Contract Review
6. Best Practices of Contract Management
1. Introduction-
The businesses require the collaboration of teams to successfully achieve their objectives.
These collaborations happen with the vendors, suppliers, clients, contractors and even
customers via signed contracts between them. The parties involved in contracts abide by
the terms mentioned in it.
A clear understanding of the basics of contract management enables the contract manager
to successfully execute the contract.
2/6
2. What is Contract and Contract Management?
The section 2(b) of Indian Contract Act, 1872 defines the contract as-
“any agreement enforceable by law”
The same section also defines the other terms related to the contract such as offer,
acceptance, promise, promisor and promise, consideration, agreement, reciprocal
promises, void agreement, etc. The same can be read in details here.
2.1 Contract Management-
Contract Management can be summarised as the process of performing activities that
enables both the contracting authority and the contractor to fulfil their contractual
obligations. It also ensures the contract meets the optimum combination of cost, time,
and quality during the contract period.
3. Need for Contract Management-
A contract can’t run itself; it needs to be proactively managed. Contract management
needs resources to manage it. The key resources are Project Manager, Contract Manager,
Contracting Authority, and Contractor’s representative.
The contract management fulfils the following objectives-
a. Protect the agreed contractual position.
b. Accept deliverables under the contract.
c. Maintain agreed allocation of risks.
d. Monitor contractor’s performance against output specifications.
e. Take appropriate action on the financial implication of any failure.
f. Ensure that payments are conditional upon the contractor’s quality of performance.
g. Maintain continuous improvements & service deliveries.
4. Contract Management Lifecycle-
The contract management lifecycle can be broadly classified into two parts- pre-award
and post-award. The pre-award activities include initiation, planning, and tender
preparation. The post-award activities are execution, performance measurement, closing
and review.
3/6
Contract Management Life Cycle
The steps of contract management lifecycle are-
4.1 Pre-award-
a. Prepare a procurement note stating the purpose, requirement and need of the
procurement.
b. Develop Procurement Process, specifications, contract strategy, tender evaluation
criteria.
c. Do market survey for current market practices, trends, price schedules etc.
d. Publish a Specific Procurement Note or an advertisement.
e. Invite Tenders and Receive them.
f. Clarify the ambiguities or doubts, if any from the contractors who have submitted
the tenders.
g. Evaluate the submitted contracts as per predefined tender evaluation criteria and
award the contract to the most suitable bidder.
h. Debrief the unsuccessful bidders or disqualified bidders.
4.2 Post-award-
i. Manage contract during the execution by performance measurement of the
contractor as per the defined contractual parameters, risk assessment and
mitigation, maintaining timeline and quality during the contract period.
ii. Keep the contractor in the loop regarding the variations on contract and apprise the
contractor of its performance.
iii. Post closure of the contract, maintain a feedback register to record findings,
learnings, observations, risks, etc. to use them as the benchmark for the future
procurement process.
5. Stages of Contract Management-
4/6
The basics of contract management must include the stages of contract management as it
increases the control of contract manager over the entire process and helps in easier
execution. The contract goes through five stages throughout its life. The stages are as
formulation, administration, risk management, closure and review.
5.1 Formulation of a Contract-
A contract has component documents dealing with the different topics and bound
together in a logical sequence. It has price schedules, schedules of works, requirement,
technical specifications, agreement, distribution list, general terms and conditions, special
conditions, other amendments to the contract, agreed work methodology, contractor’s
notification of contract award.
The contract should be prepared in line with the equality, mutual benefit of the
contracting authority and contractor and applicable law.
The main focus should be kept on following areas while preparing the contract-
a. Specifications
b. General Clauses- Applicable law, the language of communication, the order of
precedence, communication route etc.
c. Main responsibilities of the owner and contractor.
d. Commercial Clauses.
e. Contract Execution Timeline- Commencement, work program, procurement and
delivery, delays etc.
f. Compliance with specifications- QA policy, inspection, testing, the rectification of
defects.
g. Payment- Assessment and certification method, time of payment, method of
payment and delayed payment etc.
h. Variations and Claims.
i. Titles-Ownership of objects, materials, equipment at the site.
j. Risks- Provision for damage in transportation, theft etc.
k. Insurances.
l. Force Majeure.
m. Failure to Perform-Termination, security, delay damages, performance guarantee.
n. Other area-Breach of contract, social and environmental issue.
o. Resolution of Disputes.
5.2 Contract Administration-
The contract administration can be explained by following activities-
a. Maintaining contact details of key personnel.
b. Scheduling of meetings and notice periods.
c. Developing and maintain a mechanism for managing things.
d. Monitoring cost and payment procedure.
e. Establishment & maintaining contract documentation.
5/6
f. Management reporting.
5.3 Risk Management-
The study of risk is an integral part of contract management. When studying the basics of
contract management, it comes important to get an understanding of the process of risk
management.
The risk management process involves the identification and assessment of risks, their
evaluation, treatment and mitigation.
The major risks arise from variations in the contract. The variations arise due to the
change in work scope, design change, error/omission in design, different site conditions,
value engineering, change in technology, the extension of duration, legislative change,
poor contract management, safety consideration, genuine unforeseen circumstances.
Further, the variations in the contract can lead to the change in cost, change in funding
requirement, delays and EOTs, wasted or additional efforts, unproductive labour cost,
reprogramming of contract to absorb or reduce the effects of variations.
5.4 Ending Contract-
A contract is closed when the contractual obligations of both the parties have been
completed. Sometimes, the contract is ended even if any one of the parties don’t perform
their contractual obligations well.
Upon closure of contract; joint inspection, commissioning and handover are done
followed by settlement of final bill of the contractor and the issuance pf the taking-over
certificate by the employer to the contractor along with the release of securities and
retention amount.
The employer can end the contract after 14 days of giving written notice or immediately
when the contractor fails to perform its duties, abandon the project, non-compliance with
the quality, sub-contracting to another contractor without written notice, bankruptcy etc.
The contractor can also end the contract when the employer fails to perform its duties,
failure to issue IPC within 56 days of receipt of documents, non-receipt of payment after
42 days of issuance of IPC, bankruptcy etc.
5.5 Contract Review-
The purpose of the contract review is to develop good practices of procurement and to
establish the benchmarks.
After the closure of the contract, arrangement benefits are assessed, the lessons learnt are
recorded, best practices are capitalised and performance is recorded for future reference.
The contract review checklist must include the review requirement, assessment of how the
requirements have developed, analysis of contract performance, recording of milestones.
6/6
6. The Best Practices of Contract Management-
Some of the best practices of the contract management are as follows-
a. The contract should be such formulated and administered to avoid/minimise the
variations, claims and delays.
b. Thorough planning, market survey and site inspection to be done when formulating
the contract to minimise/avoid the variance.
c. Technical specifications, QA/QC program and performance measurement should be
clearly defined to avoid any ambiguity at the execution stage.
d. Project kick-off meeting to be organised after contract award to bring the employer
and the contractor on the same page before starting execution.
e. In the Kick-off meeting, both the employer and the contractor to be apprised of each
other’s contractual obligations.
f. Payments should be linked with time and quality performance of the contractor.
g. Delays on account of employer and contractor should be separately recorded.
h. The risk register should be maintained.
i. Formal communication between the parties, minutes of the meetings etc. should be
recorded for future references.
j. Both the employer and the contractor should try to maintain the same staff
throughout the contract life as it builds the relationship and helps in the successful
implementation of the contract.
Liked the article? Please comment below to let me know. Also, help me to spread the word
about this blog by sharing it.
Check out my other article on Project Scheduling here.
For article on Basics of Building Information Modeling, click here.

More Related Content

PPT
CH-4 Contract Management.ppt
PDF
contract management, stages of contract management
PPTX
Contracts risk management notes bagamoyo 2.12.2017 final v1
PPTX
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
PDF
Project procurement management PMBOK Sixth Edition
PPTX
What is Contract Lifecycle Management?
PDF
Bid Evaluation
CH-4 Contract Management.ppt
contract management, stages of contract management
Contracts risk management notes bagamoyo 2.12.2017 final v1
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Project procurement management PMBOK Sixth Edition
What is Contract Lifecycle Management?
Bid Evaluation

What's hot (20)

PPTX
Advance Payments in Works
PPTX
Fidic conditions of contract presentation
PPTX
# FIDIC Payment Flow Charts # By SN Panigrahi
PDF
Contracts
PPTX
TENDER DOCUMENT
PDF
Contract payment and variation
PPTX
Contracts & Claims Management Workshop (Session-1)
PPTX
#FIDIC Understanding Basics# By SN Panigrahi
PPTX
Lecture 4 - selection of contract forms
PPTX
Variations in works contracts
PDF
Bot(build operate transfer)
PDF
Fidic contracts management introduction
PDF
Procurement in construction
PPTX
Gcc vs scc
PPTX
PPTX
Module 4 lecture 1
PDF
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
PDF
Claims 20.1 (Flow chart)
PDF
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
PPTX
types of contracts
Advance Payments in Works
Fidic conditions of contract presentation
# FIDIC Payment Flow Charts # By SN Panigrahi
Contracts
TENDER DOCUMENT
Contract payment and variation
Contracts & Claims Management Workshop (Session-1)
#FIDIC Understanding Basics# By SN Panigrahi
Lecture 4 - selection of contract forms
Variations in works contracts
Bot(build operate transfer)
Fidic contracts management introduction
Procurement in construction
Gcc vs scc
Module 4 lecture 1
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Claims 20.1 (Flow chart)
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
types of contracts
Ad

Similar to Basics of Contract Management (20)

PPTX
EXTENDED SCM FORUM PRESENTATION- CONTRACT MANAGEMENT.PPTX
PPT
L8_PROJECT CONTRACT Management.ppt
PPTX
chapter 6 of human resource management (6).pptx
PPTX
Contract management
PPTX
PROCUREMENT & CONTRACT MANAGEMENT.pptx
PPTX
Contract Management
PDF
717-MSC2-Mohamed Shabana-Procurement Risk and contract Management.pdf
PPTX
Chapter 9 - Admin Contract managment .pptx
PPT
Contract Management
PPTX
Contract_Management1 presentation 2025.pptx
PPTX
Contract management
PPTX
Overview to contract management
PPTX
CONTRACT MANAGEMENT.pptx
PDF
Contract Management
RTF
Contracts can pay you dividends
PPTX
Contract management general
PDF
Project procuremenet contract in ethiopia
PDF
Contractor Management Business Organisation Environment Implementation Perfor...
PPT
Contract management.ppt
EXTENDED SCM FORUM PRESENTATION- CONTRACT MANAGEMENT.PPTX
L8_PROJECT CONTRACT Management.ppt
chapter 6 of human resource management (6).pptx
Contract management
PROCUREMENT & CONTRACT MANAGEMENT.pptx
Contract Management
717-MSC2-Mohamed Shabana-Procurement Risk and contract Management.pdf
Chapter 9 - Admin Contract managment .pptx
Contract Management
Contract_Management1 presentation 2025.pptx
Contract management
Overview to contract management
CONTRACT MANAGEMENT.pptx
Contract Management
Contracts can pay you dividends
Contract management general
Project procuremenet contract in ethiopia
Contractor Management Business Organisation Environment Implementation Perfor...
Contract management.ppt
Ad

More from SHAZEBALIKHAN1 (20)

PDF
Critical Path Explained With 7 Q&As and a Free Excel Template
PDF
5 Project Risk Identification Tools I Use & How You Can Use Them Too
PDF
Top 20 Standard Contract Clauses Every Manager Should Know
PDF
Residential Building Preliminary Cost Estimate- Excel Template
PDF
3 Most Important In-situ Soil Tests for Construction Works
PDF
5 Must Know Types of Concrete Testing for Civil Engineers
PDF
Construction Project Schedule Template- Residential Building
PDF
All About Construction Labour Planning- Excel Template
PDF
10 Powerful Construction Cost Estimation Steps
PDF
Construction Material Estimate with MS Excel file
PDF
Managing the Construction Claims Effectively
PDF
How Does MS Project Works 6- Task Controlling Factors
PDF
Most Popular 20 Evergreen Project Management Terms
PDF
Top 5 Concrete Quality Control Methods at Site
PDF
My 5 Learnings of Waterfall Project Management
PDF
Construction Project Schedule Example- Residential Building
PDF
5 Popular Types of Construction Contracts
PDF
Project Time Estimation 6 Powerful Tips & Tricks
PDF
Types of Building Foundations- Shallow and Deep
PDF
DCMA 14-Point Schedule Quality Check
Critical Path Explained With 7 Q&As and a Free Excel Template
5 Project Risk Identification Tools I Use & How You Can Use Them Too
Top 20 Standard Contract Clauses Every Manager Should Know
Residential Building Preliminary Cost Estimate- Excel Template
3 Most Important In-situ Soil Tests for Construction Works
5 Must Know Types of Concrete Testing for Civil Engineers
Construction Project Schedule Template- Residential Building
All About Construction Labour Planning- Excel Template
10 Powerful Construction Cost Estimation Steps
Construction Material Estimate with MS Excel file
Managing the Construction Claims Effectively
How Does MS Project Works 6- Task Controlling Factors
Most Popular 20 Evergreen Project Management Terms
Top 5 Concrete Quality Control Methods at Site
My 5 Learnings of Waterfall Project Management
Construction Project Schedule Example- Residential Building
5 Popular Types of Construction Contracts
Project Time Estimation 6 Powerful Tips & Tricks
Types of Building Foundations- Shallow and Deep
DCMA 14-Point Schedule Quality Check

Recently uploaded (20)

DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
Digital Logic Computer Design lecture notes
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
web development for engineering and engineering
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Digital Logic Computer Design lecture notes
Lecture Notes Electrical Wiring System Components
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
web development for engineering and engineering
CYBER-CRIMES AND SECURITY A guide to understanding
Foundation to blockchain - A guide to Blockchain Tech
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
OOP with Java - Java Introduction (Basics)
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Automation-in-Manufacturing-Chapter-Introduction.pdf
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx

Basics of Contract Management

  • 1. 1/6 Civilverse Admin 17 January 2021 Basics of Contract Management civilverse.org/contract-management-basics Table of Content for Basics of Contract Management- 1. Introduction 2. What is Contract and Contract Management? 3. Need for Contract Management 4. Contract Management Life Cycle 5. Stages of Contract Management 1. Formulation of Contract 2. Contract Administration 3. Risk Management 4. Ending Contract 5. Contract Review 6. Best Practices of Contract Management 1. Introduction- The businesses require the collaboration of teams to successfully achieve their objectives. These collaborations happen with the vendors, suppliers, clients, contractors and even customers via signed contracts between them. The parties involved in contracts abide by the terms mentioned in it. A clear understanding of the basics of contract management enables the contract manager to successfully execute the contract.
  • 2. 2/6 2. What is Contract and Contract Management? The section 2(b) of Indian Contract Act, 1872 defines the contract as- “any agreement enforceable by law” The same section also defines the other terms related to the contract such as offer, acceptance, promise, promisor and promise, consideration, agreement, reciprocal promises, void agreement, etc. The same can be read in details here. 2.1 Contract Management- Contract Management can be summarised as the process of performing activities that enables both the contracting authority and the contractor to fulfil their contractual obligations. It also ensures the contract meets the optimum combination of cost, time, and quality during the contract period. 3. Need for Contract Management- A contract can’t run itself; it needs to be proactively managed. Contract management needs resources to manage it. The key resources are Project Manager, Contract Manager, Contracting Authority, and Contractor’s representative. The contract management fulfils the following objectives- a. Protect the agreed contractual position. b. Accept deliverables under the contract. c. Maintain agreed allocation of risks. d. Monitor contractor’s performance against output specifications. e. Take appropriate action on the financial implication of any failure. f. Ensure that payments are conditional upon the contractor’s quality of performance. g. Maintain continuous improvements & service deliveries. 4. Contract Management Lifecycle- The contract management lifecycle can be broadly classified into two parts- pre-award and post-award. The pre-award activities include initiation, planning, and tender preparation. The post-award activities are execution, performance measurement, closing and review.
  • 3. 3/6 Contract Management Life Cycle The steps of contract management lifecycle are- 4.1 Pre-award- a. Prepare a procurement note stating the purpose, requirement and need of the procurement. b. Develop Procurement Process, specifications, contract strategy, tender evaluation criteria. c. Do market survey for current market practices, trends, price schedules etc. d. Publish a Specific Procurement Note or an advertisement. e. Invite Tenders and Receive them. f. Clarify the ambiguities or doubts, if any from the contractors who have submitted the tenders. g. Evaluate the submitted contracts as per predefined tender evaluation criteria and award the contract to the most suitable bidder. h. Debrief the unsuccessful bidders or disqualified bidders. 4.2 Post-award- i. Manage contract during the execution by performance measurement of the contractor as per the defined contractual parameters, risk assessment and mitigation, maintaining timeline and quality during the contract period. ii. Keep the contractor in the loop regarding the variations on contract and apprise the contractor of its performance. iii. Post closure of the contract, maintain a feedback register to record findings, learnings, observations, risks, etc. to use them as the benchmark for the future procurement process. 5. Stages of Contract Management-
  • 4. 4/6 The basics of contract management must include the stages of contract management as it increases the control of contract manager over the entire process and helps in easier execution. The contract goes through five stages throughout its life. The stages are as formulation, administration, risk management, closure and review. 5.1 Formulation of a Contract- A contract has component documents dealing with the different topics and bound together in a logical sequence. It has price schedules, schedules of works, requirement, technical specifications, agreement, distribution list, general terms and conditions, special conditions, other amendments to the contract, agreed work methodology, contractor’s notification of contract award. The contract should be prepared in line with the equality, mutual benefit of the contracting authority and contractor and applicable law. The main focus should be kept on following areas while preparing the contract- a. Specifications b. General Clauses- Applicable law, the language of communication, the order of precedence, communication route etc. c. Main responsibilities of the owner and contractor. d. Commercial Clauses. e. Contract Execution Timeline- Commencement, work program, procurement and delivery, delays etc. f. Compliance with specifications- QA policy, inspection, testing, the rectification of defects. g. Payment- Assessment and certification method, time of payment, method of payment and delayed payment etc. h. Variations and Claims. i. Titles-Ownership of objects, materials, equipment at the site. j. Risks- Provision for damage in transportation, theft etc. k. Insurances. l. Force Majeure. m. Failure to Perform-Termination, security, delay damages, performance guarantee. n. Other area-Breach of contract, social and environmental issue. o. Resolution of Disputes. 5.2 Contract Administration- The contract administration can be explained by following activities- a. Maintaining contact details of key personnel. b. Scheduling of meetings and notice periods. c. Developing and maintain a mechanism for managing things. d. Monitoring cost and payment procedure. e. Establishment & maintaining contract documentation.
  • 5. 5/6 f. Management reporting. 5.3 Risk Management- The study of risk is an integral part of contract management. When studying the basics of contract management, it comes important to get an understanding of the process of risk management. The risk management process involves the identification and assessment of risks, their evaluation, treatment and mitigation. The major risks arise from variations in the contract. The variations arise due to the change in work scope, design change, error/omission in design, different site conditions, value engineering, change in technology, the extension of duration, legislative change, poor contract management, safety consideration, genuine unforeseen circumstances. Further, the variations in the contract can lead to the change in cost, change in funding requirement, delays and EOTs, wasted or additional efforts, unproductive labour cost, reprogramming of contract to absorb or reduce the effects of variations. 5.4 Ending Contract- A contract is closed when the contractual obligations of both the parties have been completed. Sometimes, the contract is ended even if any one of the parties don’t perform their contractual obligations well. Upon closure of contract; joint inspection, commissioning and handover are done followed by settlement of final bill of the contractor and the issuance pf the taking-over certificate by the employer to the contractor along with the release of securities and retention amount. The employer can end the contract after 14 days of giving written notice or immediately when the contractor fails to perform its duties, abandon the project, non-compliance with the quality, sub-contracting to another contractor without written notice, bankruptcy etc. The contractor can also end the contract when the employer fails to perform its duties, failure to issue IPC within 56 days of receipt of documents, non-receipt of payment after 42 days of issuance of IPC, bankruptcy etc. 5.5 Contract Review- The purpose of the contract review is to develop good practices of procurement and to establish the benchmarks. After the closure of the contract, arrangement benefits are assessed, the lessons learnt are recorded, best practices are capitalised and performance is recorded for future reference. The contract review checklist must include the review requirement, assessment of how the requirements have developed, analysis of contract performance, recording of milestones.
  • 6. 6/6 6. The Best Practices of Contract Management- Some of the best practices of the contract management are as follows- a. The contract should be such formulated and administered to avoid/minimise the variations, claims and delays. b. Thorough planning, market survey and site inspection to be done when formulating the contract to minimise/avoid the variance. c. Technical specifications, QA/QC program and performance measurement should be clearly defined to avoid any ambiguity at the execution stage. d. Project kick-off meeting to be organised after contract award to bring the employer and the contractor on the same page before starting execution. e. In the Kick-off meeting, both the employer and the contractor to be apprised of each other’s contractual obligations. f. Payments should be linked with time and quality performance of the contractor. g. Delays on account of employer and contractor should be separately recorded. h. The risk register should be maintained. i. Formal communication between the parties, minutes of the meetings etc. should be recorded for future references. j. Both the employer and the contractor should try to maintain the same staff throughout the contract life as it builds the relationship and helps in the successful implementation of the contract. Liked the article? Please comment below to let me know. Also, help me to spread the word about this blog by sharing it. Check out my other article on Project Scheduling here. For article on Basics of Building Information Modeling, click here.