1. Beam 1-2,B (Ground Floor Plan) Teo Vi Vien
Dead load
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load at 1-2,A-B
= 3.6kN/m² x 1.875m/2
=​ ​3.375kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2
=​ ​5.22kN/m
Total dead load
= (1.62 + 8.55 + 3.375 + 5.22)kN/m
=​ ​18.765kN/m
Ultimate dead load
= 18.765kN/m x 1.4
=​ ​26.3kN/m
Live load
Live load at 1-2,A-B
= 1.5kN/m² x 1.875m/2
= 1.41kN/m
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m
Total live load
= (1.41 + 2.175)kN/m
= 3.59kN/m
Ultimate live load
= 3.59kN/m x 1.6
= 5.74kN/m
Total ultimate load
= 26.3kN/m + 5.74kN/m
= 32.04kN/m
Distributed load
= (32.04kN/m x 3.775m)
= 120.95kN ​/2 (UDL)
= 60.48kN ​(Reaction Force) 60.48kN x 1.89m x 1/2 = ​57.15kNm
2. Beam 2-Y,C (Ground Floor Plan) Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Dead load at 2-Y,A-C
= 3.6kN/m² x 4.78m/2
= 8.6kN/m
Dead load 2-Y,C-D
= 3.6 kN/m² x 1.75m/2
= 3.15kN/m
Total dead load
= (8.6 + 3.15 + 1.62)kN/m
= 13.37kN/m
Ultimate dead load
= 13.37kN/m x 1.4
= 18.72kN/m
Live load
Live load at 2-Y,A-C
= 1.5kN/m² x 4.78m/2
= 3.59kN/m
Live load at 2-Y,C-D
= 1.5kN/m² x 1.75m/2
= 1.31kN/m
Total live load
= (3.59 + 1.31)kN/m
= 4.9kN/m
Ultimate live load
= 4.9kN/m x 1.6
= 7.84kN/m
Total ultimate load
= 7.84kN/m + 18.72kN/m
= 26.56kN/m
Distributed load
= (26.56kN/m x 5.2m)
= 138.11kN​ /2 (UDL)
= 69.06kN ​(Reaction Force)
Shear force diagram
69.06kN x 2.6m x 1/2 = ​89.78kNm
3. Beam 2,A-D (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 2-4,A-C
= 3.6kN/m² x 4.775m/2 x 2/3
= 5.73kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2 x 2/3
= 3.48kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.6m/2
= 2.88kN/m
Total dead load at grid A-B
= (1.62 + 8.55 + 5.73)kN/m
= 15.9kN/m
Total dead load at grid B-C
= (1.62 + 8.55 + 5.73 + 3.48)kN/m
= 19.38kN/m
Total dead load at grid C-D
= (1.62 + 8.55 + 2.88)kN/m
= 13.05kN/m
Ultimate dead load of grid A-B
= 15.9kN/m x 1.4
= 22.26kN/m
Ultimate dead load of grid B-C
= 19.38kN/m x 1.4
= 27.13kN/m
Ultimate dead load of grid C-D
= 13.05kN/m x 1.4
= 18.27kN/m
Live load
Live load at 2-4,A-C
= 1.5kN/m² x 4.775m/2 x 2/3
= 2.39kN/m
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2 x 2/3
= 1.45kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.6m/2
= 1.2kN/m
Total live load on grid A-B
= 2.39kN/m
Total live load on grid B-C
= (2.39 + 1.45)kN/m
= 3.84kN/m
Total live load on grid C-D
= 1.2kN/m
Ultimate live load for grid A-B
= 2.39kN/m x 1.6
= 3.824kN/m
Ultimate live load for grid B-C
= 3.84kN/m x 1.6
= 6.144kN/m
Ultimate live load for grid C-D
= 1.2kN/m x 1.6
= 1.92kN/m
Total ultimate load on grid A-B
= (22.26 + 3.824)kN/m
26.08kN/m
Total ultimate load on grid B-C
= (27.13 + 6.144)kN/m
= 33.28kN/m
Total ultimate load on grid C-D
= (18.27 + 1.92)kN/m
= 20.19kN/m
Take point load from 1-2,B
= 60.48kN
Take point load from 2-4,C and 1-2,C
= 69.06kN + 73.19kN
= 142.25kN
Take moment at point A,
48.9kN/m(0.9375m) + 60.48kN/m(1.875m) + 96.51kN/m(3.325m) + 142.25kN/m(4.775m) +
35.33kN/m(5.65m) - DkN/m(6.525m) = 0
6.525D = 1358.998
D = 208.28kN
Take moment at point D,
35.33kN/m(0.875m) + 142.25kN/m(1.75m) + 96.51kN/m(3.2m) + 60.48kN/m(4.65m) +
48.9kN/m(5.59m) - AkN/m(6.525m) = 0
6.525A = 1143.266
A = 175.21kN
Shear area diagram
A = 1/2 x (126.31 + 175.21)kN x 1.875m
= 282.68kNm
B = 1/2 x 65.83kN x 1.978m
= 65.11kNm
C = 1/2 x 30.68kN x 0.921m
= 14.13kNm
D = 1/2 x (172.93 + 208.26)kN x 1.75m
= 333.54kNm
4. Beam U,C-D (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.4m/2
= 2.52kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.75m/2 x 2/3
= 2.1kN/m
Total dead load
= (1.62 + 8.55 + 2.52 + 2.1)kN/m
= 14.79kN/m
Ultimate dead load
= 14.79kN/m x 1.4
= 20.71kN/m
Live load
Live load at 1-U,C-D
= 1.5kN/m² x 1.4m/2
= 1.05kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.75m/2 x 2/3
= 0.875kN/m
Total live load
= (1.05 + 0.875)kN/m
= 1.925kN/m
Ultimate live load
= 1.925kN/m x 1.6
= 3.08kN/m
Total ultimate load
= (20.71 + 3.08) kN/m
= 23.79kN/m
Distributed load
= 23.79kN/m x 1.75m
= 41.63kN​ /2 (UDL)
= 20.82kN ​(Reaction Force/Point Load at 1-2,C) 20.82kN x 0.875m x 1/2 = ​9.11kNm
5. Beam 1-2,C (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2
= 5.22kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.4m/2 x 2/3
= 1.68kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 5.22 + 1.68 + 3.15)kN/m
= 20.22kN/m
Ultimate dead load
= 20.22kN/m x 1.4
= 28.3kN/m
Live load
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.4m/2 x 2/3
= 0.7kN/m
Live load at 1-U,C-D
= 1.5kN/m² x 1.75m/2
= 1.31kN/m
Total live load
= (2.175 + 0.7 + 1.31)kN/m
= 4.19kN/m
Ultimate live load
= 4.19kN/m x 1.6
= 6.71kN
Total ultimate load
= (28.3 + 6.71)kN/m
= 35.01kN/m ​x 3.775m
= 132.16kN ​(UDL)
Point load from ​Beam 4. U,C-D
= 20.82kN
Take moment at point 2C,
20.8kN(1.4m) + 132.16kN(1.8875m) - 2CkN(3.775m) = 0
Reaction force at 2C = 73.79kN
Reaction force at 1C
= 20.8kN + 132.16kN - 73.79kN
= 79.17kN
Shear graph area
A = 1/2 x (30.16kN + 79.17kN) x 1.4m = ​76.53kNm
x/2.375 = 9.36/83.15
x = 0.267
B = 1/2 x 9.36kN x 0.267m = ​1.25kNm
C = 1/2 x 73.79kN x 2.108m = ​77.77kNm
6. Beam T-2,D’ Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load T-2,D-D’
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Dead load T-2,D’-E
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Total dead load
= (1.62 + 8.55 + 2.16 + 2.16)kN/m
= 14.49kN/m
Ultimate dead load
= 14.49kN/m x 1.4
= 20.29kN/m
Live load
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load at T-2,D’-E
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Total live load
= (0.9 + 0.9)kN/m
= 1.8kN/m
Ultimate live load
= 1.8kN/m x 1.6
= 2.88kN/m
Total ultimate load
= (20.29 + 2.88)kN/m
= 23.17kN/m
Distributed load
= 23.17kN/m x 2.1m
=48.66kN /2
= 24.33kN (Point load)
Shear area diagram = 24.33kN x 1.05m x 1/2 = ​12.77kNm
7. Beam T,D-E Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at T-2,D-D’
= 3.6kN/m² x 1.2m/2 x 2/3
= 1.44kN/m
Dead load at T-2,D’-E
= 3.6kN/m² x 1.2/2 x 2/3
= 1.44kN/m
Dead load 1-T,D-E
= 3.6kN/m² x 1.5m/2
= 2.7kN/m
Total dead load
= (1.62 + 8.55 + 1.44 + 1.44 + 2.7)kN/m
= 15.75kN/m
Ultimate dead load
= 15.75kN/m x 1.4
= 22.05kN/m
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2 x 2/3
= 0.6kN/m
Live load at T-2,D’-E
= 1.5kN/m² x 1.2m/2 x 2/3
= 0.6kN/m
Live load at 1-T,D-E
= 1.5kN/m² x 1.5m/2
= 1.125kN/m
Total live load
= (0.6 + 0.6 + 1.125)kN/m
= 2.325kN/m
Ultimate live load
= 2.325kN/m x 1.6
= 3.72kN/m
Total ultimate load
= (22.05 + 3.72)kN/m
= 25.77kN/m x 2.7m
= 69.58kN
Point load from beam T-2,D’
= 24.33kN
Take moment at point D,
69.58kN(1.35m) + 24.33kN(1.35m) - DkN(2.7m) = 0
Reaction force at ​D = 46.95kN
Reaction force at E
= 24.32kN + 69.58kN - 46.95kN
= 46.95kN
Shear area diagram
= 1/2 x (46.95 + 12.16)kN x 1.35m
=39.9kNm
8. Beam 1-2,D (Ground Floor Plan) Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.5m/2 x 2/3
= 1.8kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Dead load at T-2,D-D’
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Dead load at 1-T,D-D’
= 3.6kN/m² x 1.6m/2 x 2/3
= 1.92kN/m
Total dead load at grid 2-U
= (1.62 + 1.8 + 2.16)kN/m = ​5.58kN/m
Total dead load at grid U-T
= (1.62 + 8.55 + 3.15 + 2.16)kN/m = ​15.48kN/m
Total dead load at grid T-1
= (1.62 + 8.55 + 3.15 + 1.92)kN/m = ​15.24kN/m
Ultimate dead load at grid U-2
= 5.58kN/m x 1.4
= 7.81kN/m
Ultimate dead load at grid T-U
= 15.48kN/m x 1.4
= 21.67kN/m
Ultimate dead load at grid 1-T
= 15.24kN/m x 1.4
= 21.34kN/m
Live load
Live load at U-2,CD
= 1.5kN/m² x 1.5m/2 x 2/3
= 0.75kN/m
Live load at 1-U,CD
= 1.5kN/m x 1.75m/2
= 1.31kN/m
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load 1-T,D-D’
= 1.5kN/m² x 1.6m/2 x 2/3
= 0.8kN/m
Total live load at grid 2-U
= (0.75 + 0.9)kN/m
= 1.65kN/m
Total live load at grid U-T
= (1.31 + 0.9)kN/m
= 1.21kN/m
Total live load at grid T-1
= (1.31 + 0.8)kN/m
= 2.11kN/m
Ultimate load at grid U-2
= 1.65kN/m x 1.6
= 2.64kN/m
Ultimate load at grid T-U
= 1.21kN/m x 1.6
= 1.936kN/m
Ultimate load at grid 1-T
= 2.11kN/m x 1.6
= 3.376kN/m
Total ultimate load on grid U-2
= (7.81 + 2.64)kN/m
= 10.45kN/m
Total ultimate load on grid T-U
= (21.67 + 1.936)kN/m
= 23.61kN/m
Total ultimate load on grid 1-T
= (21.34 + 3.376)kN/m
= 24.71kN/m
Point load of grid U-2
= (7.81 + 2.64)kN/m
= 10.45kN/m​ ​x 1.5m
= 15.68kN
Point load of grid T-U
= (21.67 + 1.936)kN/m
= 23.61kN/m x 0.5m
= 11.8kN
Point load of grid 1-T
= (21.34 + 3.376)kN/m
= 24.71kN/m x 1.6m
= 39.54kN/m
Point load from ​Beam 4. U,C-D
= 20.8kN
Reaction force as point load from ​Beam 7. T,D-E
= 46.95kN
Take moment at point A,
15.68kN/m(0.75m) + 20.8kN/m(1.5m) + 11.8kN/m(1.75m) + 46.95kN/m(2m) + 39.54kN/m(2.8m)
- B(3.6m) = 0
3.6B = 268.22kN/m
B = 74.51kN
Take moment at point B,
-39.54kN/m(0.8m) - 46.95kN/m(1.6m) - 11.8kN/m(1.85m) - 20.8kN/m(2.1m) - 15.68kN/m(2.85m)
+ A(3.6m) = 0
3.6A = 216.95kN/m
A = 60.26kN
Shear area diagram
Area A
= 1/2 x (44.58kN + 60.26kN) x 1.5m
= 78.63kNm
Area B
= 1/2 x (11.98kN + 23.78kN) x 0.5m
= 8.94kNm
Area C
= 1/2 x (34.97kN + 74.51kN) x 1.6m
= 87.58kNm
Beam 4-2, E (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 2-4, E-F
= 3.6kN/m² x 5.6m/2
= 10.08kN/m
Dead load 1-X, D-E
= 3.6kN/m² x 2.6m/2
= 4.68kN/m
Total dead load X-4, E
= (1.62 + 8.55 + 10.08) kN/m
= 20.25kN/m
Total dead load 2-X, E
= (1.62 + 8.55 + 10.08 + 4.68) kN/m
= 24.93kN/m
Ultimate dead load X-4, E
=20.25kN/m x 1.4
= 28.35kN/m
Ultimate dead load 2-X, E
= 24.93kN/m x 1.4
= 34.9kN/m
Live load 2-4, E-F
= 1.5kN/m² x 5.6m/2
= 4.2kN/m
Live load 1-X, D-E
= 1.5kN/m² x 2.6m/2
=1.95kN/m
Total live load at X-4, E
= 4.2kN/m
Total live load 2-X, E
= (4.2 + 1.95) kN/m
= 6.15kN/m
Ultimate live load X-4, E
= 4.2kN/m x 1.6
= 6.72kN/m
Ultimate live load 2-X, E
= 6.15kN/m x 1.6
= 9.84kN/m
Total ultimate load X-4, E
= (28.35 + 6.72) kN/m
= 35.07kN/m
Total ultimate load 2-X, E
= (34.9 + 9.84) kN/m
= 44.74kN/m
Point load from beam X, D-E
= ​11.34kN/m
Distributed load X-4, E
= 35.07kN/m x 4m
= 140.28kN
Distribution load 2-X, E
= 44.74kN/m x 1.6m
= 71.58kN/m
Total moment of point 4E
= 140.28kN(2m) + 11.34kN(4m) + 71.58kN(4.8m) - 2E(5.6m)
2E(5.6m) = 669.5kNm
2E reaction force = 119.55kN
4E reaction force
= (140.28 + 11.34 + 71.58 - 119.55) kN
= 103.65kN
Shear graph area
x/4 = 36.63/140.28
x = 1.04m
A = ½ (103.65kN x 2.96m)
= 153.4kNm
B = ½ (36.63kN x 1.04m)
= 19.05kNm
C = ½ (47.97kN+ 119.55kN) x 1.6m
= 134.02kNm
Beam X, D-E (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Dead load at 1-X, D-E
= 3.6kN/m² x 2.6m/2 x ⅔
= 3.12kN/m
Total dead load
= (3.12 + 1.62) kN/m
= 4.74kN/m
Ultimate dead load
= 4.74kN/m x 1.4
= 6.64kN/m
Live load 1-X, D-E
= 1.5kN/m² x 2.6m/2 x ⅔
= 1.3kN/m
Ultimate live load 1-X, D-E
= 1.3kN/m x 1.6
= 2.08kN/m
Total ultimate load
= 6.64kN/m + 2.08kN/m
=8.72kN/m
Distributed load
= 8.72kN/m x 2.6m
= 22.67kN/m​ /2
= 11.34kN
Shear force area
= ½ (11.34kN + 1.3m)
= 6.32kNm
Beam 2 E-E’ (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load 1-2, E-E’
= 3.6kN/m² x 3.4m/2 x ⅔
4.08kN/m
Dead load 2-4, E-F
= 3.6kN/m² x 5.6m/2 x ⅔
= 6.72kN/m
Total dead load
= (1.62 + 8.55 + 4.08 + 6.72) kN/m
= 20.97kN/m
Ultimate dead load
= 20.97kN/m x 1.4
= 29.36kN/m
Live load 1-2, E-E’
= 1.5kN/m² x 3.4m/2 x ⅔
= 1.7kN/m
Live load 2-4, E-F
= 1.5kN/m² x 5.6m/2 x ⅔
= 2.8kN/m
Total live load
= (1.7 + 2.8)kN/m
= 4.5kN/m
Ultimate live load
= 4.5kN/m x 1.6
= 7.2kN/m
Total ultimate load
= (29.36 + 7.2)kN/m
= 36.56kN/m
Distributed load
= 36.56kN/m x 3.4m
= 124.3kN​ / 2
= 62.15kN
Shear force area
= ½ (62.15kN x 1.7m)
= 52.83kNm
Beam T, E’-F (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load T-2, E’-F
= 3.6kN/m² x 2/2 x ⅔
= 2.4kN/m
Total dead load
= (1.62 +8.55 + 2.4) kN/m
= 12.57kN/m
Ultimate dead load
= 12.57kN/m x 1.4
= 17.6kN/m
Live load T-2, E’-F
= 1.5kN/m² x 2/2 x ⅔
= 1kN/m
Ultimate live load
= 1kN/m x 1.6
= 1.6kN/m
Total ultimate load
= (17.6 + 1.6) kN/m
= 19.2kN/m
Distributed load
= 19.2kN/m x 2m
= 38.4kN​ / 2
= 19.2kN/m
Shear force area
= ½ (1m x 19.2kN)
= 9.6kNm
Beam 1-2, E’ (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load 1-2, E-E’
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Dead load T-2, E’-F
= 3.6kN/m² x 2m/2
= 3.6kN/m
Total dead load T-2, E’
= (1.62 + 8.55 + 6.3 + 3.6)kN/m
= 20.07kN/m
Total dead load 1-T, E’
= (1.62 + 8.55 + 6.3)kN/m
= 16.47kN/m
Ultimate dead load T-2, E’
= 20.07kN/m x 1.4
= 28.1kN/m
Ultimate dead load 1-T, E’
= 16.47kN/m x 1.4
= 23.06kN/m
Live load 1-2, E-E’
= 1.5kN/m x 3.5m/2
= 2.63kN/m
Live load T-2, E’-F
= 1.5kN/m x 2m/2
= 1.5kN/m
Total live load T-2, E’
= (2.63 + 1.5)kN/m
= 4.13kN/m
Ultimate live load T-2, E’
= 4.13kN/m x 1.6
= 6.61kN/m
Ultimate live load 1-1’E’
= 2.63kN/m x 1.6
= 4.21kN/m
Total ultimate load T-2, E’
= (28.1 + 6.61)kN/m
= 34.71kN/m
Total ultimate load 1-T, E’
= (23.06 + 4.21)kN/m
= 27.27kN/m
UDL (T-2, E’) to point load
= 34.71kN/m x 2m
= 69.42kN
UDL (1-T, E’) to point load
= 27.27kN/m x 1.5m
= 40.9kN
Point load from Beam T, E’-F
= 19.2kN
Total moment of point 2E’
= 69.42kN(1m) + 19.2kN(2m) + 40.9kN(2.75m) - 1E’(3.5m)
1E’(3.5m) = 220.3kN
Reaction force 1E’ = 62.94kN
Reaction force 2E’
= (69.42 + 19.2 + 40.9 - 62.94)kN
= 66.58kN
Shear force area
x/2 = 2.84/69.42
x = 0.08m
A = ½ (66.58kN x 1.92m)
= 63.92kNm
B = ½ ( 0.08m x 2.84kN)
= 0.11kNm
C = ½ (22.04kN + 62.94kN) x 1.5m
= 63.74kNm
Beam W-Y, C winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load WY, CD
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Dead load WY, A’C
= 3.6kN/m² x 2.9m/2
= 5.22kN/m
Total dead load 3Y, C
= (1.62 + 8.55 + 3.15 + 5.22) kN/m
= 18.54kN/m
Total dead load 3W, C
= (1.62 + 3.15 + 5.22) kN/m
= 9.99kN/m
Ultimate dead load 3Y, C
= 18.54kN/m x 1.4
= 26.3kN/m
Ultimate dead load 3W, C
= 9.99kN/m x 1.4
= 13.986kN/m
Live load WY, CD
= 1.5kN/m² x 1.75m/2
= 1.313kN/m
Live load WY, A’C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m²
Total live load
= (1.313 + 2.175)kN/m
= 3.488kN/m
Ultimate live load
= 3.488kN/m x 1.6
= 5.581kN/m
Total ultimate load 3Y, C
= (26.3 + 5.581) kN/m
= 31.881kN/m
Point load 3Y, C
= 31.881kN/m x 2.9m
= 92.455kN
Point load 3W, C
= 19.567kN/m x 1.6m
= 31.307kN
Total moment YC
= 92.455kN(1.45m) + 31.307kN(3.7) - WC(4.5)
WC(4.5) = 249.896kN
Reaction force WC = 55.532kN
Reaction force YC = (92.455 + 31.307 - 55.532)
= 68.23kN
Shear force area
x/2.9 = 24.225/92.455
x = 0.76m
A = ½ (68.23kN x 2.14m)
​= 73kNm
B = ½ (24.225kN x 0.76m)
​= 9.21kNm
C = ½ (24.225kN + 55.532kN) x 1.6m
​ = 63.81
Beam Y, A’D winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load WY, A’C
= 3.6kN/m² x 3.5m/2 x ⅔
= 4.2kN/m
Dead load YZ, A’D
= 3.6kN/m² x 1m/2
= 1.8kN/m
Total dead load Y, A’C
= (1.8+4.2+1.62+8.55)
= 16.17kN/m
Ultimate dead load Y, A’C
= 16.17kN/m x 1.4
= 22.64kN/m
Total dead load Y, CD
= (1.8+1.62+8.55)kN/m
= 11.97kN/m
Ultimate dead load Y, CD
= 11.97kN/m x 1.4
= 16.758kN/m
Live load WY, A’C
= 1.5kN/m² x 3.5m/2 x ⅔
= 1.75kN/m
Live load YZ, A’D
= 1.5kN/m² x 1m/2
= 0.75kN/m
Total ultimate load Y, A’C
= (0.75+1.75) kN/m
= 2.5kN/m
Ultimate live load Y, A’C
= 2.5kN/m x 1.6
= 4kN/m
Live load Y,CD
=1.75kN/m
Ultimate live load Y, CD
= 1.75kN/m x 1.6
= 2.8kN/m
Total ultimate load Y, A’C
= (22.638+4) kN/m
= 26.64kN/m
Total ultimate load Y, CD
= (16.758+2.8) kN/m
= 19.558kN/m
Point load at Y, A’C
= 26.638kN/m x 3.5m
= 93.24kN
Point load Y, CD
= 19.558kN/m x 1.75m
= 34.2265kN
Total moment of YD
= 34.2265kN(0.875m) + 68.23kN(1.75m) + 93.24kN(3.5m) - YA’(5.25m)
YA’(5.25) = 475.69
YA’ reaction force = 90.61kN
YD reaction force = (34.2265+68.23+93.24-90.61)
= 105.09kN
Shear force area
x/3.5 = 2.63/93.24
x = 0.0987m
A = ½ (105.09kN+70.86kN) x 1.75m
​ = 153.96kNm
B = ½ (0.0987m x 2.63kN)
= 0.13kN
C = ½ (90.61kN x 3.4m)
= 154.04kNm
Beam X-4, D winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load WY, CD
= 3.6kN/m x 1.75m/2
= 3.15kN/m
Total dead load Y-4, D
= (1.62+8.55)
= 10.17kN/m
Ultimate dead load Y-4, D
= 10.17kN/m x 1.4
= 14.238kN/m
Total dead load X-Y, D
= (1.62+8.55+3.15)
= 13.32kN/m
Ultimate dead load X-Y, D
= 13.32kN/m x 1.4
= 18.648kN/m
Live load WY, CD
= 1.5kN/m x 1.75m/2
= 2.625kN/m
Ultimate live load
= 2.625kN/m x 1.6
= 4.2kN/m
Total ultimate load Y-4, D
= 14.238kN/m
Total ultimate load X-Y, D
= (18.648+4.2) kN/m
= 22.848kN/m
Point load from beam Y, A’D
= 105.09kN
Point load at Y-4
= 14.238kN/m x 0.4m
= 5.695kN
Point load at X-Y
= 22.848kN/m x 3.8m
= 86.822kN
Total moment at 4,D
= 5.695kN(0.2m) + 105.09kN(0.4m) + 86.822kN(2.3m) - XD(4.2)
XD(4.2) = 242.87Kn
Reaction force at XD = 57.83kN
Reaction force at 4D
= (5.695+105.09+86.822-57.83)kN
= 139.78kN
Shear force area
x/3.8 = 29/86.83
x = 1.27m
A = ½ (139.78kN+132.09kN) x 0.4m
​ = 54.37kNm
B = ½ (29kN x 1.27m)
​ = 18.42kNm
C = ½ (2.53m x 57.83kN)
​= 73.15kNm
Beam V, C-D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load 1-V, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Dead load V-W, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Total dead load
= (1.62 + 8.55 + 2.1 + 2.1 ) kN/m
= 14.37kN/m
Ultimate dead load
= 14.37kN/m x 1.4
= 20.118kN/m
Live load 1-V, CD
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Live load V-W, CD
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Total live load
= (1.31 + 1.31 )kN/m
= 2.62kN/m
Ultimate live load
= 2.62kN/m x 1.6
= 4.19kN/m
Total ultimate load
= (20.118 + 4.19 )kN/m
= 24.31kN/m
Distributed load
= 24.31kN/m x 1.75m
= 42.54kN / 2
= 21.27kN/m
Shear force area
= ½ (0.87m x 21.27kN/m)
= 9.3kNm
Beam W, C-D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load V-W, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Dead load W-Y, CD
= 3.6kN/m² x 1.75/2
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 2.1 + 3.15 ) kN/m
=15.42kN/m
Ultimate dead load
= 15.42kN/m x 1.4
= 21.588kN/m
Live load W, C-D
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Live load W, C-D
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Total live load
= (1.31 + 1.31 )kN/m
= 2.62kN/m
Ultimate live load
= 2.62kN/m x 1.6
= 4.19kN/m
Total ultimate load
= (21.59 + 4.19 )kN/m
= 25.78kN/m
Distributed load
= 25.78kN/m x 1.75m
= 45.12kN / 2
= 22.56kN/m
Shear force area
= ½ (0.87m x 22.56kN/m)
= 9.87kNm
Beam 1-X, D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load 1-V, D
= 3.6kN/m² x 2.65/2 x ⅔
= 3.18kN/m
Dead load V-W, D
= 3.6kN/m² x 2/2 x ⅔
= 2.4kN/m
Dead load 1-X
= 3.6kN/m² x 5.3
= 19.08kN/m
Dead load W-X,D
= 3.6kN/m² x 0.875m
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 19.08 + 3.15 ) kN/m, (1.62 + 2.4 + 19.08)kN/m, (1.62 + 8.55 + 3.18 +
19.08)kN/m
= 32.4kN/m , 23.1kN/m, 32.43kN/m
Ultimate dead load
= 32.4kN/m x 1.4, 23.1kN/m x 1.4, 32.43kN/m x 1.4
= 45.36kN/m, 32.34kN/m, 45.4kN/m
Live load 1-V, D
= 1.5kN/m² x 2.65/2
= 1.99kN/m
Live load V-W, D
= 1.5kN/m² x 2/2
= 1.5kN/m
Live load W-X, D
= 1.31kN/m
Live load 1-X
= 1.5 x 5.3/2
= 3.98kN/m
Total live load
= (1.31 + 3.98 )kN/m , (1.5 + 3.98)kN/m , (1.99 + 3.98)kN/m
= 5.29kN/m , 5.48kN/m , 5.97kN/m
Ultimate live load
= (5.29kN/m x 1.6) , (5.48kN/m x 1.6) , (5.97kN/m x 1.6)
= 8.46kN/m , 8.77kN/m , 9.55kN/m
Total ultimate load
= (45.36 + 8.46)kN/m , (32.34 + 8.77 )kN/m , (45.4 + 9.55)kN/m
= 53.82kN/m, 41.11kN/m, 54.95kN/m
Distributed load
= 53.82kN/m x 0.7m , 41.11kN/m x 2m , 54.95 x 2.65m
= 37.67kN, 82.22kN, 145.62kN
Take moment at point XD,
(37.67kN x 0.35m) + (22.56kN x 0.7m) + (82.22kN x 1.7m) + (21.27 x 2.7m) + (145.62kN x
4.025m) - 5.35z = 13.18kNm + 15.79kNm + 139.77kNm + 57.43kNm + 586.12kNm - 5.35z
= 812.29Nm - 5.35z
(5.35m)z = 812.29kNm
z = 151.83kN
(145.62kN x 1.325m) + (21.27kN x 2.65m) + (82.22kN x 3.65m) + (22.56kN x 4.65) + (37.67kN x
5.025m ) = 5.35x
192.95kNm + 56.37kNm + 300.1kNm + 104.9kNm + 189.29kNm = (5.35m)x
x = 157.68kN
Shear graph area
A = ½ (157.68kN + 120.01kN) x 0.7 = 97.19kNm
B = ½ (97.45kN + 15.23kN) x 2 = 112.68kNm
C = ½ (-6.04kN - 151.66kN) x 2.65 = -208.95kNm
Beam W, A’-C (First Floor Plan) WINTER
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at W-Y, A’-C
= 3.6kN/m² x 3.5m/2 x 2/3
= 4.2kN/m
Dead load at 1-W, A’-C
= 3.6kN/m² x 1.2/2 x 2/3
= 4.2kN/m
Total dead load
= (1.62 + 8.55 + 4.2 + 4.2)kN/m
= 18.57kN/m
Ultimate dead load
= 18.57kN/m x 1.4
= 26kN/m
Live load at W-Y, A’-C
= 1.5kN/m² x 3.5m/2 x 2/3
= 1.75kN/m
Live load at 1-W, A’-C
= 1.5kN/m² x 3.5m/2 x 2/3
= 1.75kN/m
Total live load
= (1.75 + 1.75)kN/m
= 3.5kN/m
Ultimate live load
= 3.5kN/m x 1.6
= 5.6kN/m
Total ultimate load
= (26 + 5.6)kN/m
= 31.6kN/m
Distributed load
31.6kN/m x 3.5m/2
= 55.3kN
Shear graph area
= ½ x 55.3kN x 1.75m
= 48.3kNm
Beam A’, 2-Y (First Floor Plan) WINTER
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-Y, A-A’
= 3.6kN/m² x 1.2m/2
= 2.16N/m
Dead load at W-Y, A’-C
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Dead load at 2-W, A’-C
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Total dead load at grid W-Y
= (1.62 + 8.55 + 2.16 + 6.3)kN/m
= 18.63kN/m
Total dead load at grid 2-W
= (1.62 + 8.55 + 2.16 + 6.3)kN/m
= 18.63kN/m
Ultimate dead load at grid W-Y
= (18.63kN/m x 1.4)
= 26.08kN/m
Ultimate dead load at grid 2-W
= (18.63kN/m x 1.4)
= 26.08kN/m
Live load at 1-Y, A-A’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load at W-Y, A’-C
= 1.5kN/m² x 3.5m/2
= 2.63kN/m
Live load at 2-W, A’-C
= 1.5kN/m² x3.5m/2
= 2.63kN/m
Total live load at grid W-Y
= (0.9 + 2.63)kN/m
= 3.53kN/m
Total live load at grid 2-W
= (0.9 + 2.63)kN/m
= 3.53kN/m
Ultimate live load at grid W-Y
= (3.53kN/m x 1.6)
= 5.65kN/m
Ultimate live load at grid 2-W
= (3.53kN/m x 1.6)
= 5.65kN/m
Total ultimate load at grid W-Y
= (26.08 + 5.65)kN/m
= 31.73kN/m
Total ultimate load at grid 2-W
= (26.08 + 5.65)kN/m
= 31.73kN/m
Distributed load of gid W-Y
= 31.73kN/m x 4.5m
= 142.79kN
Distributed load of grid 2-W
= 31.73kN/m x 1m
= 31.73kN
Take moment at point YA’
(142.79kN x 2.25m) + (55.3kN x 4.5m) + (31.73kN x 5m) = (5.5m)YA’
(5.5m)YA’ = 728.78kNm
YA’ = 132.51kN
Take moment at point A’2
(31.73kN x 0.5m) + (55.3kN x 1m) + (142.79kN x 3.25m) = (5.5m)2A’
(5.5m)2A’ = 535.23kNm
2A’ = 97.32kN
Shear graph area
x/4.5 = 97.32/142.79
x = 3.07
A = ½ x 3.07m x 97.32kN = 149.24kNm
B = ½ x 1.23m x 45.47kN = 32.51kNm
C = ½ x (100.77kN + 132.5kN) x 1m = 116.64
Building structure

More Related Content

PDF
Building structures final
DOCX
Chong yu xuan bstruc indi
PDF
Column
PDF
Building Structure
PDF
B.structure report
PDF
Final structure report
PDF
Individual calculation
PDF
Building Structures Final Compilation
Building structures final
Chong yu xuan bstruc indi
Column
Building Structure
B.structure report
Final structure report
Individual calculation
Building Structures Final Compilation

What's hot (15)

PDF
Building Structure calculation
PDF
Building Structure Project 2
PDF
Beam Analysis
PDF
Building Structure
DOCX
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
PPTX
7.60 ppt batfink energy
PDF
Baja kuda kuda
PPTX
B structure power point
PDF
Energy methods for damped systems
PPT
Base excitation of dynamic systems
PPT
Dynamic response of oscillators to general excitations
PDF
Physics Working Formulas
PDF
Anderson7e sm
PDF
Modern2426
PDF
Latihan soal jawab fentrans
Building Structure calculation
Building Structure Project 2
Beam Analysis
Building Structure
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
7.60 ppt batfink energy
Baja kuda kuda
B structure power point
Energy methods for damped systems
Base excitation of dynamic systems
Dynamic response of oscillators to general excitations
Physics Working Formulas
Anderson7e sm
Modern2426
Latihan soal jawab fentrans
Ad

Similar to Building structure (20)

PDF
Structural analysis of a bungalow report
PDF
Structural Analysis of a Bungalow Report
PDF
individual part
PPTX
Building Structures Report
PDF
Building Structure Project 2 (Taylor's lakeside campus)
PDF
B structure
PDF
BStructure calculation
PDF
Structure extension jun
PDF
Building structure real
DOCX
Yung Part, structure
PDF
Structural Analysis of a Bungalow
DOCX
structure analysis
DOCX
Building Structure Project 2
DOCX
Dead load of structure
PDF
B structure final_c
PDF
B structure final final
DOCX
Floor Plan calculation
DOCX
Beam and Column Analysis | Individual Component
PPTX
4444444444
PPTX
Structures
Structural analysis of a bungalow report
Structural Analysis of a Bungalow Report
individual part
Building Structures Report
Building Structure Project 2 (Taylor's lakeside campus)
B structure
BStructure calculation
Structure extension jun
Building structure real
Yung Part, structure
Structural Analysis of a Bungalow
structure analysis
Building Structure Project 2
Dead load of structure
B structure final_c
B structure final final
Floor Plan calculation
Beam and Column Analysis | Individual Component
4444444444
Structures
Ad

More from yenweizheng (20)

DOCX
Urban comparative essay
DOCX
Wz synopsis
PPTX
Food & culture
PDF
Bscience report
PPTX
Bsci ii (1)
PPTX
Bsci ii
PDF
B tech final report pdf
PPTX
Transient
PDF
Proposal
PDF
Design brief
PDF
Service report
DOCX
Vertical transportation system
DOCX
Mechancal ventilatio
DOCX
Introduction of air conditioning system
DOCX
Fire protection system bservice
DOCX
Conclusion reference
DOCX
Introduction b services
PDF
Pj street essay.docx
DOCX
Team bunga raya final report
DOCX
Business report (1)
Urban comparative essay
Wz synopsis
Food & culture
Bscience report
Bsci ii (1)
Bsci ii
B tech final report pdf
Transient
Proposal
Design brief
Service report
Vertical transportation system
Mechancal ventilatio
Introduction of air conditioning system
Fire protection system bservice
Conclusion reference
Introduction b services
Pj street essay.docx
Team bunga raya final report
Business report (1)

Recently uploaded (20)

PDF
Galatica Smart Energy Infrastructure Startup Pitch Deck
PDF
“Getting Started with Data Analytics Using R – Concepts, Tools & Case Studies”
PDF
Clinical guidelines as a resource for EBP(1).pdf
PPTX
Database Infoormation System (DBIS).pptx
PPTX
Qualitative Qantitative and Mixed Methods.pptx
PPTX
DISORDERS OF THE LIVER, GALLBLADDER AND PANCREASE (1).pptx
PPTX
advance b rammar.pptxfdgdfgdfsgdfgsdgfdfgdfgsdfgdfgdfg
PPTX
AI Strategy room jwfjksfksfjsjsjsjsjfsjfsj
PPTX
IBA_Chapter_11_Slides_Final_Accessible.pptx
PDF
.pdf is not working space design for the following data for the following dat...
PDF
annual-report-2024-2025 original latest.
PPTX
Business Ppt On Nestle.pptx huunnnhhgfvu
PPTX
Data_Analytics_and_PowerBI_Presentation.pptx
PPT
Miokarditis (Inflamasi pada Otot Jantung)
PPT
Reliability_Chapter_ presentation 1221.5784
PPTX
MODULE 8 - DISASTER risk PREPAREDNESS.pptx
PDF
TRAFFIC-MANAGEMENT-AND-ACCIDENT-INVESTIGATION-WITH-DRIVING-PDF-FILE.pdf
PPTX
IB Computer Science - Internal Assessment.pptx
PPTX
Computer network topology notes for revision
PPTX
Microsoft-Fabric-Unifying-Analytics-for-the-Modern-Enterprise Solution.pptx
Galatica Smart Energy Infrastructure Startup Pitch Deck
“Getting Started with Data Analytics Using R – Concepts, Tools & Case Studies”
Clinical guidelines as a resource for EBP(1).pdf
Database Infoormation System (DBIS).pptx
Qualitative Qantitative and Mixed Methods.pptx
DISORDERS OF THE LIVER, GALLBLADDER AND PANCREASE (1).pptx
advance b rammar.pptxfdgdfgdfsgdfgsdgfdfgdfgsdfgdfgdfg
AI Strategy room jwfjksfksfjsjsjsjsjfsjfsj
IBA_Chapter_11_Slides_Final_Accessible.pptx
.pdf is not working space design for the following data for the following dat...
annual-report-2024-2025 original latest.
Business Ppt On Nestle.pptx huunnnhhgfvu
Data_Analytics_and_PowerBI_Presentation.pptx
Miokarditis (Inflamasi pada Otot Jantung)
Reliability_Chapter_ presentation 1221.5784
MODULE 8 - DISASTER risk PREPAREDNESS.pptx
TRAFFIC-MANAGEMENT-AND-ACCIDENT-INVESTIGATION-WITH-DRIVING-PDF-FILE.pdf
IB Computer Science - Internal Assessment.pptx
Computer network topology notes for revision
Microsoft-Fabric-Unifying-Analytics-for-the-Modern-Enterprise Solution.pptx

Building structure

  • 1. 1. Beam 1-2,B (Ground Floor Plan) Teo Vi Vien Dead load Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load at 1-2,A-B = 3.6kN/m² x 1.875m/2 =​ ​3.375kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 =​ ​5.22kN/m Total dead load = (1.62 + 8.55 + 3.375 + 5.22)kN/m =​ ​18.765kN/m Ultimate dead load = 18.765kN/m x 1.4 =​ ​26.3kN/m Live load Live load at 1-2,A-B = 1.5kN/m² x 1.875m/2 = 1.41kN/m Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 = 2.175kN/m Total live load = (1.41 + 2.175)kN/m = 3.59kN/m Ultimate live load = 3.59kN/m x 1.6 = 5.74kN/m Total ultimate load = 26.3kN/m + 5.74kN/m = 32.04kN/m Distributed load = (32.04kN/m x 3.775m) = 120.95kN ​/2 (UDL) = 60.48kN ​(Reaction Force) 60.48kN x 1.89m x 1/2 = ​57.15kNm
  • 2. 2. Beam 2-Y,C (Ground Floor Plan) Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Dead load at 2-Y,A-C = 3.6kN/m² x 4.78m/2 = 8.6kN/m Dead load 2-Y,C-D = 3.6 kN/m² x 1.75m/2 = 3.15kN/m Total dead load = (8.6 + 3.15 + 1.62)kN/m = 13.37kN/m Ultimate dead load = 13.37kN/m x 1.4 = 18.72kN/m Live load Live load at 2-Y,A-C = 1.5kN/m² x 4.78m/2 = 3.59kN/m Live load at 2-Y,C-D = 1.5kN/m² x 1.75m/2 = 1.31kN/m Total live load = (3.59 + 1.31)kN/m = 4.9kN/m Ultimate live load = 4.9kN/m x 1.6 = 7.84kN/m Total ultimate load = 7.84kN/m + 18.72kN/m = 26.56kN/m Distributed load = (26.56kN/m x 5.2m) = 138.11kN​ /2 (UDL) = 69.06kN ​(Reaction Force) Shear force diagram 69.06kN x 2.6m x 1/2 = ​89.78kNm
  • 3. 3. Beam 2,A-D (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 2-4,A-C = 3.6kN/m² x 4.775m/2 x 2/3 = 5.73kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 x 2/3 = 3.48kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.6m/2 = 2.88kN/m Total dead load at grid A-B = (1.62 + 8.55 + 5.73)kN/m = 15.9kN/m Total dead load at grid B-C = (1.62 + 8.55 + 5.73 + 3.48)kN/m = 19.38kN/m Total dead load at grid C-D = (1.62 + 8.55 + 2.88)kN/m = 13.05kN/m Ultimate dead load of grid A-B = 15.9kN/m x 1.4 = 22.26kN/m Ultimate dead load of grid B-C = 19.38kN/m x 1.4 = 27.13kN/m Ultimate dead load of grid C-D = 13.05kN/m x 1.4 = 18.27kN/m
  • 4. Live load Live load at 2-4,A-C = 1.5kN/m² x 4.775m/2 x 2/3 = 2.39kN/m Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 x 2/3 = 1.45kN/m Live load at U-2,C-D = 1.5kN/m² x 1.6m/2 = 1.2kN/m Total live load on grid A-B = 2.39kN/m Total live load on grid B-C = (2.39 + 1.45)kN/m = 3.84kN/m Total live load on grid C-D = 1.2kN/m Ultimate live load for grid A-B = 2.39kN/m x 1.6 = 3.824kN/m Ultimate live load for grid B-C = 3.84kN/m x 1.6 = 6.144kN/m Ultimate live load for grid C-D = 1.2kN/m x 1.6 = 1.92kN/m Total ultimate load on grid A-B = (22.26 + 3.824)kN/m 26.08kN/m Total ultimate load on grid B-C = (27.13 + 6.144)kN/m = 33.28kN/m Total ultimate load on grid C-D = (18.27 + 1.92)kN/m = 20.19kN/m Take point load from 1-2,B = 60.48kN Take point load from 2-4,C and 1-2,C = 69.06kN + 73.19kN = 142.25kN
  • 5. Take moment at point A, 48.9kN/m(0.9375m) + 60.48kN/m(1.875m) + 96.51kN/m(3.325m) + 142.25kN/m(4.775m) + 35.33kN/m(5.65m) - DkN/m(6.525m) = 0 6.525D = 1358.998 D = 208.28kN Take moment at point D, 35.33kN/m(0.875m) + 142.25kN/m(1.75m) + 96.51kN/m(3.2m) + 60.48kN/m(4.65m) + 48.9kN/m(5.59m) - AkN/m(6.525m) = 0 6.525A = 1143.266 A = 175.21kN Shear area diagram A = 1/2 x (126.31 + 175.21)kN x 1.875m = 282.68kNm B = 1/2 x 65.83kN x 1.978m = 65.11kNm C = 1/2 x 30.68kN x 0.921m = 14.13kNm D = 1/2 x (172.93 + 208.26)kN x 1.75m = 333.54kNm
  • 6. 4. Beam U,C-D (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.4m/2 = 2.52kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.75m/2 x 2/3 = 2.1kN/m Total dead load = (1.62 + 8.55 + 2.52 + 2.1)kN/m = 14.79kN/m Ultimate dead load = 14.79kN/m x 1.4 = 20.71kN/m Live load Live load at 1-U,C-D = 1.5kN/m² x 1.4m/2 = 1.05kN/m Live load at U-2,C-D = 1.5kN/m² x 1.75m/2 x 2/3 = 0.875kN/m Total live load = (1.05 + 0.875)kN/m = 1.925kN/m Ultimate live load = 1.925kN/m x 1.6 = 3.08kN/m Total ultimate load = (20.71 + 3.08) kN/m = 23.79kN/m Distributed load = 23.79kN/m x 1.75m = 41.63kN​ /2 (UDL) = 20.82kN ​(Reaction Force/Point Load at 1-2,C) 20.82kN x 0.875m x 1/2 = ​9.11kNm
  • 7. 5. Beam 1-2,C (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 = 5.22kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.4m/2 x 2/3 = 1.68kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.75m/2 = 3.15kN/m Total dead load = (1.62 + 8.55 + 5.22 + 1.68 + 3.15)kN/m = 20.22kN/m Ultimate dead load = 20.22kN/m x 1.4 = 28.3kN/m Live load Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 = 2.175kN/m Live load at U-2,C-D = 1.5kN/m² x 1.4m/2 x 2/3 = 0.7kN/m Live load at 1-U,C-D = 1.5kN/m² x 1.75m/2 = 1.31kN/m Total live load = (2.175 + 0.7 + 1.31)kN/m = 4.19kN/m Ultimate live load = 4.19kN/m x 1.6 = 6.71kN
  • 8. Total ultimate load = (28.3 + 6.71)kN/m = 35.01kN/m ​x 3.775m = 132.16kN ​(UDL) Point load from ​Beam 4. U,C-D = 20.82kN Take moment at point 2C, 20.8kN(1.4m) + 132.16kN(1.8875m) - 2CkN(3.775m) = 0 Reaction force at 2C = 73.79kN Reaction force at 1C = 20.8kN + 132.16kN - 73.79kN = 79.17kN Shear graph area A = 1/2 x (30.16kN + 79.17kN) x 1.4m = ​76.53kNm x/2.375 = 9.36/83.15 x = 0.267 B = 1/2 x 9.36kN x 0.267m = ​1.25kNm C = 1/2 x 73.79kN x 2.108m = ​77.77kNm
  • 9. 6. Beam T-2,D’ Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load T-2,D-D’ = 3.6kN/m² x 1.2m/2 = 2.16kN/m Dead load T-2,D’-E = 3.6kN/m² x 1.2m/2 = 2.16kN/m Total dead load = (1.62 + 8.55 + 2.16 + 2.16)kN/m = 14.49kN/m Ultimate dead load = 14.49kN/m x 1.4 = 20.29kN/m Live load Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load at T-2,D’-E = 1.5kN/m² x 1.2m/2 = 0.9kN/m Total live load = (0.9 + 0.9)kN/m = 1.8kN/m Ultimate live load = 1.8kN/m x 1.6 = 2.88kN/m Total ultimate load = (20.29 + 2.88)kN/m = 23.17kN/m Distributed load = 23.17kN/m x 2.1m =48.66kN /2 = 24.33kN (Point load) Shear area diagram = 24.33kN x 1.05m x 1/2 = ​12.77kNm
  • 10. 7. Beam T,D-E Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at T-2,D-D’ = 3.6kN/m² x 1.2m/2 x 2/3 = 1.44kN/m Dead load at T-2,D’-E = 3.6kN/m² x 1.2/2 x 2/3 = 1.44kN/m Dead load 1-T,D-E = 3.6kN/m² x 1.5m/2 = 2.7kN/m Total dead load = (1.62 + 8.55 + 1.44 + 1.44 + 2.7)kN/m = 15.75kN/m Ultimate dead load = 15.75kN/m x 1.4 = 22.05kN/m Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 x 2/3 = 0.6kN/m Live load at T-2,D’-E = 1.5kN/m² x 1.2m/2 x 2/3 = 0.6kN/m Live load at 1-T,D-E = 1.5kN/m² x 1.5m/2 = 1.125kN/m Total live load = (0.6 + 0.6 + 1.125)kN/m = 2.325kN/m Ultimate live load = 2.325kN/m x 1.6 = 3.72kN/m
  • 11. Total ultimate load = (22.05 + 3.72)kN/m = 25.77kN/m x 2.7m = 69.58kN Point load from beam T-2,D’ = 24.33kN Take moment at point D, 69.58kN(1.35m) + 24.33kN(1.35m) - DkN(2.7m) = 0 Reaction force at ​D = 46.95kN Reaction force at E = 24.32kN + 69.58kN - 46.95kN = 46.95kN Shear area diagram = 1/2 x (46.95 + 12.16)kN x 1.35m =39.9kNm
  • 12. 8. Beam 1-2,D (Ground Floor Plan) Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.5m/2 x 2/3 = 1.8kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.75m/2 = 3.15kN/m Dead load at T-2,D-D’ = 3.6kN/m² x 1.2m/2 = 2.16kN/m Dead load at 1-T,D-D’ = 3.6kN/m² x 1.6m/2 x 2/3 = 1.92kN/m Total dead load at grid 2-U = (1.62 + 1.8 + 2.16)kN/m = ​5.58kN/m Total dead load at grid U-T = (1.62 + 8.55 + 3.15 + 2.16)kN/m = ​15.48kN/m Total dead load at grid T-1 = (1.62 + 8.55 + 3.15 + 1.92)kN/m = ​15.24kN/m Ultimate dead load at grid U-2 = 5.58kN/m x 1.4 = 7.81kN/m Ultimate dead load at grid T-U = 15.48kN/m x 1.4 = 21.67kN/m Ultimate dead load at grid 1-T = 15.24kN/m x 1.4 = 21.34kN/m
  • 13. Live load Live load at U-2,CD = 1.5kN/m² x 1.5m/2 x 2/3 = 0.75kN/m Live load at 1-U,CD = 1.5kN/m x 1.75m/2 = 1.31kN/m Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load 1-T,D-D’ = 1.5kN/m² x 1.6m/2 x 2/3 = 0.8kN/m Total live load at grid 2-U = (0.75 + 0.9)kN/m = 1.65kN/m Total live load at grid U-T = (1.31 + 0.9)kN/m = 1.21kN/m Total live load at grid T-1 = (1.31 + 0.8)kN/m = 2.11kN/m Ultimate load at grid U-2 = 1.65kN/m x 1.6 = 2.64kN/m Ultimate load at grid T-U = 1.21kN/m x 1.6 = 1.936kN/m Ultimate load at grid 1-T = 2.11kN/m x 1.6 = 3.376kN/m Total ultimate load on grid U-2 = (7.81 + 2.64)kN/m = 10.45kN/m Total ultimate load on grid T-U = (21.67 + 1.936)kN/m = 23.61kN/m Total ultimate load on grid 1-T = (21.34 + 3.376)kN/m = 24.71kN/m Point load of grid U-2
  • 14. = (7.81 + 2.64)kN/m = 10.45kN/m​ ​x 1.5m = 15.68kN Point load of grid T-U = (21.67 + 1.936)kN/m = 23.61kN/m x 0.5m = 11.8kN Point load of grid 1-T = (21.34 + 3.376)kN/m = 24.71kN/m x 1.6m = 39.54kN/m Point load from ​Beam 4. U,C-D = 20.8kN Reaction force as point load from ​Beam 7. T,D-E = 46.95kN Take moment at point A, 15.68kN/m(0.75m) + 20.8kN/m(1.5m) + 11.8kN/m(1.75m) + 46.95kN/m(2m) + 39.54kN/m(2.8m) - B(3.6m) = 0 3.6B = 268.22kN/m B = 74.51kN Take moment at point B, -39.54kN/m(0.8m) - 46.95kN/m(1.6m) - 11.8kN/m(1.85m) - 20.8kN/m(2.1m) - 15.68kN/m(2.85m) + A(3.6m) = 0 3.6A = 216.95kN/m A = 60.26kN Shear area diagram Area A = 1/2 x (44.58kN + 60.26kN) x 1.5m = 78.63kNm Area B = 1/2 x (11.98kN + 23.78kN) x 0.5m = 8.94kNm Area C = 1/2 x (34.97kN + 74.51kN) x 1.6m = 87.58kNm
  • 15. Beam 4-2, E (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 2-4, E-F = 3.6kN/m² x 5.6m/2 = 10.08kN/m Dead load 1-X, D-E = 3.6kN/m² x 2.6m/2 = 4.68kN/m Total dead load X-4, E = (1.62 + 8.55 + 10.08) kN/m = 20.25kN/m Total dead load 2-X, E = (1.62 + 8.55 + 10.08 + 4.68) kN/m = 24.93kN/m Ultimate dead load X-4, E =20.25kN/m x 1.4 = 28.35kN/m Ultimate dead load 2-X, E = 24.93kN/m x 1.4 = 34.9kN/m Live load 2-4, E-F = 1.5kN/m² x 5.6m/2 = 4.2kN/m Live load 1-X, D-E = 1.5kN/m² x 2.6m/2 =1.95kN/m Total live load at X-4, E = 4.2kN/m Total live load 2-X, E = (4.2 + 1.95) kN/m = 6.15kN/m Ultimate live load X-4, E = 4.2kN/m x 1.6 = 6.72kN/m Ultimate live load 2-X, E = 6.15kN/m x 1.6
  • 16. = 9.84kN/m Total ultimate load X-4, E = (28.35 + 6.72) kN/m = 35.07kN/m Total ultimate load 2-X, E = (34.9 + 9.84) kN/m = 44.74kN/m Point load from beam X, D-E = ​11.34kN/m Distributed load X-4, E = 35.07kN/m x 4m = 140.28kN Distribution load 2-X, E = 44.74kN/m x 1.6m = 71.58kN/m Total moment of point 4E = 140.28kN(2m) + 11.34kN(4m) + 71.58kN(4.8m) - 2E(5.6m) 2E(5.6m) = 669.5kNm 2E reaction force = 119.55kN 4E reaction force = (140.28 + 11.34 + 71.58 - 119.55) kN = 103.65kN Shear graph area x/4 = 36.63/140.28 x = 1.04m A = ½ (103.65kN x 2.96m) = 153.4kNm B = ½ (36.63kN x 1.04m) = 19.05kNm C = ½ (47.97kN+ 119.55kN) x 1.6m = 134.02kNm
  • 17. Beam X, D-E (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Dead load at 1-X, D-E = 3.6kN/m² x 2.6m/2 x ⅔ = 3.12kN/m Total dead load = (3.12 + 1.62) kN/m = 4.74kN/m Ultimate dead load = 4.74kN/m x 1.4 = 6.64kN/m Live load 1-X, D-E = 1.5kN/m² x 2.6m/2 x ⅔ = 1.3kN/m Ultimate live load 1-X, D-E = 1.3kN/m x 1.6 = 2.08kN/m Total ultimate load = 6.64kN/m + 2.08kN/m =8.72kN/m Distributed load = 8.72kN/m x 2.6m = 22.67kN/m​ /2 = 11.34kN Shear force area = ½ (11.34kN + 1.3m) = 6.32kNm
  • 18. Beam 2 E-E’ (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load 1-2, E-E’ = 3.6kN/m² x 3.4m/2 x ⅔ 4.08kN/m Dead load 2-4, E-F = 3.6kN/m² x 5.6m/2 x ⅔ = 6.72kN/m Total dead load = (1.62 + 8.55 + 4.08 + 6.72) kN/m = 20.97kN/m Ultimate dead load = 20.97kN/m x 1.4 = 29.36kN/m Live load 1-2, E-E’ = 1.5kN/m² x 3.4m/2 x ⅔ = 1.7kN/m Live load 2-4, E-F = 1.5kN/m² x 5.6m/2 x ⅔ = 2.8kN/m Total live load = (1.7 + 2.8)kN/m = 4.5kN/m Ultimate live load = 4.5kN/m x 1.6 = 7.2kN/m Total ultimate load = (29.36 + 7.2)kN/m = 36.56kN/m Distributed load = 36.56kN/m x 3.4m = 124.3kN​ / 2 = 62.15kN
  • 19. Shear force area = ½ (62.15kN x 1.7m) = 52.83kNm
  • 20. Beam T, E’-F (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load T-2, E’-F = 3.6kN/m² x 2/2 x ⅔ = 2.4kN/m Total dead load = (1.62 +8.55 + 2.4) kN/m = 12.57kN/m Ultimate dead load = 12.57kN/m x 1.4 = 17.6kN/m Live load T-2, E’-F = 1.5kN/m² x 2/2 x ⅔ = 1kN/m Ultimate live load = 1kN/m x 1.6 = 1.6kN/m Total ultimate load = (17.6 + 1.6) kN/m = 19.2kN/m Distributed load = 19.2kN/m x 2m = 38.4kN​ / 2 = 19.2kN/m Shear force area = ½ (1m x 19.2kN) = 9.6kNm
  • 21. Beam 1-2, E’ (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load 1-2, E-E’ = 3.6kN/m² x 3.5m/2 = 6.3kN/m Dead load T-2, E’-F = 3.6kN/m² x 2m/2 = 3.6kN/m Total dead load T-2, E’ = (1.62 + 8.55 + 6.3 + 3.6)kN/m = 20.07kN/m Total dead load 1-T, E’ = (1.62 + 8.55 + 6.3)kN/m = 16.47kN/m Ultimate dead load T-2, E’ = 20.07kN/m x 1.4 = 28.1kN/m Ultimate dead load 1-T, E’ = 16.47kN/m x 1.4 = 23.06kN/m Live load 1-2, E-E’ = 1.5kN/m x 3.5m/2 = 2.63kN/m Live load T-2, E’-F = 1.5kN/m x 2m/2 = 1.5kN/m Total live load T-2, E’ = (2.63 + 1.5)kN/m = 4.13kN/m Ultimate live load T-2, E’ = 4.13kN/m x 1.6 = 6.61kN/m Ultimate live load 1-1’E’ = 2.63kN/m x 1.6 = 4.21kN/m
  • 22. Total ultimate load T-2, E’ = (28.1 + 6.61)kN/m = 34.71kN/m Total ultimate load 1-T, E’ = (23.06 + 4.21)kN/m = 27.27kN/m UDL (T-2, E’) to point load = 34.71kN/m x 2m = 69.42kN UDL (1-T, E’) to point load = 27.27kN/m x 1.5m = 40.9kN Point load from Beam T, E’-F = 19.2kN Total moment of point 2E’ = 69.42kN(1m) + 19.2kN(2m) + 40.9kN(2.75m) - 1E’(3.5m) 1E’(3.5m) = 220.3kN Reaction force 1E’ = 62.94kN Reaction force 2E’ = (69.42 + 19.2 + 40.9 - 62.94)kN = 66.58kN Shear force area x/2 = 2.84/69.42 x = 0.08m A = ½ (66.58kN x 1.92m) = 63.92kNm B = ½ ( 0.08m x 2.84kN) = 0.11kNm C = ½ (22.04kN + 62.94kN) x 1.5m = 63.74kNm
  • 23. Beam W-Y, C winter Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load WY, CD = 3.6kN/m² x 1.75m/2 = 3.15kN/m Dead load WY, A’C = 3.6kN/m² x 2.9m/2 = 5.22kN/m Total dead load 3Y, C = (1.62 + 8.55 + 3.15 + 5.22) kN/m = 18.54kN/m Total dead load 3W, C = (1.62 + 3.15 + 5.22) kN/m = 9.99kN/m Ultimate dead load 3Y, C = 18.54kN/m x 1.4 = 26.3kN/m Ultimate dead load 3W, C = 9.99kN/m x 1.4 = 13.986kN/m Live load WY, CD = 1.5kN/m² x 1.75m/2 = 1.313kN/m Live load WY, A’C = 1.5kN/m² x 2.9m/2 = 2.175kN/m² Total live load = (1.313 + 2.175)kN/m = 3.488kN/m Ultimate live load = 3.488kN/m x 1.6 = 5.581kN/m Total ultimate load 3Y, C = (26.3 + 5.581) kN/m = 31.881kN/m
  • 24. Point load 3Y, C = 31.881kN/m x 2.9m = 92.455kN Point load 3W, C = 19.567kN/m x 1.6m = 31.307kN Total moment YC = 92.455kN(1.45m) + 31.307kN(3.7) - WC(4.5) WC(4.5) = 249.896kN Reaction force WC = 55.532kN Reaction force YC = (92.455 + 31.307 - 55.532) = 68.23kN Shear force area x/2.9 = 24.225/92.455 x = 0.76m A = ½ (68.23kN x 2.14m) ​= 73kNm B = ½ (24.225kN x 0.76m) ​= 9.21kNm C = ½ (24.225kN + 55.532kN) x 1.6m ​ = 63.81
  • 25. Beam Y, A’D winter Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load WY, A’C = 3.6kN/m² x 3.5m/2 x ⅔ = 4.2kN/m Dead load YZ, A’D = 3.6kN/m² x 1m/2 = 1.8kN/m Total dead load Y, A’C = (1.8+4.2+1.62+8.55) = 16.17kN/m Ultimate dead load Y, A’C = 16.17kN/m x 1.4 = 22.64kN/m Total dead load Y, CD = (1.8+1.62+8.55)kN/m = 11.97kN/m Ultimate dead load Y, CD = 11.97kN/m x 1.4 = 16.758kN/m Live load WY, A’C = 1.5kN/m² x 3.5m/2 x ⅔ = 1.75kN/m Live load YZ, A’D = 1.5kN/m² x 1m/2 = 0.75kN/m Total ultimate load Y, A’C = (0.75+1.75) kN/m = 2.5kN/m Ultimate live load Y, A’C = 2.5kN/m x 1.6 = 4kN/m Live load Y,CD =1.75kN/m
  • 26. Ultimate live load Y, CD = 1.75kN/m x 1.6 = 2.8kN/m Total ultimate load Y, A’C = (22.638+4) kN/m = 26.64kN/m Total ultimate load Y, CD = (16.758+2.8) kN/m = 19.558kN/m Point load at Y, A’C = 26.638kN/m x 3.5m = 93.24kN Point load Y, CD = 19.558kN/m x 1.75m = 34.2265kN Total moment of YD = 34.2265kN(0.875m) + 68.23kN(1.75m) + 93.24kN(3.5m) - YA’(5.25m) YA’(5.25) = 475.69 YA’ reaction force = 90.61kN YD reaction force = (34.2265+68.23+93.24-90.61) = 105.09kN Shear force area x/3.5 = 2.63/93.24 x = 0.0987m A = ½ (105.09kN+70.86kN) x 1.75m ​ = 153.96kNm B = ½ (0.0987m x 2.63kN) = 0.13kN C = ½ (90.61kN x 3.4m) = 154.04kNm
  • 27. Beam X-4, D winter Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load WY, CD = 3.6kN/m x 1.75m/2 = 3.15kN/m Total dead load Y-4, D = (1.62+8.55) = 10.17kN/m Ultimate dead load Y-4, D = 10.17kN/m x 1.4 = 14.238kN/m Total dead load X-Y, D = (1.62+8.55+3.15) = 13.32kN/m Ultimate dead load X-Y, D = 13.32kN/m x 1.4 = 18.648kN/m Live load WY, CD = 1.5kN/m x 1.75m/2 = 2.625kN/m Ultimate live load = 2.625kN/m x 1.6 = 4.2kN/m Total ultimate load Y-4, D = 14.238kN/m Total ultimate load X-Y, D = (18.648+4.2) kN/m = 22.848kN/m Point load from beam Y, A’D = 105.09kN Point load at Y-4 = 14.238kN/m x 0.4m = 5.695kN
  • 28. Point load at X-Y = 22.848kN/m x 3.8m = 86.822kN Total moment at 4,D = 5.695kN(0.2m) + 105.09kN(0.4m) + 86.822kN(2.3m) - XD(4.2) XD(4.2) = 242.87Kn Reaction force at XD = 57.83kN Reaction force at 4D = (5.695+105.09+86.822-57.83)kN = 139.78kN Shear force area x/3.8 = 29/86.83 x = 1.27m A = ½ (139.78kN+132.09kN) x 0.4m ​ = 54.37kNm B = ½ (29kN x 1.27m) ​ = 18.42kNm C = ½ (2.53m x 57.83kN) ​= 73.15kNm
  • 29. Beam V, C-D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load 1-V, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Dead load V-W, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Total dead load = (1.62 + 8.55 + 2.1 + 2.1 ) kN/m = 14.37kN/m Ultimate dead load = 14.37kN/m x 1.4 = 20.118kN/m Live load 1-V, CD = 1.5kN/m² x 1.75/2 = 1.31kN/m Live load V-W, CD = 1.5kN/m² x 1.75/2 = 1.31kN/m Total live load = (1.31 + 1.31 )kN/m = 2.62kN/m Ultimate live load = 2.62kN/m x 1.6 = 4.19kN/m Total ultimate load = (20.118 + 4.19 )kN/m = 24.31kN/m Distributed load = 24.31kN/m x 1.75m = 42.54kN / 2 = 21.27kN/m Shear force area = ½ (0.87m x 21.27kN/m) = 9.3kNm
  • 30. Beam W, C-D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load V-W, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Dead load W-Y, CD = 3.6kN/m² x 1.75/2 = 3.15kN/m Total dead load = (1.62 + 8.55 + 2.1 + 3.15 ) kN/m =15.42kN/m Ultimate dead load = 15.42kN/m x 1.4 = 21.588kN/m Live load W, C-D = 1.5kN/m² x 1.75/2 = 1.31kN/m Live load W, C-D = 1.5kN/m² x 1.75/2 = 1.31kN/m Total live load = (1.31 + 1.31 )kN/m = 2.62kN/m Ultimate live load = 2.62kN/m x 1.6 = 4.19kN/m Total ultimate load = (21.59 + 4.19 )kN/m = 25.78kN/m Distributed load = 25.78kN/m x 1.75m = 45.12kN / 2 = 22.56kN/m Shear force area = ½ (0.87m x 22.56kN/m) = 9.87kNm
  • 31. Beam 1-X, D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load 1-V, D = 3.6kN/m² x 2.65/2 x ⅔ = 3.18kN/m Dead load V-W, D = 3.6kN/m² x 2/2 x ⅔ = 2.4kN/m Dead load 1-X = 3.6kN/m² x 5.3 = 19.08kN/m Dead load W-X,D = 3.6kN/m² x 0.875m = 3.15kN/m Total dead load = (1.62 + 8.55 + 19.08 + 3.15 ) kN/m, (1.62 + 2.4 + 19.08)kN/m, (1.62 + 8.55 + 3.18 + 19.08)kN/m = 32.4kN/m , 23.1kN/m, 32.43kN/m Ultimate dead load = 32.4kN/m x 1.4, 23.1kN/m x 1.4, 32.43kN/m x 1.4 = 45.36kN/m, 32.34kN/m, 45.4kN/m Live load 1-V, D = 1.5kN/m² x 2.65/2 = 1.99kN/m Live load V-W, D = 1.5kN/m² x 2/2 = 1.5kN/m Live load W-X, D = 1.31kN/m Live load 1-X = 1.5 x 5.3/2 = 3.98kN/m
  • 32. Total live load = (1.31 + 3.98 )kN/m , (1.5 + 3.98)kN/m , (1.99 + 3.98)kN/m = 5.29kN/m , 5.48kN/m , 5.97kN/m Ultimate live load = (5.29kN/m x 1.6) , (5.48kN/m x 1.6) , (5.97kN/m x 1.6) = 8.46kN/m , 8.77kN/m , 9.55kN/m Total ultimate load = (45.36 + 8.46)kN/m , (32.34 + 8.77 )kN/m , (45.4 + 9.55)kN/m = 53.82kN/m, 41.11kN/m, 54.95kN/m Distributed load = 53.82kN/m x 0.7m , 41.11kN/m x 2m , 54.95 x 2.65m = 37.67kN, 82.22kN, 145.62kN Take moment at point XD, (37.67kN x 0.35m) + (22.56kN x 0.7m) + (82.22kN x 1.7m) + (21.27 x 2.7m) + (145.62kN x 4.025m) - 5.35z = 13.18kNm + 15.79kNm + 139.77kNm + 57.43kNm + 586.12kNm - 5.35z = 812.29Nm - 5.35z (5.35m)z = 812.29kNm z = 151.83kN (145.62kN x 1.325m) + (21.27kN x 2.65m) + (82.22kN x 3.65m) + (22.56kN x 4.65) + (37.67kN x 5.025m ) = 5.35x 192.95kNm + 56.37kNm + 300.1kNm + 104.9kNm + 189.29kNm = (5.35m)x x = 157.68kN Shear graph area A = ½ (157.68kN + 120.01kN) x 0.7 = 97.19kNm B = ½ (97.45kN + 15.23kN) x 2 = 112.68kNm C = ½ (-6.04kN - 151.66kN) x 2.65 = -208.95kNm
  • 33. Beam W, A’-C (First Floor Plan) WINTER Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at W-Y, A’-C = 3.6kN/m² x 3.5m/2 x 2/3 = 4.2kN/m Dead load at 1-W, A’-C = 3.6kN/m² x 1.2/2 x 2/3 = 4.2kN/m Total dead load = (1.62 + 8.55 + 4.2 + 4.2)kN/m = 18.57kN/m Ultimate dead load = 18.57kN/m x 1.4 = 26kN/m Live load at W-Y, A’-C = 1.5kN/m² x 3.5m/2 x 2/3 = 1.75kN/m Live load at 1-W, A’-C = 1.5kN/m² x 3.5m/2 x 2/3 = 1.75kN/m Total live load = (1.75 + 1.75)kN/m = 3.5kN/m Ultimate live load = 3.5kN/m x 1.6 = 5.6kN/m Total ultimate load = (26 + 5.6)kN/m = 31.6kN/m Distributed load 31.6kN/m x 3.5m/2 = 55.3kN Shear graph area = ½ x 55.3kN x 1.75m = 48.3kNm
  • 34. Beam A’, 2-Y (First Floor Plan) WINTER Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-Y, A-A’ = 3.6kN/m² x 1.2m/2 = 2.16N/m Dead load at W-Y, A’-C = 3.6kN/m² x 3.5m/2 = 6.3kN/m Dead load at 2-W, A’-C = 3.6kN/m² x 3.5m/2 = 6.3kN/m Total dead load at grid W-Y = (1.62 + 8.55 + 2.16 + 6.3)kN/m = 18.63kN/m Total dead load at grid 2-W = (1.62 + 8.55 + 2.16 + 6.3)kN/m = 18.63kN/m Ultimate dead load at grid W-Y = (18.63kN/m x 1.4) = 26.08kN/m Ultimate dead load at grid 2-W = (18.63kN/m x 1.4) = 26.08kN/m Live load at 1-Y, A-A’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load at W-Y, A’-C = 1.5kN/m² x 3.5m/2 = 2.63kN/m Live load at 2-W, A’-C = 1.5kN/m² x3.5m/2 = 2.63kN/m Total live load at grid W-Y = (0.9 + 2.63)kN/m = 3.53kN/m Total live load at grid 2-W
  • 35. = (0.9 + 2.63)kN/m = 3.53kN/m Ultimate live load at grid W-Y = (3.53kN/m x 1.6) = 5.65kN/m Ultimate live load at grid 2-W = (3.53kN/m x 1.6) = 5.65kN/m Total ultimate load at grid W-Y = (26.08 + 5.65)kN/m = 31.73kN/m Total ultimate load at grid 2-W = (26.08 + 5.65)kN/m = 31.73kN/m Distributed load of gid W-Y = 31.73kN/m x 4.5m = 142.79kN Distributed load of grid 2-W = 31.73kN/m x 1m = 31.73kN Take moment at point YA’ (142.79kN x 2.25m) + (55.3kN x 4.5m) + (31.73kN x 5m) = (5.5m)YA’ (5.5m)YA’ = 728.78kNm YA’ = 132.51kN Take moment at point A’2 (31.73kN x 0.5m) + (55.3kN x 1m) + (142.79kN x 3.25m) = (5.5m)2A’ (5.5m)2A’ = 535.23kNm 2A’ = 97.32kN Shear graph area x/4.5 = 97.32/142.79 x = 3.07 A = ½ x 3.07m x 97.32kN = 149.24kNm B = ½ x 1.23m x 45.47kN = 32.51kNm C = ½ x (100.77kN + 132.5kN) x 1m = 116.64