Cooperative Performance in BIM
: Information delivery cycle
The following picture illustrates the strategies which the British government
developeded. Every point needs a whole book but let's discuss them together.

In this picture we see a logical framework for production of information in project stages.
This approach does not require more work, but requires mutual understanding and
confidence within the team. When we commit to this approach, activities of profusion
such as stopping work to look for information and defects resulting from weak
BIMarabia – Omar Selim
coordination between the models and invisible data are reduced. There are two
beginnings:
The first start is from NEED at the top right of the previous picture, if we start a new
project.
The second start is form Opex start for already existing buildings. We start from the first
point NEED where we define information which employers need (BIM Employers
Information Requirements, EIR), develop the strategy and provide a clear definition of
work requirements and basic decision points (we can rely on CIC BIM protocol) and the
most important sections are:
• Technical, what are software platforms?
• Management, especially for administrative processes.
• Commercial, financial details of the project.
As follows:
BIMarabia – Omar Selim

Where we determine the required, who will perform it and here we determine the
resources needed for the project. Then procurement arrow comes out and we determine
roles, responsibilities, authorities and BIM EXECUTION PLAN. The next step is
developing the business plan, standards and methods. It includes:
 Project Implementation Plan
 Supply Chain Capability Summary

Then we move towards the references and the Master Information Delivery Plan, MIDP,
in which we determine the protocols and procedures for each project stage. Where we
will implement each operation and when we do the schedules whch includes:
 Task Team Information Delivery Plan
 Responsibility Matrix
BIMarabia – Omar Selim
By entering the project’s operations, information and details at every stage increase until
we finish full model on delivery. The first part PIM is divided into six stages, the second
part AIM is the seventh stage and the seven stages are in the Common Data
Environment, CDE.
‫األول‬ ‫القسم‬Project Information Model, PIM:‫التالية‬ ‫المراحل‬ ‫ويشمل‬ ،
1-‫مبدئية‬ ‫فكرة‬ ‫وجود‬ Brief.
Having a preliminary idea
2-‫ومعايير‬ ‫أسس‬ ‫وجود‬ Concept .
The existence of the principles and standards
3-‫بالعناصر‬ ‫التعريف‬ ‫مرحلة‬ Definition.
4-‫التصميم‬ ‫مرحلة‬ Design.
5-‫والعموالت‬ ‫البناء‬ ‫مرحلة‬ Build & Commission.
6-‫والتقفيل‬ ‫التسليم‬ ‫مرحلة‬ Handover & Closeout.
BIMarabia – Omar Selim
The second part Asset Information Model, AIM includes one stage, operation and in
use. Comparing the project performance with the owner's requirements, if they do not
meet, the elements that are not met are identified and changed. At this stage, we will
have sufficient information and model to manage the facility. For more details at this
point, you can revise the UK Construction Industry Council.
BIMarabia – Omar Selim
Below the information delivery cycle, you can see:
 The green circles represent information exchange between Supplier's and
Information Exchange supplier
 The red circles represent the exchange of information among team members and
discussions with the owner. Employer's Decision Point.
The BIM workflow plan through common collaborationtools:
At the beginning we should be aware of BIM workflow term:
BIM = software tools
This means that BIM includes software tools that help us in modeling
Workflow = ways & plans
This means identifying plans and ways to use these tools for improving results.
In general, there are two main ways in BIM for working cooperatively in a company and
they are:
1-Direct linking between different disciplines for the same model (available in Revit
program), its concept is similar to external files concept in CAD system xref , one of its
advantages is the small size of its files and it is also possible to manage the permits
through it , noting that the work is not in one file.
BIMarabia – Omar Selim
2-Worksharing, there is one central model which is shared by everyone and easy to
access and deal with. Its advantage is more collaborative (which BIM adopts) so it
allows updating the project in real time. Its disadvantage is the large size of files due to
the results and it also requires a very conscious management of work set concept.
Work organization:
There are fourworkscenariosandwe shoulddetermine which one willuse:
1- One file where everyone works on
2- Each department (architectural - structural - electromechanical) works on its
file and all are linked.
3-The project is divided into sections such as:
a. The ground floor and lower floors in a file.
b. The first floor and the rest of floors in another file.
c. The general location in a file.
The second and third methods are combined if the project is too large. For
example, the architectural plan of ground floor will be in a separate file.
BIMarabia – Omar Selim
Validation of the Model :

 Open the central file, disconnect it from work and do Audit.
 Separate all Non-transmittal linked-in files.
 Delete all unused views, sheets, schedules, images, legends, etc.
 Delete unused design options.
 Use Purge command three times because there are some items not deleted from
the first time.
 update saving the central form, including all relevant details and notes
 Save file to publish folder with the same name
Technologyfor supporting collaboration:
We can consider that the obstacle of collaboration between different platforms has been
technically overcome through creating the IFC formula for supporting coordinated operation.
This formula is being continuously developed to support different disciplines until it becomes a
standard for documenting programs efficiency in information exchange. Although of a little
support of design programs in dealing with the IFC standard, other methods have been created
to overcome thisimbalance.
On the human side, contractual formulas _such as design and implementation_ were
adopted to enhance cooperation between the owner, engineers and contractors at an
early stage of the project. This information sharing has helped in knowledge exchange
and discovering innovative ideas which have reflected in design processes and outputs.
These changes needed introducing new standards for work at the level of projects,
organizations and industry, up to the national level.
The integrated design is a comprehensive process for integrating information from
stakeholders through developing protocols of decision, responsibility, equity, rewards
and risk from the project start. In the Integrated Project Delivery (IPD), all building
information acquired during different phases and related to people, systems and
practices is integrated into an innovative process to improve the value for participants.
BIMarabia – Omar Selim
Employers Information Requirements EIR is an emerging example of this integration that
relates to information about the technical, managerial and operational capabilities of the
organization. For this, the integration of the AEC industry with universities, governments
and other industries is imperative to increase the efficiency of individual capabilities, as
well as to encourage companies to adopt innovative technology. The benefit of using
BIM in projects varies according to the method of use - modeling, collaboration, or
integration – and depending on the target level (whether individuals, projects,
organizations or industry).
BIMarabia – Omar Selim
Common Data Environment, CDE:
20% to 25% of project team time is lost in file search. This loss can be avoided by
organizing data as we will now read when examining the shared data environment. What
we are going to see is a British code that focuses on the second level of BIM. There is a
collaborative environment, but it was created in separate files. It is aimed to simplify and
organize work to achieve Employer's Information Requirements.
The following figure clarifies CDE in general:
BIMarabia – Omar Selim
BIMarabia – Omar Selim
Let's start in the next part to focus on the process before starting implementation:
1. BIM manager creates subfolders as following:
BIMarabia – Omar Selim
In designing we start with WORK IN PROGRESS which all team members work on this
folder, which contains all plans and drawings under way. This folder is the place of files
that have not yet been approved.
The files could be modified to fit the requirements of the consultant and they should
contain the following checks:
a) Model suitability check.
b) SMP check.
c) Technical content check.
d) COBie completeness check.
e) Drawings extract checks along with any additional documentation that is
shared as a co-ordinated package of information.
f) Approval by the task team manager.
BIMarabia – Omar Selim
‫المعلومات‬ ‫تمر‬‫إ‬‫البوابة‬ ‫لى‬ APPROVED 1 ‫لتنتقل‬‫إ‬‫الثانية‬ ‫المرحلة‬ ‫لى‬ SHARED
2-‫مجلد‬ Shared ‫الت‬ ‫سيتم‬ ‫التي‬ ‫للملفات‬‫األ‬ ‫كل‬ ‫مع‬ ‫تبادلها‬ ‫يتم‬ ‫و‬ ‫منها‬ ‫حقق‬‫المؤسس‬ ‫و‬ ‫قسام‬‫و‬ ‫ات‬
‫بهم‬ ‫الخاص‬ ‫التصميم‬ ‫لتطوير‬ ‫األخرى‬ ‫الشركات‬،‫توضع‬ ‫كما‬‫أ‬‫العا‬ ‫المشتركة‬ ‫الملفات‬ ‫يضا‬‫في‬ ‫بما‬ ‫مة‬
‫ذلك‬‫ال‬‫ملفات‬:‫التالية‬
XREF, title sheets, mapping, surveys, imagery … etc.
Information passes the portal APPROVED 1 and move to the second stage SHARED
2 - SHARED folder for the files which will be checked out and exchanged with all
disciplines, institutions and companies to develop their design and common files are also
included such as XREF, title sheets, mapping, surveys, imagery … etc
Published.
PUBLISH folder is available for the team by placing it in Client Shared Area (a folder
contains SHARED & PUBLISH), it must be approved by the employer or his authorized
representative and it must also include: does work is compliant with requirements of
employer EIR or not.
This folder contains more subfolders that can be modified to suit requirements of owner's
consultant. The information passes the portal AUTHORISED and what is approved is
transferred to the third stage Published.
BIMarabia – Omar Selim
3- Published stage contains all final files and drawings that is published, approved and
become independent without links from other files by making BIND to it. This folder
contains the last IFC folder. Data cannot be deleted or edited in this stage, but will keep
even archiving information received through VERIFIED portal, which represents moving
to Archive stage.
4-Archive stage contains all versions and previous processes (Milestone), and finally
received files from others that be read only cannot be modified. Sharing information in
such a way saves a lot of time and effort. Modification rights have reserved only for the
original building, the rest can be only read and seen.
‫ما‬ ‫كل‬ ‫االن‬ ‫حتى‬: ‫الكود‬ ‫في‬ ‫موجود‬ ‫كان‬ ‫ذكر‬2007: PAS 1192
‫من‬ ‫جزء‬ ‫هو‬ ‫و‬Capital Expenditures CapEX ‫و‬‫كيفية‬ ‫هو‬‫إ‬‫التصمي‬ ‫مكتب‬ ‫داخل‬ ‫الملفات‬ ‫دارة‬‫م‬
‫الكود‬ ‫في‬ ‫ثم‬2013-2- BS 1192 ‫في‬ ‫التوسع‬ ‫تم‬ Capital Expenditures, CapEX ،‫و‬‫إ‬‫ضافه‬
‫جزء‬‫آ‬‫الموقع‬ ‫داخل‬ ‫العمل‬ ‫لطريقة‬ ‫خر‬ Operational Expenditures, OpEx.
So far, all of this was mentioned in PAS 1192:2007,
it is a part of Capital Expenditures CapEX which is how to manage files within a design
office
In BS 1192 - 2 - 2013, the Capital Expenditures (CapEX) was expanded and another
part was added (the operational mode, OpEx).
Capital Expenditures, CapEX :
Firstly: Capital Expenditures, CapEX:
After finishing the previous stages WIP & SHARED & PUBLISH & ARCHIVE,
there is Specialist Appointment which is special requirements like SUPPLIER, it goes to
WIP to modify the design through APPROVED portal to the SHARED stage in the
CLINT SHARED AREA.
BIMarabia – Omar Selim
OperationalExpenditures, OpEx:
Secondly: Operational Expenditures, OpEx:
Work in the field, the files exist in PUBLISHED DOCUMENTATION are checked out
through VALIDATED portal and documented through ACCEPTED portal to be used
when they go to the site. These files cannot be modified in OpEx, the consultant of the
client shall deliver the site to the contractor and the documentation get in information
exchange.
BIMarabia – Omar Selim
During the work, it must be RE-VERIFIED by sending any request for information, RFI.
For example, there is a door and its height is 180 cm, or a mosque and its direction is
not correct, or a modify resulting from the site to the consultant of the owner or financier ,
when it is approved by the consultant, he sent it to the design office for modifying
through the sixth portal Authorized.

More Related Content

DOCX
Bim contracts
PDF
Bi marabia5en
DOCX
BIM research report
PDF
COBIE2 Challenge - Perspectives
PDF
Vico Software: 4D and 5D perspectives on BIM
PPTX
Bim its applications
PDF
Software app present (QS)
PPTX
Software app slides
Bim contracts
Bi marabia5en
BIM research report
COBIE2 Challenge - Perspectives
Vico Software: 4D and 5D perspectives on BIM
Bim its applications
Software app present (QS)
Software app slides

What's hot (20)

PPT
Software application (QS)
PDF
Ho.01 bim.arabic
PDF
Fm roundtable presentations
PDF
Software app slides
PDF
Software report
PDF
Extended Summary_Sofia Sideri_Final
PDF
Construction Supply Chain Management (Group Assignment) - BIM 7D
PPT
BIM from an FM perspective
PDF
Integrating decision support systems (dss)and bim
PDF
A methodology for cim modelling and its transformation to pim
DOCX
A general plan for the phases of bim work
PDF
Software assignment 1
PDF
Software Application Report
PPTX
Building Information Modeling - From Concept to Completion
PPTX
Possibilities of adding FM-specific data into BIM in early Design Phases
PDF
2D to 3D modeling and why you need BIM
PDF
Software Application Group Assignment
PDF
Government soft landings and the benefits of BIM to FM
PDF
Software Presentation Slides
PDF
PP1 report
Software application (QS)
Ho.01 bim.arabic
Fm roundtable presentations
Software app slides
Software report
Extended Summary_Sofia Sideri_Final
Construction Supply Chain Management (Group Assignment) - BIM 7D
BIM from an FM perspective
Integrating decision support systems (dss)and bim
A methodology for cim modelling and its transformation to pim
A general plan for the phases of bim work
Software assignment 1
Software Application Report
Building Information Modeling - From Concept to Completion
Possibilities of adding FM-specific data into BIM in early Design Phases
2D to 3D modeling and why you need BIM
Software Application Group Assignment
Government soft landings and the benefits of BIM to FM
Software Presentation Slides
PP1 report
Ad

Similar to Cooperative performance in bim (20)

DOCX
ch9.docx
DOCX
Bim implementation
PPTX
BIM Documentation UserGuide for Professionals
PPTX
Innovation in practice presentation 10 06-15
PPTX
CH-1 (2).pptx
PDF
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
PDF
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
PDF
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
PDF
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
PDF
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
PPT
BIM: an overview
PDF
July 2015 Construct15_Richard Morwood_V4 (2)
PDF
Making the Work Visible
PPTX
BIM for ABU DHABI AIRPORT (1).pptx
PDF
s131478 - Master Thesis
PDF
ورشة الطريق إلى البيم ورشة الطريق إلى البيم
PDF
ENR467723
PDF
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?
PDF
Bim execution plan
PDF
Bim and project management
ch9.docx
Bim implementation
BIM Documentation UserGuide for Professionals
Innovation in practice presentation 10 06-15
CH-1 (2).pptx
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
Class_Presentation_ES119021_New_BIM_Managers_Startup_Guide_Charles_Berteaux_I...
BIM: an overview
July 2015 Construct15_Richard Morwood_V4 (2)
Making the Work Visible
BIM for ABU DHABI AIRPORT (1).pptx
s131478 - Master Thesis
ورشة الطريق إلى البيم ورشة الطريق إلى البيم
ENR467723
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?
Bim execution plan
Bim and project management
Ad

More from Omar Selim (20)

PDF
Omar Salim Biography Omar Salim Biography
PDF
OMAR SELIM portfolio OMAR SELIM portfolio
PDF
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
PDF
إعادة الإعمار .pdf
PDF
_الذكاء الاصطناعي .pdf
PDF
SmartHome.pdf
PDF
_الذكاء الاصطناعي .pdf
DOCX
Ch-3.docx
DOCX
ch-12.docx
DOCX
Ch-4.docx
DOCX
ch8.docx
DOCX
ch10.docx
DOCX
ch-11.docx
DOCX
ch-13.docx
DOCX
Ch-5.docx
DOCX
Ch-2.docx
DOCX
ch-6.docx
DOCX
Ch-1.docx
DOCX
all.docx
PDF
BIMarabia12.pdf
Omar Salim Biography Omar Salim Biography
OMAR SELIM portfolio OMAR SELIM portfolio
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
إعادة الإعمار .pdf
_الذكاء الاصطناعي .pdf
SmartHome.pdf
_الذكاء الاصطناعي .pdf
Ch-3.docx
ch-12.docx
Ch-4.docx
ch8.docx
ch10.docx
ch-11.docx
ch-13.docx
Ch-5.docx
Ch-2.docx
ch-6.docx
Ch-1.docx
all.docx
BIMarabia12.pdf

Recently uploaded (20)

PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
Pharma ospi slides which help in ospi learning
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
01-Introduction-to-Information-Management.pdf
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PPTX
Cell Structure & Organelles in detailed.
PPTX
Cell Types and Its function , kingdom of life
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
O5-L3 Freight Transport Ops (International) V1.pdf
Pharma ospi slides which help in ospi learning
Final Presentation General Medicine 03-08-2024.pptx
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
01-Introduction-to-Information-Management.pdf
Abdominal Access Techniques with Prof. Dr. R K Mishra
Cell Structure & Organelles in detailed.
Cell Types and Its function , kingdom of life
2.FourierTransform-ShortQuestionswithAnswers.pdf
Microbial disease of the cardiovascular and lymphatic systems
Chinmaya Tiranga quiz Grand Finale.pdf
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
VCE English Exam - Section C Student Revision Booklet
A systematic review of self-coping strategies used by university students to ...
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Pharmacology of Heart Failure /Pharmacotherapy of CHF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
Module 4: Burden of Disease Tutorial Slides S2 2025

Cooperative performance in bim

  • 1. BIMarabia – Omar Selim Cooperative Performance in BIM : Information delivery cycle The following picture illustrates the strategies which the British government developeded. Every point needs a whole book but let's discuss them together.  In this picture we see a logical framework for production of information in project stages. This approach does not require more work, but requires mutual understanding and confidence within the team. When we commit to this approach, activities of profusion such as stopping work to look for information and defects resulting from weak
  • 2. BIMarabia – Omar Selim coordination between the models and invisible data are reduced. There are two beginnings: The first start is from NEED at the top right of the previous picture, if we start a new project. The second start is form Opex start for already existing buildings. We start from the first point NEED where we define information which employers need (BIM Employers Information Requirements, EIR), develop the strategy and provide a clear definition of work requirements and basic decision points (we can rely on CIC BIM protocol) and the most important sections are: • Technical, what are software platforms? • Management, especially for administrative processes. • Commercial, financial details of the project. As follows:
  • 3. BIMarabia – Omar Selim  Where we determine the required, who will perform it and here we determine the resources needed for the project. Then procurement arrow comes out and we determine roles, responsibilities, authorities and BIM EXECUTION PLAN. The next step is developing the business plan, standards and methods. It includes:  Project Implementation Plan  Supply Chain Capability Summary  Then we move towards the references and the Master Information Delivery Plan, MIDP, in which we determine the protocols and procedures for each project stage. Where we will implement each operation and when we do the schedules whch includes:  Task Team Information Delivery Plan  Responsibility Matrix
  • 4. BIMarabia – Omar Selim By entering the project’s operations, information and details at every stage increase until we finish full model on delivery. The first part PIM is divided into six stages, the second part AIM is the seventh stage and the seven stages are in the Common Data Environment, CDE. ‫األول‬ ‫القسم‬Project Information Model, PIM:‫التالية‬ ‫المراحل‬ ‫ويشمل‬ ، 1-‫مبدئية‬ ‫فكرة‬ ‫وجود‬ Brief. Having a preliminary idea 2-‫ومعايير‬ ‫أسس‬ ‫وجود‬ Concept . The existence of the principles and standards 3-‫بالعناصر‬ ‫التعريف‬ ‫مرحلة‬ Definition. 4-‫التصميم‬ ‫مرحلة‬ Design. 5-‫والعموالت‬ ‫البناء‬ ‫مرحلة‬ Build & Commission. 6-‫والتقفيل‬ ‫التسليم‬ ‫مرحلة‬ Handover & Closeout.
  • 5. BIMarabia – Omar Selim The second part Asset Information Model, AIM includes one stage, operation and in use. Comparing the project performance with the owner's requirements, if they do not meet, the elements that are not met are identified and changed. At this stage, we will have sufficient information and model to manage the facility. For more details at this point, you can revise the UK Construction Industry Council.
  • 6. BIMarabia – Omar Selim Below the information delivery cycle, you can see:  The green circles represent information exchange between Supplier's and Information Exchange supplier  The red circles represent the exchange of information among team members and discussions with the owner. Employer's Decision Point. The BIM workflow plan through common collaborationtools: At the beginning we should be aware of BIM workflow term: BIM = software tools This means that BIM includes software tools that help us in modeling Workflow = ways & plans This means identifying plans and ways to use these tools for improving results. In general, there are two main ways in BIM for working cooperatively in a company and they are: 1-Direct linking between different disciplines for the same model (available in Revit program), its concept is similar to external files concept in CAD system xref , one of its advantages is the small size of its files and it is also possible to manage the permits through it , noting that the work is not in one file.
  • 7. BIMarabia – Omar Selim 2-Worksharing, there is one central model which is shared by everyone and easy to access and deal with. Its advantage is more collaborative (which BIM adopts) so it allows updating the project in real time. Its disadvantage is the large size of files due to the results and it also requires a very conscious management of work set concept. Work organization: There are fourworkscenariosandwe shoulddetermine which one willuse: 1- One file where everyone works on 2- Each department (architectural - structural - electromechanical) works on its file and all are linked. 3-The project is divided into sections such as: a. The ground floor and lower floors in a file. b. The first floor and the rest of floors in another file. c. The general location in a file. The second and third methods are combined if the project is too large. For example, the architectural plan of ground floor will be in a separate file.
  • 8. BIMarabia – Omar Selim Validation of the Model :   Open the central file, disconnect it from work and do Audit.  Separate all Non-transmittal linked-in files.  Delete all unused views, sheets, schedules, images, legends, etc.  Delete unused design options.  Use Purge command three times because there are some items not deleted from the first time.  update saving the central form, including all relevant details and notes  Save file to publish folder with the same name Technologyfor supporting collaboration: We can consider that the obstacle of collaboration between different platforms has been technically overcome through creating the IFC formula for supporting coordinated operation. This formula is being continuously developed to support different disciplines until it becomes a standard for documenting programs efficiency in information exchange. Although of a little support of design programs in dealing with the IFC standard, other methods have been created to overcome thisimbalance. On the human side, contractual formulas _such as design and implementation_ were adopted to enhance cooperation between the owner, engineers and contractors at an early stage of the project. This information sharing has helped in knowledge exchange and discovering innovative ideas which have reflected in design processes and outputs. These changes needed introducing new standards for work at the level of projects, organizations and industry, up to the national level. The integrated design is a comprehensive process for integrating information from stakeholders through developing protocols of decision, responsibility, equity, rewards and risk from the project start. In the Integrated Project Delivery (IPD), all building information acquired during different phases and related to people, systems and practices is integrated into an innovative process to improve the value for participants.
  • 9. BIMarabia – Omar Selim Employers Information Requirements EIR is an emerging example of this integration that relates to information about the technical, managerial and operational capabilities of the organization. For this, the integration of the AEC industry with universities, governments and other industries is imperative to increase the efficiency of individual capabilities, as well as to encourage companies to adopt innovative technology. The benefit of using BIM in projects varies according to the method of use - modeling, collaboration, or integration – and depending on the target level (whether individuals, projects, organizations or industry).
  • 10. BIMarabia – Omar Selim Common Data Environment, CDE: 20% to 25% of project team time is lost in file search. This loss can be avoided by organizing data as we will now read when examining the shared data environment. What we are going to see is a British code that focuses on the second level of BIM. There is a collaborative environment, but it was created in separate files. It is aimed to simplify and organize work to achieve Employer's Information Requirements. The following figure clarifies CDE in general:
  • 12. BIMarabia – Omar Selim Let's start in the next part to focus on the process before starting implementation: 1. BIM manager creates subfolders as following:
  • 13. BIMarabia – Omar Selim In designing we start with WORK IN PROGRESS which all team members work on this folder, which contains all plans and drawings under way. This folder is the place of files that have not yet been approved. The files could be modified to fit the requirements of the consultant and they should contain the following checks: a) Model suitability check. b) SMP check. c) Technical content check. d) COBie completeness check. e) Drawings extract checks along with any additional documentation that is shared as a co-ordinated package of information. f) Approval by the task team manager.
  • 14. BIMarabia – Omar Selim ‫المعلومات‬ ‫تمر‬‫إ‬‫البوابة‬ ‫لى‬ APPROVED 1 ‫لتنتقل‬‫إ‬‫الثانية‬ ‫المرحلة‬ ‫لى‬ SHARED 2-‫مجلد‬ Shared ‫الت‬ ‫سيتم‬ ‫التي‬ ‫للملفات‬‫األ‬ ‫كل‬ ‫مع‬ ‫تبادلها‬ ‫يتم‬ ‫و‬ ‫منها‬ ‫حقق‬‫المؤسس‬ ‫و‬ ‫قسام‬‫و‬ ‫ات‬ ‫بهم‬ ‫الخاص‬ ‫التصميم‬ ‫لتطوير‬ ‫األخرى‬ ‫الشركات‬،‫توضع‬ ‫كما‬‫أ‬‫العا‬ ‫المشتركة‬ ‫الملفات‬ ‫يضا‬‫في‬ ‫بما‬ ‫مة‬ ‫ذلك‬‫ال‬‫ملفات‬:‫التالية‬ XREF, title sheets, mapping, surveys, imagery … etc. Information passes the portal APPROVED 1 and move to the second stage SHARED 2 - SHARED folder for the files which will be checked out and exchanged with all disciplines, institutions and companies to develop their design and common files are also included such as XREF, title sheets, mapping, surveys, imagery … etc Published. PUBLISH folder is available for the team by placing it in Client Shared Area (a folder contains SHARED & PUBLISH), it must be approved by the employer or his authorized representative and it must also include: does work is compliant with requirements of employer EIR or not. This folder contains more subfolders that can be modified to suit requirements of owner's consultant. The information passes the portal AUTHORISED and what is approved is transferred to the third stage Published.
  • 15. BIMarabia – Omar Selim 3- Published stage contains all final files and drawings that is published, approved and become independent without links from other files by making BIND to it. This folder contains the last IFC folder. Data cannot be deleted or edited in this stage, but will keep even archiving information received through VERIFIED portal, which represents moving to Archive stage. 4-Archive stage contains all versions and previous processes (Milestone), and finally received files from others that be read only cannot be modified. Sharing information in such a way saves a lot of time and effort. Modification rights have reserved only for the original building, the rest can be only read and seen. ‫ما‬ ‫كل‬ ‫االن‬ ‫حتى‬: ‫الكود‬ ‫في‬ ‫موجود‬ ‫كان‬ ‫ذكر‬2007: PAS 1192 ‫من‬ ‫جزء‬ ‫هو‬ ‫و‬Capital Expenditures CapEX ‫و‬‫كيفية‬ ‫هو‬‫إ‬‫التصمي‬ ‫مكتب‬ ‫داخل‬ ‫الملفات‬ ‫دارة‬‫م‬ ‫الكود‬ ‫في‬ ‫ثم‬2013-2- BS 1192 ‫في‬ ‫التوسع‬ ‫تم‬ Capital Expenditures, CapEX ،‫و‬‫إ‬‫ضافه‬ ‫جزء‬‫آ‬‫الموقع‬ ‫داخل‬ ‫العمل‬ ‫لطريقة‬ ‫خر‬ Operational Expenditures, OpEx. So far, all of this was mentioned in PAS 1192:2007, it is a part of Capital Expenditures CapEX which is how to manage files within a design office In BS 1192 - 2 - 2013, the Capital Expenditures (CapEX) was expanded and another part was added (the operational mode, OpEx). Capital Expenditures, CapEX : Firstly: Capital Expenditures, CapEX: After finishing the previous stages WIP & SHARED & PUBLISH & ARCHIVE, there is Specialist Appointment which is special requirements like SUPPLIER, it goes to WIP to modify the design through APPROVED portal to the SHARED stage in the CLINT SHARED AREA.
  • 16. BIMarabia – Omar Selim OperationalExpenditures, OpEx: Secondly: Operational Expenditures, OpEx: Work in the field, the files exist in PUBLISHED DOCUMENTATION are checked out through VALIDATED portal and documented through ACCEPTED portal to be used when they go to the site. These files cannot be modified in OpEx, the consultant of the client shall deliver the site to the contractor and the documentation get in information exchange.
  • 17. BIMarabia – Omar Selim During the work, it must be RE-VERIFIED by sending any request for information, RFI. For example, there is a door and its height is 180 cm, or a mosque and its direction is not correct, or a modify resulting from the site to the consultant of the owner or financier , when it is approved by the consultant, he sent it to the design office for modifying through the sixth portal Authorized.