Enterprise System
Implementation Strategies
             and Phases
             July 27, 2012
Housekeeping



Phones are muted
Use the question block for
questions
Copy of presentation
available upon request
About Your Presenter
• Sr. VP KeyedIn Solutions Consulting Group
   –   Helping companies align their business and technology
   –   Focus on people, process, and then the technology
   –   Subject matter expert on business process management
   –   On-going research into next generation of technology for
       enterprise systems
• 25 years experience in enterprise systems
   – USAF Research Project (1985)
   – Founder of enterprise quality software company (1988)
• Trusted advisor to global organizations, government
  agencies, and professional groups

                                                  http://www.linkedin.com/in/johncachat
Thought for the Day



“The value of an
idea lies in the
using of it.”
Thomas Alva Edison




                      4
Driving from Point A to Point B

• Wrong directions guarantee poor results
• GPS provides the plan
• Then stuff happens
  – Construction
  – Traffic
  – Accident
• Adjust and arrive




                                            5
Today’s Discussion

• Implementation Strategies
  – Full blown
  – Staggered or Phased
• Implementation Phases
  –   Project planning
  –   Application exploration
  –   System design
  –   System testing
  –   System activation – “go live”
Full Blown Approach

       Everything, everywhere, at the same time

Pros                                   Cons
Less integrations with legacy system   Lesson learned can not be transferred
need to be developed                   to other sites

Can eliminate legacy system            Short term, more intensive consultant
maintenance fees faster                support and therefore more expensive

                                       More room for failure – too many
                                       moving parts

                                       Requires strong project management




                                                                               7
Staggered or Phased Approach

Different stuff, at different sites (departments), at
different times

 Pros                                  Cons
 Less consultant intensive             Temporary interfaces may have to be
                                       built
 Problem areas can be separated out
                                        Have to pay maintenance on legacy
 Internal employees may be able to take systems for a long period of time
 over in later phases

 Less room for failure




                                                                             8
Implementation Strategies

• Which approach is best?

• It is probably better to win a
  series of battles then risk losing
  the war!

• Which has the highest probability
  of success?

• How much can your company
  absorb at one time?




                                       9
Implementation Phases

• Transition from legacy to new system
  –   Project planning
  –   Application exploration
  –   System design
  –   System testing
  –   System activation – “go live”




                                         10
Project Planning

• First we have to figure out
  what we are going to do
  before we figure out how we
  are going to do it
• Magnitude, duration, and cost
• Resources
• Risk Management
• IT IS NOT GANTT CHARTS!




                                  11
Project Planning

• Living documents
• Communication tools
   – Issue Management
   – Status Reporting
• Take the time to do it right




                                 12
Application Exploration

• Users and consultants sit down in front of the
  app and explore the functionality
• Use training or demo data – do not use an
  empty version
• Goal is to get end users familiar with the system,
  how to navigate, and understand the options
  available
• Objective is to get the end users more
  knowledgeable so that they can ask better
  questions



                                                       13
Application Exploration Objectives

• Begin the process of
  knowledge transfer from
  consultant to end user
• Identify gaps
• Explore different
  configurations / set up options
• Discuss in and out of scope
  concerns




                                     14
System Design

•   Configure the system
•   Organizational structure
•   Reporting
•   Security
•   Key files (customer, employee, supplier, etc)
•   Avoid overthinking and cumbersome setups
•   Use best practices
•   Avoid customizations



                                                    15
Customization

• Avoid at all costs, really – stay vanilla
• Customization is not configuration

Customization – Bad                      Configuration - OK
•   Changing source code                 • OEM tools that change screens
•   Changing data structures             • Workflow engines
•   Changing business rules / triggers   • Report Writers (be careful)
•   Changing batch programs




                                                                           16
The KeyedIn Approach

• Use the software “as is out of the box”
• Use BPM to develop specific solutions for your
  specific needs




                                                   17
System Design Objectives

• Continue the knowledge transfer
  starting with application exploration
• Establish the framework for the
  system
• Finalize and document the
  customer’s desired system
  configuration
• Setup the initial security
  configuration



                                          18
Types Of System Testing

Type                 Description
Parallel Testing     Users test an entire process, like running payroll, and
                     compare to results from legacy system
Stress testing       Users “pound” the system – number of users, response
                     time, running reports
System integration   Users test the entire process – from start to finish, across
testing              integration point3
Unit Testing         Users test specific scenarios – not the entire process –
                     make sure this thing works
User acceptance      Users follow specific test scripts – a comprehensive set of
testing (UAT)        instructions to verify system does what it is intended to
                     do
                                      Note: System testing versus system validation



                                                                                      19
System Testing Objectives

• Discover, document, and resolve any design,
  data, processing or application issues
• Refine system configuration as required
• Test customizations
• Continue knowledge transfer and make end
  users comfortable with their roles
• Identify and resolve resource issues
• Clarify go-live training needs
• Refine the initial security matrix


                                                20
System Activation – “Go Live”

• Assuming the new system is
  –   Configured properly
  –   Tested
  –   People are ready
  –   Processes are documented
• Cutover
• Go-Live
• Retire / shutdown legacy system




                                    21
The Group Responsibly Matrix
 Roles in the System Implementation
               Project   Application   System   System     System
              Planning   Exploration   Design   Testing   Activation
Sr.            HIGH         Low         Low      Low        HIGH
Management
Project        HIGH       Medium        Low      Low        HIGH
Managers
End Users       Low        HIGH         HIGH    HIGH        HIGH

Internal      Medium        Low        Medium   HIGH        HIGH
Technical
Resources
Consultants   Medium       HIGH         HIGH    HIGH        HIGH




                                                                       22
Red Flags

• 400 line project plan with no
  resources
• No full time Project Manager or
  process
• Corner office is dictating how the
  system should be configured
• No risk analysis performed
• Employees do not understand
  why this is being done



                                       23
Things to Remember….


• Spend time on planning

• Allow for changes / updates

• Celebrate the go live event




                                24
About KeyedIn Consulting Group




Experts providing solutions to specific problems
   – Business and IT Alignment
   – People and Process Alignment
   – Enterprise Software Selection
   – Project Rescue
   – Project Management & PMO Managed Services


                                                   25
Follow KeyedIn



       Corporate Website: www.keyedin.com



       www.twitter.com/keyedinsolution



       www.linkedin.com/company/2434133?trk=tyah




                                                   26
Free Whitepapers

Download
@
www.keyedin.com




                   27
Upcoming Webinars



7/27/12   Enterprise System Implementation Strategies and Phases
7/31/12   Project Teams: People Issues, Roles and Responsibilities




                         Register at
                       www.keyedin.com


                                                                     28
Questions & Answers




Q A       &
   Copy of Presentation   Future Webinars

          Contact:
         Shelly Bird           Visit:
    sbird@keyedin.com     www.keyedin.com
   952-835-1041 ext.163

More Related Content

PPTX
Datadogoverview.pptx
PDF
SAP CPI-DS.pdf
PDF
SAP ASAP 8 Methodology
PDF
SAP HANA Use Cases in 27 Industries
PPTX
MongoDB for Time Series Data Part 2: Analyzing Time Series Data Using the Agg...
PDF
Upgrade Preparation Best Practices & Templates | INNOVATE16
PPTX
Simple Salesforce Data Migration
PPT
Data Center Migration
Datadogoverview.pptx
SAP CPI-DS.pdf
SAP ASAP 8 Methodology
SAP HANA Use Cases in 27 Industries
MongoDB for Time Series Data Part 2: Analyzing Time Series Data Using the Agg...
Upgrade Preparation Best Practices & Templates | INNOVATE16
Simple Salesforce Data Migration
Data Center Migration

What's hot (20)

PDF
Rise with SAP
PDF
SAP S/4HANA Migration Cockpit
PDF
SAP S4HANA Migration Cockpit.pdf
PPTX
Sap Cloud Migration
PDF
A Guide to a Successful SAP Hybris Commerce Cloud Project
PPTX
SAP Activate Overview
PDF
Custom policies in mule 4 and a circuit breaker example
PPTX
SAP C4C Introduction - Business Scenario
PDF
SAP ERP Solutions - How It Evolved Over Time
PPTX
SAP HANA Migration Deck.pptx
ODP
Monitoring via Datadog
PDF
eDocumentus for IBM Maximo
PPTX
Transition to SAP S/4HANA System Conversion: A step-by-step guide
PDF
Sizing sap s 4 hana using the quick sizer tool
PPTX
Observability vs APM vs Monitoring Comparison
PPTX
2015 04 Preparing for the SAP S/4HANA Migration
PPTX
Oracle Project Financial Management Cloud in 9 Weeks
PDF
Combining Logs, Metrics, and Traces for Unified Observability
PPT
Data Management and Migration in Salesforce
PDF
Oracle University - Your Complete Training Source for Oracle Software and Har...
Rise with SAP
SAP S/4HANA Migration Cockpit
SAP S4HANA Migration Cockpit.pdf
Sap Cloud Migration
A Guide to a Successful SAP Hybris Commerce Cloud Project
SAP Activate Overview
Custom policies in mule 4 and a circuit breaker example
SAP C4C Introduction - Business Scenario
SAP ERP Solutions - How It Evolved Over Time
SAP HANA Migration Deck.pptx
Monitoring via Datadog
eDocumentus for IBM Maximo
Transition to SAP S/4HANA System Conversion: A step-by-step guide
Sizing sap s 4 hana using the quick sizer tool
Observability vs APM vs Monitoring Comparison
2015 04 Preparing for the SAP S/4HANA Migration
Oracle Project Financial Management Cloud in 9 Weeks
Combining Logs, Metrics, and Traces for Unified Observability
Data Management and Migration in Salesforce
Oracle University - Your Complete Training Source for Oracle Software and Har...
Ad

Viewers also liked (20)

PPT
Chapter17 system implementation
PPT
Enterprise Systems
PPT
ERP Implementation Life Cycle
PPT
Enterprise Systems: SCM, CRM, & ERP
PPT
11.file system implementation
PPT
Chapter09 logic modeling
PDF
Psdot 3 building and maintaining trust in internet voting with biometrics aut...
PDF
L10 system implementation
PPT
Chapter10 conceptual data modeling
PPTX
Net income (ni) approach
PPTX
Organizational Assessment Models
PPTX
Benefits of erp
PDF
Erp implementation methodologies_ph_d_book
PPT
Organizational Design And Assessment Overview And Process
PPT
ERP implementation
PPTX
MIS 18 Enterprise Management System
PPTX
Organizational diagnosis ppt
PPT
Organizational Diagnosis
 
PPTX
ERP implementation
PPT
Organization Development - Intervention Processes
Chapter17 system implementation
Enterprise Systems
ERP Implementation Life Cycle
Enterprise Systems: SCM, CRM, & ERP
11.file system implementation
Chapter09 logic modeling
Psdot 3 building and maintaining trust in internet voting with biometrics aut...
L10 system implementation
Chapter10 conceptual data modeling
Net income (ni) approach
Organizational Assessment Models
Benefits of erp
Erp implementation methodologies_ph_d_book
Organizational Design And Assessment Overview And Process
ERP implementation
MIS 18 Enterprise Management System
Organizational diagnosis ppt
Organizational Diagnosis
 
ERP implementation
Organization Development - Intervention Processes
Ad

Similar to Enterprise system implementation strategies and phases (20)

PPTX
Darim's Synagogue Data Series, Part 3
PDF
Why organizations maintain legacy systems
PDF
chapter11-120827115420-phpapp01.pdf
PPTX
Chapter 11 Managing Systems Implementation .pptx
PPT
Sysdev
PDF
Key Considerations for a Successful Hyperion Planning Implementation
PPTX
Improving UX through Application Lifecycle Management
PDF
Living in a fantasy world – theoretical system implementations
PDF
Подборка о рисках ИТ-проектов
PDF
PPTX
Agile marries itil
PDF
Software Engineering The Multiview Approach And Wisdm
PDF
Erp 20090521
PDF
Aras Innovator PLM Deployment Methodology
PDF
Why organizations implement new systems
PPTX
CS 414 (IT Project Management)
PPT
Entre3
PPT
IIIT Guest Talk 0512
PPTX
Project Mangement
PPTX
3B - How to effectively engage users and managers in IT projects - Richard Co...
 
Darim's Synagogue Data Series, Part 3
Why organizations maintain legacy systems
chapter11-120827115420-phpapp01.pdf
Chapter 11 Managing Systems Implementation .pptx
Sysdev
Key Considerations for a Successful Hyperion Planning Implementation
Improving UX through Application Lifecycle Management
Living in a fantasy world – theoretical system implementations
Подборка о рисках ИТ-проектов
Agile marries itil
Software Engineering The Multiview Approach And Wisdm
Erp 20090521
Aras Innovator PLM Deployment Methodology
Why organizations implement new systems
CS 414 (IT Project Management)
Entre3
IIIT Guest Talk 0512
Project Mangement
3B - How to effectively engage users and managers in IT projects - Richard Co...
 

More from John Cachat (20)

PDF
Apqp for wind energy 2.0 sep 10 2020
PDF
APQP PPAP supplier software overview mar 12 2020
PDF
Stop managing ppap submissions with xls and email mar 2 2020
PDF
As9145 readiness survey initial results feb 18 2020 cachat
PDF
Agile project management Overview May 2014 John Cachat
PDF
Why people should think about end of-life issues Apr 21 2014
PDF
Near Death Awareness During End of Life Apr 21 2014
PDF
Integration technology to solve business problems in manufacturing
PDF
Generation of idiots on cell phones
PDF
Deming 14 points survey 2010 from john cachat
PDF
What all quality professionals must know about cf os april 2013
PDF
Tired of cumbersome xls april 2013
PDF
Software validation do's and dont's may 2013
PDF
Integration technology to solve business problems in manufacturing may 2013
PDF
Harmonize your qms model to meet iso 13485 regulations april 2013
PDF
Engineering change management webinar april 2013
PDF
Document management 201
PDF
Document management 101 may 2013
PDF
Bridging the gap between quality and finance may 2013
PDF
Apqp bumming you out briefing may 30 2013
Apqp for wind energy 2.0 sep 10 2020
APQP PPAP supplier software overview mar 12 2020
Stop managing ppap submissions with xls and email mar 2 2020
As9145 readiness survey initial results feb 18 2020 cachat
Agile project management Overview May 2014 John Cachat
Why people should think about end of-life issues Apr 21 2014
Near Death Awareness During End of Life Apr 21 2014
Integration technology to solve business problems in manufacturing
Generation of idiots on cell phones
Deming 14 points survey 2010 from john cachat
What all quality professionals must know about cf os april 2013
Tired of cumbersome xls april 2013
Software validation do's and dont's may 2013
Integration technology to solve business problems in manufacturing may 2013
Harmonize your qms model to meet iso 13485 regulations april 2013
Engineering change management webinar april 2013
Document management 201
Document management 101 may 2013
Bridging the gap between quality and finance may 2013
Apqp bumming you out briefing may 30 2013

Recently uploaded (20)

PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PPT
Data mining for business intelligence ch04 sharda
PDF
Hindu Circuler Economy - Model (Concept)
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Lecture 3 - Risk Management and Compliance.pdf
PDF
A Brief Introduction About Julia Allison
PDF
Business model innovation report 2022.pdf
PPTX
DMT - Profile Brief About Business .pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
Starting the business from scratch using well proven technique
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Data mining for business intelligence ch04 sharda
Hindu Circuler Economy - Model (Concept)
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
HR Introduction Slide (1).pptx on hr intro
Chapter 5_Foreign Exchange Market in .pdf
Probability Distribution, binomial distribution, poisson distribution
340036916-American-Literature-Literary-Period-Overview.ppt
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
Laughter Yoga Basic Learning Workshop Manual
Lecture 3 - Risk Management and Compliance.pdf
A Brief Introduction About Julia Allison
Business model innovation report 2022.pdf
DMT - Profile Brief About Business .pptx
Euro SEO Services 1st 3 General Updates.docx
Starting the business from scratch using well proven technique
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...

Enterprise system implementation strategies and phases

  • 2. Housekeeping Phones are muted Use the question block for questions Copy of presentation available upon request
  • 3. About Your Presenter • Sr. VP KeyedIn Solutions Consulting Group – Helping companies align their business and technology – Focus on people, process, and then the technology – Subject matter expert on business process management – On-going research into next generation of technology for enterprise systems • 25 years experience in enterprise systems – USAF Research Project (1985) – Founder of enterprise quality software company (1988) • Trusted advisor to global organizations, government agencies, and professional groups http://www.linkedin.com/in/johncachat
  • 4. Thought for the Day “The value of an idea lies in the using of it.” Thomas Alva Edison 4
  • 5. Driving from Point A to Point B • Wrong directions guarantee poor results • GPS provides the plan • Then stuff happens – Construction – Traffic – Accident • Adjust and arrive 5
  • 6. Today’s Discussion • Implementation Strategies – Full blown – Staggered or Phased • Implementation Phases – Project planning – Application exploration – System design – System testing – System activation – “go live”
  • 7. Full Blown Approach Everything, everywhere, at the same time Pros Cons Less integrations with legacy system Lesson learned can not be transferred need to be developed to other sites Can eliminate legacy system Short term, more intensive consultant maintenance fees faster support and therefore more expensive More room for failure – too many moving parts Requires strong project management 7
  • 8. Staggered or Phased Approach Different stuff, at different sites (departments), at different times Pros Cons Less consultant intensive Temporary interfaces may have to be built Problem areas can be separated out Have to pay maintenance on legacy Internal employees may be able to take systems for a long period of time over in later phases Less room for failure 8
  • 9. Implementation Strategies • Which approach is best? • It is probably better to win a series of battles then risk losing the war! • Which has the highest probability of success? • How much can your company absorb at one time? 9
  • 10. Implementation Phases • Transition from legacy to new system – Project planning – Application exploration – System design – System testing – System activation – “go live” 10
  • 11. Project Planning • First we have to figure out what we are going to do before we figure out how we are going to do it • Magnitude, duration, and cost • Resources • Risk Management • IT IS NOT GANTT CHARTS! 11
  • 12. Project Planning • Living documents • Communication tools – Issue Management – Status Reporting • Take the time to do it right 12
  • 13. Application Exploration • Users and consultants sit down in front of the app and explore the functionality • Use training or demo data – do not use an empty version • Goal is to get end users familiar with the system, how to navigate, and understand the options available • Objective is to get the end users more knowledgeable so that they can ask better questions 13
  • 14. Application Exploration Objectives • Begin the process of knowledge transfer from consultant to end user • Identify gaps • Explore different configurations / set up options • Discuss in and out of scope concerns 14
  • 15. System Design • Configure the system • Organizational structure • Reporting • Security • Key files (customer, employee, supplier, etc) • Avoid overthinking and cumbersome setups • Use best practices • Avoid customizations 15
  • 16. Customization • Avoid at all costs, really – stay vanilla • Customization is not configuration Customization – Bad Configuration - OK • Changing source code • OEM tools that change screens • Changing data structures • Workflow engines • Changing business rules / triggers • Report Writers (be careful) • Changing batch programs 16
  • 17. The KeyedIn Approach • Use the software “as is out of the box” • Use BPM to develop specific solutions for your specific needs 17
  • 18. System Design Objectives • Continue the knowledge transfer starting with application exploration • Establish the framework for the system • Finalize and document the customer’s desired system configuration • Setup the initial security configuration 18
  • 19. Types Of System Testing Type Description Parallel Testing Users test an entire process, like running payroll, and compare to results from legacy system Stress testing Users “pound” the system – number of users, response time, running reports System integration Users test the entire process – from start to finish, across testing integration point3 Unit Testing Users test specific scenarios – not the entire process – make sure this thing works User acceptance Users follow specific test scripts – a comprehensive set of testing (UAT) instructions to verify system does what it is intended to do Note: System testing versus system validation 19
  • 20. System Testing Objectives • Discover, document, and resolve any design, data, processing or application issues • Refine system configuration as required • Test customizations • Continue knowledge transfer and make end users comfortable with their roles • Identify and resolve resource issues • Clarify go-live training needs • Refine the initial security matrix 20
  • 21. System Activation – “Go Live” • Assuming the new system is – Configured properly – Tested – People are ready – Processes are documented • Cutover • Go-Live • Retire / shutdown legacy system 21
  • 22. The Group Responsibly Matrix Roles in the System Implementation Project Application System System System Planning Exploration Design Testing Activation Sr. HIGH Low Low Low HIGH Management Project HIGH Medium Low Low HIGH Managers End Users Low HIGH HIGH HIGH HIGH Internal Medium Low Medium HIGH HIGH Technical Resources Consultants Medium HIGH HIGH HIGH HIGH 22
  • 23. Red Flags • 400 line project plan with no resources • No full time Project Manager or process • Corner office is dictating how the system should be configured • No risk analysis performed • Employees do not understand why this is being done 23
  • 24. Things to Remember…. • Spend time on planning • Allow for changes / updates • Celebrate the go live event 24
  • 25. About KeyedIn Consulting Group Experts providing solutions to specific problems – Business and IT Alignment – People and Process Alignment – Enterprise Software Selection – Project Rescue – Project Management & PMO Managed Services 25
  • 26. Follow KeyedIn Corporate Website: www.keyedin.com www.twitter.com/keyedinsolution www.linkedin.com/company/2434133?trk=tyah 26
  • 28. Upcoming Webinars 7/27/12 Enterprise System Implementation Strategies and Phases 7/31/12 Project Teams: People Issues, Roles and Responsibilities Register at www.keyedin.com 28
  • 29. Questions & Answers Q A & Copy of Presentation Future Webinars Contact: Shelly Bird Visit: sbird@keyedin.com www.keyedin.com 952-835-1041 ext.163