SlideShare a Scribd company logo
URBACT LAB 1
SESSION 3
Action
Planning
FEEDBACK FROM ULSG 2
• What was useful?
• What was difficult?
URBACT LAB 1 SESSION 3 2
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 3
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 4
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 5
THE CONCEPT OF ‘ACTION PLANNING’
• Moving from defining problems and expected results to
determining actions designed to achieve them and
indicators to measure your success
• A critical stage - requires careful timing and
management
• Local Support Group involvement vital
• Co-creation delivers better action plans
URBACT LAB 1 SESSION 3 6
WHERE ARE WE IN PLANNING CYCLE MODEL?
URBACT LAB 1 SESSION 1 7
Problems
Stakeholders
Evidence
Results
Ideas
Actions
Resources
Check
Consultation
Launch
Problems
Stakeholders
Evidence
Results
Ideas
Actions
Resources
Check
Consultation
Launch
ACTION PLANS
• Coherent set of tangible actions in response to the
expected results
• Stakeholder involvement – roles and responsibilities
• Clear timeline (1,3,5,10 year plan?)
• Link to 2014-2020 results framework (results, actions,
outputs, indicators)
• What-How-Who-When-Where?
URBACT LAB 1 SESSION 3 8
DEVELOPING AN ACTION TABLE
URBACT LAB 1 SESSION 3 9
ACTION TABLE
Expected result Reduced motorised traffic in the city centre to 50% of 1990 figures
Action Title & Short
Description
Lead Actor or
Agency
Key Partners Intended
Outputs
Timescale Resources per annum
1.1 Introduction of smart
traffic charging scheme
Establishment of charging
perimeter and installation
smart control infrastructure
Municipality –
Transport
Dept.
- Police
- Private IT
company
- Parking Authority
- Motorist
organisations
- Media
Lower % of
daily
commuter
car journeys
December 2015 ?
1.2 Programme of
pedestrianisation and redesign
of public open space
1.3 Increase public transport
offer
1.4 Extend and improve cycle
network
1.5 Reorganise parking system
(offer and access routes)
…
THE ESIMeC EXPERIENCE – 1 SABADELL
URBACT LAB 1 SESSION 3 10
Actions Objective1, Action 1 Objective 1 Action 2
Description Effective use of the “one-stop window”
office: Increase collaboration between
organisations that provide services to
businesses in the city
Re draft the local agreement to enhance
employment and competitiveness in Sabadell
Duration June 2012 - June 2013 December 2012
Resources Own resources Own resources
Actors Local Development Agency
CIESC, Chamber of commerce, ASCAMM,
LEITAT, Secot
Local Development Agency
CIESC, Chamber of commerce, ASCAMM,
LEITAT, Secot
Activities To update agreements with other entities
in Sabadell city.
To collect an updated list of contacts for
local organizations collaborating with the
office
To join information already obtained by all
the entities concerning skills needs by the
business.
3 meetings with the members stating the
agreement
Include new relevant parties in the new
economic framework of the city
Results Short term we expect greater flexibility in
solving specific problems of the business
sector
Also is expected to increase confidence in
the administration
Achieving a consensus position with the
agreement of all organizations face new
challenges.
Emphasize demand led workforce
development in a strategic document for the
city
Q&A
• Questions on action planning
• Experiences?
URBACT LAB 1 SESSION 3 11
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 12
GOOD PLANS AND DECISIONS
URBACT LAB 1 SESSION 3 13
Content (C)
People (P)
motivation
commitment
enthusiasm
Quality of a plan
or decision =CxP
Source: GROUP EXPO by Veikko Mantere
STRUCTURE AND PARTICIPATION
URBACT LAB 1 SESSION 3 14
Participative meeting
methods
Conventional meeting
led by a chairperson
Agora, meeting on equal
terms, panel
Group meetings
dominated by one or a
small number of
participants
Clear meeting structure
No or poor structure
Strong
participation
Weak
participation
Joint
view of the
participants
The
chairperson’s
view
The most
powerful
participants’ view
Each participant
has his or her
own view
SOME METHODS TO
GENERATE ACTIVITIES
URBACT LAB 1 SESSION 3 15
DE BONO THINKING HATS
URBACT LAB 1 SESSION 3 16
DE BONO THINKING HATS
URBACT LAB 1 SESSION 3 17
OPERA
URBACT LAB 1 SESSION 3 18
wn suggestions
air discussions
xplanations
anking
rranging
O
P
E
R
A
START – STOP - CONTINUE
URBACT LAB 1 SESSION 3 19
START STOP continue
• …………
• …...........
• ………….
• ………….
• …………..
• …………
• …...........
• ………….
• ………….
• …………..
• …………
• …...........
• ………….
• ………….
• …………..
IMPACT / EFFORT MATRIX
URBACT LAB 1 SESSION 3 20
EFFORT
IMPACT
LOW
HIGH
HIGH
USEFUL RESOURCES
• URBACT Guide - GETTING RESULTS THROUGH ANIMATED
MEETINGS: SEVEN TOP TIPS
• Dave Gray – Sunni Brown – James Macafuno: GAMESTORMING –
A Playbook for Innovators, Rulebreakers, and Changemakers
URBACT LAB 1 SESSION 3 21
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 22
RESOURCES – KEY PRINCIPLES
URBACT LAB 1 SESSION 3 23
Vision
Strategy
Expected
Results
Actions
Projects
RESOURCES
RESOURCES – KEY PRINCIPLES
• Resources are the means to an end – not an end in
themselves
• Funding is just one example of resources
URBACT LAB 1 SESSION 3 24
RESOURCES – KEY PRINCIPLES
• Be clear about what you want to achieve and what you
need € for
• Explore wide range of potential funding sources
• Create a funding ‘cocktail’
• Be creative but realistic
• Consider monitoring requirements
URBACT LAB 1 SESSION 3 25
FUNDING – KEY SOURCES
• European – CP 2014-2020
• National and Regional
• ‘New’ instruments / methods
– Crowd funding
– Public private partnerships
– Doing more with less – citizens, self organisation
URBACT LAB 1 SESSION 3 26
DISCUSSION ON RESOURCES
• Experiences
• Future funding opportunities in your country
• Any experience with non traditional sources (crowd
sourcing? revolving funds etc?)
URBACT LAB 1 SESSION 3 27
LAB 3
• Feedback on ULSG at work
• PART 1 -DESIGNING AN ACTION PLAN
– Key principles
– Ensuring participation
• PART 2 – RESOURCES
• PART 3 – PREPARATION FOR ULSG AT WORK
URBACT LAB 1 SESSION 3 28
ULSG@WORK 3
• Objective: to develop a coherent set of actions
• Tasks: to brainstorm ideas using De Bono Hats and to
record and structure the best using OPERA
• Tools: Action table, De Bono Hats and OPERA
• Deliverables: Action chart filled in (poster)
URBACT LAB 1 SESSION 3 29
WHAT NEXT?
• 15:30 to 17:30 ULSG@work-3
• Free evening
• Friday
– 0900 URBACT Talk
– LAB and ULSG@work 4 (Checking / assessment LAP) and
preparing for
– LAB 5 (Dragons’ Den – The contest)
– Awards Ceremony
– PARTY!!
URBACT LAB 1 SESSION 3 30

More Related Content

PPTX
URBACT Summer University 2013 - Labs - Human Capital - Session 3
PPTX
URBACT Summer University 2013 - Labs - Attractive cities for young people - S...
PPTX
URBACT Summer University 2013 - Labs - 21st Century Public Services - Session 3
PPTX
URBACT Summer University 2013 - Labs - Low Carbon Transition - Session 3
PPTX
URBACT Summer University 2013 - Labs - 21st Century Public Services - Session 1
PPTX
URBACT Summer University 2013 - Labs - Shared Public Space - Session 3
PPTX
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 3
PPT
Plan making - getting your plan in place (July 2013)
URBACT Summer University 2013 - Labs - Human Capital - Session 3
URBACT Summer University 2013 - Labs - Attractive cities for young people - S...
URBACT Summer University 2013 - Labs - 21st Century Public Services - Session 3
URBACT Summer University 2013 - Labs - Low Carbon Transition - Session 3
URBACT Summer University 2013 - Labs - 21st Century Public Services - Session 1
URBACT Summer University 2013 - Labs - Shared Public Space - Session 3
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 3
Plan making - getting your plan in place (July 2013)

Viewers also liked (8)

PPTX
URBACT Summer University 2013 - Labs - Shared Public Space - Session 4
PPT
Summer University 2013: URBACT Talk - Furio Honsell: Leadership and European ...
PPTX
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 2
PPTX
URBACT Summer University 2013 - Labs - Shared Public Space - Session 1
PPTX
URBACT Summer University 2013 - Labs - Open Innovation - Session 3
PPTX
URBACT Summer University 2013 - Labs - Human Capital - Session 2
PPTX
URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 1
PPTX
URBACT Summer University 2013 - Labs - Open Innovation - Session 1
URBACT Summer University 2013 - Labs - Shared Public Space - Session 4
Summer University 2013: URBACT Talk - Furio Honsell: Leadership and European ...
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 2
URBACT Summer University 2013 - Labs - Shared Public Space - Session 1
URBACT Summer University 2013 - Labs - Open Innovation - Session 3
URBACT Summer University 2013 - Labs - Human Capital - Session 2
URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 1
URBACT Summer University 2013 - Labs - Open Innovation - Session 1
Ad

Similar to URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 3 (20)

PPTX
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 1
PPTX
Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...
PPTX
URBACT Summer University 2013 - Labs - Low Carbon Transition - Session 1
PPTX
URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 2
PPTX
URBACT Summer University 2013 - Labs - Attractive cities for young people - S...
PPT
Main PRA.ppt
PPTX
URBACT Summer University 2013 - Labs - Human Capital - Session 1
PPTX
URBACT Summer University 2013 - Labs - Human Capital - Session 4
PPTX
URBACT Summer University 2013 - Labs - Open Innovation - Session 4
PPTX
Evaluation pal program monitoring and evaluation technology
PPTX
Introduction to Prelida
PPTX
Consultation workshop on RRI - English
PPTX
URBACT Summer University 2013 - Labs - Open Innovation - Session 2
PPT
Logical Framework And Project Proposal
PDF
Interreg Sudoe TWIST - Common Strategy
PDF
lfatrainingday1slides.pdf
PPTX
Scaling better, together: An outline of ILRI’s approach to scaling
PDF
Monitoring & Evaluation learning and exchange forum
PPTX
Creu Cymru Emergence - Introductory Webinar
PPTX
Gilly Salmon Carpe Diem August 2015
URBACT Summer University 2013 - Labs - Mixed Use of City Centers - Session 1
Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...
URBACT Summer University 2013 - Labs - Low Carbon Transition - Session 1
URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 2
URBACT Summer University 2013 - Labs - Attractive cities for young people - S...
Main PRA.ppt
URBACT Summer University 2013 - Labs - Human Capital - Session 1
URBACT Summer University 2013 - Labs - Human Capital - Session 4
URBACT Summer University 2013 - Labs - Open Innovation - Session 4
Evaluation pal program monitoring and evaluation technology
Introduction to Prelida
Consultation workshop on RRI - English
URBACT Summer University 2013 - Labs - Open Innovation - Session 2
Logical Framework And Project Proposal
Interreg Sudoe TWIST - Common Strategy
lfatrainingday1slides.pdf
Scaling better, together: An outline of ILRI’s approach to scaling
Monitoring & Evaluation learning and exchange forum
Creu Cymru Emergence - Introductory Webinar
Gilly Salmon Carpe Diem August 2015
Ad

More from URBACT (20)

PDF
Walter Deffaa Mumbai World Cities Presentation 25-05-15
PPT
URBACT presentation 16 may 2014
PPTX
URBACT III – Future Orientations
PPT
Finance & PRESAGE Presentation
PPT
Transfer Pilots Plenary - Transnational Exchanges (30.01)
PPT
Project Management and Finance
PPT
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
PPT
Transfer Pilots Plenary - Baseline Presentation (29.01)
PPTX
Programme and Pilots Overview
PPT
Structural Youth Unemployment and Local Development Strategies
PPTX
Sustainable Cities. Setting the Scene
PPTX
URBACT Project USER in RIGA
PPTX
Cities as Arenas of Low-Carbon Transition? Analysing the Cases of Graz and Fr...
PPT
Jobtown Project. Avilés
PPTX
Peer Review Session: Municipality of Suceava
PPT
Sustainable Urban Markets: Municipality of Suceava, Romania
PDF
City of Trieste
PPTX
Transitions to Sustainability and the Role of Policy
PDF
Lublin - Partner of EUniverCities
PPTX
Ourense City and Integrated Urban Planning
Walter Deffaa Mumbai World Cities Presentation 25-05-15
URBACT presentation 16 may 2014
URBACT III – Future Orientations
Finance & PRESAGE Presentation
Transfer Pilots Plenary - Transnational Exchanges (30.01)
Project Management and Finance
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
Transfer Pilots Plenary - Baseline Presentation (29.01)
Programme and Pilots Overview
Structural Youth Unemployment and Local Development Strategies
Sustainable Cities. Setting the Scene
URBACT Project USER in RIGA
Cities as Arenas of Low-Carbon Transition? Analysing the Cases of Graz and Fr...
Jobtown Project. Avilés
Peer Review Session: Municipality of Suceava
Sustainable Urban Markets: Municipality of Suceava, Romania
City of Trieste
Transitions to Sustainability and the Role of Policy
Lublin - Partner of EUniverCities
Ourense City and Integrated Urban Planning

Recently uploaded (20)

DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPTX
HR Introduction Slide (1).pptx on hr intro
PPTX
Principles of Marketing, Industrial, Consumers,
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPT
Chapter four Project-Preparation material
PPTX
Lecture (1)-Introduction.pptx business communication
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
unit 1 COST ACCOUNTING AND COST SHEET
Chapter 5_Foreign Exchange Market in .pdf
Roadmap Map-digital Banking feature MB,IB,AB
Lecture 3344;;,,(,(((((((((((((((((((((((
Nidhal Samdaie CV - International Business Consultant
Ôn tập tiếng anh trong kinh doanh nâng cao
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
2025 Product Deck V1.0.pptxCATALOGTCLCIA
HR Introduction Slide (1).pptx on hr intro
Principles of Marketing, Industrial, Consumers,
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
ICG2025_ICG 6th steering committee 30-8-24.pptx
Chapter four Project-Preparation material
Lecture (1)-Introduction.pptx business communication
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
COST SHEET- Tender and Quotation unit 2.pdf
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider

URBACT Summer University 2013 - Labs - Promoting Entrepreneurship - Session 3

  • 1. URBACT LAB 1 SESSION 3 Action Planning
  • 2. FEEDBACK FROM ULSG 2 • What was useful? • What was difficult? URBACT LAB 1 SESSION 3 2
  • 3. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 3
  • 4. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 4
  • 5. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 5
  • 6. THE CONCEPT OF ‘ACTION PLANNING’ • Moving from defining problems and expected results to determining actions designed to achieve them and indicators to measure your success • A critical stage - requires careful timing and management • Local Support Group involvement vital • Co-creation delivers better action plans URBACT LAB 1 SESSION 3 6
  • 7. WHERE ARE WE IN PLANNING CYCLE MODEL? URBACT LAB 1 SESSION 1 7 Problems Stakeholders Evidence Results Ideas Actions Resources Check Consultation Launch Problems Stakeholders Evidence Results Ideas Actions Resources Check Consultation Launch
  • 8. ACTION PLANS • Coherent set of tangible actions in response to the expected results • Stakeholder involvement – roles and responsibilities • Clear timeline (1,3,5,10 year plan?) • Link to 2014-2020 results framework (results, actions, outputs, indicators) • What-How-Who-When-Where? URBACT LAB 1 SESSION 3 8
  • 9. DEVELOPING AN ACTION TABLE URBACT LAB 1 SESSION 3 9 ACTION TABLE Expected result Reduced motorised traffic in the city centre to 50% of 1990 figures Action Title & Short Description Lead Actor or Agency Key Partners Intended Outputs Timescale Resources per annum 1.1 Introduction of smart traffic charging scheme Establishment of charging perimeter and installation smart control infrastructure Municipality – Transport Dept. - Police - Private IT company - Parking Authority - Motorist organisations - Media Lower % of daily commuter car journeys December 2015 ? 1.2 Programme of pedestrianisation and redesign of public open space 1.3 Increase public transport offer 1.4 Extend and improve cycle network 1.5 Reorganise parking system (offer and access routes) …
  • 10. THE ESIMeC EXPERIENCE – 1 SABADELL URBACT LAB 1 SESSION 3 10 Actions Objective1, Action 1 Objective 1 Action 2 Description Effective use of the “one-stop window” office: Increase collaboration between organisations that provide services to businesses in the city Re draft the local agreement to enhance employment and competitiveness in Sabadell Duration June 2012 - June 2013 December 2012 Resources Own resources Own resources Actors Local Development Agency CIESC, Chamber of commerce, ASCAMM, LEITAT, Secot Local Development Agency CIESC, Chamber of commerce, ASCAMM, LEITAT, Secot Activities To update agreements with other entities in Sabadell city. To collect an updated list of contacts for local organizations collaborating with the office To join information already obtained by all the entities concerning skills needs by the business. 3 meetings with the members stating the agreement Include new relevant parties in the new economic framework of the city Results Short term we expect greater flexibility in solving specific problems of the business sector Also is expected to increase confidence in the administration Achieving a consensus position with the agreement of all organizations face new challenges. Emphasize demand led workforce development in a strategic document for the city
  • 11. Q&A • Questions on action planning • Experiences? URBACT LAB 1 SESSION 3 11
  • 12. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 12
  • 13. GOOD PLANS AND DECISIONS URBACT LAB 1 SESSION 3 13 Content (C) People (P) motivation commitment enthusiasm Quality of a plan or decision =CxP Source: GROUP EXPO by Veikko Mantere
  • 14. STRUCTURE AND PARTICIPATION URBACT LAB 1 SESSION 3 14 Participative meeting methods Conventional meeting led by a chairperson Agora, meeting on equal terms, panel Group meetings dominated by one or a small number of participants Clear meeting structure No or poor structure Strong participation Weak participation Joint view of the participants The chairperson’s view The most powerful participants’ view Each participant has his or her own view
  • 15. SOME METHODS TO GENERATE ACTIVITIES URBACT LAB 1 SESSION 3 15
  • 16. DE BONO THINKING HATS URBACT LAB 1 SESSION 3 16
  • 17. DE BONO THINKING HATS URBACT LAB 1 SESSION 3 17
  • 18. OPERA URBACT LAB 1 SESSION 3 18 wn suggestions air discussions xplanations anking rranging O P E R A
  • 19. START – STOP - CONTINUE URBACT LAB 1 SESSION 3 19 START STOP continue • ………… • …........... • …………. • …………. • ………….. • ………… • …........... • …………. • …………. • ………….. • ………… • …........... • …………. • …………. • …………..
  • 20. IMPACT / EFFORT MATRIX URBACT LAB 1 SESSION 3 20 EFFORT IMPACT LOW HIGH HIGH
  • 21. USEFUL RESOURCES • URBACT Guide - GETTING RESULTS THROUGH ANIMATED MEETINGS: SEVEN TOP TIPS • Dave Gray – Sunni Brown – James Macafuno: GAMESTORMING – A Playbook for Innovators, Rulebreakers, and Changemakers URBACT LAB 1 SESSION 3 21
  • 22. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 22
  • 23. RESOURCES – KEY PRINCIPLES URBACT LAB 1 SESSION 3 23 Vision Strategy Expected Results Actions Projects RESOURCES
  • 24. RESOURCES – KEY PRINCIPLES • Resources are the means to an end – not an end in themselves • Funding is just one example of resources URBACT LAB 1 SESSION 3 24
  • 25. RESOURCES – KEY PRINCIPLES • Be clear about what you want to achieve and what you need € for • Explore wide range of potential funding sources • Create a funding ‘cocktail’ • Be creative but realistic • Consider monitoring requirements URBACT LAB 1 SESSION 3 25
  • 26. FUNDING – KEY SOURCES • European – CP 2014-2020 • National and Regional • ‘New’ instruments / methods – Crowd funding – Public private partnerships – Doing more with less – citizens, self organisation URBACT LAB 1 SESSION 3 26
  • 27. DISCUSSION ON RESOURCES • Experiences • Future funding opportunities in your country • Any experience with non traditional sources (crowd sourcing? revolving funds etc?) URBACT LAB 1 SESSION 3 27
  • 28. LAB 3 • Feedback on ULSG at work • PART 1 -DESIGNING AN ACTION PLAN – Key principles – Ensuring participation • PART 2 – RESOURCES • PART 3 – PREPARATION FOR ULSG AT WORK URBACT LAB 1 SESSION 3 28
  • 29. ULSG@WORK 3 • Objective: to develop a coherent set of actions • Tasks: to brainstorm ideas using De Bono Hats and to record and structure the best using OPERA • Tools: Action table, De Bono Hats and OPERA • Deliverables: Action chart filled in (poster) URBACT LAB 1 SESSION 3 29
  • 30. WHAT NEXT? • 15:30 to 17:30 ULSG@work-3 • Free evening • Friday – 0900 URBACT Talk – LAB and ULSG@work 4 (Checking / assessment LAP) and preparing for – LAB 5 (Dragons’ Den – The contest) – Awards Ceremony – PARTY!! URBACT LAB 1 SESSION 3 30