Determine One way or two way slab
Slab C-E/5-8 = Ly/Lx
= 8.925/6.850
= 1.30<2
(Two way slab)
Slab D-E/2-5 = Ly/Lx
= 5.000/4.925
= 1.02<2
(Two way slab)
Slab E-F/3-5a = Ly/Lx
= 6.000/4.934
= 1.22<2
(Two way slab)
Slab self-weight = Thickness of slab x Density of concrete
= 0.15m x 24kN/m3
= 3.60kN/m2
Beam E/3-5a
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
Dead load
Beam Self Weight = Beam size x Density of concrete
= (0.15 x 0.30)m2 x 24kN/m3
= 1.08kN/m
Brick Wall Weight = Wall height x Wall thickness x Density of wall
= (3.5 x 0.15) m2 x 19 kN/m3
= 9.98 kN/m
Dead load on slab = Slab self weight x (Lx/2)
C-E/5-8 = 3.60kN/m x (6.850m/2)
= 12.33kN/m
Dead load on slab = Slab self weight x (Lx/2) x 2/3
D-E/2-5 = 3.60kN/m x (4.925m/2) x 2/3
= 5.91kN/m
Dead load on slab = Slab self weight x (Lx/2) x 2/3
E-F/3-5a = 3.60kN/m x (4.934m/2) x 2/3
= 5.92kN/m
Total dead load
on beam E/3-5 = (1.08+9.98+5.91+5.92)kN/m
= 22.89kN/m
on beam E/5-5a = (1.08+9.98+12.33+5.92)kN/m
= 29.31kN/m
3 5a
1.08kN/m
Slab C-E/5-8
12.33kN/m
Slab D-E/2-5
5.91kN/m
Slab E-F/3-5a
5.92kN/m
5
4.934m
1.009m3.925m
Total Dead Load
22.89 kN/m 29.31 kN/m
9.98kN/m
Brick wall weight
Beam self weight
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
Live load
Live load on slab = Live load (UBBL) x (Lx/2)
C-E/5-8 = 2.0kN/m2 x (6.850m/2)
= 6.85kN/m
Live load on slab = Live load (UBBL) x (Lx/2) x 2/3
D-E/2-5 = 2.0kN/m2 x (4.925m/2) x 2/3
= 3.28kN/m
Live load on slab = Live load (UBBL) x (Lx/2) x 2/3
E-F/3-5a = 1.5kN/m2 x (4.934m/2) x 2/3
= 2.47kN/m
Total live load
on beam E/3-5 = (3.28+2.47)kN/m
= 5.75kN/m
on beam E/5-5a = (6.85+2.47)kN/m
= 9.32kN/m
6.35kN/m
Slab D-E/2-5
Total Live Load
Slab C-E/5-8
3 5a
Slab E-F/3-5a
6.85kN/m
3.28kN/m
2.47 kN/m
5.75 kN/m 9.32 kN/m
5
4.934m
1.009m3.925m
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
The Ultimate load
For E/3-5
Ultimate load = Ultimate Dead Load+Ultimate Live load
= (22.89kN/m x 1.4) + (5.75kN/m x1.6)
= 41.25kN/m
For E/5-5a
= Ultimate Dead Load+Ultimate Live load
= (29.31kN/m x 1.4) + (9.32kN/m x1.6)
= 55.95kN/m
Point Load
Point load at point C/1a
= Reaction force B from beam B-D/3
= 159.22kN
Reaction forces
Total load on
For E/3-5 = 41.25kN/m x 3.925m
= 161.91kN
For E/5-5a = 55.95kN/m x 1.009m
= 56.45kN
∑Mb = 0
0 = Ra(4.934) - 161.91(2.972) - 159.22(1.009)
- 56.45(0.505)
4.934Ra = 670.36
Ra = 135.86kN
∑y = 0
0 = 135.86 - 161.91 - 159.22 - 56.45 + Rb
Rb = 241.72kN
The load factor that needs to be applied: 1.4 for dead load and 1.6 for
live load
159.22 kN
56.45 kN161.91 kN
159.22 kN
159.22 kN
159.22 kN
56.45 kN161.91 kN
Rb=241.72kNRa=135.86kN
RbRa
RbRa=135.86kN
3 5a
0.505m1.963m
41.25 kN/m 55.95 kN/m
Ultimate Load
56.45 kN161.91 kN
5
4.934m
1.009m3.925m
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
Load Diagram
Shear Diagram
x/3.925 = 26.05/(26.05+135.86)
x = 0.63
Bending moment
Area (+)
= 1/2(3.925-0.63)(135.86)
= 223.83 ≈ 224
Area (-)
= 1/2(0.63)(26.05) + 1/2(185.27+241.72)(1.009)
= 8.21 + 215.42
= 223.63 ≈ 224
3 5a5
4.934m
1.009m3.925m
135.86kN
-241.72kN
-26.05kN
-185.27kN
56.45 kN161.91 kN
Rb=241.72kNRa=135.86kN
159.22 kN
x
26.05 kN
135.86kN
3.925
224 kN
0 kN 0 kN
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
BLD61203 STRUCTURES
GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201

More Related Content

PDF
Lamyu 3
PDF
Lamyu 1
PDF
Lamyu 2
PDF
Lamyu column 1 e
PDF
One way slab load calculation
PDF
B structure
PPTX
Sambungan baut & las
Lamyu 3
Lamyu 1
Lamyu 2
Lamyu column 1 e
One way slab load calculation
B structure
Sambungan baut & las

What's hot (19)

PPTX
Water tank design ppt
DOCX
Preliminary design of beam
PDF
1 perhitungan-balok
PDF
Building Structures Report (Group and Individual)
DOCX
Preliminary design of slab
PDF
Building structure real
DOCX
design of stair case
PDF
Mechanics of materials
PDF
33406960 manual-desain-jembatan-baja-oleh-gilang-aditya
PDF
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
DOCX
Laporan prancangan struktur
DOC
CASE STUDY - STRUCTURAL DESIGN FOR MODERN INSULATOR'S SHUTTLE KILN ROOF
PDF
Building Structures Final Compilation
PDF
10-Design of Tension Member with Bolted Connection (Steel Structural Design &...
PDF
5b design of welded plate girder using EBS and IS
PDF
Cee 311(2)
PDF
Desain sengkang struktur beton bertulang
PPTX
L16 : Slope Deflection Method for Analysis of Indeterminate Beams
DOC
Fatigue lab
Water tank design ppt
Preliminary design of beam
1 perhitungan-balok
Building Structures Report (Group and Individual)
Preliminary design of slab
Building structure real
design of stair case
Mechanics of materials
33406960 manual-desain-jembatan-baja-oleh-gilang-aditya
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Laporan prancangan struktur
CASE STUDY - STRUCTURAL DESIGN FOR MODERN INSULATOR'S SHUTTLE KILN ROOF
Building Structures Final Compilation
10-Design of Tension Member with Bolted Connection (Steel Structural Design &...
5b design of welded plate girder using EBS and IS
Cee 311(2)
Desain sengkang struktur beton bertulang
L16 : Slope Deflection Method for Analysis of Indeterminate Beams
Fatigue lab
Ad

Similar to Lamyu 4 (20)

PDF
Building Structures_Project_02
PPTX
Oscar individual b structure report
PPTX
Building Structures Report
PDF
Building Structure Project 2 (Taylor's lakeside campus)
PDF
Hb structure
PDF
Building structures final
DOCX
Building Structure Project 2
PDF
Final structure report
DOCX
Chong yu xuan bstruc indi
PDF
Structural Analysis of a Bungalow
PDF
Individual Caluculation
DOCX
Beam and Column Analysis | Individual Component
PDF
individual part
PDF
B.structure report
PDF
Building Structure
PDF
Structure extension jun
PDF
Building Structure Project 2
PPTX
Structures
PDF
Building structure
PDF
Building Structure Project 2
Building Structures_Project_02
Oscar individual b structure report
Building Structures Report
Building Structure Project 2 (Taylor's lakeside campus)
Hb structure
Building structures final
Building Structure Project 2
Final structure report
Chong yu xuan bstruc indi
Structural Analysis of a Bungalow
Individual Caluculation
Beam and Column Analysis | Individual Component
individual part
B.structure report
Building Structure
Structure extension jun
Building Structure Project 2
Structures
Building structure
Building Structure Project 2
Ad

More from Lam Yu (20)

PPTX
Group presentation compiled and updated 2
PDF
Lamyu column 6 f (1)
PPTX
Estimating final
PPTX
Estimating presentation (final)
DOCX
Supply chain invidividual123123
DOCX
Supply chain invidividual
DOCX
Ms (1)
DOCX
Sc bim
PPTX
Bs1 (1)
PDF
Final ct aa slides
PDF
Smart tunnel
PDF
Bs finallll (1)
PDF
Site surveying-almost-1
PDF
Site surveying-2-done-1
PPTX
Pile cap
DOCX
Introduction
PPTX
Tutorial 6 (1)
PPTX
Tutorial 4(b)
PPTX
Tutorial 4(a) (2)
PPTX
Tutorial 3 (2)
Group presentation compiled and updated 2
Lamyu column 6 f (1)
Estimating final
Estimating presentation (final)
Supply chain invidividual123123
Supply chain invidividual
Ms (1)
Sc bim
Bs1 (1)
Final ct aa slides
Smart tunnel
Bs finallll (1)
Site surveying-almost-1
Site surveying-2-done-1
Pile cap
Introduction
Tutorial 6 (1)
Tutorial 4(b)
Tutorial 4(a) (2)
Tutorial 3 (2)

Recently uploaded (20)

PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PPTX
20th Century Theater, Methods, History.pptx
PPTX
Computer Architecture Input Output Memory.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
IGGE1 Understanding the Self1234567891011
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
HVAC Specification 2024 according to central public works department
PDF
International_Financial_Reporting_Standa.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
20th Century Theater, Methods, History.pptx
Computer Architecture Input Output Memory.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
IGGE1 Understanding the Self1234567891011
B.Sc. DS Unit 2 Software Engineering.pptx
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
HVAC Specification 2024 according to central public works department
International_Financial_Reporting_Standa.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Paper A Mock Exam 9_ Attempt review.pdf.
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Environmental Education MCQ BD2EE - Share Source.pdf

Lamyu 4

  • 1. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201 Determine One way or two way slab Slab C-E/5-8 = Ly/Lx = 8.925/6.850 = 1.30<2 (Two way slab) Slab D-E/2-5 = Ly/Lx = 5.000/4.925 = 1.02<2 (Two way slab) Slab E-F/3-5a = Ly/Lx = 6.000/4.934 = 1.22<2 (Two way slab) Slab self-weight = Thickness of slab x Density of concrete = 0.15m x 24kN/m3 = 3.60kN/m2 Beam E/3-5a
  • 2. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201 Dead load Beam Self Weight = Beam size x Density of concrete = (0.15 x 0.30)m2 x 24kN/m3 = 1.08kN/m Brick Wall Weight = Wall height x Wall thickness x Density of wall = (3.5 x 0.15) m2 x 19 kN/m3 = 9.98 kN/m Dead load on slab = Slab self weight x (Lx/2) C-E/5-8 = 3.60kN/m x (6.850m/2) = 12.33kN/m Dead load on slab = Slab self weight x (Lx/2) x 2/3 D-E/2-5 = 3.60kN/m x (4.925m/2) x 2/3 = 5.91kN/m Dead load on slab = Slab self weight x (Lx/2) x 2/3 E-F/3-5a = 3.60kN/m x (4.934m/2) x 2/3 = 5.92kN/m Total dead load on beam E/3-5 = (1.08+9.98+5.91+5.92)kN/m = 22.89kN/m on beam E/5-5a = (1.08+9.98+12.33+5.92)kN/m = 29.31kN/m 3 5a 1.08kN/m Slab C-E/5-8 12.33kN/m Slab D-E/2-5 5.91kN/m Slab E-F/3-5a 5.92kN/m 5 4.934m 1.009m3.925m Total Dead Load 22.89 kN/m 29.31 kN/m 9.98kN/m Brick wall weight Beam self weight
  • 3. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201 Live load Live load on slab = Live load (UBBL) x (Lx/2) C-E/5-8 = 2.0kN/m2 x (6.850m/2) = 6.85kN/m Live load on slab = Live load (UBBL) x (Lx/2) x 2/3 D-E/2-5 = 2.0kN/m2 x (4.925m/2) x 2/3 = 3.28kN/m Live load on slab = Live load (UBBL) x (Lx/2) x 2/3 E-F/3-5a = 1.5kN/m2 x (4.934m/2) x 2/3 = 2.47kN/m Total live load on beam E/3-5 = (3.28+2.47)kN/m = 5.75kN/m on beam E/5-5a = (6.85+2.47)kN/m = 9.32kN/m 6.35kN/m Slab D-E/2-5 Total Live Load Slab C-E/5-8 3 5a Slab E-F/3-5a 6.85kN/m 3.28kN/m 2.47 kN/m 5.75 kN/m 9.32 kN/m 5 4.934m 1.009m3.925m
  • 4. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201 The Ultimate load For E/3-5 Ultimate load = Ultimate Dead Load+Ultimate Live load = (22.89kN/m x 1.4) + (5.75kN/m x1.6) = 41.25kN/m For E/5-5a = Ultimate Dead Load+Ultimate Live load = (29.31kN/m x 1.4) + (9.32kN/m x1.6) = 55.95kN/m Point Load Point load at point C/1a = Reaction force B from beam B-D/3 = 159.22kN Reaction forces Total load on For E/3-5 = 41.25kN/m x 3.925m = 161.91kN For E/5-5a = 55.95kN/m x 1.009m = 56.45kN ∑Mb = 0 0 = Ra(4.934) - 161.91(2.972) - 159.22(1.009) - 56.45(0.505) 4.934Ra = 670.36 Ra = 135.86kN ∑y = 0 0 = 135.86 - 161.91 - 159.22 - 56.45 + Rb Rb = 241.72kN The load factor that needs to be applied: 1.4 for dead load and 1.6 for live load 159.22 kN 56.45 kN161.91 kN 159.22 kN 159.22 kN 159.22 kN 56.45 kN161.91 kN Rb=241.72kNRa=135.86kN RbRa RbRa=135.86kN 3 5a 0.505m1.963m 41.25 kN/m 55.95 kN/m Ultimate Load 56.45 kN161.91 kN 5 4.934m 1.009m3.925m
  • 5. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201 Load Diagram Shear Diagram x/3.925 = 26.05/(26.05+135.86) x = 0.63 Bending moment Area (+) = 1/2(3.925-0.63)(135.86) = 223.83 ≈ 224 Area (-) = 1/2(0.63)(26.05) + 1/2(185.27+241.72)(1.009) = 8.21 + 215.42 = 223.63 ≈ 224 3 5a5 4.934m 1.009m3.925m 135.86kN -241.72kN -26.05kN -185.27kN 56.45 kN161.91 kN Rb=241.72kNRa=135.86kN 159.22 kN x 26.05 kN 135.86kN 3.925 224 kN 0 kN 0 kN
  • 6. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201
  • 7. BLD61203 STRUCTURES GROUP 8 ANDY CHIN 0326973 I DAPHNE TAN 0329055 I TANG LAM YU 0324966 I TEOW KAH YAN 0327201