SlideShare a Scribd company logo
2010 NASA PROJECT MANAGEMENT
            CHALLENGE

“How Configuration Management Helps Projects
        Innovate and Communicate”
         Moody Gardens Hotel and Convention Center
                     Galveston, Texas
                    10 February 2010


                    Louis A. Cioletti, MS, CMII
                   Carla F. Guidry, MPA, CMIIC


                                                     Used with Permission
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

   Presentation outline:

   •Compare Project Management (PM) and
    Configuration Management (CM) processes
   •Compare Traditional CM with CM II approach
   •Present two PM models:
    •Kepner-Tregoe
    •Deming (Shewhart)
   •Describe why projects fail
   •Present methods how CM helps projects
    innovate/communicate



                                                 2
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE
 PM process encompasses:                          Projects are composed of
                                                  processes; a process is a series of
 • Project Work Breakdown Structure (WBS)         actions bringing about a desired
                                                  result.
 • Time-phased project budget
 • Detailed project schedules (deliverables and   Projects may fall into several major
 milestones)                                      categories:
 • Create baselines for performance               • Process-oriented
 measurement
 • Link schedules to budgets, resources and
                                                  • Product oriented
 documents                                        • Phased-oriented
                                                  • Resource-oriented
 •Track risks

 • Track manpower resources and requirements      Whatever project is selected, the
                                                  recording of performance
 • Track and summarize multiple project data      standards, details, assumptions,
 • Schedule Gantt and PERT charts
                                                  etc. is necessary.

       How does CM support the manager to meet the project’s
       needs, goals, and objectives? Let’s look at CM processes …
                                                                                         3
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

 CM process encompasses:
                                          “There is an increasingly important
 • Information accessibility              need for speed in project delivery
 • Information integrity                  and the equally important need for
                                          reliability in delivering the project
 • Properly structured baselines          (product) as promised.”
 • Naming and numbering convention
                                          -PMI 1999, Frank Patrick
 • Traceability
 • Metrics
 • Interchangeability
 • Recording and reporting information
 • Assuring conformance to requirements

CM’s role supports the project manager’s processes, but how might this
happen?
                                                                                  4
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE
                                               The traditional CM approach
                 • Planning & Management       dissolves it’s project
                 • Identification
   Traditional                                 effectiveness and limits the
                 • Change Management
  CM Approach    • Status Accounting           coordination and
    (EIA-649)    • Verification & Audit        communication attributes
                                               among too few project
                                               entities.

                 • Accommodating change
                 • Accommodating the reuse     CM II relies on an enterprise-
                   of standards and best
                   practices
                                               wide, closed-loop change
 Configuration   • Assuring all requirements   process with conformance to
 Management        are clear, concise, and     requirements that’s not
  II Approach      valid                       limited to a design definition
                 • Communicating 1-3 to        process.
                   each user promptly, and
                 • Assuring conformance in
                   each case


                                                                                5
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE
 Project Management can be as detailed as the Kepner –Tregoe ®
 model or …
                                      KT® has an excellent PM model to
                                        meet task deadlines within
                                        schedule and/or cost
                                        constraints.

                                      KT® PM process is divided into:
                                              Project Definition
                                              Project Planning
                                              Project Implementation
                                          Project Communication coordinates all
                                               the processes.




                                                                                  6
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE
Project Management can take a simple approach as the
Deming (Shewhart)® Cycle (also called the PDC/SA model)
                                         W. Edwards Deming proposed
                                            processes that continuously
                                            analyze and measure product
                                            variations to identify any deviation
                                            from customer requirements.

                                         The Plan-Do-Check(or Study)-Act
                                            (PDC/SA) continuous feedback
                                            loop allows managers to identify
                                            and change the parts of the
                                            process that need improvement.


        CM expands Deming’s single loop cycle into...
                                                                                   7
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

   ….. A dual cycle of the Deming (Shewhart)® Cycle
                                           CM sees the PDC/SA cycle as a
                                             dual process with one cycle
                                             for requirements definition
                                             in concert with the other
                                             cycle on the as-planned
                                             physical items (project
                                             tasks).

                                           Each cycle is interdependent
                                              and must be synchronized.



 But no plan or process is executed without issues or problems.
                                                                           8
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

                                         But might these problems be a result and not
                                         the causative factors? Perhaps the underlying
                                         causes might really be –

                                         Poor communication among leadership,
                                         stakeholders, and staff

Given various models and processes for
Project Management, what are the most    Poor (or incomplete) project requirements
pressing problems inherent with every
project?
                                         No change control process
• Cost overrides
• Late delivery of goods/supplies/
product                                  Poor documentation or data management
• Late completion of task along the
critical path
                                         Lack of resources or mismatched skills

                                                                                         9
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

 Typically, CM is embedded lower in
 organizations (usually under an
 Engineering function) with additional
 change management activities even
 further distributed.                                           Program
                                                                  Mgr


             Marketing &         Product                                                                         Business
                                               Legal            Operations         Finances             HR
               Sales           Engineering                                                                       Programs



               Product                                                        Master                             Contract
       R&D                 Enineering     QA   Process Eng Purchasing                    Production   Policies
               Design                                                        Schedule                             Mgmt

                                                       Change                   Change                  Change      Change
                              CM                        Mgmt                     Mgmt                                Mgmt
                                                                                                         Mgmt


                              Standards


                               Change
                                Mgmt


       “The only time you don’t want to fail is the last time you try!”
                               - Charles F. Kettering                                                                        10
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

   Which communication process would you rather have?



                                               Integrated
                                               Repository




 Decentralized communication           Centralized communication
       Many “dialects”           “Everybody speaks the same language”
       Many processes                        Single process

                    Here’s where CM can help!
                                                                        11
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

           Three CM methods that help
           projects to innovate and
           communicate:
1. Innovate by raising CM to
the management level of the
project or Work Breakdown
Structure (WBS).                                                 CM II’s “Umbrella Coverage”
                                                                 provides an integrated
   Executive                           Project                   infrastructure that’s currently
                                        Mgr
                                                                 missing from a traditional CM
 Major Divisions   Purch/
                                 CM              Opns
                                                         HW/SW   model.
                    Rcvg                                  Dev


  Subordinate               QA        Eng        Sched
   Divisions




                                                                                                   12
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

2. Change documents first using a consistent change process for any baseline.
Requirements drive the document before the physical item must conform.

                                              Continouus Improvement

                     Validation and Release
                     of Requirements
                                              End Test (Verify Conformance)



                                                   Verify Conformance




            Improvement of                                                    Corrective Action
              Requirements                                                    (Change Process)
          (Change Process)




    How does the Project Manager communicate customer/product
    requirements, its changes, and potential cost/schedule impacts?                               13
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE




        Improvement of
          Requirements
      (Change Process)




End-item Design Basics are developed concurrently and represent high level views of
what the product is and what it can do.
                                                                                      14
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

3. Reduce corrective actions (intervention resources) that would normally affect 40% - 60% of
resources through CM’s closed-loop change process. Change happens!




                                                                                                15
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE


CM helps projects Innovate and Communicate by …
                                                                     Project
                                                                     success
                                               Eliminate/reduce
                                               corrective actions

                           Change
                           documents first!



          Raise CM to
          management
          level
                        CM is not only highly process-oriented; it is a process
                        for communicating requirements, accommodating
                        change, and minimizing corrective actions!



                                                                                  16
HOW CONFIGURATION MANAGEMENT HELPS PROJECTS
INNOVATE AND COMMUNICATE

  Whatever PM tool model is used, CM can positively impact a
  project’s success.


                         Project performance (schedule, quality, and
                         cost) can be no better than the ability to
                         communicate requirements which, in turn, is
                         no better than the CM process to
                         communicate project decisions and the
                         correct requirements.



  “For those who believe, no proof is necessary.
           For those who don't believe, no proof is possible”
                           - Stuart Chase
                                                                       17

More Related Content

PPTX
Amer.tahani
PDF
Gary.humphreys
PDF
Law.richard
PDF
Carol.mullenax
PDF
K.pagel.beene
PDF
Thomas.a.greathouse.r
PDF
Thomas.coonce
PPT
Gonzales.matthew
Amer.tahani
Gary.humphreys
Law.richard
Carol.mullenax
K.pagel.beene
Thomas.a.greathouse.r
Thomas.coonce
Gonzales.matthew

What's hot (19)

PPTX
Symons
PDF
Eggert.joe
PPTX
Harvey.tony
PDF
Osterkamp jeff
PDF
Harrison.g.poole.k
PPTX
Noneman.steven
PPTX
Blythe ortiz7120 5e handbooks 2 15-2012 final
PDF
Sally.godfrey
PPTX
Ed mangopanelpm challengefinal
PDF
Murphy.dar jean.jean
PDF
Ingoldsby.k.lee.y
PPTX
Claunch.cathy
PDF
Humphreys.gary
PDF
Healy edward
PPTX
Backup darren elliott
PPT
Carmichael.kevin
PPTX
Mahmood porter
PDF
Kelly.elliott
PDF
Ken poole
Symons
Eggert.joe
Harvey.tony
Osterkamp jeff
Harrison.g.poole.k
Noneman.steven
Blythe ortiz7120 5e handbooks 2 15-2012 final
Sally.godfrey
Ed mangopanelpm challengefinal
Murphy.dar jean.jean
Ingoldsby.k.lee.y
Claunch.cathy
Humphreys.gary
Healy edward
Backup darren elliott
Carmichael.kevin
Mahmood porter
Kelly.elliott
Ken poole
Ad

Similar to Louis.cioletti (20)

PPT
Se lect14 btech
PPTX
PPTX
Bpp 3213 lecture 1
PPSX
Project+ updated prsntn 2012
PPTX
Project Management
PPTX
Project management
PPTX
Chapter 03
PPTX
Basic Project Management
PPTX
Project management in pharmaceutical generic industry basics and standards
PDF
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
PPTX
Pm expectations duluth
PDF
Major Project Management
PPT
PDF
Performance Improvement of Fashion Industry Through the Supply Chain Collabor...
PDF
Project Management In Our Changing World
PPT
Project Management
PDF
Ms project training ver 01
PPT
Ch3 proj.mgt
PPTX
Introduction to project management
PDF
Jim.cassidy
Se lect14 btech
Bpp 3213 lecture 1
Project+ updated prsntn 2012
Project Management
Project management
Chapter 03
Basic Project Management
Project management in pharmaceutical generic industry basics and standards
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
Pm expectations duluth
Major Project Management
Performance Improvement of Fashion Industry Through the Supply Chain Collabor...
Project Management In Our Changing World
Project Management
Ms project training ver 01
Ch3 proj.mgt
Introduction to project management
Jim.cassidy
Ad

More from NASAPMC (20)

PDF
Bejmuk bo
PDF
Baniszewski john
PDF
Yew manson
PDF
Wood frank
PDF
Wood frank
PDF
Wessen randi (cd)
PDF
Vellinga joe
PDF
Trahan stuart
PDF
Stock gahm
PDF
Snow lee
PDF
Smalley sandra
PDF
Seftas krage
PDF
Sampietro marco
PDF
Rudolphi mike
PDF
Roberts karlene
PDF
Rackley mike
PDF
Paradis william
PDF
O'keefe william
PDF
Muller ralf
PDF
Mulenburg jerry
Bejmuk bo
Baniszewski john
Yew manson
Wood frank
Wood frank
Wessen randi (cd)
Vellinga joe
Trahan stuart
Stock gahm
Snow lee
Smalley sandra
Seftas krage
Sampietro marco
Rudolphi mike
Roberts karlene
Rackley mike
Paradis william
O'keefe william
Muller ralf
Mulenburg jerry

Recently uploaded (20)

PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
How to Get Funding for Your Trucking Business
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
Lecture (1)-Introduction.pptx business communication
PPTX
5 Stages of group development guide.pptx
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
PDF
Training And Development of Employee .pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Business model innovation report 2022.pdf
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
Business Ethics - An introduction and its overview.pptx
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
How to Get Funding for Your Trucking Business
Reconciliation AND MEMORANDUM RECONCILATION
Lecture (1)-Introduction.pptx business communication
5 Stages of group development guide.pptx
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
unit 1 COST ACCOUNTING AND COST SHEET
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Training And Development of Employee .pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Business model innovation report 2022.pdf
340036916-American-Literature-Literary-Period-Overview.ppt
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Laughter Yoga Basic Learning Workshop Manual
WRN_Investor_Presentation_August 2025.pdf
Chapter 5_Foreign Exchange Market in .pdf
Business Ethics - An introduction and its overview.pptx
ICG2025_ICG 6th steering committee 30-8-24.pptx

Louis.cioletti

  • 1. 2010 NASA PROJECT MANAGEMENT CHALLENGE “How Configuration Management Helps Projects Innovate and Communicate” Moody Gardens Hotel and Convention Center Galveston, Texas 10 February 2010 Louis A. Cioletti, MS, CMII Carla F. Guidry, MPA, CMIIC Used with Permission
  • 2. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Presentation outline: •Compare Project Management (PM) and Configuration Management (CM) processes •Compare Traditional CM with CM II approach •Present two PM models: •Kepner-Tregoe •Deming (Shewhart) •Describe why projects fail •Present methods how CM helps projects innovate/communicate 2
  • 3. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE PM process encompasses: Projects are composed of processes; a process is a series of • Project Work Breakdown Structure (WBS) actions bringing about a desired result. • Time-phased project budget • Detailed project schedules (deliverables and Projects may fall into several major milestones) categories: • Create baselines for performance • Process-oriented measurement • Link schedules to budgets, resources and • Product oriented documents • Phased-oriented • Resource-oriented •Track risks • Track manpower resources and requirements Whatever project is selected, the recording of performance • Track and summarize multiple project data standards, details, assumptions, • Schedule Gantt and PERT charts etc. is necessary. How does CM support the manager to meet the project’s needs, goals, and objectives? Let’s look at CM processes … 3
  • 4. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE CM process encompasses: “There is an increasingly important • Information accessibility need for speed in project delivery • Information integrity and the equally important need for reliability in delivering the project • Properly structured baselines (product) as promised.” • Naming and numbering convention -PMI 1999, Frank Patrick • Traceability • Metrics • Interchangeability • Recording and reporting information • Assuring conformance to requirements CM’s role supports the project manager’s processes, but how might this happen? 4
  • 5. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE The traditional CM approach • Planning & Management dissolves it’s project • Identification Traditional effectiveness and limits the • Change Management CM Approach • Status Accounting coordination and (EIA-649) • Verification & Audit communication attributes among too few project entities. • Accommodating change • Accommodating the reuse CM II relies on an enterprise- of standards and best practices wide, closed-loop change Configuration • Assuring all requirements process with conformance to Management are clear, concise, and requirements that’s not II Approach valid limited to a design definition • Communicating 1-3 to process. each user promptly, and • Assuring conformance in each case 5
  • 6. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Project Management can be as detailed as the Kepner –Tregoe ® model or … KT® has an excellent PM model to meet task deadlines within schedule and/or cost constraints. KT® PM process is divided into:  Project Definition  Project Planning  Project Implementation Project Communication coordinates all the processes. 6
  • 7. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Project Management can take a simple approach as the Deming (Shewhart)® Cycle (also called the PDC/SA model) W. Edwards Deming proposed processes that continuously analyze and measure product variations to identify any deviation from customer requirements. The Plan-Do-Check(or Study)-Act (PDC/SA) continuous feedback loop allows managers to identify and change the parts of the process that need improvement. CM expands Deming’s single loop cycle into... 7
  • 8. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE ….. A dual cycle of the Deming (Shewhart)® Cycle CM sees the PDC/SA cycle as a dual process with one cycle for requirements definition in concert with the other cycle on the as-planned physical items (project tasks). Each cycle is interdependent and must be synchronized. But no plan or process is executed without issues or problems. 8
  • 9. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE But might these problems be a result and not the causative factors? Perhaps the underlying causes might really be – Poor communication among leadership, stakeholders, and staff Given various models and processes for Project Management, what are the most Poor (or incomplete) project requirements pressing problems inherent with every project? No change control process • Cost overrides • Late delivery of goods/supplies/ product Poor documentation or data management • Late completion of task along the critical path Lack of resources or mismatched skills 9
  • 10. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Typically, CM is embedded lower in organizations (usually under an Engineering function) with additional change management activities even further distributed. Program Mgr Marketing & Product Business Legal Operations Finances HR Sales Engineering Programs Product Master Contract R&D Enineering QA Process Eng Purchasing Production Policies Design Schedule Mgmt Change Change Change Change CM Mgmt Mgmt Mgmt Mgmt Standards Change Mgmt “The only time you don’t want to fail is the last time you try!” - Charles F. Kettering 10
  • 11. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Which communication process would you rather have? Integrated Repository Decentralized communication Centralized communication Many “dialects” “Everybody speaks the same language” Many processes Single process Here’s where CM can help! 11
  • 12. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Three CM methods that help projects to innovate and communicate: 1. Innovate by raising CM to the management level of the project or Work Breakdown Structure (WBS). CM II’s “Umbrella Coverage” provides an integrated Executive Project infrastructure that’s currently Mgr missing from a traditional CM Major Divisions Purch/ CM Opns HW/SW model. Rcvg Dev Subordinate QA Eng Sched Divisions 12
  • 13. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE 2. Change documents first using a consistent change process for any baseline. Requirements drive the document before the physical item must conform. Continouus Improvement Validation and Release of Requirements End Test (Verify Conformance) Verify Conformance Improvement of Corrective Action Requirements (Change Process) (Change Process) How does the Project Manager communicate customer/product requirements, its changes, and potential cost/schedule impacts? 13
  • 14. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Improvement of Requirements (Change Process) End-item Design Basics are developed concurrently and represent high level views of what the product is and what it can do. 14
  • 15. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE 3. Reduce corrective actions (intervention resources) that would normally affect 40% - 60% of resources through CM’s closed-loop change process. Change happens! 15
  • 16. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE CM helps projects Innovate and Communicate by … Project success Eliminate/reduce corrective actions Change documents first! Raise CM to management level CM is not only highly process-oriented; it is a process for communicating requirements, accommodating change, and minimizing corrective actions! 16
  • 17. HOW CONFIGURATION MANAGEMENT HELPS PROJECTS INNOVATE AND COMMUNICATE Whatever PM tool model is used, CM can positively impact a project’s success. Project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements. “For those who believe, no proof is necessary. For those who don't believe, no proof is possible” - Stuart Chase 17