SlideShare a Scribd company logo
Question No. 1 2 3 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
#
30
MMUP Review Exam - Answer Key
Name: ID.No:
Question No. A B C D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
# 30
MMUP Review Exam - Answer Sheet
Name: EMP.No:
Cost Control Department
"
MMUP Review Exam
Name: EMP No.
Project:
Date:
Page 1 of 7
Cost Control Department
1 The Performance of a specific task in CPM is known as:
a. Dummy
b. Event
c. Activity
d. Contract
2 Completion of an activity on CPM network diagram is generally known as:
a. Event
b. Node
c. Connector
d. All Of The Above.
3 Pick up the incorrect statement from the following:
a. The Activity Is The Time Consuming Part Of A Project.
b. The Beginning And The End Of A Job Are Called Events.
c. The Activity Which Consumes Maximum Time Is Called Anode.
d. Logically And Sequentially Connected Activities And Events From A Network
4 The time by which activity completion time can be delayed without affecting the start of succeeding
activities is known as:
a. Duration
b. Total Float
c. Free Float
d. Interfering Float
5 The difference between the time available to do a job and the time required to do the job is known as:
a. Event
b. Float
c. Duration
d. Constrain
6 Critical path lies along the activites having total float
a. Positive
b. Negative
c. Zero
d. Same
Page 2 of 7
Cost Control Department
7 The first state of a construction is:
a. Preparation Of Estimate.
b. Survey Of The Site.
c. Initiation Of Proposal.
d. Preparation Of Tender.
8 PERT is:
a. An Analytic Concept.
b. Limited Of Event Oriented Diagrams.
c. Used For Research And Development Project
d. All Of The Above.
9 For the network shown in the given figure, the expected time for the activity.
3 - 4 - 5 5 - 7 - 9 6 - 8 - 10
a. 1-2 Is 4
b. 2-3 Is 7
c. 3-4 Is 8
d. All Of The Above.
10 Find the reaction R2
a. 400 Kip
b. 225 Kip
c. 75 Kip
d. 100 Kip
11 A 10 kg block hangs from a cable. What is the tension in the cable?
a. 98 Kg
b. 101 Kg.M/Sec2
c. 98 N
d. 100 Kg
1 2 3 4
Page 3 of 7
Cost Control Department
12
Supported beam of span 20m due to moving udL4t/m spanning over 5m. The absolute maximum
bending moment is simply
a. 87.5 T. M At The Support
b. 1,875 T.M Near Mid Point
c. 3.5 T.M At The Mid Poing
d. 87.5 T.M At The Mid Point
13
Determine the nominal moment Mn for a beam of cross section shown where fc1 = 4,000, Psi assume
A615, grade 60 steel that has a yield strength of 60 Ksi and a modulus of elasticity = 29x106 Psi
a. 247.78 Ft.Kip
b. 274.78 Ft.Kip
c. 278.47 Ft.Kip
d. 297.34 Ft.Kip
Page 4 of 7
Cost Control Department
14 Over-reinforced Beam:
a. Ʃs = Ʃy And Ʃc = 0.003
b. Ʃs > Ʃy And Ʃc = 0.003. The Beam Will Have Less Steel Than Required To Create The Balanced
Condition
c. Ʃs < Ʃy And Ʃc = 0.003. This Will Cause The Concret To Crush Suddenly Before That Steel
Reaches Its Yield Point
d. None Of The Above.
15
A force of 10 Kn is acting on circular rod with diameter 10 mm, and 2m long and made of steel with
modulus of elasticity of 200 Gpa. The change length is
a. 1.27 mm
b. 0,0127 mm
c. 0,00127mm
d. 2 mm
16
Reinforcing steel bars of T10 mm at 10 cm spacing to be replaced by T12 mm. Calculate the new
required spacing
a. 14.4 mm
b. 6.9 mm
c. 12 mm
d. 8.3 mm
17 Permissible compressive strength of M 300 concrete grade is
a. 100 Kg/ Cm2
b. 150 Kg/ Cm2
c. 200 Kg/ Cm2
d. 300 Kg/ Cm2
Page 5 of 7
Cost Control Department
18 Mass concrete is defined as the concrete where: (QCS)
a. The Dimension Is Equal To 1.5 M
b. Where The Large Dimension Exceeds 1.5 M
c. The Least Dimension Exceeds 1.5 M
d. None Of The Above.
19 Stripping times of formwork are below:
a. Beams Side Wall And Columns (1 Day)
b. Beams Joist And Grider (10 Days) Props To Beam 15 Days
c. All Of The Above.
20 The increased cohesiveness of concrete makes it:
a. Less Liable To Segregation
b. More Liable To Segregation
c. More Liable To Bleeding
d. More Liable For Surface Scaling In Frosty Weather
21 Workability improved by adding:
a. Air-Entraining Agent
b. Foaming Agent
c. Oily-Agent
d. All Of The Above.
22 Pick up the correct proportion of chemical ingredients of cement.
a. Lime: Silica: Alumina: Iron Oxide: 63 : 22 : 6 :3
b. Silica: Lime: Alumina: Iron Oxide: 63 : 22 : 6 :3
c. Alumina: Silica: Lime: Iron Oxide: 63 : 22 : 6 :3
d. Iron Oxide: Alumina: Silica: L:Ime: 63 : 22 : 6 :3
23 Separation of water or water sand cement from a freshly concrete is known
a. Bleeding
b. Creeping
c. Segregation
d. Flooding
24 The grade of concrete M150 means tha compressive strength of a 15 cube after 28 days is
a. 100 Kg/Cm²
b. 150 Kg/Cm²
c. 200 Kg/Cm²
d. 250 Kg/Cm²
Page 6 of 7
Cost Control Department
25 The main object of compaction of concete is
a. To Elimate Air Holes
b. To Achieve Maximum Density
c. To Provide Intimate Contact Between The Concrete And Embedded Materials
d. All Of The Above
26 Non-uniform compaction may cause the concrete
a. Porous
b. Non-Homogeneous
c. Reduced Strength
d. All Of The Above
27 Strength of concrete with passage of time
a. Increases
b. Decreases
c. Fluctuates
d. Remains Constant
28
Consider the following statements in relation to the given sketch
1. Soil is partially saturated at degree of saturation = 60%
2. Void Ratio = 40%
3. Water Content = 30%
4. Saturated unit weight = 1.5 glcc
a. 1,2 And 3 Are Correct
b. 1,3 And 4 Are Correct
c. 2,3 And 4 Are Correct
d. 1,2 And 4 Are Correct
29 The structure shown in the given figure is stable if
a. X = 2Y
b. 2X = Y
c. √2
d. X = √2 Y
30
In the truss shown in the given figure which one of the following members has no force induced in it?
a. C.D.
b. C.E.
c. C.F.
d. D.F.
W W
L L L
D
E F
A C
Page 7 of 7

More Related Content

PDF
Mmup questionnaire 4
PDF
Mmup questionnaire 10
PDF
Mmup questionnaire 2
PDF
Mmup questionnaire 3
PDF
Mmup questionnaire 8
PDF
Mmup questionnaire 6
PDF
Mmup questionnaire 1
PDF
Mmup questionnaire 5
Mmup questionnaire 4
Mmup questionnaire 10
Mmup questionnaire 2
Mmup questionnaire 3
Mmup questionnaire 8
Mmup questionnaire 6
Mmup questionnaire 1
Mmup questionnaire 5

What's hot (8)

PDF
Mmup questionnaire 9
PDF
MMUP exam quastions (provided by people who took the exam)
PPTX
PDF
06 cv662
PPT
Lec 16-flexural analysis and design of beamns
PDF
59105128 civil-engineering-objective-type-questions
DOCX
STRIPPING OF FORMWORK
PDF
LONG WALL AND SHORT WALL METHOD-6
Mmup questionnaire 9
MMUP exam quastions (provided by people who took the exam)
06 cv662
Lec 16-flexural analysis and design of beamns
59105128 civil-engineering-objective-type-questions
STRIPPING OF FORMWORK
LONG WALL AND SHORT WALL METHOD-6
Ad

Similar to Mmup questionnaire 7 (11)

PDF
Ce1302 design of rc elements
PDF
Ssc junior-engineer-question-papers-for-civil-7
PDF
2.concrete technology
PDF
3.structure engineering
PDF
civil engineering question with Answer RCC
DOCX
2 marks Question with Answer for Design of Reinforced Cement Concrete Elements
PDF
Civil engineering objective 5
PDF
Design-Of-concrete-Structure MCQ.pdf
PDF
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
PDF
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
PDF
Design of rcc structures
Ce1302 design of rc elements
Ssc junior-engineer-question-papers-for-civil-7
2.concrete technology
3.structure engineering
civil engineering question with Answer RCC
2 marks Question with Answer for Design of Reinforced Cement Concrete Elements
Civil engineering objective 5
Design-Of-concrete-Structure MCQ.pdf
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
Design of rcc structures
Ad

More from Omar Selim (20)

PDF
Omar Salim Biography Omar Salim Biography
PDF
OMAR SELIM portfolio OMAR SELIM portfolio
PDF
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
PDF
إعادة الإعمار .pdf
PDF
_الذكاء الاصطناعي .pdf
PDF
SmartHome.pdf
PDF
_الذكاء الاصطناعي .pdf
DOCX
Ch-3.docx
DOCX
ch-12.docx
DOCX
Ch-4.docx
DOCX
ch8.docx
DOCX
ch10.docx
DOCX
ch-11.docx
DOCX
ch9.docx
DOCX
ch-13.docx
DOCX
Ch-5.docx
DOCX
Ch-2.docx
DOCX
ch-6.docx
DOCX
Ch-1.docx
DOCX
all.docx
Omar Salim Biography Omar Salim Biography
OMAR SELIM portfolio OMAR SELIM portfolio
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
إعادة الإعمار .pdf
_الذكاء الاصطناعي .pdf
SmartHome.pdf
_الذكاء الاصطناعي .pdf
Ch-3.docx
ch-12.docx
Ch-4.docx
ch8.docx
ch10.docx
ch-11.docx
ch9.docx
ch-13.docx
Ch-5.docx
Ch-2.docx
ch-6.docx
Ch-1.docx
all.docx

Recently uploaded (20)

PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
HVAC Specification 2024 according to central public works department
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
Introduction to Building Materials
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
IGGE1 Understanding the Self1234567891011
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
Share_Module_2_Power_conflict_and_negotiation.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
History, Philosophy and sociology of education (1).pptx
HVAC Specification 2024 according to central public works department
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Introduction to Building Materials
AI-driven educational solutions for real-life interventions in the Philippine...
Practical Manual AGRO-233 Principles and Practices of Natural Farming
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
TNA_Presentation-1-Final(SAVE)) (1).pptx
B.Sc. DS Unit 2 Software Engineering.pptx
IGGE1 Understanding the Self1234567891011
LDMMIA Reiki Yoga Finals Review Spring Summer

Mmup questionnaire 7

  • 1. Question No. 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 # 30 MMUP Review Exam - Answer Key Name: ID.No:
  • 2. Question No. A B C D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 # 30 MMUP Review Exam - Answer Sheet Name: EMP.No:
  • 3. Cost Control Department " MMUP Review Exam Name: EMP No. Project: Date: Page 1 of 7
  • 4. Cost Control Department 1 The Performance of a specific task in CPM is known as: a. Dummy b. Event c. Activity d. Contract 2 Completion of an activity on CPM network diagram is generally known as: a. Event b. Node c. Connector d. All Of The Above. 3 Pick up the incorrect statement from the following: a. The Activity Is The Time Consuming Part Of A Project. b. The Beginning And The End Of A Job Are Called Events. c. The Activity Which Consumes Maximum Time Is Called Anode. d. Logically And Sequentially Connected Activities And Events From A Network 4 The time by which activity completion time can be delayed without affecting the start of succeeding activities is known as: a. Duration b. Total Float c. Free Float d. Interfering Float 5 The difference between the time available to do a job and the time required to do the job is known as: a. Event b. Float c. Duration d. Constrain 6 Critical path lies along the activites having total float a. Positive b. Negative c. Zero d. Same Page 2 of 7
  • 5. Cost Control Department 7 The first state of a construction is: a. Preparation Of Estimate. b. Survey Of The Site. c. Initiation Of Proposal. d. Preparation Of Tender. 8 PERT is: a. An Analytic Concept. b. Limited Of Event Oriented Diagrams. c. Used For Research And Development Project d. All Of The Above. 9 For the network shown in the given figure, the expected time for the activity. 3 - 4 - 5 5 - 7 - 9 6 - 8 - 10 a. 1-2 Is 4 b. 2-3 Is 7 c. 3-4 Is 8 d. All Of The Above. 10 Find the reaction R2 a. 400 Kip b. 225 Kip c. 75 Kip d. 100 Kip 11 A 10 kg block hangs from a cable. What is the tension in the cable? a. 98 Kg b. 101 Kg.M/Sec2 c. 98 N d. 100 Kg 1 2 3 4 Page 3 of 7
  • 6. Cost Control Department 12 Supported beam of span 20m due to moving udL4t/m spanning over 5m. The absolute maximum bending moment is simply a. 87.5 T. M At The Support b. 1,875 T.M Near Mid Point c. 3.5 T.M At The Mid Poing d. 87.5 T.M At The Mid Point 13 Determine the nominal moment Mn for a beam of cross section shown where fc1 = 4,000, Psi assume A615, grade 60 steel that has a yield strength of 60 Ksi and a modulus of elasticity = 29x106 Psi a. 247.78 Ft.Kip b. 274.78 Ft.Kip c. 278.47 Ft.Kip d. 297.34 Ft.Kip Page 4 of 7
  • 7. Cost Control Department 14 Over-reinforced Beam: a. Ʃs = Ʃy And Ʃc = 0.003 b. Ʃs > Ʃy And Ʃc = 0.003. The Beam Will Have Less Steel Than Required To Create The Balanced Condition c. Ʃs < Ʃy And Ʃc = 0.003. This Will Cause The Concret To Crush Suddenly Before That Steel Reaches Its Yield Point d. None Of The Above. 15 A force of 10 Kn is acting on circular rod with diameter 10 mm, and 2m long and made of steel with modulus of elasticity of 200 Gpa. The change length is a. 1.27 mm b. 0,0127 mm c. 0,00127mm d. 2 mm 16 Reinforcing steel bars of T10 mm at 10 cm spacing to be replaced by T12 mm. Calculate the new required spacing a. 14.4 mm b. 6.9 mm c. 12 mm d. 8.3 mm 17 Permissible compressive strength of M 300 concrete grade is a. 100 Kg/ Cm2 b. 150 Kg/ Cm2 c. 200 Kg/ Cm2 d. 300 Kg/ Cm2 Page 5 of 7
  • 8. Cost Control Department 18 Mass concrete is defined as the concrete where: (QCS) a. The Dimension Is Equal To 1.5 M b. Where The Large Dimension Exceeds 1.5 M c. The Least Dimension Exceeds 1.5 M d. None Of The Above. 19 Stripping times of formwork are below: a. Beams Side Wall And Columns (1 Day) b. Beams Joist And Grider (10 Days) Props To Beam 15 Days c. All Of The Above. 20 The increased cohesiveness of concrete makes it: a. Less Liable To Segregation b. More Liable To Segregation c. More Liable To Bleeding d. More Liable For Surface Scaling In Frosty Weather 21 Workability improved by adding: a. Air-Entraining Agent b. Foaming Agent c. Oily-Agent d. All Of The Above. 22 Pick up the correct proportion of chemical ingredients of cement. a. Lime: Silica: Alumina: Iron Oxide: 63 : 22 : 6 :3 b. Silica: Lime: Alumina: Iron Oxide: 63 : 22 : 6 :3 c. Alumina: Silica: Lime: Iron Oxide: 63 : 22 : 6 :3 d. Iron Oxide: Alumina: Silica: L:Ime: 63 : 22 : 6 :3 23 Separation of water or water sand cement from a freshly concrete is known a. Bleeding b. Creeping c. Segregation d. Flooding 24 The grade of concrete M150 means tha compressive strength of a 15 cube after 28 days is a. 100 Kg/Cm² b. 150 Kg/Cm² c. 200 Kg/Cm² d. 250 Kg/Cm² Page 6 of 7
  • 9. Cost Control Department 25 The main object of compaction of concete is a. To Elimate Air Holes b. To Achieve Maximum Density c. To Provide Intimate Contact Between The Concrete And Embedded Materials d. All Of The Above 26 Non-uniform compaction may cause the concrete a. Porous b. Non-Homogeneous c. Reduced Strength d. All Of The Above 27 Strength of concrete with passage of time a. Increases b. Decreases c. Fluctuates d. Remains Constant 28 Consider the following statements in relation to the given sketch 1. Soil is partially saturated at degree of saturation = 60% 2. Void Ratio = 40% 3. Water Content = 30% 4. Saturated unit weight = 1.5 glcc a. 1,2 And 3 Are Correct b. 1,3 And 4 Are Correct c. 2,3 And 4 Are Correct d. 1,2 And 4 Are Correct 29 The structure shown in the given figure is stable if a. X = 2Y b. 2X = Y c. √2 d. X = √2 Y 30 In the truss shown in the given figure which one of the following members has no force induced in it? a. C.D. b. C.E. c. C.F. d. D.F. W W L L L D E F A C Page 7 of 7