SlideShare a Scribd company logo
Question No. 1 2 3 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
> 30
MMUP Review Exam - Answer Key
Name: ID.No:
Question No. A B C D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
> 30
MMUP Review Exam - Answer Sheet
Name: EMP.No:
Cost Control Department
>
MMUP Review Exam
Name: EMP No.
Project:
Date:
Page 1 of 7
Cost Control Department
1 Completion of an activity on CPM network diagram is generally known as:
a. Event
b. Node
c. Connector
d. All Of The Above.
2 Pick up the incorrect statement from the following:
a. The Activity Is The Time Consuming Part Of A Project.
b. The Beginning And The End Of A Job Are Called Events.
c. The Activity Which Consumes Maximum Time Is Called Anode.
d. Logically And Sequentially Connected Activities And Events From A Network
3 Critical path lies along the activites having total float
a. Positive
b. Negative
c. Zero
d. Same
4 PERT is:
a. An Analytic Concept.
b. Limited Of Event Oriented Diagrams.
c. Used For Research And Development Project
d. All Of The Above.
5 For the network shown in the given figure, the expected time for the activity.
3 - 4 - 5 5 - 7 - 9 6 - 8 - 10
a. 1-2 Is 4
b. 2-3 Is 7
c. 3-4 Is 8
d. All Of The Above.
6 The three time estimates for the activities fo the network shown in the given figure are shown above their
arrows: The earliest expected time for the even 4 is:
3 - 4 - 5 5 - 7 - 9 6 - 8 - 10
a. 19
b. 14
c. 24
d. None Of Those
1 2 3 4
1 2 3 4
Page 2 of 7
Cost Control Department
7 Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are
written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence
time for the event 2 is:
15 - 28 - 21 27 - 35 - 43 12 - 15 - 16
a. .20
b. .25
c. .35
d. .15
8 Work Package XX have a(4) stage and each stage will take one week to complete with $500 estimated
cost per stage. End of 2nd week, 3 stages were completed and contractor has spend $1,700. What is
the cost variance (cv)?
a. 500
b. -$200
c. 200
d. None Of The Above.
9 Assume you can lease an item you need for project for $ 800/day. To purchase the item the cost is $
12,000 plus daily operational cost of $ 400/day. If you need the item for more than 30 days, it is more
economical to:
a. To Lease It
b. To Purchase It
10 Bob invest $ 1,000 today and an interest rate of 5%. After 10 years, his investment will be worth?
a. 1200.2
b. 1500.49
c. 1628.89
d. 1328.4
1 2 3 4
Page 3 of 7
Cost Control Department
11
Determine the nominal moment Mn for a beam of cross section shown where fc1 = 4,000, Psi assume
A615, grade 60 steel that has a yield strength of 60 Ksi and a modulus of elasticity = 29x106 Psi
a. 247.78 Ft.Kip
b. 274.78 Ft.Kip
c. 278.47 Ft.Kip
d. 297.34 Ft.Kip
12 Under normal conditions using an ordinary cement, the period of removal of the form work is:
a. 7 Days For Beam Soffits
b. 14 Days For Bottom Slabs Of Spans 4.6 M And More
c. 21 Days For Bottom Beams Over 6 M Spans
d. All Of The Above.
13 Construction joint should be provided within:
a. The Middle Third Of Spans
b. At 1/3 To 1/4 Of Span In Slabs And Beams
c. Where Bm And S.F. Are Small
d. All Of The Above.
14 The increased cohesiveness of concrete makes it:
a. Less Liable To Segregation
b. More Liable To Segregation
c. More Liable To Bleeding
d. More Liable For Surface Scaling In Frosty Weather
Page 4 of 7
Cost Control Department
15 Pick up the correct statement from the following:
a. The Weight Of Ingredients Of Concrete Mix Is Taken In Kilograms.
b. Water And Aggregates Are Measured In Liters.
c. The Finished Concrete Is Measured In Cubic Meters.
d. All Of The Above.
16 Workability of concrete is measured by:
a. Vicat Apparatus Test
b. Slump Test
c. Minimum Void Method
d. Talbot Richart Test
17 According to the recommendation of IS 456-1978, the expansion joints:
a. Are Provided Where Plane Changes Abruptly
b. Are Provided To Ensure Minimum Resistance.
c. Are Supported On Separate Columns
d. All Of The Above.
18 Shrinkage in concrete can be reduced by using:
a. Low Water Cement Ratio.
b. Less Cement In The Concrete.
c. Proper Concrete Mix.
d. Pre-Saturated Aggregates
19 You are asked to construct a massive dam. The type of cement you will use is:
a. Ordinary Portland Cement
b. Rapid Hardening Cement
c. Low Heat Cement
d. Blast Furnace Slag Cement
20 C.R.R.I. are used to obtain a relationship between strength of concrete and:
a. Water Cement Ratio
b. Workability
c. Grading Of Aggregate
d. Fineness Modulus
21 Specified compressive strength of concrete is obtained from cube tests at the end of:
a. 3 Days
b. 7 Days
c. 14 Days
d. 28 Days
Page 5 of 7
Cost Control Department
22 The grade of concrete M150 means tha compressive strength of a 15 cube after 28 days is
a. 100 Kg/Cm²
b. 150 Kg/Cm²
c. 200 Kg/Cm²
d. 250 Kg/Cm²
23 The main object of compaction of concete is
a. To Elimate Air Holes
b. To Achieve Maximum Density
c. To Provide Intimate Contact Between The Concrete And Embedded Materials
d. All Of The Above
24 Non-uniform compaction may cause the concrete
a. Porous
b. Non-Homogeneous
c. Reduced Strength
d. All Of The Above
25
Consider the following statements in relation to the given sketch
1. Soil is partially saturated at degree of saturation = 60%
2. Void Ratio = 40%
3. Water Content = 30%
4. Saturated unit weight = 1.5 glcc
a. 1,2 And 3 Are Correct
b. 1,3 And 4 Are Correct
c. 2,3 And 4 Are Correct
d. 1,2 And 4 Are Correct
26 The structure shown in the given figure is stable if
a. X = 2Y
b. 2X = Y
c. √2
d. X = √2 Y
27
The final deflection due to all loads including the effects of temperature, creep and shringage and
measured from as-cost level of supports of floors, roof and all other horizontal members should not
exceed
a. Span/350
b. Span/300
c. Span/250
d. Span/200
Page 6 of 7
Cost Control Department
28
In the truss shown in the given figure which one of the following members has no force induced in it?
a. C.D.
b. C.E.
c. C.F.
d. D.F.
29 The fluid in Fig 01 is water and h=7.16m assuming the atmas pheric pressure is standard, compute
gauge pressure and absolute pressure at (N)
a. 3.3 KPa
b. 310.8 KPa
c. 33 KPa
d. 31.08 KPa
30 A piece of wood 305mm (1 ft) square and 3m (L 0ft) long weighing 6,288.46n/m³ (40 Lb/ft³) is submerged
vertically in a body of water its upper end being flush with the water surface. What vertical force required
to hold it positions.
a. 98.27 N
b. 982.77 N
c. 1000 N
d. 100 N
W W
L L L
D
E F
A C
+
h
water
F
BF
W 3m
Page 7 of 7

More Related Content

PDF
Mmup questionnaire 10
PDF
Mmup questionnaire 3
PDF
Mmup questionnaire 2
PDF
Mmup questionnaire 7
PDF
Mmup questionnaire 1
PDF
Mmup questionnaire 6
PDF
Mmup questionnaire 5
PDF
Mmup questionnaire 8
Mmup questionnaire 10
Mmup questionnaire 3
Mmup questionnaire 2
Mmup questionnaire 7
Mmup questionnaire 1
Mmup questionnaire 6
Mmup questionnaire 5
Mmup questionnaire 8

What's hot (11)

PDF
Mmup questionnaire 9
PDF
design mix for concrete as per is 10262
PPTX
PPTX
Concrete mix design
DOCX
mix design m25
PDF
2.concrete technology
PDF
mix design m30
DOCX
STRIPPING OF FORMWORK
PPT
Lec 16-flexural analysis and design of beamns
DOCX
Sample calculation for design mix of concrete
PDF
06 cv662
Mmup questionnaire 9
design mix for concrete as per is 10262
Concrete mix design
mix design m25
2.concrete technology
mix design m30
STRIPPING OF FORMWORK
Lec 16-flexural analysis and design of beamns
Sample calculation for design mix of concrete
06 cv662
Ad

Similar to Mmup questionnaire 4 (20)

PDF
Ssc junior-engineer-question-papers-for-civil-7
PDF
2008 - NOV.pdf
PDF
ME REVIEWER
PPT
Concrete mix design
PDF
CEE598_Gummaraj_Bharath_Final_Project
PDF
MMUP exam quastions (provided by people who took the exam)
PDF
Concrete design mix (ss)
DOCX
1. Which section of a contract contains guidelines that ensure f.docx
PDF
7th Semester (July-2016) Civil Engineering Question Paper
PDF
DOCX
PROJECT
PPT
Lecture 6 7 Rm Shear Walls
DOCX
ME 5720 Fall 2015 - Wind Turbine Project_FINAL
PDF
Lecture7_2021_v2.pdf
PDF
Aci mix design very good
DOCX
1.Which section of a contract contains guidelines that ensure .docx
PPTX
CONCRETE Design mix
PDF
Basement wall design
PPT
Concrete mix design
Ssc junior-engineer-question-papers-for-civil-7
2008 - NOV.pdf
ME REVIEWER
Concrete mix design
CEE598_Gummaraj_Bharath_Final_Project
MMUP exam quastions (provided by people who took the exam)
Concrete design mix (ss)
1. Which section of a contract contains guidelines that ensure f.docx
7th Semester (July-2016) Civil Engineering Question Paper
PROJECT
Lecture 6 7 Rm Shear Walls
ME 5720 Fall 2015 - Wind Turbine Project_FINAL
Lecture7_2021_v2.pdf
Aci mix design very good
1.Which section of a contract contains guidelines that ensure .docx
CONCRETE Design mix
Basement wall design
Concrete mix design
Ad

More from Omar Selim (20)

PDF
Omar Salim Biography Omar Salim Biography
PDF
OMAR SELIM portfolio OMAR SELIM portfolio
PDF
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
PDF
إعادة الإعمار .pdf
PDF
_الذكاء الاصطناعي .pdf
PDF
SmartHome.pdf
PDF
_الذكاء الاصطناعي .pdf
DOCX
Ch-3.docx
DOCX
ch-12.docx
DOCX
Ch-4.docx
DOCX
ch8.docx
DOCX
ch10.docx
DOCX
ch-11.docx
DOCX
ch9.docx
DOCX
ch-13.docx
DOCX
Ch-5.docx
DOCX
Ch-2.docx
DOCX
ch-6.docx
DOCX
Ch-1.docx
DOCX
all.docx
Omar Salim Biography Omar Salim Biography
OMAR SELIM portfolio OMAR SELIM portfolio
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
إعادة الإعمار .pdf
_الذكاء الاصطناعي .pdf
SmartHome.pdf
_الذكاء الاصطناعي .pdf
Ch-3.docx
ch-12.docx
Ch-4.docx
ch8.docx
ch10.docx
ch-11.docx
ch9.docx
ch-13.docx
Ch-5.docx
Ch-2.docx
ch-6.docx
Ch-1.docx
all.docx

Recently uploaded (20)

PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
HVAC Specification 2024 according to central public works department
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Computer Architecture Input Output Memory.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
IGGE1 Understanding the Self1234567891011
PDF
Empowerment Technology for Senior High School Guide
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
20th Century Theater, Methods, History.pptx
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
Introduction to Building Materials
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
1_English_Language_Set_2.pdf probationary
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
HVAC Specification 2024 according to central public works department
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
What if we spent less time fighting change, and more time building what’s rig...
Computer Architecture Input Output Memory.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
IGGE1 Understanding the Self1234567891011
Empowerment Technology for Senior High School Guide
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Paper A Mock Exam 9_ Attempt review.pdf.
20th Century Theater, Methods, History.pptx
LDMMIA Reiki Yoga Finals Review Spring Summer
Share_Module_2_Power_conflict_and_negotiation.pptx
Introduction to Building Materials
Chinmaya Tiranga quiz Grand Finale.pdf
1_English_Language_Set_2.pdf probationary
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Practical Manual AGRO-233 Principles and Practices of Natural Farming

Mmup questionnaire 4

  • 1. Question No. 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 > 30 MMUP Review Exam - Answer Key Name: ID.No:
  • 2. Question No. A B C D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 > 30 MMUP Review Exam - Answer Sheet Name: EMP.No:
  • 3. Cost Control Department > MMUP Review Exam Name: EMP No. Project: Date: Page 1 of 7
  • 4. Cost Control Department 1 Completion of an activity on CPM network diagram is generally known as: a. Event b. Node c. Connector d. All Of The Above. 2 Pick up the incorrect statement from the following: a. The Activity Is The Time Consuming Part Of A Project. b. The Beginning And The End Of A Job Are Called Events. c. The Activity Which Consumes Maximum Time Is Called Anode. d. Logically And Sequentially Connected Activities And Events From A Network 3 Critical path lies along the activites having total float a. Positive b. Negative c. Zero d. Same 4 PERT is: a. An Analytic Concept. b. Limited Of Event Oriented Diagrams. c. Used For Research And Development Project d. All Of The Above. 5 For the network shown in the given figure, the expected time for the activity. 3 - 4 - 5 5 - 7 - 9 6 - 8 - 10 a. 1-2 Is 4 b. 2-3 Is 7 c. 3-4 Is 8 d. All Of The Above. 6 The three time estimates for the activities fo the network shown in the given figure are shown above their arrows: The earliest expected time for the even 4 is: 3 - 4 - 5 5 - 7 - 9 6 - 8 - 10 a. 19 b. 14 c. 24 d. None Of Those 1 2 3 4 1 2 3 4 Page 2 of 7
  • 5. Cost Control Department 7 Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2 is: 15 - 28 - 21 27 - 35 - 43 12 - 15 - 16 a. .20 b. .25 c. .35 d. .15 8 Work Package XX have a(4) stage and each stage will take one week to complete with $500 estimated cost per stage. End of 2nd week, 3 stages were completed and contractor has spend $1,700. What is the cost variance (cv)? a. 500 b. -$200 c. 200 d. None Of The Above. 9 Assume you can lease an item you need for project for $ 800/day. To purchase the item the cost is $ 12,000 plus daily operational cost of $ 400/day. If you need the item for more than 30 days, it is more economical to: a. To Lease It b. To Purchase It 10 Bob invest $ 1,000 today and an interest rate of 5%. After 10 years, his investment will be worth? a. 1200.2 b. 1500.49 c. 1628.89 d. 1328.4 1 2 3 4 Page 3 of 7
  • 6. Cost Control Department 11 Determine the nominal moment Mn for a beam of cross section shown where fc1 = 4,000, Psi assume A615, grade 60 steel that has a yield strength of 60 Ksi and a modulus of elasticity = 29x106 Psi a. 247.78 Ft.Kip b. 274.78 Ft.Kip c. 278.47 Ft.Kip d. 297.34 Ft.Kip 12 Under normal conditions using an ordinary cement, the period of removal of the form work is: a. 7 Days For Beam Soffits b. 14 Days For Bottom Slabs Of Spans 4.6 M And More c. 21 Days For Bottom Beams Over 6 M Spans d. All Of The Above. 13 Construction joint should be provided within: a. The Middle Third Of Spans b. At 1/3 To 1/4 Of Span In Slabs And Beams c. Where Bm And S.F. Are Small d. All Of The Above. 14 The increased cohesiveness of concrete makes it: a. Less Liable To Segregation b. More Liable To Segregation c. More Liable To Bleeding d. More Liable For Surface Scaling In Frosty Weather Page 4 of 7
  • 7. Cost Control Department 15 Pick up the correct statement from the following: a. The Weight Of Ingredients Of Concrete Mix Is Taken In Kilograms. b. Water And Aggregates Are Measured In Liters. c. The Finished Concrete Is Measured In Cubic Meters. d. All Of The Above. 16 Workability of concrete is measured by: a. Vicat Apparatus Test b. Slump Test c. Minimum Void Method d. Talbot Richart Test 17 According to the recommendation of IS 456-1978, the expansion joints: a. Are Provided Where Plane Changes Abruptly b. Are Provided To Ensure Minimum Resistance. c. Are Supported On Separate Columns d. All Of The Above. 18 Shrinkage in concrete can be reduced by using: a. Low Water Cement Ratio. b. Less Cement In The Concrete. c. Proper Concrete Mix. d. Pre-Saturated Aggregates 19 You are asked to construct a massive dam. The type of cement you will use is: a. Ordinary Portland Cement b. Rapid Hardening Cement c. Low Heat Cement d. Blast Furnace Slag Cement 20 C.R.R.I. are used to obtain a relationship between strength of concrete and: a. Water Cement Ratio b. Workability c. Grading Of Aggregate d. Fineness Modulus 21 Specified compressive strength of concrete is obtained from cube tests at the end of: a. 3 Days b. 7 Days c. 14 Days d. 28 Days Page 5 of 7
  • 8. Cost Control Department 22 The grade of concrete M150 means tha compressive strength of a 15 cube after 28 days is a. 100 Kg/Cm² b. 150 Kg/Cm² c. 200 Kg/Cm² d. 250 Kg/Cm² 23 The main object of compaction of concete is a. To Elimate Air Holes b. To Achieve Maximum Density c. To Provide Intimate Contact Between The Concrete And Embedded Materials d. All Of The Above 24 Non-uniform compaction may cause the concrete a. Porous b. Non-Homogeneous c. Reduced Strength d. All Of The Above 25 Consider the following statements in relation to the given sketch 1. Soil is partially saturated at degree of saturation = 60% 2. Void Ratio = 40% 3. Water Content = 30% 4. Saturated unit weight = 1.5 glcc a. 1,2 And 3 Are Correct b. 1,3 And 4 Are Correct c. 2,3 And 4 Are Correct d. 1,2 And 4 Are Correct 26 The structure shown in the given figure is stable if a. X = 2Y b. 2X = Y c. √2 d. X = √2 Y 27 The final deflection due to all loads including the effects of temperature, creep and shringage and measured from as-cost level of supports of floors, roof and all other horizontal members should not exceed a. Span/350 b. Span/300 c. Span/250 d. Span/200 Page 6 of 7
  • 9. Cost Control Department 28 In the truss shown in the given figure which one of the following members has no force induced in it? a. C.D. b. C.E. c. C.F. d. D.F. 29 The fluid in Fig 01 is water and h=7.16m assuming the atmas pheric pressure is standard, compute gauge pressure and absolute pressure at (N) a. 3.3 KPa b. 310.8 KPa c. 33 KPa d. 31.08 KPa 30 A piece of wood 305mm (1 ft) square and 3m (L 0ft) long weighing 6,288.46n/m³ (40 Lb/ft³) is submerged vertically in a body of water its upper end being flush with the water surface. What vertical force required to hold it positions. a. 98.27 N b. 982.77 N c. 1000 N d. 100 N W W L L L D E F A C + h water F BF W 3m Page 7 of 7