MMUP Review Exam - Answer Key
Name: ID.No:
Question No. A B C D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
^ 30
MMUP Review Exam - Answer Sheet
Name: EMP.No:
Cost Control Department
^
MMUP Review Exam
Name: EMP No.
Project:
Date:
Page 1 of 7
Cost Control Department
1 Completion of an activity on CPM network diagram is generally known as:
a. Event
b. Node
c. Connector
d. All Of The Above.
2 Pick up the incorrect statement from the following:
a. The Activity Is The Time Consuming Part Of A Project.
b. The Beginning And The End Of A Job Are Called Events.
c. The Activity Which Consumes Maximum Time Is Called Anode.
d. Logically And Sequentially Connected Activities And Events From A Network
3 Critical path network helps an engineer to:
a. To Concentrate His Attention On Critical Activities.
b. To Divert The Resources From Non-Critical Advanced Activities To Critical Activities.
c. To Be Cautious For Avoiding Any Delay In The Ciritical Activities To Avoid Delay Of The Project.
d. All Of The Above.
4 Pick up the correct network for the activities of pouring concrete, erection of formwork, removal of
formwork and curing of concrete from the following:
a. Pouring Of Concrete, Erection Of Form Work, Curing Of Concrete, Removal Of Formwork.
b. Erection Of Formwork, Pouring Of Concrete, Curing Of Concrete, Removal Of Formwork.
c. Removal Of Formwork, Erection Of Formwork, Pouring Of Concrete, Curing Of Concrete.
d. Pouring Of Concrete, Curing Of Concrete, Erection Of Formwork, Removal Of Formwork.
5 The first state of a construction is:
a. Preparation Of Estimate.
b. Survey Of The Site.
c. Initiation Of Proposal.
d. Preparation Of Tender.
6 The three time estimates for the activities fo the network shown in the given figure are shown above their
arrows: The earliest expected time for the even 4 is:
3 - 4 - 5 5 - 7 - 9 6 - 8 - 10
a. 19
b. 14
c. 24
d. None Of Those
1 2 3 4
Page 2 of 7
Cost Control Department
7 Work Package XX have a(4) stage and each stage will take one week to complete with $500 estimated
cost per stage. End of 2nd week, 3 stages were completed and contractor has spend $1,700. What is
the cost variance (cv)?
a. 500
b. -$200
c. 200
d. None Of The Above.
8 A subcontractor has the task of erecting 8,400 sq2 of metal scaffolds. The contractor can use several
crews with various cost. It is expected that the production will vary with the crew size as given below:
Consider the following rates:
Labor = $ 96/day; Carpenter = $ 128/day; Foreman = $ 144/day; Scaffolder = $60/day
a. $ 76.22 /Day
b. $ 33.252 /Day
c. $ 70.00 /Day
d. None Of The Above.
9 A 10 kg block hangs from a cable. What is the tension in the cable?
a. 98 Kg
b. 101 Kg.M/Sec2
c. 98 N
d. 100 Kg
10
A force of 10 Kn is acting on circular rod with diameter 10 mm, and 2m long and made of steel with
modulus of elasticity of 200 Gpa. The change length is
a. 1.27 mm
b. 0,0127 mm
c. 0,00127mm
d. 2 mm
11
If a concrete beam is supported as continuous beam, the section at the support must be designated as:
a. T-Beam
b. Rectangular Beam
c. Simply Supported Beam
d. Flange Beam
Page 3 of 7
Cost Control Department
12
A retaining wall h = 5m, rsoil = 19Kn/m3,angle of friction Φ = 30o
Calculate the earth pressure on the wall.
a. 120 Kn/M
b. 55 Kn/M
c. 78 Kn/M
d. None Of The Above.
13 Determine the average plastic limit in soil
Observation:
Help: Plastic limit = water content
The water content (W) of soil sample = mass of water x 100 average value
mass of solids
a. 0.137
b. 0.12
c. 0.437
d. 0.0173
14 Under normal conditions using an ordinary cement, the period of removal of the form work is:
a. 7 Days For Beam Soffits
b. 14 Days For Bottom Slabs Of Spans 4.6 M And More
c. 21 Days For Bottom Beams Over 6 M Spans
d. All Of The Above.
15 Stripping times of formwork are below:
a. Beams Side Wall And Columns (1 Day)
b. Beams Joist And Grider (10 Days) Props To Beam 15 Days
c. All Of The Above.
16 Construction joint should be provided within:
a. The Middle Third Of Spans
b. At 1/3 To 1/4 Of Span In Slabs And Beams
c. Where Bm And S.F. Are Small
d. All Of The Above.
17 Pick up the correct statement from the following:
a. The Weight Of Ingredients Of Concrete Mix Is Taken In Kilograms.
b. Water And Aggregates Are Measured In Liters.
c. The Finished Concrete Is Measured In Cubic Meters.
d. All Of The Above.
Page 4 of 7
Cost Control Department
18 Specified compressive strength of concrete is obtained from cube tests at the end of:
a. 3 Days
b. 7 Days
c. 14 Days
d. 28 Days
19 ISI has specified full strength of concrete after:
a. 7 Days
b. 14 Days
c. 21 Days
d. None Of These.
20 Joints in concrete structures, are provided
a. To Reduce The Tensile Stresses Likely To Be Developed Due To Evaporation Of Water
b. Minimise The Change In The Dimensions Of The Slab
c. To Minimise The Necessary Cracking
d. All Of The Above
21 High temperature
a. Increases The Strength Of Concrete
b. Decreases The Strength Of Concrete
c. Has No Effect On The Strength Of Concrete
d. None Of The Above
22 The top diameter, bottom diameter and the height of a slump mould are:
a. 10Cm, 20Cm, 30Cm
b. 10Cm, 30Cm, 20 Cm
c. 20Cm, 10Cm, 30Cm
d. 20Cm, 30Cm, 10Cm
23 Placing of concrete should preferably be done at a temperature of
a. 0°C
b. 10°C
c. 20°C
d. 27 ± 2°C
24 Non-uniform compaction may cause the concrete
a. Porous
b. Non-Homogeneous
c. Reduced Strength
d. All Of The Above
Page 5 of 7
Cost Control Department
25 Strength of concrete with passage of time
a. Increases
b. Decreases
c. Fluctuates
d. Remains Constant
26
The shear force diagram for a simple supported beam of span L is given in the figure. The maximum
bending moment is
a. W.L/2
b. W(L/2 - L1)
c. W L1
d. W (L - 2L1)
27
Couple M is applied at C a simply supported Beam AB. What is the maximum shear force for the Beam?
a. Zero
b. M
c. 2M/3
d. M/3
28 The frame shown in the given figure has
a. One Unknown Reaction Components
b. Two Unknown Reaction Components
c. Three Unknown Components
d. Six Unknown Reaction Components
29
The final deflection due to all loads including the effects of temperature, creep and shringage and
measured from as-cost level of supports of floors, roof and all other horizontal members should not
exceed
a. Span/350
b. Span/300
c. Span/250
d. Span/200
Page 6 of 7
Cost Control Department
30
In the truss shown in the given figure which one of the following members has no force induced in it?
a. C.D.
b. C.E.
c. C.F.
d. D.F.
W W
L L L
D
E F
A C
Page 7 of 7

More Related Content

PDF
Mmup questionnaire 3
PDF
Mmup questionnaire 4
PDF
Mmup questionnaire 10
PDF
Mmup questionnaire 1
PDF
Mmup questionnaire 6
PDF
Mmup questionnaire 7
PDF
Mmup questionnaire 5
PDF
Mmup questionnaire 9
Mmup questionnaire 3
Mmup questionnaire 4
Mmup questionnaire 10
Mmup questionnaire 1
Mmup questionnaire 6
Mmup questionnaire 7
Mmup questionnaire 5
Mmup questionnaire 9

What's hot (8)

PDF
Mmup questionnaire 8
PPTX
PPT
Lec 16-flexural analysis and design of beamns
PDF
Ev 2 calculo aplicado 2021
DOCX
STRIPPING OF FORMWORK
PDF
07 a60105 estimatingandcosting
PDF
06 cv662
PDF
6.eastimating and costing
Mmup questionnaire 8
Lec 16-flexural analysis and design of beamns
Ev 2 calculo aplicado 2021
STRIPPING OF FORMWORK
07 a60105 estimatingandcosting
06 cv662
6.eastimating and costing
Ad

Similar to Mmup questionnaire 2 (15)

PDF
MMUP exam quastions (provided by people who took the exam)
PDF
Ssc junior-engineer-question-papers-for-civil-7
PDF
2.concrete technology
DOCX
@ETCONp Construction Exam 8 .DOCX
PPTX
Concrete technology-questions
PDF
Civil engineering objective 5
PPTX
QUIZ-I (PM).pptx fundamentals of construction technology
PDF
civil engineering question with Answer RCC
PDF
3.structure engineering
PDF
Civil Engineering Competitive Questions
PDF
Ce1302 design of rc elements
PDF
Top civil engineering Interview questions and Answers
DOCX
Ayush
PPTX
CONSTRUCTION MATERIALS OF CIVIL ENGG.pptx
PPTX
Labour Productivity for construction projects
MMUP exam quastions (provided by people who took the exam)
Ssc junior-engineer-question-papers-for-civil-7
2.concrete technology
@ETCONp Construction Exam 8 .DOCX
Concrete technology-questions
Civil engineering objective 5
QUIZ-I (PM).pptx fundamentals of construction technology
civil engineering question with Answer RCC
3.structure engineering
Civil Engineering Competitive Questions
Ce1302 design of rc elements
Top civil engineering Interview questions and Answers
Ayush
CONSTRUCTION MATERIALS OF CIVIL ENGG.pptx
Labour Productivity for construction projects
Ad

More from Omar Selim (20)

PDF
Omar Salim Biography Omar Salim Biography
PDF
OMAR SELIM portfolio OMAR SELIM portfolio
PDF
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
PDF
إعادة الإعمار .pdf
PDF
_الذكاء الاصطناعي .pdf
PDF
SmartHome.pdf
PDF
_الذكاء الاصطناعي .pdf
DOCX
Ch-3.docx
DOCX
ch-12.docx
DOCX
Ch-4.docx
DOCX
ch8.docx
DOCX
ch10.docx
DOCX
ch-11.docx
DOCX
ch9.docx
DOCX
ch-13.docx
DOCX
Ch-5.docx
DOCX
Ch-2.docx
DOCX
ch-6.docx
DOCX
Ch-1.docx
DOCX
all.docx
Omar Salim Biography Omar Salim Biography
OMAR SELIM portfolio OMAR SELIM portfolio
BIM_Director_OMAR_SELIM_CV BIM_Director_OMAR_SELIM_CV
إعادة الإعمار .pdf
_الذكاء الاصطناعي .pdf
SmartHome.pdf
_الذكاء الاصطناعي .pdf
Ch-3.docx
ch-12.docx
Ch-4.docx
ch8.docx
ch10.docx
ch-11.docx
ch9.docx
ch-13.docx
Ch-5.docx
Ch-2.docx
ch-6.docx
Ch-1.docx
all.docx

Recently uploaded (20)

PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
Introduction to pro and eukaryotes and differences.pptx
PPTX
Computer Architecture Input Output Memory.pptx
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Indian roads congress 037 - 2012 Flexible pavement
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Practical Manual AGRO-233 Principles and Practices of Natural Farming
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Share_Module_2_Power_conflict_and_negotiation.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Hazard Identification & Risk Assessment .pdf
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
AI-driven educational solutions for real-life interventions in the Philippine...
Unit 4 Computer Architecture Multicore Processor.pptx
Introduction to pro and eukaryotes and differences.pptx
Computer Architecture Input Output Memory.pptx

Mmup questionnaire 2

  • 1. Question No. 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 ^ 30 MMUP Review Exam - Answer Key Name: ID.No:
  • 2. Question No. A B C D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 ^ 30 MMUP Review Exam - Answer Sheet Name: EMP.No:
  • 3. Cost Control Department ^ MMUP Review Exam Name: EMP No. Project: Date: Page 1 of 7
  • 4. Cost Control Department 1 Completion of an activity on CPM network diagram is generally known as: a. Event b. Node c. Connector d. All Of The Above. 2 Pick up the incorrect statement from the following: a. The Activity Is The Time Consuming Part Of A Project. b. The Beginning And The End Of A Job Are Called Events. c. The Activity Which Consumes Maximum Time Is Called Anode. d. Logically And Sequentially Connected Activities And Events From A Network 3 Critical path network helps an engineer to: a. To Concentrate His Attention On Critical Activities. b. To Divert The Resources From Non-Critical Advanced Activities To Critical Activities. c. To Be Cautious For Avoiding Any Delay In The Ciritical Activities To Avoid Delay Of The Project. d. All Of The Above. 4 Pick up the correct network for the activities of pouring concrete, erection of formwork, removal of formwork and curing of concrete from the following: a. Pouring Of Concrete, Erection Of Form Work, Curing Of Concrete, Removal Of Formwork. b. Erection Of Formwork, Pouring Of Concrete, Curing Of Concrete, Removal Of Formwork. c. Removal Of Formwork, Erection Of Formwork, Pouring Of Concrete, Curing Of Concrete. d. Pouring Of Concrete, Curing Of Concrete, Erection Of Formwork, Removal Of Formwork. 5 The first state of a construction is: a. Preparation Of Estimate. b. Survey Of The Site. c. Initiation Of Proposal. d. Preparation Of Tender. 6 The three time estimates for the activities fo the network shown in the given figure are shown above their arrows: The earliest expected time for the even 4 is: 3 - 4 - 5 5 - 7 - 9 6 - 8 - 10 a. 19 b. 14 c. 24 d. None Of Those 1 2 3 4 Page 2 of 7
  • 5. Cost Control Department 7 Work Package XX have a(4) stage and each stage will take one week to complete with $500 estimated cost per stage. End of 2nd week, 3 stages were completed and contractor has spend $1,700. What is the cost variance (cv)? a. 500 b. -$200 c. 200 d. None Of The Above. 8 A subcontractor has the task of erecting 8,400 sq2 of metal scaffolds. The contractor can use several crews with various cost. It is expected that the production will vary with the crew size as given below: Consider the following rates: Labor = $ 96/day; Carpenter = $ 128/day; Foreman = $ 144/day; Scaffolder = $60/day a. $ 76.22 /Day b. $ 33.252 /Day c. $ 70.00 /Day d. None Of The Above. 9 A 10 kg block hangs from a cable. What is the tension in the cable? a. 98 Kg b. 101 Kg.M/Sec2 c. 98 N d. 100 Kg 10 A force of 10 Kn is acting on circular rod with diameter 10 mm, and 2m long and made of steel with modulus of elasticity of 200 Gpa. The change length is a. 1.27 mm b. 0,0127 mm c. 0,00127mm d. 2 mm 11 If a concrete beam is supported as continuous beam, the section at the support must be designated as: a. T-Beam b. Rectangular Beam c. Simply Supported Beam d. Flange Beam Page 3 of 7
  • 6. Cost Control Department 12 A retaining wall h = 5m, rsoil = 19Kn/m3,angle of friction Φ = 30o Calculate the earth pressure on the wall. a. 120 Kn/M b. 55 Kn/M c. 78 Kn/M d. None Of The Above. 13 Determine the average plastic limit in soil Observation: Help: Plastic limit = water content The water content (W) of soil sample = mass of water x 100 average value mass of solids a. 0.137 b. 0.12 c. 0.437 d. 0.0173 14 Under normal conditions using an ordinary cement, the period of removal of the form work is: a. 7 Days For Beam Soffits b. 14 Days For Bottom Slabs Of Spans 4.6 M And More c. 21 Days For Bottom Beams Over 6 M Spans d. All Of The Above. 15 Stripping times of formwork are below: a. Beams Side Wall And Columns (1 Day) b. Beams Joist And Grider (10 Days) Props To Beam 15 Days c. All Of The Above. 16 Construction joint should be provided within: a. The Middle Third Of Spans b. At 1/3 To 1/4 Of Span In Slabs And Beams c. Where Bm And S.F. Are Small d. All Of The Above. 17 Pick up the correct statement from the following: a. The Weight Of Ingredients Of Concrete Mix Is Taken In Kilograms. b. Water And Aggregates Are Measured In Liters. c. The Finished Concrete Is Measured In Cubic Meters. d. All Of The Above. Page 4 of 7
  • 7. Cost Control Department 18 Specified compressive strength of concrete is obtained from cube tests at the end of: a. 3 Days b. 7 Days c. 14 Days d. 28 Days 19 ISI has specified full strength of concrete after: a. 7 Days b. 14 Days c. 21 Days d. None Of These. 20 Joints in concrete structures, are provided a. To Reduce The Tensile Stresses Likely To Be Developed Due To Evaporation Of Water b. Minimise The Change In The Dimensions Of The Slab c. To Minimise The Necessary Cracking d. All Of The Above 21 High temperature a. Increases The Strength Of Concrete b. Decreases The Strength Of Concrete c. Has No Effect On The Strength Of Concrete d. None Of The Above 22 The top diameter, bottom diameter and the height of a slump mould are: a. 10Cm, 20Cm, 30Cm b. 10Cm, 30Cm, 20 Cm c. 20Cm, 10Cm, 30Cm d. 20Cm, 30Cm, 10Cm 23 Placing of concrete should preferably be done at a temperature of a. 0°C b. 10°C c. 20°C d. 27 ± 2°C 24 Non-uniform compaction may cause the concrete a. Porous b. Non-Homogeneous c. Reduced Strength d. All Of The Above Page 5 of 7
  • 8. Cost Control Department 25 Strength of concrete with passage of time a. Increases b. Decreases c. Fluctuates d. Remains Constant 26 The shear force diagram for a simple supported beam of span L is given in the figure. The maximum bending moment is a. W.L/2 b. W(L/2 - L1) c. W L1 d. W (L - 2L1) 27 Couple M is applied at C a simply supported Beam AB. What is the maximum shear force for the Beam? a. Zero b. M c. 2M/3 d. M/3 28 The frame shown in the given figure has a. One Unknown Reaction Components b. Two Unknown Reaction Components c. Three Unknown Components d. Six Unknown Reaction Components 29 The final deflection due to all loads including the effects of temperature, creep and shringage and measured from as-cost level of supports of floors, roof and all other horizontal members should not exceed a. Span/350 b. Span/300 c. Span/250 d. Span/200 Page 6 of 7
  • 9. Cost Control Department 30 In the truss shown in the given figure which one of the following members has no force induced in it? a. C.D. b. C.E. c. C.F. d. D.F. W W L L L D E F A C Page 7 of 7