Presented by
Dr. R. RAJA, M.E., Ph.D.,
Assistant Professor, Department of EEE,
Muthayammal Engineering College, (Autonomous)
Namakkal (Dt), Rasipuram – 637408
MUTHAYAMMAL ENGINEERING COLLEGE
(An Autonomous Institution)
(Approved by AICTE, New Delhi, Accredited by NAAC, NBA & Affiliated to Anna University),
Rasipuram - 637 408, Namakkal Dist., Tamil Nadu.
Obstacles to TQM Implementation
Obstacles to TQM Implementation
Many organizations, especially small ones with a niche, are comfortable with their
current state. They are satisfied with the amount of work being performed, the profits
realized and the perception that the customers are satisfied. Organizations with this
culture will see little need for TQM until they begin to lose market share.
1. Lack of management commitment
 In order for any organizational effort to succeed, there must be a substantial
management commitment of management time and organizational resources.
 The purpose must be clearly and continuously communicated to all personnel
management must consistently apply the principle of TQM.
10/20/2020 2
Count..
2. Inability to change organizational culture
Changing an organization's culture is difficult and will require as much as five years.
Individuals resist change--they become habituated to doing a particular process and it
becomes the preferred way. Management must understand and utilize the basic
concepts of change. They are;
1. People change when they want to and to meet their own needs
2. Never expect anyone to engage in behaviour that serves the organization's values
unless adequate reason(why) has been given.
3. For change to be accepted, people must be moved from a state of fear to trust.
It is difficult for individuals to change their way of doing things; It is much more
difficult for an organization to make cultural change.
10/20/2020 3
 Organization that spend more planning for the cultural aspects of implementing
a TQM program will improve their chance of success. e.g. concern to India,
Chandigarh is the first smoke free city of India, this is the cultural change.
3. Improper planning
 All constituents of the organization must be involved in the development of the
implementation plan and any modifications that occur as the plan evolves.
 The Two-way communication of ideas is the matter of great importance and
should be taken by all personnel during the development of the plan and its
implementation. Customer satisfaction should be the goal rather than financial
or sales goals.
10/20/2020 4
Count..
Count..
4. Lack of continuous training and education
 Training and education is an ongoing process for everyone in the organization.
Needs must be determined and a plan developed to achieve those needs.
 Training and education are most effective, when senior management conducts
the training on the principles of TQM. External trainer can be hired for
communicating the TQM effort to all personnel on a continual basis.
 Lack of training in group discussion and communication techniques, quality
improvement skills, problem identification, and the problem-solving method
was the second most important obstacle.
10/20/2020 5
Count..
5. Incompatible organizational structure and isolated individuals and
departments
 Difference between departments and individuals can create implementation
problems.
 The use of multifunctional teams will help to break down long-standing
barriers.
 Restructuring to make the organization more response to customer needs may
be needed. Individuals who do not embrace the new philosophy can be required
to leave the organization.
10/20/2020 6
6. Ineffective measurement techniques and lack of access to data and results
 Key characteristics of the organization should be measured for effective
decision making.
 To improve a process are you need to measure the effect of improvement ideas.
Access to data and quick retrieval is necessary for effective processes.
 Find the root cause, correct the problem and eliminate the root cause to prevent
recurrence of the problem
10/20/2020 7
Count..
Count..
7. Paying inadequate attention to internal and external customers
 Organizations need to understand the changing needs and expectations of their
customers.
 Effective feedback mechanism that provide data for decision making are
necessary for this understanding. Give the right people (who are directly
working on the product) direct access to the customers.
 When an organization fails to empower individuals and teams, it can't hold
them responsible for producing results.
10/20/2020 8
8. Inadequate use of empowerment and team work
 Teams need to have the proper training and at least in the beginning by a
facilitator. Individuals should be empowered to make decisions that affect the
efficiency of their process or the satisfaction of their customer.
9. Failure to continuously improve
 It is tempting to sit back and rest on your laurels. However, a lack of continuous
improvement of the process, product and service will even leave the leader of
the pack in the dust.
10/20/2020 9
Count..
Thank You
10/20/2020 10

More Related Content

PPTX
Value chain analysis
PPTX
Total Quality Management (TQM)
PPT
Kano Model
PPTX
Startup India PPT
PPTX
Total Quality Management
PPT
Supplier Relationship Management
PPTX
GATT AND WTO
Value chain analysis
Total Quality Management (TQM)
Kano Model
Startup India PPT
Total Quality Management
Supplier Relationship Management
GATT AND WTO

What's hot (20)

PPTX
TQM Framework, Benefits and Obstacles
PPTX
PPTX
Quality Statements
PPTX
The deming philosophy
PPTX
Quality function deployment (qfd)
PPTX
Dr. Kaoru Ishikawa
PPTX
Production and operations management
PPTX
Importance of Leadership in Total Quality Mangement
PPT
New 7 Management Tools
PPT
Customer Satisfaction-Total Quality Management (TQM)
PPTX
Quality circle
PPT
TQM QFD
DOCX
Total quality management
PPSX
Reliability for Total Quality Management (TQM)
PPTX
Quality Guru Philip B. Crosby’s Management Principles
PPTX
Quality control and inspection
PPTX
Strategic quality planning
PPTX
Joseph juran contribution to tqm
PPT
Quality Function Development
TQM Framework, Benefits and Obstacles
Quality Statements
The deming philosophy
Quality function deployment (qfd)
Dr. Kaoru Ishikawa
Production and operations management
Importance of Leadership in Total Quality Mangement
New 7 Management Tools
Customer Satisfaction-Total Quality Management (TQM)
Quality circle
TQM QFD
Total quality management
Reliability for Total Quality Management (TQM)
Quality Guru Philip B. Crosby’s Management Principles
Quality control and inspection
Strategic quality planning
Joseph juran contribution to tqm
Quality Function Development
Ad

Similar to Obstacles to TQM Implementation (20)

PDF
INCLUSIVE TRAINING AT WORKPLACE THROUGH INFORMATION TECHNOLOGY
DOCX
14 hours agoNikesh Bantu Discussion 1COLLAPSETop of Form.docx
DOCX
Unit VIII Homework Conduct a phone or personal interview wi.docx
DOCX
Obstacle to tqm
PDF
04 project report .pdf
DOCX
Running head RISK 1RISK6Risk Analys.docx
DOCX
Discussion1INNOVATIONMEANING- The innovation is the process .docx
PDF
Quality Statements and Seven Steps to Strategic Quality Planning
DOCX
Competitive landscape of indian it industry
PDF
A STUDY ON EMPLOYEE RETENTION PRACTICES OF AUTOMOBILE INDUSTRIES IN INDIA WIT...
DOCX
Running head RISKS AND REWARDS 1RISKS AND REWAR.docx
DOCX
Business Analysis and System Recommendation.docx
PDF
Key Factors required to Implement Total Quality Management within the Textile...
PPTX
Skill gap and hrd interventions
PPTX
Organizational Change
PPTX
Communication Plan of Organization PowerPoint
DOCX
Discussion 1Post 1Top of FormToday, data quality and privac.docx
PDF
Human Resource Information Systems Basics Applications and Future Directions ...
PDF
Dynamics of Motivation strategies for Knowledgeworker
DOCX
Running head LEVERAGING HUMAN CAPITAL ACQUIRING EMPLOYEES .docx
INCLUSIVE TRAINING AT WORKPLACE THROUGH INFORMATION TECHNOLOGY
14 hours agoNikesh Bantu Discussion 1COLLAPSETop of Form.docx
Unit VIII Homework Conduct a phone or personal interview wi.docx
Obstacle to tqm
04 project report .pdf
Running head RISK 1RISK6Risk Analys.docx
Discussion1INNOVATIONMEANING- The innovation is the process .docx
Quality Statements and Seven Steps to Strategic Quality Planning
Competitive landscape of indian it industry
A STUDY ON EMPLOYEE RETENTION PRACTICES OF AUTOMOBILE INDUSTRIES IN INDIA WIT...
Running head RISKS AND REWARDS 1RISKS AND REWAR.docx
Business Analysis and System Recommendation.docx
Key Factors required to Implement Total Quality Management within the Textile...
Skill gap and hrd interventions
Organizational Change
Communication Plan of Organization PowerPoint
Discussion 1Post 1Top of FormToday, data quality and privac.docx
Human Resource Information Systems Basics Applications and Future Directions ...
Dynamics of Motivation strategies for Knowledgeworker
Running head LEVERAGING HUMAN CAPITAL ACQUIRING EMPLOYEES .docx
Ad

More from Dr.Raja R (20)

PDF
Advanced Electrical Drive Controls, Types and Implementation”
PDF
Electrical Drives and Control Heating and Cooling Curves
PDF
Classification of electric drive with advantage and disadvantage
PDF
Electric Drives and Controls Unit 1 Introduction
PDF
Qualitative study of different renewable energy resources
PDF
Environmental impacts of renewable energy generation systems (cost ghg emission)
PDF
Applications of carbon materials in electrical engineering
PDF
Circuit Theory: Nodes, Branches and Loops of a Circuit
PDF
High voltage transformers
PDF
Making india non fossil fuel based
PDF
Stepper motor in industrial applications
PDF
Advances in Solar Panel Technologies for Efficient Energy Production
PDF
Introduction to reactive power control in electrical power
PDF
Basic Difference Between Wires and Cables
PDF
Residential Electrical Wiring Systems Basics
PDF
Renewable energy and sustainable development
PDF
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
PDF
Benchmarking in Total Quality Management
PDF
Types of Benchmarking in Total Quality Management
PDF
Reasons to Benchmark in Total Quality Management
Advanced Electrical Drive Controls, Types and Implementation”
Electrical Drives and Control Heating and Cooling Curves
Classification of electric drive with advantage and disadvantage
Electric Drives and Controls Unit 1 Introduction
Qualitative study of different renewable energy resources
Environmental impacts of renewable energy generation systems (cost ghg emission)
Applications of carbon materials in electrical engineering
Circuit Theory: Nodes, Branches and Loops of a Circuit
High voltage transformers
Making india non fossil fuel based
Stepper motor in industrial applications
Advances in Solar Panel Technologies for Efficient Energy Production
Introduction to reactive power control in electrical power
Basic Difference Between Wires and Cables
Residential Electrical Wiring Systems Basics
Renewable energy and sustainable development
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality Management
Reasons to Benchmark in Total Quality Management

Recently uploaded (20)

PPTX
introduction to high performance computing
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
UNIT - 3 Total quality Management .pptx
PPTX
Current and future trends in Computer Vision.pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Artificial Intelligence
PPT
introduction to datamining and warehousing
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PDF
Soil Improvement Techniques Note - Rabbi
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PPT
Occupational Health and Safety Management System
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
introduction to high performance computing
Fundamentals of safety and accident prevention -final (1).pptx
Fundamentals of Mechanical Engineering.pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Information Storage and Retrieval Techniques Unit III
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
UNIT - 3 Total quality Management .pptx
Current and future trends in Computer Vision.pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Artificial Intelligence
introduction to datamining and warehousing
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Soil Improvement Techniques Note - Rabbi
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Occupational Health and Safety Management System
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk

Obstacles to TQM Implementation

  • 1. Presented by Dr. R. RAJA, M.E., Ph.D., Assistant Professor, Department of EEE, Muthayammal Engineering College, (Autonomous) Namakkal (Dt), Rasipuram – 637408 MUTHAYAMMAL ENGINEERING COLLEGE (An Autonomous Institution) (Approved by AICTE, New Delhi, Accredited by NAAC, NBA & Affiliated to Anna University), Rasipuram - 637 408, Namakkal Dist., Tamil Nadu. Obstacles to TQM Implementation
  • 2. Obstacles to TQM Implementation Many organizations, especially small ones with a niche, are comfortable with their current state. They are satisfied with the amount of work being performed, the profits realized and the perception that the customers are satisfied. Organizations with this culture will see little need for TQM until they begin to lose market share. 1. Lack of management commitment  In order for any organizational effort to succeed, there must be a substantial management commitment of management time and organizational resources.  The purpose must be clearly and continuously communicated to all personnel management must consistently apply the principle of TQM. 10/20/2020 2
  • 3. Count.. 2. Inability to change organizational culture Changing an organization's culture is difficult and will require as much as five years. Individuals resist change--they become habituated to doing a particular process and it becomes the preferred way. Management must understand and utilize the basic concepts of change. They are; 1. People change when they want to and to meet their own needs 2. Never expect anyone to engage in behaviour that serves the organization's values unless adequate reason(why) has been given. 3. For change to be accepted, people must be moved from a state of fear to trust. It is difficult for individuals to change their way of doing things; It is much more difficult for an organization to make cultural change. 10/20/2020 3
  • 4.  Organization that spend more planning for the cultural aspects of implementing a TQM program will improve their chance of success. e.g. concern to India, Chandigarh is the first smoke free city of India, this is the cultural change. 3. Improper planning  All constituents of the organization must be involved in the development of the implementation plan and any modifications that occur as the plan evolves.  The Two-way communication of ideas is the matter of great importance and should be taken by all personnel during the development of the plan and its implementation. Customer satisfaction should be the goal rather than financial or sales goals. 10/20/2020 4 Count..
  • 5. Count.. 4. Lack of continuous training and education  Training and education is an ongoing process for everyone in the organization. Needs must be determined and a plan developed to achieve those needs.  Training and education are most effective, when senior management conducts the training on the principles of TQM. External trainer can be hired for communicating the TQM effort to all personnel on a continual basis.  Lack of training in group discussion and communication techniques, quality improvement skills, problem identification, and the problem-solving method was the second most important obstacle. 10/20/2020 5
  • 6. Count.. 5. Incompatible organizational structure and isolated individuals and departments  Difference between departments and individuals can create implementation problems.  The use of multifunctional teams will help to break down long-standing barriers.  Restructuring to make the organization more response to customer needs may be needed. Individuals who do not embrace the new philosophy can be required to leave the organization. 10/20/2020 6
  • 7. 6. Ineffective measurement techniques and lack of access to data and results  Key characteristics of the organization should be measured for effective decision making.  To improve a process are you need to measure the effect of improvement ideas. Access to data and quick retrieval is necessary for effective processes.  Find the root cause, correct the problem and eliminate the root cause to prevent recurrence of the problem 10/20/2020 7 Count..
  • 8. Count.. 7. Paying inadequate attention to internal and external customers  Organizations need to understand the changing needs and expectations of their customers.  Effective feedback mechanism that provide data for decision making are necessary for this understanding. Give the right people (who are directly working on the product) direct access to the customers.  When an organization fails to empower individuals and teams, it can't hold them responsible for producing results. 10/20/2020 8
  • 9. 8. Inadequate use of empowerment and team work  Teams need to have the proper training and at least in the beginning by a facilitator. Individuals should be empowered to make decisions that affect the efficiency of their process or the satisfaction of their customer. 9. Failure to continuously improve  It is tempting to sit back and rest on your laurels. However, a lack of continuous improvement of the process, product and service will even leave the leader of the pack in the dust. 10/20/2020 9 Count..