A Scenario-based Approach to Strategic Planning
Integrating Planning and Process Perspective of Strategy
Torsten Wulf, Philip Meißner, Stephan Stubner
The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010.
-

Aim to the conflict between the planning school and the process school of strategy has shaped the debate on strategy
creation.
This scenario-based approach to strategic planning leads to the formulation of a core strategy which is complemented
by several strategic options that are derived from different strategic scenarios.
Overall, frameworks for strategy creation which integrate the planning and the process perspectives of strategy have to
fulfill four major requirements:
Multiple options: different strategy options for the diversity of possible future developments.
Multiple perspectives: viewpoints and information from diverse stakeholders in order to challenge existing assumptions.
Systematic, tool-based process: clear process for which specific strategy tools are defined so that an easy and quick application
to practice is possible.
Flexibility: Adaptable to different environmental conditions in order to ease application.

Overview of the scenario-based
approach to strategic planning.
A Scenario-based Approach to Strategic Planning
Integrating Planning and Process Perspective of Strategy
Torsten Wulf, Philip Meißner, Stephan Stubner
The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010.

1. Definition of Scope: Framing Checklist

2. Perception Analysis: 360° Stakeholder Feedback
(Survey instrument - available online and offline)
Three main goals drive this process step.
- To establish a comprehensive list of factors that
potentially influence the future of the company.
- To evaluate these factors according to their potential
performance impact and their degree of uncertainty.
- To benchmark perspectives of different stakeholder
groups concerning these influencing factors.
A Scenario-based Approach to Strategic Planning
Integrating Planning and Process Perspective of Strategy
Torsten Wulf, Philip Meißner, Stephan Stubner
The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010.
3. Trend and Uncertainty Analysis: Impact/ Uncertainty Grid (for the German Photovoltaic Industry)
A Scenario-based Approach to Strategic Planning
Integrating Planning and Process Perspective of Strategy
Torsten Wulf, Philip Meißner, Stephan Stubner
The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010.
4. Scenario Building: Scenario Matrix
Three steps to describe in more details
-Develop influence diagram for each scenario.
-Develop a storyline for each scenario on the basis of the influence diagram.
-Describe scenarios in full detail: Phoenix, Survival of the Fittest, Icarus, Go Green.

Key Uncertainty 1

Key Uncertainty 2

Simplified Influence Diagram for the German Photovoltaic Industry
A Scenario-based Approach to Strategic Planning
Integrating Planning and Process Perspective of Strategy
Torsten Wulf, Philip Meißner, Stephan Stubner
The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010.
5. Strategy Definition: Strategy Manual
-Strategy discussion around four important elements
- Developments in the macro-environment.
- Potential behavior of competitors and customers.
- The intended positioning and competitive strategies of one’s own company.
- The respective design of the value chain and action plans.
- Determine for each scenario
- Determine those developments of elements
6. Monitoring: Scenario Cockpit
- Define important indicators for each scenario.
- Determine value ranges for these indicators.
- Constant monitoring of the defined indicators.

Scenario-Based Strategic Planning Process
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004
-

This paper aims at developing a new methodology that links both roadmapping and scenarios in order to
plan the co-ordinated development and deployment of new and existing technologies and applications.
Describing the process on the basis of Rapid Product Development (RPD) technologies for the
automotive industry as an example.
Six steps of science and technology roadmapping
process by technology-push-requirements-pull
approach

Roadmapping Process

1.Roadmapping Preparation
- Technology Roadmapping Architecture
(TRMA)
2. System Analysis
- RDP steps (Product Planning, Product,
Construction, Product Preparation, Product
Testing)
- Influence Matrix
- System Grids
- RPD key influence factors (Virtual or Physical
Modelling and Prototyping, Reverse
Engineering, Data Management, Change
Management, etc.
3.Scenario Projection
- Projections-Portfolios
4.Scenario Building
- Consistence-Matrix, Cluster-Analysis
5. Time Assessment
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004

Projection on Technology Potential
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004

RPD – Technology Scenarios
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004

Time assessment on technology
performance S-curves
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004

RPD Roadmap on the latest from 05 to 20 years
Scenario-based Roadmapping – A Conceptual View
Fernando Lizaso and Guido Reger. University of Brandenburg, Germany.
EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods,
Seville 13-14 May 2004

Scenarios (and Paths) Selection
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Objective
1.Building more systematic roadmapping process
- Qualify Function Deployment (QFD): Element selection, Customer-oriented approach
- Scenario Planning: Alternative strategic decision setting
2.Enhancing user conveniences
- Web-based roadmapping system
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Phase 1. Roadmap Framing
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Phase 2. Roadmap Creation
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Phase 3. Strategic Reanalysis
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Structure Design
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Screen Design
Development and Application of Web-Based Technology Roadmap
: QFD and Scenario Planning Approach
Kim, Ha Ye*, Park, Yong Tae**
* Interdisciplinary Program in Technology and Management
** Department of Industrial Engineering
College of Engineering, Seoul National University, Seoul, Korea. 2004.
Screen Design
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.
Objective: To develop a set of roadmaps for metal processing R&D to achieve breakthrough sustainability
“clean production” for the European CLEANPROD project.
Five mental acts of Foresight

The place and function of scenarios and roadmapping in the overall Foresight methodology
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

Combining scenarios and roadmapping
1.Using scenarios ‘before’ the roadmapping exercise
- Scenarios are part of the preparatory activities for roadmapping.
- Help to identify what constant (presumptive anomalies) may fail in the future.
- Might indicate a radical change of approach.
2.Using scenarios ‘during’ the roadmapping exercise
- Represent alternatives routes in the form of internally consistent narratives, or
vignettes.
3.Using scenarios ‘after’ the roadmapping exercise.
- Scenarios are tools to both test the robustness of roadmaps and develop an overall
picture of the way ahead.
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

“B” — or “before” scenarios are used before the actual
roadmapping exercise starts. These are mainly the
baseline scenarios which provide context for the
roadmap. They inform roadmaps about the future
developments in the Social, Technological, Economic,
Ecological and Technological developments and Values
(STEEPV).
“D” — or “during” scenarios are developed during the
roadmapping exercise. These might be in the form of
“vignettes”, which illustrate one or more components of
the roadmap in detail. There are usually more than one
“D” scenario involved in the roadmapping exercise. they
cover a fairly narrow range of technical possibilities,
perhaps a specific trajectory of development linking
technology “T” to the market “M”.
“R” is the “overall” scenario of the roadmap. It brings
together a range of D scenarios/vignettes in an
internally consistent way and provides an overview of
the overall roadmap. R scenario constitutes the body of
the roadmap.
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

Setting the context with “before” scenarios

“Before” scenarios
set the context
for roadmaps.
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

CLEANPROD
roadmaps.
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

CLEANPROD
roadmaps
(continued).
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

Testing robustness with “after” scenarios
In order to test robustness of he roadmap, two individual scenarios were
picked out, based on the extent to which socioeconomic attitudes and governance
become either more individual or more collective.
Global Economy — Business as Usual is the most individualised, ungoverned
scenario: here global competition is cost-driven, with R&D helping to sustain leadingedge products. But the uptake of nanotechnology disappoints and progress on
sustainability and the environment is incremental.
Sustainable Times — Integrated Breakthrough scenario assumes both a high
degree of acceptance by individuals of the need for sustainability and sophisticated
public pricing mechanisms to cope with “externalities”.
It is clear that some of the incremental improvements selected for technical
development under the “Business as Usual” scenario are not worth funding under the
“Sustainable Times” outlook.
Using scenarios for roadmapping: The case of clean production
Ozcan Saritas and Jonathan Aylen
Manchester Institute of Innovation Research, University of Manchester, UK.
Technological Forecasting & Social Change 77 (2010) P.1061–1075.

“Overall” scenarios and policy proposals
From Future Scenarios to Roadmapping:
A practical guide to explore innovation and strategy
Lykke Margot Ricard and Kristian Borch, Technical University of Denmark.
The 4th International Seville Conference on Future-Oriented Technology Analysis (FTA).
12-13 May 2011

“While Participatory scenario-making provides visions for multiple futures - a
roadmap only operate with one vision. Our contribution with this paper is to bridge the
flexibility of multiple visions of scenarios with the action-oriented roadmap.”
Case of the FTA exercise
-A group of lead engineers, technology managers or a division involved in exploring
innovation and future developments (20-30 persons) from a company – public or private.
-The group has some insight in the present strategies and challenges of the company.
-The STEEPV model for trends and drivers up to 2025 is used to facilitate the construction of
four future scenarios.
-The four scenarios are constructed based on two identified uncertainties and a number of
market drivers.
Question: Which set of multiple futures might be likely and how can the company
prepare for all of them?
From Future Scenarios to Roadmapping:
A practical guide to explore innovation and strategy
Lykke Margot Ricard and Kristian Borch, Technical University of Denmark.
The 4th International Seville Conference on Future-Oriented Technology Analysis (FTA).
12-13 May 2011
-

The vision is explained as a picture of the company’s position in each scenario.
Synthesize the four visions into one common vision which the following participatory technology
roadmapping exercise could build upon.
A common vision is established in plenum. In plenum the group is presented to a framework of the
strategic landscape.
Design of the roadmap and structure

Four scenarios, four visions

More Related Content

PPT
Technology Management and Strategy [Part III]
PPT
Technology Management and Strategy [Part IV]
PPTX
Introduction to Technological Forecasting
PPTX
Technology Forecasting - Monitoring and Intelligence Methods
PPT
Technology+forecasting
PDF
Technology Roadmapping
PDF
Technology roadmap
PPT
Technology forcasting ch#5
Technology Management and Strategy [Part III]
Technology Management and Strategy [Part IV]
Introduction to Technological Forecasting
Technology Forecasting - Monitoring and Intelligence Methods
Technology+forecasting
Technology Roadmapping
Technology roadmap
Technology forcasting ch#5

What's hot (19)

PPT
Technology forecasting
PPT
Methods or Techniques of Technology Forecasting
PPTX
Introduction to Management of Technology
PPS
Technology strategy
PPTX
Wk 3 critical factors in managing technology
PPT
Technology Management and its basics
DOCX
Top 5 Features of Technology
PPT
Technology management
PPT
Introduction to Technology Assessments As tool for Forecasting and evaluation...
PPT
Technology management
PPTX
'Business' of R&D
PPT
Technology management
PPTX
INTEGRATION OF PEOPLE AND TECHNOLOGY
PPT
Overview of Technology Management
PPT
Ppt on technology mgmt
PPTX
Technology Management
PPT
Technology Management Chapter 1 Notes
PDF
R&D portfolio steering and strategy
PPT
Forecasting Technological Change (1)
Technology forecasting
Methods or Techniques of Technology Forecasting
Introduction to Management of Technology
Technology strategy
Wk 3 critical factors in managing technology
Technology Management and its basics
Top 5 Features of Technology
Technology management
Introduction to Technology Assessments As tool for Forecasting and evaluation...
Technology management
'Business' of R&D
Technology management
INTEGRATION OF PEOPLE AND TECHNOLOGY
Overview of Technology Management
Ppt on technology mgmt
Technology Management
Technology Management Chapter 1 Notes
R&D portfolio steering and strategy
Forecasting Technological Change (1)
Ad

Viewers also liked (17)

PDF
Critical Considerations for Mobile and IoT Strategy
PPTX
IoT + AI + Big Data Integration Strategy Insights from Patents 3Q 2016
PDF
Io t 디바이스 어떻게 발전하고 무엇을 바꿀가 2015.12.01
PDF
사물인터넷 비즈니스 어프로치 (Internet of Things (IoT) Business Approach)
PPT
Technology Management and Strategy [Part I]
PDF
아마존 사례로 살펴보는 사물인터넷 도입 전략 - 2015.04.17
DOCX
Internet of Things (IoT) Strategic Patent Development and Monetization for Ne...
PPTX
The Internet of Things: Exploring revenue generating use cases
PDF
WSO2Con USA 2017: Building Enterprise Grade IoT Architectures for Digital Tra...
PDF
Consumer vs industrial IoT
PPTX
Internet of Things (IoT) Business & Technology & Patent Integrated Strategy
PDF
사물인터넷, 이제는 서비스다!
PDF
ICBM 산업동향과 IoT 기반의 사업전략
PDF
사물인터넷 강의 - 사물인터넷 기반의 비즈니스 전략
PDF
The Age of the IOT & Digital Business
PDF
IoT architecture
PDF
What is Artificial Intelligence | Artificial Intelligence Tutorial For Beginn...
Critical Considerations for Mobile and IoT Strategy
IoT + AI + Big Data Integration Strategy Insights from Patents 3Q 2016
Io t 디바이스 어떻게 발전하고 무엇을 바꿀가 2015.12.01
사물인터넷 비즈니스 어프로치 (Internet of Things (IoT) Business Approach)
Technology Management and Strategy [Part I]
아마존 사례로 살펴보는 사물인터넷 도입 전략 - 2015.04.17
Internet of Things (IoT) Strategic Patent Development and Monetization for Ne...
The Internet of Things: Exploring revenue generating use cases
WSO2Con USA 2017: Building Enterprise Grade IoT Architectures for Digital Tra...
Consumer vs industrial IoT
Internet of Things (IoT) Business & Technology & Patent Integrated Strategy
사물인터넷, 이제는 서비스다!
ICBM 산업동향과 IoT 기반의 사업전략
사물인터넷 강의 - 사물인터넷 기반의 비즈니스 전략
The Age of the IOT & Digital Business
IoT architecture
What is Artificial Intelligence | Artificial Intelligence Tutorial For Beginn...
Ad

Similar to Technology Management and Strategy [Part II] (20)

PPT
Scenario Building
PPT
Scenarios for business and policy
PPTX
Webinar: Strategic roadmaping - take control in times of uncertainty - 19 April
PPT
Foresight For Profitable Futures Mark Ostryn
PDF
Scenario Planning: linking Finance & Strategy Perspectives.
PDF
Scenario planning - How it helps businesses make better decisions when faced ...
PPTX
02 Future Analysis 2013
PDF
Scenario Planning Effect Of Oil Prices On The Global Economy
PDF
Scenarios & Branding | Patrick Collings 2011
PDF
Roadmapping the Future From the Outside In
PDF
Rohit Talwar - Ripping up the Rule Book - Imex America - Las Vegas - October...
PDF
Rohit Talwar - Virtual Experiential Travel - IQ2 IF Conference - London No...
PPT
corporate foresight - an introduction
PDF
Futures, Strategic Design and Innovation
PPTX
Strategic foresight and scenario based planning
PPTX
Crash Course in Scenario Planning
PDF
Rohit Talwar - FCCI and Convention 2020 Presentation to the IMEX Politician'...
PPTX
GLOBAL FORESIGHT: LESSONS FROM SCENARIO AND ROADMAPPING EXERCISE ON MANUFACTU...
PPTX
Abiliti Thinking About The Future Of Energy 1st Contact Pre Nda[2007] Wip
PPTX
Thinking About The Future
Scenario Building
Scenarios for business and policy
Webinar: Strategic roadmaping - take control in times of uncertainty - 19 April
Foresight For Profitable Futures Mark Ostryn
Scenario Planning: linking Finance & Strategy Perspectives.
Scenario planning - How it helps businesses make better decisions when faced ...
02 Future Analysis 2013
Scenario Planning Effect Of Oil Prices On The Global Economy
Scenarios & Branding | Patrick Collings 2011
Roadmapping the Future From the Outside In
Rohit Talwar - Ripping up the Rule Book - Imex America - Las Vegas - October...
Rohit Talwar - Virtual Experiential Travel - IQ2 IF Conference - London No...
corporate foresight - an introduction
Futures, Strategic Design and Innovation
Strategic foresight and scenario based planning
Crash Course in Scenario Planning
Rohit Talwar - FCCI and Convention 2020 Presentation to the IMEX Politician'...
GLOBAL FORESIGHT: LESSONS FROM SCENARIO AND ROADMAPPING EXERCISE ON MANUFACTU...
Abiliti Thinking About The Future Of Energy 1st Contact Pre Nda[2007] Wip
Thinking About The Future

More from Thanakrit Lersmethasakul (20)

PPTX
CHAMPSPACE: Living as a Champion
PPTX
CHAMPSPACE: Living as a Champion (Draft)
PPTX
Doing Business on Modern Trade Era
PPTX
Integrated Life Architecture (Draft)
PPTX
Roadmap, roadmapping, roadmapper, roadmappee and roadmapware
PPTX
Scenario Planning
PPTX
Organizational cultures II
PPTX
Organizational cultures I
PPTX
Core Concept: Software Defined Everything
PPTX
How different between Big Data, Business Intelligence and Analytics ?
PPTX
Epigram Collection
PPTX
Algorithmic Trading
PPTX
Doing Business Index
PPT
Web-based Design for the status of a Technology Roadmap
PPTX
National Innovation Systems
PPTX
Innovation Systems
PPTX
National Innovation Systems
PPTX
LEGO Serious Play
PPTX
Why What How in Sense of CRM
PPTX
Traditional Standard Enterprise Architecture
CHAMPSPACE: Living as a Champion
CHAMPSPACE: Living as a Champion (Draft)
Doing Business on Modern Trade Era
Integrated Life Architecture (Draft)
Roadmap, roadmapping, roadmapper, roadmappee and roadmapware
Scenario Planning
Organizational cultures II
Organizational cultures I
Core Concept: Software Defined Everything
How different between Big Data, Business Intelligence and Analytics ?
Epigram Collection
Algorithmic Trading
Doing Business Index
Web-based Design for the status of a Technology Roadmap
National Innovation Systems
Innovation Systems
National Innovation Systems
LEGO Serious Play
Why What How in Sense of CRM
Traditional Standard Enterprise Architecture

Recently uploaded (20)

PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Nidhal Samdaie CV - International Business Consultant
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Types of control:Qualitative vs Quantitative
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
How to Get Funding for Your Trucking Business
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
IFRS Notes in your pocket for study all the time
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Business model innovation report 2022.pdf
PPTX
Amazon (Business Studies) management studies
PDF
Training And Development of Employee .pdf
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Euro SEO Services 1st 3 General Updates.docx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Nidhal Samdaie CV - International Business Consultant
340036916-American-Literature-Literary-Period-Overview.ppt
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
unit 1 COST ACCOUNTING AND COST SHEET
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Chapter 5_Foreign Exchange Market in .pdf
Types of control:Qualitative vs Quantitative
Probability Distribution, binomial distribution, poisson distribution
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
How to Get Funding for Your Trucking Business
Reconciliation AND MEMORANDUM RECONCILATION
ICG2025_ICG 6th steering committee 30-8-24.pptx
IFRS Notes in your pocket for study all the time
Unit 1 Cost Accounting - Cost sheet
Business model innovation report 2022.pdf
Amazon (Business Studies) management studies
Training And Development of Employee .pdf

Technology Management and Strategy [Part II]

  • 1. Technology Management and Strategy [Part II] Thanakrit Lersmethasakul Lersmethasakul@live.com
  • 2. A Scenario-based Approach to Strategic Planning Integrating Planning and Process Perspective of Strategy Torsten Wulf, Philip Meißner, Stephan Stubner The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010. - Aim to the conflict between the planning school and the process school of strategy has shaped the debate on strategy creation. This scenario-based approach to strategic planning leads to the formulation of a core strategy which is complemented by several strategic options that are derived from different strategic scenarios. Overall, frameworks for strategy creation which integrate the planning and the process perspectives of strategy have to fulfill four major requirements: Multiple options: different strategy options for the diversity of possible future developments. Multiple perspectives: viewpoints and information from diverse stakeholders in order to challenge existing assumptions. Systematic, tool-based process: clear process for which specific strategy tools are defined so that an easy and quick application to practice is possible. Flexibility: Adaptable to different environmental conditions in order to ease application. Overview of the scenario-based approach to strategic planning.
  • 3. A Scenario-based Approach to Strategic Planning Integrating Planning and Process Perspective of Strategy Torsten Wulf, Philip Meißner, Stephan Stubner The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010. 1. Definition of Scope: Framing Checklist 2. Perception Analysis: 360° Stakeholder Feedback (Survey instrument - available online and offline) Three main goals drive this process step. - To establish a comprehensive list of factors that potentially influence the future of the company. - To evaluate these factors according to their potential performance impact and their degree of uncertainty. - To benchmark perspectives of different stakeholder groups concerning these influencing factors.
  • 4. A Scenario-based Approach to Strategic Planning Integrating Planning and Process Perspective of Strategy Torsten Wulf, Philip Meißner, Stephan Stubner The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010. 3. Trend and Uncertainty Analysis: Impact/ Uncertainty Grid (for the German Photovoltaic Industry)
  • 5. A Scenario-based Approach to Strategic Planning Integrating Planning and Process Perspective of Strategy Torsten Wulf, Philip Meißner, Stephan Stubner The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010. 4. Scenario Building: Scenario Matrix Three steps to describe in more details -Develop influence diagram for each scenario. -Develop a storyline for each scenario on the basis of the influence diagram. -Describe scenarios in full detail: Phoenix, Survival of the Fittest, Icarus, Go Green. Key Uncertainty 1 Key Uncertainty 2 Simplified Influence Diagram for the German Photovoltaic Industry
  • 6. A Scenario-based Approach to Strategic Planning Integrating Planning and Process Perspective of Strategy Torsten Wulf, Philip Meißner, Stephan Stubner The Center for Scenario Planning, Leipzig Graduate School of Management, July 2010. 5. Strategy Definition: Strategy Manual -Strategy discussion around four important elements - Developments in the macro-environment. - Potential behavior of competitors and customers. - The intended positioning and competitive strategies of one’s own company. - The respective design of the value chain and action plans. - Determine for each scenario - Determine those developments of elements 6. Monitoring: Scenario Cockpit - Define important indicators for each scenario. - Determine value ranges for these indicators. - Constant monitoring of the defined indicators. Scenario-Based Strategic Planning Process
  • 7. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 - This paper aims at developing a new methodology that links both roadmapping and scenarios in order to plan the co-ordinated development and deployment of new and existing technologies and applications. Describing the process on the basis of Rapid Product Development (RPD) technologies for the automotive industry as an example. Six steps of science and technology roadmapping process by technology-push-requirements-pull approach Roadmapping Process 1.Roadmapping Preparation - Technology Roadmapping Architecture (TRMA) 2. System Analysis - RDP steps (Product Planning, Product, Construction, Product Preparation, Product Testing) - Influence Matrix - System Grids - RPD key influence factors (Virtual or Physical Modelling and Prototyping, Reverse Engineering, Data Management, Change Management, etc. 3.Scenario Projection - Projections-Portfolios 4.Scenario Building - Consistence-Matrix, Cluster-Analysis 5. Time Assessment
  • 8. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 Projection on Technology Potential
  • 9. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 RPD – Technology Scenarios
  • 10. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 Time assessment on technology performance S-curves
  • 11. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 RPD Roadmap on the latest from 05 to 20 years
  • 12. Scenario-based Roadmapping – A Conceptual View Fernando Lizaso and Guido Reger. University of Brandenburg, Germany. EU-US Seminar: New Technology Foresight, Forecasting & Assessment Methods, Seville 13-14 May 2004 Scenarios (and Paths) Selection
  • 13. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Objective 1.Building more systematic roadmapping process - Qualify Function Deployment (QFD): Element selection, Customer-oriented approach - Scenario Planning: Alternative strategic decision setting 2.Enhancing user conveniences - Web-based roadmapping system
  • 14. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Phase 1. Roadmap Framing
  • 15. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Phase 2. Roadmap Creation
  • 16. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Phase 3. Strategic Reanalysis
  • 17. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Structure Design
  • 18. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Screen Design
  • 19. Development and Application of Web-Based Technology Roadmap : QFD and Scenario Planning Approach Kim, Ha Ye*, Park, Yong Tae** * Interdisciplinary Program in Technology and Management ** Department of Industrial Engineering College of Engineering, Seoul National University, Seoul, Korea. 2004. Screen Design
  • 20. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. Objective: To develop a set of roadmaps for metal processing R&D to achieve breakthrough sustainability “clean production” for the European CLEANPROD project. Five mental acts of Foresight The place and function of scenarios and roadmapping in the overall Foresight methodology
  • 21. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. Combining scenarios and roadmapping 1.Using scenarios ‘before’ the roadmapping exercise - Scenarios are part of the preparatory activities for roadmapping. - Help to identify what constant (presumptive anomalies) may fail in the future. - Might indicate a radical change of approach. 2.Using scenarios ‘during’ the roadmapping exercise - Represent alternatives routes in the form of internally consistent narratives, or vignettes. 3.Using scenarios ‘after’ the roadmapping exercise. - Scenarios are tools to both test the robustness of roadmaps and develop an overall picture of the way ahead.
  • 22. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. “B” — or “before” scenarios are used before the actual roadmapping exercise starts. These are mainly the baseline scenarios which provide context for the roadmap. They inform roadmaps about the future developments in the Social, Technological, Economic, Ecological and Technological developments and Values (STEEPV). “D” — or “during” scenarios are developed during the roadmapping exercise. These might be in the form of “vignettes”, which illustrate one or more components of the roadmap in detail. There are usually more than one “D” scenario involved in the roadmapping exercise. they cover a fairly narrow range of technical possibilities, perhaps a specific trajectory of development linking technology “T” to the market “M”. “R” is the “overall” scenario of the roadmap. It brings together a range of D scenarios/vignettes in an internally consistent way and provides an overview of the overall roadmap. R scenario constitutes the body of the roadmap.
  • 23. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. Setting the context with “before” scenarios “Before” scenarios set the context for roadmaps.
  • 24. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. CLEANPROD roadmaps.
  • 25. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. CLEANPROD roadmaps (continued).
  • 26. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. Testing robustness with “after” scenarios In order to test robustness of he roadmap, two individual scenarios were picked out, based on the extent to which socioeconomic attitudes and governance become either more individual or more collective. Global Economy — Business as Usual is the most individualised, ungoverned scenario: here global competition is cost-driven, with R&D helping to sustain leadingedge products. But the uptake of nanotechnology disappoints and progress on sustainability and the environment is incremental. Sustainable Times — Integrated Breakthrough scenario assumes both a high degree of acceptance by individuals of the need for sustainability and sophisticated public pricing mechanisms to cope with “externalities”. It is clear that some of the incremental improvements selected for technical development under the “Business as Usual” scenario are not worth funding under the “Sustainable Times” outlook.
  • 27. Using scenarios for roadmapping: The case of clean production Ozcan Saritas and Jonathan Aylen Manchester Institute of Innovation Research, University of Manchester, UK. Technological Forecasting & Social Change 77 (2010) P.1061–1075. “Overall” scenarios and policy proposals
  • 28. From Future Scenarios to Roadmapping: A practical guide to explore innovation and strategy Lykke Margot Ricard and Kristian Borch, Technical University of Denmark. The 4th International Seville Conference on Future-Oriented Technology Analysis (FTA). 12-13 May 2011 “While Participatory scenario-making provides visions for multiple futures - a roadmap only operate with one vision. Our contribution with this paper is to bridge the flexibility of multiple visions of scenarios with the action-oriented roadmap.” Case of the FTA exercise -A group of lead engineers, technology managers or a division involved in exploring innovation and future developments (20-30 persons) from a company – public or private. -The group has some insight in the present strategies and challenges of the company. -The STEEPV model for trends and drivers up to 2025 is used to facilitate the construction of four future scenarios. -The four scenarios are constructed based on two identified uncertainties and a number of market drivers. Question: Which set of multiple futures might be likely and how can the company prepare for all of them?
  • 29. From Future Scenarios to Roadmapping: A practical guide to explore innovation and strategy Lykke Margot Ricard and Kristian Borch, Technical University of Denmark. The 4th International Seville Conference on Future-Oriented Technology Analysis (FTA). 12-13 May 2011 - The vision is explained as a picture of the company’s position in each scenario. Synthesize the four visions into one common vision which the following participatory technology roadmapping exercise could build upon. A common vision is established in plenum. In plenum the group is presented to a framework of the strategic landscape. Design of the roadmap and structure Four scenarios, four visions