SlideShare a Scribd company logo
Scientific Journal Impact Factor (SJIF): 1.711
International Journal of Modern Trends in Engineering
and Research
www.ijmter.com
e-ISSN: 2349-9745
p-ISSN: 2393-8161
GSM Based Wireless Load-Shedding Management System for Non
Emergency Condition
Patil P T1
, Dattatraya raut
2
, Sagar Sutar3
, Sandesh Narute4
1
Departmentof Electrical, SBPCOE
2
Department of Electrical, SBPCOE
3
Department of Electrical, SBPCOE
4
Department of Electrical, SBPCOE
Abstract—In that papers, most of us current a new cost-effective wireless allocated fill shedding
technique for non-emergency scenarios. Throughout electric power transformer destinations
wherever SCADA technique can't be utilized, your suggested remedy offers a realistic choice that
will includes the usage of microcontrollers as well as recent GSM commercial infrastructure in order
to deliver first alert SMS communications in order to customers counseling them to proactively
lessen their particular electric power usage prior to technique capacity can be attained as well as step-
by-step electric power shutdown takes place. Some sort of story verbal exchanges process as well as
message arranged are invented to deal with your messaging between the transformer web sites, the
spot that the microcontrollers are situated as well as the spot that the sizes occur, as well as the key
control web page the spot that the repository server can be organized. Furthermore, the machine
posts alert communications towards the end-users mobile products which have been utilized since
verbal exchanges terminals. The system has become put in place as well as tried by using distinct
experimental effects.
Keywords-Smart Grid, Load shedding, Demand Side Management, GSM Wireless Networks,
SCADA systems.
I. INTRODUCTION
India is experiencing an unprecedented increase in electricity consumption. A direct
consequence of these increase demand is the enormous load burden that has been imposed on the
national electricity grid, especially during peak demand periods. One solution to this problem would
be lode shedding is a process in which electric power is cutoff on certain lines of power transformers
when the demand approaches the system capacity. Load shedding is particularly important in isolated
systems (islands of service) since there is no interconnected supply of power if the demand exceeds
the power rating of the transformers. Typically load shedding is done by supervisory and monitoring
systems such as supervisory control and data acquisition systems known as SCADA systems which
continuously monitor vital parameters of the power system and decide when and how much load to
shed. SCADA systems usually shed the appropriate power load keeping a well-balanced system and
at the same time maintaining reasonable customer satisfaction. In a typical load-shedding scheme a
list of loads is used during the shedding process depending on a priority level attributed to the
various customer loads. When there is an excessive load on the transformers, the SCADA system
starts shedding the lowest priority load.[7] This method of shedding is acceptable as long as the
transformers are monitored by the central SCADA system. Remotely-located transformers, lacking
SCADA connection cannot benefit from this scheme. Such transformers should have their own
protection mechanisms for handling emergencies [1-3]. Load shedding in general has been studied
extensively in the literature and adaptive strategies for Emergency Load-Shedding (ELS)
circumstances in isolated systems, in particular, are studied in detail in [4-6]. In this paper we present
a novel wireless-distributed load shedding management system which is designed to handle remotely
distributed transformers that are not connected to a SCADA system. The proposed system is
designed for nonemergency cases and proactively involves users in the shedding process. Systems
International Journal of Modern Trends in Engineering and Research (IJMTER)
Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161
@IJMTER-2014,All rights Reserved 595
located in a hot climate zone, such as the emirates of Sharjah and Dubai of the United Arab Emirates,
have many remotely-distributed transformers throughout the coverage area. During hot days, the
peak power consumption is significantly higher than normal loads. Even though the power grid is
designed to handle such peak loads, it is possible that spurious excessive demand may cause power
shutdown.
II .LITERATURE SURVEY
Power need within Maharashtra have been rising at a very high price within the last 24
months. With 2004-05, the high need went up by 11357 MW to 12749 MW around 2003-04which is
a leap associated with 12. 26per when compared with before regular increase associated with 2.
74per. As the need have been increasing, the age group potential has always been stable together
with maximum option of 9300 MW. This particular experienced ended in some sort of high hole
associated with 3449 MW within 2004-05.With 2005-06, the high need recorded within May well 05
was 12987 MW and that is once more some sort of leap associated with 238 MW in the earlier yr.
This particular experienced ended in some sort of shortage (load shedding)of 3687 MW within May
well 05. Inside the thirty day period associated with Oct 05, the high evening need that experienced
decrease to 10, 000 MW within September has within the last twenty times risen to 12, 200MW. This
is a leap associated with 2, 250 MW inside a amount of 7 to 8 times. Past this can be a feature
Mumbai during which Tata Electrical power had been attracting MSEDCL's strength within high
time increasing weight losing within MSEDCL's areas. Thinking about the increase sought after, the
existing debt associated with 3500 -- four thousand MW could possibly rise to 10, 000 MW by
means of 2012- 13 in the event endeavors’ are not built to increase availableness. Electrical power is
definitely a vital part inside the fiscal increase of your Express. As per the Economists, the
investment associated with Rs. 1 Cr. inside the strength sector ends up with some sort of Rs. 20 Cr.
Progress throughout the market. MSEDCL is additionally trying to take care of the need via Desire
Aspect Supervision Procedures.
III. SYSTEM ARCHITECTURE
Fig3.1Block diagram of system
In above system, consumer energy consumption is continuously monitored by current transformer.
This output from CT is given to signal conditioner, so that it can be made compatible with
microcontroller input. This input is compared with max. Limit allocated to the customer.
This comparison is done only at pick time of energy consumption like 6 P.M to10 P.M. If
consumer uses more energy then set limit, then initially he gets warning messages to user still if he
didn't reduce power consumption then energy supply is cutout by means of relay.
International Journal of Modern Trends in Engineering and Research (IJMTER)
Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161
@IJMTER-2014,All rights Reserved 596
IV. FLOW CHART
Fig3.2 System flow architecture
V. HARDWARE DESCRIPTION
Current Transformer, Rectifier Filter and Circuit:
Here current transformer is used to step down the load current.This recent is actually and then
transferred over the fill rectifier circuit filtering. Circuit to get the voltage in terms of load
Current. Then it is given to the scaling amplifier, buffer and unity gain amplifier.
Scaling Amplifier, Buffer and Unity Gain Amplifier:
The scaling amplifier is used to provide the necessary scaling gain for the rectified
Signal. The unity gain amp is used in order to isolate reduce the burden (loading effect)
toprevious stage. Then the output is given to the serial ADC.
Analog to Digital Converter:
ADC used here is serial ADC. It converts the analog information to digital data.
This digital data is given to the micro-controller.
Microcontroller:
Here, micro-controller will take the data from serial ADC and it will transmit tothe pc. Then micro-
controller will wait to receive data from pc. If the received data willcompared with stored per-
International Journal of Modern Trends in Engineering and Research (IJMTER)
Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161
@IJMTER-2014,All rights Reserved 597
defined value result is send back to the micro-controller. Then System Development micro-controller
gives signal to the relay.
Relay Driver Circuit:
It is used to drive the relays. Micro-controller gives the signal to the relay drivercircuit to drive the
relay so the heavy load equipment’s will be turned on or off.
Buzzer:
Whenever overload condition occurs the buzzer will start.
VI. SOFTWARE DESCRIPTION
The software was designed in Assembly Language. The microcontroller is a programmable
chip, which needs to be programmed to perform the desired functions (Yelaran and Emery,
2010).The source code was first compiled on the notepad.Proper attention was paid to the code
during compilation so as to avoid any form of logical and syntax error. The generated hex file after
compilation was then transferring to the microcontroller chip with the aid of an EDSIMprogrammer.
VII. GSM MODEM INTERFACE UNIT
The GSM modem(Samsung G5282) was used to perform communication between the user
and microcontroller. This is responsible to do the bidirectional operation of sending an alert sms to
user mobile about the current status of the load and sent command to microcontroller from user.
These alerts sms sent to the user mobile that are already stored in the draft of the phone modem.
Whenever the microcontroller triggers the transistor connecting to the GSM modem, it will either
request for the SMS in the draft to be sent to the user or to put ON the GSM phone.
REFERENCES
[1]J.J. Ford, H. Bevrani, G. Ledwich, "Adaptive load shedding andregional protection,” International Journal of
Electrical Power & EnergySystems”, Volume 31, Pages 611-618. Issue 10, November-December 2009
[2] F. Capitanescu, B. Otomega, H. Lefebvre, V. Sermanson, T. VanCutsem, “Decentralized tap changer blocking and
load sheddingagainst voltage instability: Prospective tests on the RTE system,Electrical Power and Energy Systems”, Vol
31, Issue 9, 2009, pp 570–576.
[3] R. M. Maliszewski, R.D. Dunlop, and G. L. Wilson, “Frequencyactuated load shedding and restoration Part I—
philosophy”, IEEETransactions on Power Apparatus and Systems, vol. 90, no. 4, 1971, pp.1452–1459.
[4] A. Saffarian, M. Sanaye-pasand, H. Asadi,”Performance Investigationof New Combinational Load Shedding
Schemes”, Joint InternationalConference on Power System Technology and IEEE Power IndiaConference, 2008. pp 1 –
8.
[5] A. A. Abou, A. Zein El-Din, S. R. Spea, S.R., “Optimal load shedding n power systems”, Eleventh International
Middle East Power SystemsConference, Volume 2, 2006, pp. 568 – 575.
[6] S. J. Huang, and C. -C. Huang, “An adaptive load shedding method with time-based design for isolated power
systems” InternationalJournal of Electrical Power & Energy Systems, vol. 22, no. 1, January2000, pp. 51-58. ,
January2000
[7]D. Rudrapalet. al. “Automated Load SheddingPeriod Control Systems”, International Journal onComputer Sc. &
Engineering, Vol 3, Issue 5, pp.1159 - 1168, May 2011.
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition

More Related Content

PPTX
auto matic load shedding control for substation
PDF
SMART LOAD SHEDDING
PPTX
Automtaic Cyclic Load shedding in Distribution system
PPT
Programmable Load Shedding for the utility department
PDF
Load Shedding Management
PDF
Under frequency load shedding for energy management using anfis case study
PPTX
Automated load shedding using microcontroller
PDF
LOAD SHEDDING DESIGN FOR AN INDUSTRIAL COGENERATION SYSTEM
auto matic load shedding control for substation
SMART LOAD SHEDDING
Automtaic Cyclic Load shedding in Distribution system
Programmable Load Shedding for the utility department
Load Shedding Management
Under frequency load shedding for energy management using anfis case study
Automated load shedding using microcontroller
LOAD SHEDDING DESIGN FOR AN INDUSTRIAL COGENERATION SYSTEM

What's hot (20)

PPTX
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
PDF
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
PDF
Report - PLC Based Electrical Load Management System
PDF
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
PDF
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
PDF
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
PDF
Wide area monitoring, protection and control in future smart grid
DOCX
automatic phase changer in three phase supply
PDF
IRJET- Continuous Power Supply by Switching Three Sources
PPTX
Load dispatch center
PDF
IRJET- Designing of Single Ended Primary Inductance Converter for Solar P...
PDF
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
PDF
Physical structure and characteristics of energy storage systems
PDF
Fault location techniques in smart distribution system
PPTX
Power system interconnection presentation
PDF
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
PDF
Intelligent electrical system
DOCX
“Microcontroller Based Substation Monitoring system with gsm modem”.
PPT
Under voltage load shedding
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Report - PLC Based Electrical Load Management System
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
Wide area monitoring, protection and control in future smart grid
automatic phase changer in three phase supply
IRJET- Continuous Power Supply by Switching Three Sources
Load dispatch center
IRJET- Designing of Single Ended Primary Inductance Converter for Solar P...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Physical structure and characteristics of energy storage systems
Fault location techniques in smart distribution system
Power system interconnection presentation
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
Intelligent electrical system
“Microcontroller Based Substation Monitoring system with gsm modem”.
Under voltage load shedding
Ad

Viewers also liked (19)

PDF
Etap validation cases and comparison results
PDF
National Consumers League 2013 State of ID Theft Report
PDF
Hardware prototype of smart home energy management system
KEY
Digital Environment Home Energy Management System
PDF
Energy Management Systems in the Home: Gateway to the Customer HAN
DOC
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
PDF
Project Report Shivram Mukherjee (Energy Management), 2009 11
PDF
full report original
PDF
PPT
Power Supply Management System Of A Small Satellite By Wajid
PPTX
Optimum energy management system
PPT
Power Management in BMS
DOCX
Automation of capacitor banks based on MVAR Requirement
PPTX
Madan mohan malaviya
DOCX
PF correction using SEPIC
PPTX
PLC based load managment
PDF
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
DOCX
project report on plc based load sharing
PPTX
Microcontroller based-substation-monitoring-and-controlling-system
Etap validation cases and comparison results
National Consumers League 2013 State of ID Theft Report
Hardware prototype of smart home energy management system
Digital Environment Home Energy Management System
Energy Management Systems in the Home: Gateway to the Customer HAN
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
Project Report Shivram Mukherjee (Energy Management), 2009 11
full report original
Power Supply Management System Of A Small Satellite By Wajid
Optimum energy management system
Power Management in BMS
Automation of capacitor banks based on MVAR Requirement
Madan mohan malaviya
PF correction using SEPIC
PLC based load managment
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
project report on plc based load sharing
Microcontroller based-substation-monitoring-and-controlling-system
Ad

Similar to GSM Based Wireless Load-Shedding Management System for Non Emergency Condition (20)

PDF
A Novel Approach for Programmable Interface Based Load Shedding for Voltage S...
PDF
Development and Performance Evaluation of an Intelligent Electric Power Switc...
PDF
eIisrt arutselvi (electrical)
PDF
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
PDF
IRJET- Automatic Load Sharing of Transformer
PDF
An Automatic Load Controller for Domestic Applications
PDF
IRJET- Automatic Load Balancing and Phase Balancing by PLC and Scada
PDF
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
PDF
Analysis optimization and monitoring system
PDF
Intelligent Load Shedding Using TCP/IP for Smart Grids
PDF
Electrical-Power-Systems-by-C.L.WADHWA.pdf
PDF
Dhiraj power system automation
PDF
Dhiraj power system automation
PPTX
Abhishek scada ppt
PPTX
Abhishek scada ppt
PPTX
Power quality 2
PDF
Smart Grid July 09
PPTX
Application of scada for system automation on smart grid rev2
PDF
Using Alternative Energy Sources Way to Intellectualization and Greater Energ...
PPSX
Power system automation introduction
A Novel Approach for Programmable Interface Based Load Shedding for Voltage S...
Development and Performance Evaluation of an Intelligent Electric Power Switc...
eIisrt arutselvi (electrical)
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
IRJET- Automatic Load Sharing of Transformer
An Automatic Load Controller for Domestic Applications
IRJET- Automatic Load Balancing and Phase Balancing by PLC and Scada
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
Analysis optimization and monitoring system
Intelligent Load Shedding Using TCP/IP for Smart Grids
Electrical-Power-Systems-by-C.L.WADHWA.pdf
Dhiraj power system automation
Dhiraj power system automation
Abhishek scada ppt
Abhishek scada ppt
Power quality 2
Smart Grid July 09
Application of scada for system automation on smart grid rev2
Using Alternative Energy Sources Way to Intellectualization and Greater Energ...
Power system automation introduction

More from Editor IJMTER (20)

PDF
A NEW DATA ENCODER AND DECODER SCHEME FOR NETWORK ON CHIP
PDF
A RESEARCH - DEVELOP AN EFFICIENT ALGORITHM TO RECOGNIZE, SEPARATE AND COUNT ...
PDF
Analysis of VoIP Traffic in WiMAX Environment
PDF
A Hybrid Cloud Approach for Secure Authorized De-Duplication
PDF
Aging protocols that could incapacitate the Internet
PDF
A Cloud Computing design with Wireless Sensor Networks For Agricultural Appli...
PDF
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
PDF
Sustainable Construction With Foam Concrete As A Green Green Building Material
PDF
USE OF ICT IN EDUCATION ONLINE COMPUTER BASED TEST
PDF
Textual Data Partitioning with Relationship and Discriminative Analysis
PDF
Testing of Matrices Multiplication Methods on Different Processors
PDF
Survey on Malware Detection Techniques
PDF
SURVEY OF TRUST BASED BLUETOOTH AUTHENTICATION FOR MOBILE DEVICE
PDF
SURVEY OF GLAUCOMA DETECTION METHODS
PDF
Survey: Multipath routing for Wireless Sensor Network
PDF
Step up DC-DC Impedance source network based PMDC Motor Drive
PDF
SPIRITUAL PERSPECTIVE OF AUROBINDO GHOSH’S PHILOSOPHY IN TODAY’S EDUCATION
PDF
Software Quality Analysis Using Mutation Testing Scheme
PDF
Software Defect Prediction Using Local and Global Analysis
PDF
Software Cost Estimation Using Clustering and Ranking Scheme
A NEW DATA ENCODER AND DECODER SCHEME FOR NETWORK ON CHIP
A RESEARCH - DEVELOP AN EFFICIENT ALGORITHM TO RECOGNIZE, SEPARATE AND COUNT ...
Analysis of VoIP Traffic in WiMAX Environment
A Hybrid Cloud Approach for Secure Authorized De-Duplication
Aging protocols that could incapacitate the Internet
A Cloud Computing design with Wireless Sensor Networks For Agricultural Appli...
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
Sustainable Construction With Foam Concrete As A Green Green Building Material
USE OF ICT IN EDUCATION ONLINE COMPUTER BASED TEST
Textual Data Partitioning with Relationship and Discriminative Analysis
Testing of Matrices Multiplication Methods on Different Processors
Survey on Malware Detection Techniques
SURVEY OF TRUST BASED BLUETOOTH AUTHENTICATION FOR MOBILE DEVICE
SURVEY OF GLAUCOMA DETECTION METHODS
Survey: Multipath routing for Wireless Sensor Network
Step up DC-DC Impedance source network based PMDC Motor Drive
SPIRITUAL PERSPECTIVE OF AUROBINDO GHOSH’S PHILOSOPHY IN TODAY’S EDUCATION
Software Quality Analysis Using Mutation Testing Scheme
Software Defect Prediction Using Local and Global Analysis
Software Cost Estimation Using Clustering and Ranking Scheme

Recently uploaded (20)

PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PPTX
introduction to high performance computing
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
Abrasive, erosive and cavitation wear.pdf
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PPT
Occupational Health and Safety Management System
PPT
Total quality management ppt for engineering students
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
PPT on Performance Review to get promotions
PPTX
Artificial Intelligence
Exploratory_Data_Analysis_Fundamentals.pdf
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
introduction to high performance computing
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
R24 SURVEYING LAB MANUAL for civil enggi
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Abrasive, erosive and cavitation wear.pdf
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Occupational Health and Safety Management System
Total quality management ppt for engineering students
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Fundamentals of Mechanical Engineering.pptx
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPT on Performance Review to get promotions
Artificial Intelligence

GSM Based Wireless Load-Shedding Management System for Non Emergency Condition

  • 1. Scientific Journal Impact Factor (SJIF): 1.711 International Journal of Modern Trends in Engineering and Research www.ijmter.com e-ISSN: 2349-9745 p-ISSN: 2393-8161 GSM Based Wireless Load-Shedding Management System for Non Emergency Condition Patil P T1 , Dattatraya raut 2 , Sagar Sutar3 , Sandesh Narute4 1 Departmentof Electrical, SBPCOE 2 Department of Electrical, SBPCOE 3 Department of Electrical, SBPCOE 4 Department of Electrical, SBPCOE Abstract—In that papers, most of us current a new cost-effective wireless allocated fill shedding technique for non-emergency scenarios. Throughout electric power transformer destinations wherever SCADA technique can't be utilized, your suggested remedy offers a realistic choice that will includes the usage of microcontrollers as well as recent GSM commercial infrastructure in order to deliver first alert SMS communications in order to customers counseling them to proactively lessen their particular electric power usage prior to technique capacity can be attained as well as step- by-step electric power shutdown takes place. Some sort of story verbal exchanges process as well as message arranged are invented to deal with your messaging between the transformer web sites, the spot that the microcontrollers are situated as well as the spot that the sizes occur, as well as the key control web page the spot that the repository server can be organized. Furthermore, the machine posts alert communications towards the end-users mobile products which have been utilized since verbal exchanges terminals. The system has become put in place as well as tried by using distinct experimental effects. Keywords-Smart Grid, Load shedding, Demand Side Management, GSM Wireless Networks, SCADA systems. I. INTRODUCTION India is experiencing an unprecedented increase in electricity consumption. A direct consequence of these increase demand is the enormous load burden that has been imposed on the national electricity grid, especially during peak demand periods. One solution to this problem would be lode shedding is a process in which electric power is cutoff on certain lines of power transformers when the demand approaches the system capacity. Load shedding is particularly important in isolated systems (islands of service) since there is no interconnected supply of power if the demand exceeds the power rating of the transformers. Typically load shedding is done by supervisory and monitoring systems such as supervisory control and data acquisition systems known as SCADA systems which continuously monitor vital parameters of the power system and decide when and how much load to shed. SCADA systems usually shed the appropriate power load keeping a well-balanced system and at the same time maintaining reasonable customer satisfaction. In a typical load-shedding scheme a list of loads is used during the shedding process depending on a priority level attributed to the various customer loads. When there is an excessive load on the transformers, the SCADA system starts shedding the lowest priority load.[7] This method of shedding is acceptable as long as the transformers are monitored by the central SCADA system. Remotely-located transformers, lacking SCADA connection cannot benefit from this scheme. Such transformers should have their own protection mechanisms for handling emergencies [1-3]. Load shedding in general has been studied extensively in the literature and adaptive strategies for Emergency Load-Shedding (ELS) circumstances in isolated systems, in particular, are studied in detail in [4-6]. In this paper we present a novel wireless-distributed load shedding management system which is designed to handle remotely distributed transformers that are not connected to a SCADA system. The proposed system is designed for nonemergency cases and proactively involves users in the shedding process. Systems
  • 2. International Journal of Modern Trends in Engineering and Research (IJMTER) Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161 @IJMTER-2014,All rights Reserved 595 located in a hot climate zone, such as the emirates of Sharjah and Dubai of the United Arab Emirates, have many remotely-distributed transformers throughout the coverage area. During hot days, the peak power consumption is significantly higher than normal loads. Even though the power grid is designed to handle such peak loads, it is possible that spurious excessive demand may cause power shutdown. II .LITERATURE SURVEY Power need within Maharashtra have been rising at a very high price within the last 24 months. With 2004-05, the high need went up by 11357 MW to 12749 MW around 2003-04which is a leap associated with 12. 26per when compared with before regular increase associated with 2. 74per. As the need have been increasing, the age group potential has always been stable together with maximum option of 9300 MW. This particular experienced ended in some sort of high hole associated with 3449 MW within 2004-05.With 2005-06, the high need recorded within May well 05 was 12987 MW and that is once more some sort of leap associated with 238 MW in the earlier yr. This particular experienced ended in some sort of shortage (load shedding)of 3687 MW within May well 05. Inside the thirty day period associated with Oct 05, the high evening need that experienced decrease to 10, 000 MW within September has within the last twenty times risen to 12, 200MW. This is a leap associated with 2, 250 MW inside a amount of 7 to 8 times. Past this can be a feature Mumbai during which Tata Electrical power had been attracting MSEDCL's strength within high time increasing weight losing within MSEDCL's areas. Thinking about the increase sought after, the existing debt associated with 3500 -- four thousand MW could possibly rise to 10, 000 MW by means of 2012- 13 in the event endeavors’ are not built to increase availableness. Electrical power is definitely a vital part inside the fiscal increase of your Express. As per the Economists, the investment associated with Rs. 1 Cr. inside the strength sector ends up with some sort of Rs. 20 Cr. Progress throughout the market. MSEDCL is additionally trying to take care of the need via Desire Aspect Supervision Procedures. III. SYSTEM ARCHITECTURE Fig3.1Block diagram of system In above system, consumer energy consumption is continuously monitored by current transformer. This output from CT is given to signal conditioner, so that it can be made compatible with microcontroller input. This input is compared with max. Limit allocated to the customer. This comparison is done only at pick time of energy consumption like 6 P.M to10 P.M. If consumer uses more energy then set limit, then initially he gets warning messages to user still if he didn't reduce power consumption then energy supply is cutout by means of relay.
  • 3. International Journal of Modern Trends in Engineering and Research (IJMTER) Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161 @IJMTER-2014,All rights Reserved 596 IV. FLOW CHART Fig3.2 System flow architecture V. HARDWARE DESCRIPTION Current Transformer, Rectifier Filter and Circuit: Here current transformer is used to step down the load current.This recent is actually and then transferred over the fill rectifier circuit filtering. Circuit to get the voltage in terms of load Current. Then it is given to the scaling amplifier, buffer and unity gain amplifier. Scaling Amplifier, Buffer and Unity Gain Amplifier: The scaling amplifier is used to provide the necessary scaling gain for the rectified Signal. The unity gain amp is used in order to isolate reduce the burden (loading effect) toprevious stage. Then the output is given to the serial ADC. Analog to Digital Converter: ADC used here is serial ADC. It converts the analog information to digital data. This digital data is given to the micro-controller. Microcontroller: Here, micro-controller will take the data from serial ADC and it will transmit tothe pc. Then micro- controller will wait to receive data from pc. If the received data willcompared with stored per-
  • 4. International Journal of Modern Trends in Engineering and Research (IJMTER) Volume 02, Issue 01, [January - 2015] e-ISSN: 2349-9745, p-ISSN: 2393-8161 @IJMTER-2014,All rights Reserved 597 defined value result is send back to the micro-controller. Then System Development micro-controller gives signal to the relay. Relay Driver Circuit: It is used to drive the relays. Micro-controller gives the signal to the relay drivercircuit to drive the relay so the heavy load equipment’s will be turned on or off. Buzzer: Whenever overload condition occurs the buzzer will start. VI. SOFTWARE DESCRIPTION The software was designed in Assembly Language. The microcontroller is a programmable chip, which needs to be programmed to perform the desired functions (Yelaran and Emery, 2010).The source code was first compiled on the notepad.Proper attention was paid to the code during compilation so as to avoid any form of logical and syntax error. The generated hex file after compilation was then transferring to the microcontroller chip with the aid of an EDSIMprogrammer. VII. GSM MODEM INTERFACE UNIT The GSM modem(Samsung G5282) was used to perform communication between the user and microcontroller. This is responsible to do the bidirectional operation of sending an alert sms to user mobile about the current status of the load and sent command to microcontroller from user. These alerts sms sent to the user mobile that are already stored in the draft of the phone modem. Whenever the microcontroller triggers the transistor connecting to the GSM modem, it will either request for the SMS in the draft to be sent to the user or to put ON the GSM phone. REFERENCES [1]J.J. Ford, H. Bevrani, G. Ledwich, "Adaptive load shedding andregional protection,” International Journal of Electrical Power & EnergySystems”, Volume 31, Pages 611-618. Issue 10, November-December 2009 [2] F. Capitanescu, B. Otomega, H. Lefebvre, V. Sermanson, T. VanCutsem, “Decentralized tap changer blocking and load sheddingagainst voltage instability: Prospective tests on the RTE system,Electrical Power and Energy Systems”, Vol 31, Issue 9, 2009, pp 570–576. [3] R. M. Maliszewski, R.D. Dunlop, and G. L. Wilson, “Frequencyactuated load shedding and restoration Part I— philosophy”, IEEETransactions on Power Apparatus and Systems, vol. 90, no. 4, 1971, pp.1452–1459. [4] A. Saffarian, M. Sanaye-pasand, H. Asadi,”Performance Investigationof New Combinational Load Shedding Schemes”, Joint InternationalConference on Power System Technology and IEEE Power IndiaConference, 2008. pp 1 – 8. [5] A. A. Abou, A. Zein El-Din, S. R. Spea, S.R., “Optimal load shedding n power systems”, Eleventh International Middle East Power SystemsConference, Volume 2, 2006, pp. 568 – 575. [6] S. J. Huang, and C. -C. Huang, “An adaptive load shedding method with time-based design for isolated power systems” InternationalJournal of Electrical Power & Energy Systems, vol. 22, no. 1, January2000, pp. 51-58. , January2000 [7]D. Rudrapalet. al. “Automated Load SheddingPeriod Control Systems”, International Journal onComputer Sc. & Engineering, Vol 3, Issue 5, pp.1159 - 1168, May 2011.