SlideShare a Scribd company logo
Technical Series
Design Review Based on Failure Mode
1-Day Workshop
Understand and describe the relationship
between the engineering and management
knowledge
Establish requirements for an effective
DRBFM
Record all the design, validation, and
production actions
Gain and maintain consistency and
proficiency of DRBFM
Course Objective
© Tetrahedron Manufacturing Services Pvt Ltd
Phone : +91 7042140046 Email : training@tetrahedron.in
Tetrahedron Academy
Who should attend
Manufacturing engineering
Product engineers
Design engineers
Quality engineers
Validation and test engineers
Managers leading any of the above
teams
New Product Development Mangers
Validation and Test Engineers
Senior Engineers
DRBFM is a focused process that supports an
engineering mind-set and eliminates waste, such as
debating rankings and mindless brainstorming.
It centers on early prevention and engineering
knowledge, eliminating time spent debating ranking
systems, waiting for lead engineers to document and list
their concerns, identifying what types of concerns are
open for discussion and resolution, and brainstorming
without any actionable closure.
This DRBFM Training will provide roles and
responsibilities of management, design engineers,
manufacturing engineers, facilitators and technical
experts.
Those interested in DRBFM will benefit from
understanding the rationale behind this methodology
and learn to guide teams through the paradigm shifts
and mind set that are needed.
DRBFM focuses on three things for better review:
Good Design
Good Discussion
Good Dissection
Benefits of attending
Over the last three years 500+ Participants
has attended this session across India
DRBFM is a technique concentrated on
change management and nonstop,
permanent improvement. DRBFM focuses
on failure prevention on early stages and
depends on engineering knowledge. It was
developed based on the philosophy that
design problems occur when changes are
made to existing engineering design that
have already been proven successful.
Know your trainer
B tech from IIT Roorkee, PGDM from IIM
Calcutta and is an Ex IES officer with 14+
yrs of intensive experience in
Manufacturing Sector.
He has helped manufacturing companies
turn-around by implementing
Manufacturing Excellence through Lean,
Six Sigma, Manufacturing Strategy.
He is a passionate reader and have
inclination to solve complex business
problems within very short span of time.
Technical Series
Workshop Agenda
© Tetrahedron Manufacturing Services Pvt Ltd
Phone : +91 7042140046 Email : training@tetrahedron.in
Tetrahedron Academy
Feedback From Past Participants
This o kshop has helped i e ie i g the
e gi ee i g desig s ti e a d ti e agai
Ou desig uality le el has ee
i p o ed sig ifi a tly
It gi es ette idea fo desig a d to
e ie its failu e odes
Must fo all a ufa tu i g o pa ies
This o kshop guided us to go th ough the
present design before going for further
modification of designs.
DRBFM Procedure, Forms, Planning and
Preparation
Scope and Purpose
Process Map – General Requirements
Planning – Formats, examples
Planning Results and Output
Preparation – Formats, examples
Preparation Results and Linkage with DRBM Format
Definition of Change Section
DRBFM – Forum 1, Design Review, Action
Results and Follow Up
Engineer analysis
Change Point definition
Identification of concerns
Identification of causes and influences on the vehicle
Identification of effects
Identification of severity/priority
Actions to gain engineering knowledge – evidence
DRBFM – Forum 2, Design Review, Action
Results and Follow Up
Design Review introduction
Change Point overview
Identification of additional concerns
Identification of additional causes and influences on
the product
Identification of effects
Identification of severity/priority
Actions taken to eliminate concerns
Design actions to gain engineering knowledge –
evidence
Validation actions to gain evidence of reliability
Manufacturing, assembly, and supplier actions
Action results and feedback to design guidelines
Roles and responsibilities

More Related Content

PDF
Design Review Based on Failure Mode Workshop by Tetrahedron
PDF
Design FMEA Workshop by Tetrahedron
PDF
PMO-NOPOLY Julie Bozzi Oregon
PDF
Process FMEA 2-Day Workshop by Tetrahedron
PPTX
Six sigma final
DOCX
JobDescription-SeniorPrincipalEngineer
DOCX
Om 0015 maintenance management
PPTX
VTU MBA-TQM 12MBA42 Module 7
Design Review Based on Failure Mode Workshop by Tetrahedron
Design FMEA Workshop by Tetrahedron
PMO-NOPOLY Julie Bozzi Oregon
Process FMEA 2-Day Workshop by Tetrahedron
Six sigma final
JobDescription-SeniorPrincipalEngineer
Om 0015 maintenance management
VTU MBA-TQM 12MBA42 Module 7

What's hot (20)

PDF
Energy University Data Center Certified Associate Exam_nikouy
PDF
Certificate of Achievement Stuart Westbrook Schneider Electric Data Center Ce...
PPTX
Zero defect programme
PPSX
Maria Managment Spectrum
PPT
Introduction to MSF
PPTX
Dynamic system development method
PPTX
4 p’s of management spectrum and the w5hh principle
PPTX
TQM, Unit 4, VTU Syallabus
PPTX
Agile methodology
PDF
Project Management Basics Training Promotion
PPTX
Ch24 quality management
PPSX
Dynamic Systems Development Method (DSDM) - Agile
PPT
What Makes A Great Dev Team - Mike Robinson
DOC
Project Mgt
PDF
Operation Manager Interview Questions and Answers 2021
DOCX
Sr Quality Business Operation Manager
PDF
Thailand SPIN Day: CMMI vs.Agile มิตร ศัตรู หรือความไม่รู้ต่างที่หลอกเรา (29/...
PPT
MSF (Microsoft Solution Framework)
PPTX
Specialized estimation tech
PPTX
Six Sigma Green Belt Training Part 7
Energy University Data Center Certified Associate Exam_nikouy
Certificate of Achievement Stuart Westbrook Schneider Electric Data Center Ce...
Zero defect programme
Maria Managment Spectrum
Introduction to MSF
Dynamic system development method
4 p’s of management spectrum and the w5hh principle
TQM, Unit 4, VTU Syallabus
Agile methodology
Project Management Basics Training Promotion
Ch24 quality management
Dynamic Systems Development Method (DSDM) - Agile
What Makes A Great Dev Team - Mike Robinson
Project Mgt
Operation Manager Interview Questions and Answers 2021
Sr Quality Business Operation Manager
Thailand SPIN Day: CMMI vs.Agile มิตร ศัตรู หรือความไม่รู้ต่างที่หลอกเรา (29/...
MSF (Microsoft Solution Framework)
Specialized estimation tech
Six Sigma Green Belt Training Part 7
Ad

Similar to Design Review Based on Failure Mode 1-Day Workshop by Tetrahedron (20)

PDF
Design for Six Sigma (DFSS) Workshop by Tetrahedron
PDF
Design for Six Sigma (DFSS) 2-Day Workshop
PDF
Big Data Science and Data Analytics Workshop by Tetrahedron
PPT
Plm specialist-Professor-PLM-0909
PDF
ANI | Agile Mindset Day @Gurugram | Agile Planning: Effective Practices and C...
PDF
Benchmarking Workshop by Tetrahedron
PDF
Design Thinking (DM) Workshop by Tetrahedron
PDF
DFMPro Brochure
PDF
Business Simulation – Manufacturing Workshop by Tetrahedron
PDF
Supervisory development program
PPT
Quality by design
DOC
Resume (1)
PDF
Supervisory Development Program - Short Duration
PPTX
Business Analyst Online Training in Hyderabad, India
PPTX
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...
PDF
Management of Change Training Course
DOC
CV Fehran 2014 ver 1.0 - Copy (1)
PPT
Lecture2 2
DOCX
D Tindall Full Resume May 2015 V3
Design for Six Sigma (DFSS) Workshop by Tetrahedron
Design for Six Sigma (DFSS) 2-Day Workshop
Big Data Science and Data Analytics Workshop by Tetrahedron
Plm specialist-Professor-PLM-0909
ANI | Agile Mindset Day @Gurugram | Agile Planning: Effective Practices and C...
Benchmarking Workshop by Tetrahedron
Design Thinking (DM) Workshop by Tetrahedron
DFMPro Brochure
Business Simulation – Manufacturing Workshop by Tetrahedron
Supervisory development program
Quality by design
Resume (1)
Supervisory Development Program - Short Duration
Business Analyst Online Training in Hyderabad, India
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...
Management of Change Training Course
CV Fehran 2014 ver 1.0 - Copy (1)
Lecture2 2
D Tindall Full Resume May 2015 V3
Ad

More from Sagar Sangam Sahu (20)

PDF
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
PDF
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
PDF
Advanced Maintenance Strategy Workshop by Tetrahedron
PDF
Manufacturing Excellence Workshop by Tetrahedron
PDF
Training & Skill Development Workshop by Tetrahedron
PDF
WIP Manufacturing Excellence by Tetrahedron
PDF
Theory of Constraints 3-Day Workshop Program by Tetrahedron
PDF
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
PDF
Team Building 1-Day Out-bound Workshop by Tetrahedron
PDF
Operational Effectiveness & Management Program Workshop by Tetrahedron
PDF
Negotiation Skill Workshop by Tetrahedron
PDF
International Financial Reporting Standard (IFRS) Workshop by Tetrahedron
PDF
Finance for Non-Finance Manager Workshop by Tetrahedron
PDF
Failure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
PDF
Finance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
PDF
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
PDF
Sales Training Workshop Series by Tetrahedron
PDF
Balance Score Card (BSC) Workshop by Tetrahedron
PDF
Advanced GD&T and Tolerance Stack up Analysis Workshop by Tetrahedron
PDF
7 Tools For Effective Performance Appraisal Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Advanced Maintenance Strategy Workshop by Tetrahedron
Manufacturing Excellence Workshop by Tetrahedron
Training & Skill Development Workshop by Tetrahedron
WIP Manufacturing Excellence by Tetrahedron
Theory of Constraints 3-Day Workshop Program by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Team Building 1-Day Out-bound Workshop by Tetrahedron
Operational Effectiveness & Management Program Workshop by Tetrahedron
Negotiation Skill Workshop by Tetrahedron
International Financial Reporting Standard (IFRS) Workshop by Tetrahedron
Finance for Non-Finance Manager Workshop by Tetrahedron
Failure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
Finance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series by Tetrahedron
Balance Score Card (BSC) Workshop by Tetrahedron
Advanced GD&T and Tolerance Stack up Analysis Workshop by Tetrahedron
7 Tools For Effective Performance Appraisal Workshop by Tetrahedron

Recently uploaded (20)

PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
TLE Review Electricity (Electricity).pptx
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Approach and Philosophy of On baking technology
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PPT
Teaching material agriculture food technology
PDF
Mushroom cultivation and it's methods.pdf
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Tartificialntelligence_presentation.pptx
PPTX
Spectroscopy.pptx food analysis technology
PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
Machine Learning_overview_presentation.pptx
PPTX
1. Introduction to Computer Programming.pptx
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Network Security Unit 5.pdf for BCA BBA.
TLE Review Electricity (Electricity).pptx
Advanced methodologies resolving dimensionality complications for autism neur...
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Approach and Philosophy of On baking technology
MIND Revenue Release Quarter 2 2025 Press Release
Teaching material agriculture food technology
Mushroom cultivation and it's methods.pdf
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Building Integrated photovoltaic BIPV_UPV.pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Mobile App Security Testing_ A Comprehensive Guide.pdf
Tartificialntelligence_presentation.pptx
Spectroscopy.pptx food analysis technology
Programs and apps: productivity, graphics, security and other tools
Machine Learning_overview_presentation.pptx
1. Introduction to Computer Programming.pptx

Design Review Based on Failure Mode 1-Day Workshop by Tetrahedron

  • 1. Technical Series Design Review Based on Failure Mode 1-Day Workshop Understand and describe the relationship between the engineering and management knowledge Establish requirements for an effective DRBFM Record all the design, validation, and production actions Gain and maintain consistency and proficiency of DRBFM Course Objective © Tetrahedron Manufacturing Services Pvt Ltd Phone : +91 7042140046 Email : training@tetrahedron.in Tetrahedron Academy Who should attend Manufacturing engineering Product engineers Design engineers Quality engineers Validation and test engineers Managers leading any of the above teams New Product Development Mangers Validation and Test Engineers Senior Engineers DRBFM is a focused process that supports an engineering mind-set and eliminates waste, such as debating rankings and mindless brainstorming. It centers on early prevention and engineering knowledge, eliminating time spent debating ranking systems, waiting for lead engineers to document and list their concerns, identifying what types of concerns are open for discussion and resolution, and brainstorming without any actionable closure. This DRBFM Training will provide roles and responsibilities of management, design engineers, manufacturing engineers, facilitators and technical experts. Those interested in DRBFM will benefit from understanding the rationale behind this methodology and learn to guide teams through the paradigm shifts and mind set that are needed. DRBFM focuses on three things for better review: Good Design Good Discussion Good Dissection Benefits of attending Over the last three years 500+ Participants has attended this session across India DRBFM is a technique concentrated on change management and nonstop, permanent improvement. DRBFM focuses on failure prevention on early stages and depends on engineering knowledge. It was developed based on the philosophy that design problems occur when changes are made to existing engineering design that have already been proven successful.
  • 2. Know your trainer B tech from IIT Roorkee, PGDM from IIM Calcutta and is an Ex IES officer with 14+ yrs of intensive experience in Manufacturing Sector. He has helped manufacturing companies turn-around by implementing Manufacturing Excellence through Lean, Six Sigma, Manufacturing Strategy. He is a passionate reader and have inclination to solve complex business problems within very short span of time. Technical Series Workshop Agenda © Tetrahedron Manufacturing Services Pvt Ltd Phone : +91 7042140046 Email : training@tetrahedron.in Tetrahedron Academy Feedback From Past Participants This o kshop has helped i e ie i g the e gi ee i g desig s ti e a d ti e agai Ou desig uality le el has ee i p o ed sig ifi a tly It gi es ette idea fo desig a d to e ie its failu e odes Must fo all a ufa tu i g o pa ies This o kshop guided us to go th ough the present design before going for further modification of designs. DRBFM Procedure, Forms, Planning and Preparation Scope and Purpose Process Map – General Requirements Planning – Formats, examples Planning Results and Output Preparation – Formats, examples Preparation Results and Linkage with DRBM Format Definition of Change Section DRBFM – Forum 1, Design Review, Action Results and Follow Up Engineer analysis Change Point definition Identification of concerns Identification of causes and influences on the vehicle Identification of effects Identification of severity/priority Actions to gain engineering knowledge – evidence DRBFM – Forum 2, Design Review, Action Results and Follow Up Design Review introduction Change Point overview Identification of additional concerns Identification of additional causes and influences on the product Identification of effects Identification of severity/priority Actions taken to eliminate concerns Design actions to gain engineering knowledge – evidence Validation actions to gain evidence of reliability Manufacturing, assembly, and supplier actions Action results and feedback to design guidelines Roles and responsibilities