This document summarizes a study that used Primavera P6 software to schedule the construction of a high-rise residential building project. The study collected data on the project activities and durations, then modeled the schedule in Primavera P6 to determine the critical path and optimize the timeline. Key outcomes included reducing the risk of delays and cost overruns, optimizing resource management, and generating reports to track progress against the baseline schedule. The conclusions stated that Primavera P6 is an effective tool for construction scheduling that allows linking all activities, determining float times, and monitoring scheduled versus actual progress.